SlideShare a Scribd company logo
Kazuhisa Koakutsu
Leader, Climate and Energy Area
Institute for Global Environmental Strategies (IGES)
The Japan-Mongolia Cooperation
on the Joint Crediting Mechanism
and Recommendations for Mongolian Enterprises
2Institute for Global Environmental Strategies
IGES conducts practical and solution-
oriented research focusing on the Asia-
Pacific region to develop innovative
policy approaches and propose
environmental policies to achieve
sustainable development in the region.
IGES Climate and Energy Area
conducts strategic research activities
to contribute to global efforts to
combat climate change, covering:
• Future climate regime
• Sustainable energy
• Climate mitigation
• Climate finance
• Asia low carbon strategy
• Market mechanisms,
including CDM and JCM
3Institute for Global Environmental Strategies
The Joint Crediting Mechanism (JCM)
Cooperation between Government of Japan and Mongolia
Facilitates greenhouse gas emissions reduction/removal projects by
companies, cities, etc. in Mongolia
As a result of emission reductions, “JCM credits” will be utilized to achieve
Japan’s emission reduction target and may be utilized to achieve
Mongolia’s target.
At present, JCM credits are not tradable.
JCM Financial Support from Japanese government is available.
Utilized in
partner country
accordingly
Credits
to Japan
Credits
to partner
country
corresponding
Used to achieve
Japan’s emission
reduction target
JCM
Credits
dividing
Partner
country’s
share
JCM project
JCM Financial
Support
Scheme
“Contribution”
Japan Partner country (e.g. Mongolia)
4Institute for Global Environmental Strategies
JCM established in 16 countries since 2013
JCM in Mongolia started from January 8h, 2013
JCM Mongolia secretariat: Ministry of Environment and Tourism
http://www.jcm-mongolia.com/
5Institute for Global Environmental Strategies
15 projects already registered by governments
Country Technology Type Location
Mongolia Heat Only Boilers
118th School of
Ulaanbaatar
Mongolia Heat Only Boilers
Bornuur soum public
facilities
Indonesia
Cooling system
(refrigerator, freezer)
Frozen Food Processing
Plant
Indonesia
Cooling system
(refrigerator, freezer)
Food Industry Cold
Storage
Indonesia Centrifugal Chiller Textile factory
Indonesia Centrifugal Chiller Textile factory
Indonesia Centrifugal Chiller Textile factory
Indonesia
AC System, LED Lighting,
Fridge/Freezer
Convenience store
Vietnam Tachograph Trucks, trailers
Vietnam
Inverter-type room air
conditioners
Hospitals
Vietnam Amorphous transformers Electricity grid
Vietnam
Boiler, heat pump, LED
lighting
Hotel
Palau Small-scale Solar PV School rooftop
Palau Small-scale Solar PV Building rooftop
Palau Small-scale Solar PV Building rooftop
JCM credits issued
to Japanese and
Indonesian side
https://www.jcm.go.jp/projects/registers
Japan: Suuri-Keikaku
Mongolia: Anu-Service
6Institute for Global Environmental Strategies
97 projects already selected for financing,
various technologies are implemented
High Efficiency LED
Lighting, Cambodia
High-efficiency Heat Only
Boilers, Mongolia
Power Generation by Waste-
heat Recovery in Cement
Industry, Indonesia
Double Bundle-type
Heat Pump, Indonesia
Energy Savings at Convenience
Stores, Indonesia
10 MW Solar Power Project in
Darkhan City, Mongolia
JCM project list: http://gec.jp/jcm/projects/index.html
Amorphous High Efficiency
Transformers in Power Grids, Vietnam
LED lighting, co-generation, waste management, water management,
hydropower, transportation, biomass, forestry, etc.
5 projects
selected in
Mongolia:
Solar PV (3)
Boiler (2)
7Institute for Global Environmental Strategies
• Finances up to the half of an investment cost for
facilities, equipment, vehicles, etc. which reduce
CO2 from fossil fuel combustion.
• Includes projects in collaboration with JICA and
other government-affiliated financial institute.
JCM Model
Project
• Finances part of project cost for REDD+ projects.
• At least half or ratio of financial support to project
cost of JCM credits issued are expected to be
delivered to the government of Japan except the
amount which is allocated to the partner country
based on its legislation.
JCM REDD+
Model Project
• Grant for incremental cost of technologies for
projects under public and state-owned entities.
• Interest subsidy to ADB-financed loans for non-
government projects, to private sector borrowers
and financial institutions.
ADB Trust Fund
(Japan Fund for
JCM)
JCM Financing Programme
Mongolian companies can jointly propose projects with Japanese
companies
ADB: https://www.adb.org/site/funds/funds/japan-fund-for-joint-crediting-mechanism
jfjcm@adb.org
8Institute for Global Environmental Strategies
Application is Now Open
for JCM Model Project and REDD+ Model Project Financing
Starting date of call for request 5 September 2016
Deadline of application Friday, 2 December 2016 (12:00 JST)
Announcement of selected Model Projects 1- 2 months after the deadline
Apply: http://gec.jp/jcm/kobo/mp160905.html
Sample of required documents:
• Application Form
• Declaration by Representative Participant
• Project Implementation Plan
• Project Idea Note
• Budget
• Company information (e.g. brochure) and certificate of incorporation
• Audited financial statements
• Draft international consortium agreement
• Agreement on the Allocation of JCM Credits
• Other supporting documents
9Institute for Global Environmental Strategies
Criteria for selecting the JCM Model Project
http://gec.jp/jcm/kobo/mp160905.html
Robustness of the project implementation 40 points
Amount of emission reductions of energy-related CO2
and cost-effectiveness of emission reductions (JPY/tCO2)
40 points
Potential of the dissemination of the technology 10 points
Concept and status of JCM methodology development 10 points
• Projects installations start after the adoption of the funding and must
be completed within 3 years.
• Finance will be paid based on the verified cost actually spent for
implementation of the project.
10Institute for Global Environmental Strategies
Financial support for JCM Model Project
Number of already selected projects using a
similar technology in each partner country
% of financial support for new project
application
No project (0) Up to 50% (determined by participants)
1-3 projects Up to 40% (determined by participants)
More than 3 projects Up to 30% (determined by participants)
Covers main construction, ancillary work, machinery and
appliances, survey and test, facilities, administrative work, etc.
In Mongolia, new solar PV and boiler projects will be eligible for up to 40% of financial
support. Other technologies will be eligible for up to 50% of financial support.
Maximum Percentage of Financial Support determined based on the
number of already selected JCM Model Projects using a similar technology
in each country.
11Institute for Global Environmental Strategies
Develop
business
idea
Find Japanese
partner
Develop
consortium
(joint venture
etc.)
Apply JCM
financing
programme
and develop
methodology
Sample document of “Agreement on
International Consortium (Example)”
Recommended steps to develop
JCM projects
• Secure financial sources for the rest of initial cost
• Consult about project with JCM Mongolia secretariat
• Work with Business Council Mongolia and IGES
on business matchmaking and project development
• Business forums, trade associations, websites e.g. http://ibo.jcci.or.jp/
Japanese entity submits
application (in Japanese)
12Institute for Global Environmental Strategies
1212
Thank You
IGES Climate and Energy Area
Market Mechanisms
2108-11 Kamiyamaguchi, Hayama, Kanagawa,
240-0115 Japan
Tel: +81-46-826-9592
Fax: +81-46-855-3809
E-mail: mm-info@iges.or.jp
JCM Mongolia secretariat
http://www.jcm-mongolia.com/
13Institute for Global Environmental Strategies
Company
matching
Application to
JCM Financing
Programme
Methodology
development
PDD
development
Measurement,
reporting and
verification
Credit
Issuance
Validation
(by TPE)
Creation of
International
Consortium
(for JCM Model
Projects)
Technical support from MOEJ, IGES, the host country JCM
Secretariat and (optional) a consultant
Verification
(by TPE)
Overview of JCM Project Development
Project
approval,
start of funding
and operations
Methodology
approval
(by the Joint
Committee)
JCM Project
registration
(by the Joint
Committee)
 Validation report
 Verification report
Before project beginning
From project beginning to official
registration as JCM project
Continuous measurement,
reporting and verification of GHG
emissions for credit issuance
Monitoring
report*
By project
participants
*Support for
monitoring report
first time only
Technical support from OECC and
IGES
14Institute for Global Environmental Strategies
14Percentage of Financial Support: White: 0 project = Up to 50% | Yellow: 1-3 project(s) = Up to 40% |
Orange: more than 4 projects = Up to 30%
Yellow
Orange
Sector Technology
Mong
olia
Bangla
desh
Ethiopi
a
Kenya
Maldiv
es
Viet
Nam
Lao
PDR
Indon
esia
Costa
Rica
Palau
Camb
odia
Mexic
o
Saudi
Arabia
Chile
Myan
mar
Thaila
nd
Malay
sia Total
Energy
efficiency
Boiler 1 2 2 5
Regenerative Burners 1 1
Gas Fired Furnace 1 1
Electric Furnace 1 1
Air Conditioning System 2 1 1 4
Chiller 2 1 4 1 1 3 12
Refrigerator 1 1 3 5
Absorption Chiller Using Waste
Heat
1 1
2
Swirling Induction Type Air
conditioning System
1
1
Air Conditioning Control System 1 1 2
Heat Pump 1 1 2
Fridge and Freezer Showcase 1 1 2
Compressor 1 1
Loom 1 2 1 4
Old Corrugated Cartons Process 1 1
Battery Case Forming Device 1 1
Electrolyzer in Chlorine Production 1 1 2
Transformer 3 3
LED lighting 2 1 3
LED Street Lighting with Dimming
System
1 1
2
Pump 1 1
Aeration System 1 1
Water Heater Using Exhaust Heat 1 1
Exhaust Heat Recovery 1 1
Wire Stranding Machines 1 1
Evaporator with Mechanical Vapor
Recompression
1
1
Energy
industries
(renewable-
/non
renewable
sources)
Solar Power Plant 3 2 1 1 1 1 1 3 3 3 1 20
Solar Power Plant with Battery 1 1 2
Small Hydropower Plan 1 1 2
Power Generation by Waste Heat
Recovery
1 1 1
3
Gas Co-generation 1 2 3
Biomass Co-generation 1 1
Waste
handling
and disposal
Waste to Energy Plant 1 1
Power Generation by Methane
Recovery
1
1
Transportation Digital Tachograph System 1 1
4 6 1 3 1 16 0 24 3 3 5 1 1 0 5 21 1 95
Maximum percentage of financial support by applied technology type and
number of JCM model project by each country 29/08/2016

More Related Content

Viewers also liked

20.06.2014, NEWSWIRE, Issue330
20.06.2014, NEWSWIRE, Issue33020.06.2014, NEWSWIRE, Issue330
20.06.2014, NEWSWIRE, Issue330
The Business Council of Mongolia
 
05.09.2014 Mongolian Competitiveness Among Asian Emerging Market, Mr. Neil As...
05.09.2014 Mongolian Competitiveness Among Asian Emerging Market, Mr. Neil As...05.09.2014 Mongolian Competitiveness Among Asian Emerging Market, Mr. Neil As...
05.09.2014 Mongolian Competitiveness Among Asian Emerging Market, Mr. Neil As...
The Business Council of Mongolia
 
21.02.2014 Wirtgen surface mining technology and challenges in coal in Mongol...
21.02.2014 Wirtgen surface mining technology and challenges in coal in Mongol...21.02.2014 Wirtgen surface mining technology and challenges in coal in Mongol...
21.02.2014 Wirtgen surface mining technology and challenges in coal in Mongol...
The Business Council of Mongolia
 
23.05.2012 Putting fundings into Mongolia's growing need for power, John Lee
23.05.2012 Putting fundings into Mongolia's growing need for power, John Lee23.05.2012 Putting fundings into Mongolia's growing need for power, John Lee
23.05.2012 Putting fundings into Mongolia's growing need for power, John Lee
The Business Council of Mongolia
 
21.12.2012, NEWSWIRE, Issue 253
21.12.2012, NEWSWIRE, Issue 25321.12.2012, NEWSWIRE, Issue 253
21.12.2012, NEWSWIRE, Issue 253
The Business Council of Mongolia
 
03.09.2014 Legal developments in 2014: Changes and future developments, Erden...
03.09.2014 Legal developments in 2014: Changes and future developments, Erden...03.09.2014 Legal developments in 2014: Changes and future developments, Erden...
03.09.2014 Legal developments in 2014: Changes and future developments, Erden...
The Business Council of Mongolia
 
27.06.2014, NEWSWIRE, Issue331
27.06.2014, NEWSWIRE, Issue33127.06.2014, NEWSWIRE, Issue331
27.06.2014, NEWSWIRE, Issue331
The Business Council of Mongolia
 
28.09.2012, NEWSWIRE, Issue 241
28.09.2012, NEWSWIRE, Issue 24128.09.2012, NEWSWIRE, Issue 241
28.09.2012, NEWSWIRE, Issue 241
The Business Council of Mongolia
 
13.12.2010 Making a difference together, Ms. B. Gantuya
13.12.2010 Making a difference together, Ms. B. Gantuya13.12.2010 Making a difference together, Ms. B. Gantuya
13.12.2010 Making a difference together, Ms. B. Gantuya
The Business Council of Mongolia
 
07.12.2015 building better leaders through education & idea exchange
07.12.2015 building better leaders through education & idea exchange07.12.2015 building better leaders through education & idea exchange
07.12.2015 building better leaders through education & idea exchange
The Business Council of Mongolia
 
13.12.2010, Mongolia Investment Needs and Opportunities, Mr. Randolph Koppa
13.12.2010, Mongolia Investment Needs and Opportunities, Mr. Randolph Koppa13.12.2010, Mongolia Investment Needs and Opportunities, Mr. Randolph Koppa
13.12.2010, Mongolia Investment Needs and Opportunities, Mr. Randolph Koppa
The Business Council of Mongolia
 
23.04.2012, Trends in politics, L. Sumati
23.04.2012, Trends in politics, L. Sumati23.04.2012, Trends in politics, L. Sumati
23.04.2012, Trends in politics, L. Sumati
The Business Council of Mongolia
 
2014.02.19 Татварын багц хуулийн өөрчлөлт хувийн хэвшилд, Ч. Хашчулуун
2014.02.19 Татварын багц хуулийн өөрчлөлт хувийн хэвшилд, Ч. Хашчулуун2014.02.19 Татварын багц хуулийн өөрчлөлт хувийн хэвшилд, Ч. Хашчулуун
2014.02.19 Татварын багц хуулийн өөрчлөлт хувийн хэвшилд, Ч. Хашчулуун
The Business Council of Mongolia
 
Proyecto 1°parcial
Proyecto 1°parcialProyecto 1°parcial
Proyecto 1°parcial
Rochios Soto
 

Viewers also liked (15)

20.06.2014, NEWSWIRE, Issue330
20.06.2014, NEWSWIRE, Issue33020.06.2014, NEWSWIRE, Issue330
20.06.2014, NEWSWIRE, Issue330
 
05.09.2014 Mongolian Competitiveness Among Asian Emerging Market, Mr. Neil As...
05.09.2014 Mongolian Competitiveness Among Asian Emerging Market, Mr. Neil As...05.09.2014 Mongolian Competitiveness Among Asian Emerging Market, Mr. Neil As...
05.09.2014 Mongolian Competitiveness Among Asian Emerging Market, Mr. Neil As...
 
21.02.2014 Wirtgen surface mining technology and challenges in coal in Mongol...
21.02.2014 Wirtgen surface mining technology and challenges in coal in Mongol...21.02.2014 Wirtgen surface mining technology and challenges in coal in Mongol...
21.02.2014 Wirtgen surface mining technology and challenges in coal in Mongol...
 
23.05.2012 Putting fundings into Mongolia's growing need for power, John Lee
23.05.2012 Putting fundings into Mongolia's growing need for power, John Lee23.05.2012 Putting fundings into Mongolia's growing need for power, John Lee
23.05.2012 Putting fundings into Mongolia's growing need for power, John Lee
 
21.12.2012, NEWSWIRE, Issue 253
21.12.2012, NEWSWIRE, Issue 25321.12.2012, NEWSWIRE, Issue 253
21.12.2012, NEWSWIRE, Issue 253
 
03.09.2014 Legal developments in 2014: Changes and future developments, Erden...
03.09.2014 Legal developments in 2014: Changes and future developments, Erden...03.09.2014 Legal developments in 2014: Changes and future developments, Erden...
03.09.2014 Legal developments in 2014: Changes and future developments, Erden...
 
27.06.2014, NEWSWIRE, Issue331
27.06.2014, NEWSWIRE, Issue33127.06.2014, NEWSWIRE, Issue331
27.06.2014, NEWSWIRE, Issue331
 
28.09.2012, NEWSWIRE, Issue 241
28.09.2012, NEWSWIRE, Issue 24128.09.2012, NEWSWIRE, Issue 241
28.09.2012, NEWSWIRE, Issue 241
 
Bcm business growth index Q3 2015
Bcm business growth index Q3 2015Bcm business growth index Q3 2015
Bcm business growth index Q3 2015
 
13.12.2010 Making a difference together, Ms. B. Gantuya
13.12.2010 Making a difference together, Ms. B. Gantuya13.12.2010 Making a difference together, Ms. B. Gantuya
13.12.2010 Making a difference together, Ms. B. Gantuya
 
07.12.2015 building better leaders through education & idea exchange
07.12.2015 building better leaders through education & idea exchange07.12.2015 building better leaders through education & idea exchange
07.12.2015 building better leaders through education & idea exchange
 
13.12.2010, Mongolia Investment Needs and Opportunities, Mr. Randolph Koppa
13.12.2010, Mongolia Investment Needs and Opportunities, Mr. Randolph Koppa13.12.2010, Mongolia Investment Needs and Opportunities, Mr. Randolph Koppa
13.12.2010, Mongolia Investment Needs and Opportunities, Mr. Randolph Koppa
 
23.04.2012, Trends in politics, L. Sumati
23.04.2012, Trends in politics, L. Sumati23.04.2012, Trends in politics, L. Sumati
23.04.2012, Trends in politics, L. Sumati
 
2014.02.19 Татварын багц хуулийн өөрчлөлт хувийн хэвшилд, Ч. Хашчулуун
2014.02.19 Татварын багц хуулийн өөрчлөлт хувийн хэвшилд, Ч. Хашчулуун2014.02.19 Татварын багц хуулийн өөрчлөлт хувийн хэвшилд, Ч. Хашчулуун
2014.02.19 Татварын багц хуулийн өөрчлөлт хувийн хэвшилд, Ч. Хашчулуун
 
Proyecto 1°parcial
Proyecto 1°parcialProyecto 1°parcial
Proyecto 1°parcial
 

Similar to The Japan- Mongolia Cooperation on the Joint Crediting Mechanism

Joint Crediting Mechanism Development in Indonesia
Joint Crediting Mechanism Development in IndonesiaJoint Crediting Mechanism Development in Indonesia
Joint Crediting Mechanism Development in Indonesia
Dicky Edwin Hindarto
 
نرم افزار کامفار: تهیه گزارشات تخصصی طرح توجیهی با کامفار ویژه سال 1398 (COMFAR)
نرم افزار کامفار: تهیه گزارشات تخصصی طرح توجیهی با کامفار ویژه سال 1398 (COMFAR)نرم افزار کامفار: تهیه گزارشات تخصصی طرح توجیهی با کامفار ویژه سال 1398 (COMFAR)
نرم افزار کامفار: تهیه گزارشات تخصصی طرح توجیهی با کامفار ویژه سال 1398 (COMFAR)
AMPA
 
Climate and carbon finance
Climate and carbon finance Climate and carbon finance
Climate and carbon finance
Jacqueline Yujia Tao
 
Climate finance - K. Enting (kfw) CCXG GF March 2014
Climate finance - K. Enting (kfw) CCXG GF March 2014Climate finance - K. Enting (kfw) CCXG GF March 2014
Climate finance - K. Enting (kfw) CCXG GF March 2014
OECD Environment
 
Financing Energy Optimization Projects
Financing Energy Optimization Projects Financing Energy Optimization Projects
Financing Energy Optimization Projects
Avanceon
 
Ab0401 co2 australia s03 group 9 team sustainable (adrian heng, dave jong, gw...
Ab0401 co2 australia s03 group 9 team sustainable (adrian heng, dave jong, gw...Ab0401 co2 australia s03 group 9 team sustainable (adrian heng, dave jong, gw...
Ab0401 co2 australia s03 group 9 team sustainable (adrian heng, dave jong, gw...
NBS
 
Accessing debt capital markets to finance energy efficiency investments in th...
Accessing debt capital markets to finance energy efficiency investments in th...Accessing debt capital markets to finance energy efficiency investments in th...
Accessing debt capital markets to finance energy efficiency investments in th...
OECD Environment
 
EU Moscow Workshop
EU Moscow WorkshopEU Moscow Workshop
EU Moscow Workshop
nooone
 
Framework launch_vf.pdf
Framework launch_vf.pdfFramework launch_vf.pdf
Framework launch_vf.pdf
OECD Environment
 
Eu sme centre esco webinar 2014 05-08
Eu sme centre esco webinar 2014 05-08Eu sme centre esco webinar 2014 05-08
Eu sme centre esco webinar 2014 05-08
GreenStream Network Ltd
 
Energy Efficiency and ESCO Companies in China
Energy Efficiency and ESCO Companies in ChinaEnergy Efficiency and ESCO Companies in China
Energy Efficiency and ESCO Companies in China
GreenStream Network Ltd
 
Climate finance hemraj (sth africa)key climate initiatives ccxg gf-march2014
Climate finance hemraj (sth africa)key climate initiatives ccxg gf-march2014Climate finance hemraj (sth africa)key climate initiatives ccxg gf-march2014
Climate finance hemraj (sth africa)key climate initiatives ccxg gf-march2014
OECD Environment
 
Key issues and barriers in developing countries
Key issues and barriers in developing countriesKey issues and barriers in developing countries
Key issues and barriers in developing countries
Global CCS Institute
 
The Implementation of the Market Based Mechanism in Indonesia, a JCM Case Study
The Implementation of the Market Based Mechanism in Indonesia, a JCM Case StudyThe Implementation of the Market Based Mechanism in Indonesia, a JCM Case Study
The Implementation of the Market Based Mechanism in Indonesia, a JCM Case Study
Dicky Edwin Hindarto
 
Vietnam Green Growth Strategy
Vietnam Green Growth StrategyVietnam Green Growth Strategy
Vietnam Green Growth Strategy
greeninclusivegrowth
 
Green Aviation Through Carbon Offset Program
Green Aviation Through Carbon Offset ProgramGreen Aviation Through Carbon Offset Program
Green Aviation Through Carbon Offset Program
Dicky Edwin Hindarto
 
Experience of implementing the Joint Crediting Mechanism (JCM) and way forwar...
Experience of implementing the Joint Crediting Mechanism (JCM) and way forwar...Experience of implementing the Joint Crediting Mechanism (JCM) and way forwar...
Experience of implementing the Joint Crediting Mechanism (JCM) and way forwar...
OECD Environment
 
3.3 akinci tskb - green finance v 2
3.3 akinci tskb - green finance v 23.3 akinci tskb - green finance v 2
3.3 akinci tskb - green finance v 2
Development Co-operation Directorate (DCD-DAC)
 
Roadmap workshop II, Cecilia Tam, Chetna Hareesh Kumar, OECD
Roadmap workshop II, Cecilia Tam, Chetna Hareesh Kumar, OECDRoadmap workshop II, Cecilia Tam, Chetna Hareesh Kumar, OECD
Roadmap workshop II, Cecilia Tam, Chetna Hareesh Kumar, OECD
OECD Environment
 
ClimateLaunchPad 2021 Japan Info Session
ClimateLaunchPad 2021 Japan Info SessionClimateLaunchPad 2021 Japan Info Session
ClimateLaunchPad 2021 Japan Info Session
Christian Schmitz
 

Similar to The Japan- Mongolia Cooperation on the Joint Crediting Mechanism (20)

Joint Crediting Mechanism Development in Indonesia
Joint Crediting Mechanism Development in IndonesiaJoint Crediting Mechanism Development in Indonesia
Joint Crediting Mechanism Development in Indonesia
 
نرم افزار کامفار: تهیه گزارشات تخصصی طرح توجیهی با کامفار ویژه سال 1398 (COMFAR)
نرم افزار کامفار: تهیه گزارشات تخصصی طرح توجیهی با کامفار ویژه سال 1398 (COMFAR)نرم افزار کامفار: تهیه گزارشات تخصصی طرح توجیهی با کامفار ویژه سال 1398 (COMFAR)
نرم افزار کامفار: تهیه گزارشات تخصصی طرح توجیهی با کامفار ویژه سال 1398 (COMFAR)
 
Climate and carbon finance
Climate and carbon finance Climate and carbon finance
Climate and carbon finance
 
Climate finance - K. Enting (kfw) CCXG GF March 2014
Climate finance - K. Enting (kfw) CCXG GF March 2014Climate finance - K. Enting (kfw) CCXG GF March 2014
Climate finance - K. Enting (kfw) CCXG GF March 2014
 
Financing Energy Optimization Projects
Financing Energy Optimization Projects Financing Energy Optimization Projects
Financing Energy Optimization Projects
 
Ab0401 co2 australia s03 group 9 team sustainable (adrian heng, dave jong, gw...
Ab0401 co2 australia s03 group 9 team sustainable (adrian heng, dave jong, gw...Ab0401 co2 australia s03 group 9 team sustainable (adrian heng, dave jong, gw...
Ab0401 co2 australia s03 group 9 team sustainable (adrian heng, dave jong, gw...
 
Accessing debt capital markets to finance energy efficiency investments in th...
Accessing debt capital markets to finance energy efficiency investments in th...Accessing debt capital markets to finance energy efficiency investments in th...
Accessing debt capital markets to finance energy efficiency investments in th...
 
EU Moscow Workshop
EU Moscow WorkshopEU Moscow Workshop
EU Moscow Workshop
 
Framework launch_vf.pdf
Framework launch_vf.pdfFramework launch_vf.pdf
Framework launch_vf.pdf
 
Eu sme centre esco webinar 2014 05-08
Eu sme centre esco webinar 2014 05-08Eu sme centre esco webinar 2014 05-08
Eu sme centre esco webinar 2014 05-08
 
Energy Efficiency and ESCO Companies in China
Energy Efficiency and ESCO Companies in ChinaEnergy Efficiency and ESCO Companies in China
Energy Efficiency and ESCO Companies in China
 
Climate finance hemraj (sth africa)key climate initiatives ccxg gf-march2014
Climate finance hemraj (sth africa)key climate initiatives ccxg gf-march2014Climate finance hemraj (sth africa)key climate initiatives ccxg gf-march2014
Climate finance hemraj (sth africa)key climate initiatives ccxg gf-march2014
 
Key issues and barriers in developing countries
Key issues and barriers in developing countriesKey issues and barriers in developing countries
Key issues and barriers in developing countries
 
The Implementation of the Market Based Mechanism in Indonesia, a JCM Case Study
The Implementation of the Market Based Mechanism in Indonesia, a JCM Case StudyThe Implementation of the Market Based Mechanism in Indonesia, a JCM Case Study
The Implementation of the Market Based Mechanism in Indonesia, a JCM Case Study
 
Vietnam Green Growth Strategy
Vietnam Green Growth StrategyVietnam Green Growth Strategy
Vietnam Green Growth Strategy
 
Green Aviation Through Carbon Offset Program
Green Aviation Through Carbon Offset ProgramGreen Aviation Through Carbon Offset Program
Green Aviation Through Carbon Offset Program
 
Experience of implementing the Joint Crediting Mechanism (JCM) and way forwar...
Experience of implementing the Joint Crediting Mechanism (JCM) and way forwar...Experience of implementing the Joint Crediting Mechanism (JCM) and way forwar...
Experience of implementing the Joint Crediting Mechanism (JCM) and way forwar...
 
3.3 akinci tskb - green finance v 2
3.3 akinci tskb - green finance v 23.3 akinci tskb - green finance v 2
3.3 akinci tskb - green finance v 2
 
Roadmap workshop II, Cecilia Tam, Chetna Hareesh Kumar, OECD
Roadmap workshop II, Cecilia Tam, Chetna Hareesh Kumar, OECDRoadmap workshop II, Cecilia Tam, Chetna Hareesh Kumar, OECD
Roadmap workshop II, Cecilia Tam, Chetna Hareesh Kumar, OECD
 
ClimateLaunchPad 2021 Japan Info Session
ClimateLaunchPad 2021 Japan Info SessionClimateLaunchPad 2021 Japan Info Session
ClimateLaunchPad 2021 Japan Info Session
 

More from The Business Council of Mongolia

Three Camel Lodge 3 days itinerary
Three Camel Lodge 3 days itineraryThree Camel Lodge 3 days itinerary
Three Camel Lodge 3 days itinerary
The Business Council of Mongolia
 
Three Camel Lodge 4 days itinerary
Three Camel Lodge 4 days itineraryThree Camel Lodge 4 days itinerary
Three Camel Lodge 4 days itinerary
The Business Council of Mongolia
 
BCM Macroeconomic Updates January 2020
BCM Macroeconomic Updates January 2020BCM Macroeconomic Updates January 2020
BCM Macroeconomic Updates January 2020
The Business Council of Mongolia
 
Digital Enterprise 2019
Digital Enterprise 2019Digital Enterprise 2019
Digital Enterprise 2019
The Business Council of Mongolia
 
Faro Foundation presentation
Faro Foundation presentationFaro Foundation presentation
Faro Foundation presentation
The Business Council of Mongolia
 
Business Council of Mongolia presentation
Business Council of Mongolia presentationBusiness Council of Mongolia presentation
Business Council of Mongolia presentation
The Business Council of Mongolia
 
National Development Association of Mongolia presentation
National Development Association of Mongolia presentationNational Development Association of Mongolia presentation
National Development Association of Mongolia presentation
The Business Council of Mongolia
 
Gobi Green Energy Gankhuyag
Gobi Green Energy GankhuyagGobi Green Energy Gankhuyag
Gobi Green Energy Gankhuyag
The Business Council of Mongolia
 
Ch.Anar Competitiveness of the fintech sector
Ch.Anar Competitiveness of the fintech sectorCh.Anar Competitiveness of the fintech sector
Ch.Anar Competitiveness of the fintech sector
The Business Council of Mongolia
 
A.Bilguun Competitiveness of Mongolia's resource sector
A.Bilguun Competitiveness of Mongolia's resource sectorA.Bilguun Competitiveness of Mongolia's resource sector
A.Bilguun Competitiveness of Mongolia's resource sector
The Business Council of Mongolia
 
B.Lakshmi EPCRC Competitiveness of Mongolia
B.Lakshmi EPCRC Competitiveness of MongoliaB.Lakshmi EPCRC Competitiveness of Mongolia
B.Lakshmi EPCRC Competitiveness of Mongolia
The Business Council of Mongolia
 
Munkhzorig - Digital Transformation
Munkhzorig - Digital TransformationMunkhzorig - Digital Transformation
Munkhzorig - Digital Transformation
The Business Council of Mongolia
 
Tseesuren - Data is the Key for Innovation
Tseesuren - Data is the Key for InnovationTseesuren - Data is the Key for Innovation
Tseesuren - Data is the Key for Innovation
The Business Council of Mongolia
 
System analysis study on the Constitution of Mongolia
System analysis study on the Constitution of MongoliaSystem analysis study on the Constitution of Mongolia
System analysis study on the Constitution of Mongolia
The Business Council of Mongolia
 
Kincora Copper March 2019
Kincora Copper March 2019Kincora Copper March 2019
Kincora Copper March 2019
The Business Council of Mongolia
 
Erdenes Mongol presentation
Erdenes Mongol presentationErdenes Mongol presentation
Erdenes Mongol presentation
The Business Council of Mongolia
 
Tatsuya Hamada presentation
Tatsuya Hamada presentationTatsuya Hamada presentation
Tatsuya Hamada presentation
The Business Council of Mongolia
 
BCM Monthly Meeting BCM updates January 30, 2019
BCM Monthly Meeting BCM updates January 30, 2019BCM Monthly Meeting BCM updates January 30, 2019
BCM Monthly Meeting BCM updates January 30, 2019
The Business Council of Mongolia
 
N. Chimguundari economic corridor and investment research center Nov 12
N. Chimguundari economic corridor and investment research center Nov 12N. Chimguundari economic corridor and investment research center Nov 12
N. Chimguundari economic corridor and investment research center Nov 12
The Business Council of Mongolia
 
Procurement mca-compact-ii-presentation-bcm
Procurement mca-compact-ii-presentation-bcmProcurement mca-compact-ii-presentation-bcm
Procurement mca-compact-ii-presentation-bcm
The Business Council of Mongolia
 

More from The Business Council of Mongolia (20)

Three Camel Lodge 3 days itinerary
Three Camel Lodge 3 days itineraryThree Camel Lodge 3 days itinerary
Three Camel Lodge 3 days itinerary
 
Three Camel Lodge 4 days itinerary
Three Camel Lodge 4 days itineraryThree Camel Lodge 4 days itinerary
Three Camel Lodge 4 days itinerary
 
BCM Macroeconomic Updates January 2020
BCM Macroeconomic Updates January 2020BCM Macroeconomic Updates January 2020
BCM Macroeconomic Updates January 2020
 
Digital Enterprise 2019
Digital Enterprise 2019Digital Enterprise 2019
Digital Enterprise 2019
 
Faro Foundation presentation
Faro Foundation presentationFaro Foundation presentation
Faro Foundation presentation
 
Business Council of Mongolia presentation
Business Council of Mongolia presentationBusiness Council of Mongolia presentation
Business Council of Mongolia presentation
 
National Development Association of Mongolia presentation
National Development Association of Mongolia presentationNational Development Association of Mongolia presentation
National Development Association of Mongolia presentation
 
Gobi Green Energy Gankhuyag
Gobi Green Energy GankhuyagGobi Green Energy Gankhuyag
Gobi Green Energy Gankhuyag
 
Ch.Anar Competitiveness of the fintech sector
Ch.Anar Competitiveness of the fintech sectorCh.Anar Competitiveness of the fintech sector
Ch.Anar Competitiveness of the fintech sector
 
A.Bilguun Competitiveness of Mongolia's resource sector
A.Bilguun Competitiveness of Mongolia's resource sectorA.Bilguun Competitiveness of Mongolia's resource sector
A.Bilguun Competitiveness of Mongolia's resource sector
 
B.Lakshmi EPCRC Competitiveness of Mongolia
B.Lakshmi EPCRC Competitiveness of MongoliaB.Lakshmi EPCRC Competitiveness of Mongolia
B.Lakshmi EPCRC Competitiveness of Mongolia
 
Munkhzorig - Digital Transformation
Munkhzorig - Digital TransformationMunkhzorig - Digital Transformation
Munkhzorig - Digital Transformation
 
Tseesuren - Data is the Key for Innovation
Tseesuren - Data is the Key for InnovationTseesuren - Data is the Key for Innovation
Tseesuren - Data is the Key for Innovation
 
System analysis study on the Constitution of Mongolia
System analysis study on the Constitution of MongoliaSystem analysis study on the Constitution of Mongolia
System analysis study on the Constitution of Mongolia
 
Kincora Copper March 2019
Kincora Copper March 2019Kincora Copper March 2019
Kincora Copper March 2019
 
Erdenes Mongol presentation
Erdenes Mongol presentationErdenes Mongol presentation
Erdenes Mongol presentation
 
Tatsuya Hamada presentation
Tatsuya Hamada presentationTatsuya Hamada presentation
Tatsuya Hamada presentation
 
BCM Monthly Meeting BCM updates January 30, 2019
BCM Monthly Meeting BCM updates January 30, 2019BCM Monthly Meeting BCM updates January 30, 2019
BCM Monthly Meeting BCM updates January 30, 2019
 
N. Chimguundari economic corridor and investment research center Nov 12
N. Chimguundari economic corridor and investment research center Nov 12N. Chimguundari economic corridor and investment research center Nov 12
N. Chimguundari economic corridor and investment research center Nov 12
 
Procurement mca-compact-ii-presentation-bcm
Procurement mca-compact-ii-presentation-bcmProcurement mca-compact-ii-presentation-bcm
Procurement mca-compact-ii-presentation-bcm
 

Recently uploaded

一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
taqyea
 
High-Quality IPTV Monthly Subscription for $15
High-Quality IPTV Monthly Subscription for $15High-Quality IPTV Monthly Subscription for $15
High-Quality IPTV Monthly Subscription for $15
advik4387
 
CULR Spring 2024 Journal.pdf testing for duke
CULR Spring 2024 Journal.pdf testing for dukeCULR Spring 2024 Journal.pdf testing for duke
CULR Spring 2024 Journal.pdf testing for duke
ZevinAttisha
 
Cover Story - China's Investment Leader - Dr. Alyce SU
Cover Story - China's Investment Leader - Dr. Alyce SUCover Story - China's Investment Leader - Dr. Alyce SU
Cover Story - China's Investment Leader - Dr. Alyce SU
msthrill
 
The Role of White Label Bookkeeping Services in Supporting the Growth and Sca...
The Role of White Label Bookkeeping Services in Supporting the Growth and Sca...The Role of White Label Bookkeeping Services in Supporting the Growth and Sca...
The Role of White Label Bookkeeping Services in Supporting the Growth and Sca...
YourLegal Accounting
 
Pitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deckPitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deck
HajeJanKamps
 
Kirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip GEM Royalty TNR Gold Lithium PresentationKirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip
 
GKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt PresentationGKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt Presentation
GraceKohler1
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 
2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf
2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf
2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf
Cambridge Product Management Network
 
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdfThe Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
thesiliconleaders
 
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
IPLTech Electric
 
DearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUniDearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUni
katiejasper96
 
The latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from NewentideThe latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from Newentide
JoeYangGreatMachiner
 
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
irhcs
 
Adani Group's Active Interest In Increasing Its Presence in the Cement Manufa...
Adani Group's Active Interest In Increasing Its Presence in the Cement Manufa...Adani Group's Active Interest In Increasing Its Presence in the Cement Manufa...
Adani Group's Active Interest In Increasing Its Presence in the Cement Manufa...
Adani case
 
list of states and organizations .pdf
list of  states  and  organizations .pdflist of  states  and  organizations .pdf
list of states and organizations .pdf
Rbc Rbcua
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 
Kirill Klip GEM Royalty TNR Gold Copper Presentation
Kirill Klip GEM Royalty TNR Gold Copper PresentationKirill Klip GEM Royalty TNR Gold Copper Presentation
Kirill Klip GEM Royalty TNR Gold Copper Presentation
Kirill Klip
 
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 

Recently uploaded (20)

一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
 
High-Quality IPTV Monthly Subscription for $15
High-Quality IPTV Monthly Subscription for $15High-Quality IPTV Monthly Subscription for $15
High-Quality IPTV Monthly Subscription for $15
 
CULR Spring 2024 Journal.pdf testing for duke
CULR Spring 2024 Journal.pdf testing for dukeCULR Spring 2024 Journal.pdf testing for duke
CULR Spring 2024 Journal.pdf testing for duke
 
Cover Story - China's Investment Leader - Dr. Alyce SU
Cover Story - China's Investment Leader - Dr. Alyce SUCover Story - China's Investment Leader - Dr. Alyce SU
Cover Story - China's Investment Leader - Dr. Alyce SU
 
The Role of White Label Bookkeeping Services in Supporting the Growth and Sca...
The Role of White Label Bookkeeping Services in Supporting the Growth and Sca...The Role of White Label Bookkeeping Services in Supporting the Growth and Sca...
The Role of White Label Bookkeeping Services in Supporting the Growth and Sca...
 
Pitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deckPitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deck
 
Kirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip GEM Royalty TNR Gold Lithium PresentationKirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip GEM Royalty TNR Gold Lithium Presentation
 
GKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt PresentationGKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt Presentation
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf
2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf
2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf
 
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdfThe Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
 
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
 
DearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUniDearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUni
 
The latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from NewentideThe latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from Newentide
 
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
 
Adani Group's Active Interest In Increasing Its Presence in the Cement Manufa...
Adani Group's Active Interest In Increasing Its Presence in the Cement Manufa...Adani Group's Active Interest In Increasing Its Presence in the Cement Manufa...
Adani Group's Active Interest In Increasing Its Presence in the Cement Manufa...
 
list of states and organizations .pdf
list of  states  and  organizations .pdflist of  states  and  organizations .pdf
list of states and organizations .pdf
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
Kirill Klip GEM Royalty TNR Gold Copper Presentation
Kirill Klip GEM Royalty TNR Gold Copper PresentationKirill Klip GEM Royalty TNR Gold Copper Presentation
Kirill Klip GEM Royalty TNR Gold Copper Presentation
 
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
 

The Japan- Mongolia Cooperation on the Joint Crediting Mechanism

  • 1. Kazuhisa Koakutsu Leader, Climate and Energy Area Institute for Global Environmental Strategies (IGES) The Japan-Mongolia Cooperation on the Joint Crediting Mechanism and Recommendations for Mongolian Enterprises
  • 2. 2Institute for Global Environmental Strategies IGES conducts practical and solution- oriented research focusing on the Asia- Pacific region to develop innovative policy approaches and propose environmental policies to achieve sustainable development in the region. IGES Climate and Energy Area conducts strategic research activities to contribute to global efforts to combat climate change, covering: • Future climate regime • Sustainable energy • Climate mitigation • Climate finance • Asia low carbon strategy • Market mechanisms, including CDM and JCM
  • 3. 3Institute for Global Environmental Strategies The Joint Crediting Mechanism (JCM) Cooperation between Government of Japan and Mongolia Facilitates greenhouse gas emissions reduction/removal projects by companies, cities, etc. in Mongolia As a result of emission reductions, “JCM credits” will be utilized to achieve Japan’s emission reduction target and may be utilized to achieve Mongolia’s target. At present, JCM credits are not tradable. JCM Financial Support from Japanese government is available. Utilized in partner country accordingly Credits to Japan Credits to partner country corresponding Used to achieve Japan’s emission reduction target JCM Credits dividing Partner country’s share JCM project JCM Financial Support Scheme “Contribution” Japan Partner country (e.g. Mongolia)
  • 4. 4Institute for Global Environmental Strategies JCM established in 16 countries since 2013 JCM in Mongolia started from January 8h, 2013 JCM Mongolia secretariat: Ministry of Environment and Tourism http://www.jcm-mongolia.com/
  • 5. 5Institute for Global Environmental Strategies 15 projects already registered by governments Country Technology Type Location Mongolia Heat Only Boilers 118th School of Ulaanbaatar Mongolia Heat Only Boilers Bornuur soum public facilities Indonesia Cooling system (refrigerator, freezer) Frozen Food Processing Plant Indonesia Cooling system (refrigerator, freezer) Food Industry Cold Storage Indonesia Centrifugal Chiller Textile factory Indonesia Centrifugal Chiller Textile factory Indonesia Centrifugal Chiller Textile factory Indonesia AC System, LED Lighting, Fridge/Freezer Convenience store Vietnam Tachograph Trucks, trailers Vietnam Inverter-type room air conditioners Hospitals Vietnam Amorphous transformers Electricity grid Vietnam Boiler, heat pump, LED lighting Hotel Palau Small-scale Solar PV School rooftop Palau Small-scale Solar PV Building rooftop Palau Small-scale Solar PV Building rooftop JCM credits issued to Japanese and Indonesian side https://www.jcm.go.jp/projects/registers Japan: Suuri-Keikaku Mongolia: Anu-Service
  • 6. 6Institute for Global Environmental Strategies 97 projects already selected for financing, various technologies are implemented High Efficiency LED Lighting, Cambodia High-efficiency Heat Only Boilers, Mongolia Power Generation by Waste- heat Recovery in Cement Industry, Indonesia Double Bundle-type Heat Pump, Indonesia Energy Savings at Convenience Stores, Indonesia 10 MW Solar Power Project in Darkhan City, Mongolia JCM project list: http://gec.jp/jcm/projects/index.html Amorphous High Efficiency Transformers in Power Grids, Vietnam LED lighting, co-generation, waste management, water management, hydropower, transportation, biomass, forestry, etc. 5 projects selected in Mongolia: Solar PV (3) Boiler (2)
  • 7. 7Institute for Global Environmental Strategies • Finances up to the half of an investment cost for facilities, equipment, vehicles, etc. which reduce CO2 from fossil fuel combustion. • Includes projects in collaboration with JICA and other government-affiliated financial institute. JCM Model Project • Finances part of project cost for REDD+ projects. • At least half or ratio of financial support to project cost of JCM credits issued are expected to be delivered to the government of Japan except the amount which is allocated to the partner country based on its legislation. JCM REDD+ Model Project • Grant for incremental cost of technologies for projects under public and state-owned entities. • Interest subsidy to ADB-financed loans for non- government projects, to private sector borrowers and financial institutions. ADB Trust Fund (Japan Fund for JCM) JCM Financing Programme Mongolian companies can jointly propose projects with Japanese companies ADB: https://www.adb.org/site/funds/funds/japan-fund-for-joint-crediting-mechanism jfjcm@adb.org
  • 8. 8Institute for Global Environmental Strategies Application is Now Open for JCM Model Project and REDD+ Model Project Financing Starting date of call for request 5 September 2016 Deadline of application Friday, 2 December 2016 (12:00 JST) Announcement of selected Model Projects 1- 2 months after the deadline Apply: http://gec.jp/jcm/kobo/mp160905.html Sample of required documents: • Application Form • Declaration by Representative Participant • Project Implementation Plan • Project Idea Note • Budget • Company information (e.g. brochure) and certificate of incorporation • Audited financial statements • Draft international consortium agreement • Agreement on the Allocation of JCM Credits • Other supporting documents
  • 9. 9Institute for Global Environmental Strategies Criteria for selecting the JCM Model Project http://gec.jp/jcm/kobo/mp160905.html Robustness of the project implementation 40 points Amount of emission reductions of energy-related CO2 and cost-effectiveness of emission reductions (JPY/tCO2) 40 points Potential of the dissemination of the technology 10 points Concept and status of JCM methodology development 10 points • Projects installations start after the adoption of the funding and must be completed within 3 years. • Finance will be paid based on the verified cost actually spent for implementation of the project.
  • 10. 10Institute for Global Environmental Strategies Financial support for JCM Model Project Number of already selected projects using a similar technology in each partner country % of financial support for new project application No project (0) Up to 50% (determined by participants) 1-3 projects Up to 40% (determined by participants) More than 3 projects Up to 30% (determined by participants) Covers main construction, ancillary work, machinery and appliances, survey and test, facilities, administrative work, etc. In Mongolia, new solar PV and boiler projects will be eligible for up to 40% of financial support. Other technologies will be eligible for up to 50% of financial support. Maximum Percentage of Financial Support determined based on the number of already selected JCM Model Projects using a similar technology in each country.
  • 11. 11Institute for Global Environmental Strategies Develop business idea Find Japanese partner Develop consortium (joint venture etc.) Apply JCM financing programme and develop methodology Sample document of “Agreement on International Consortium (Example)” Recommended steps to develop JCM projects • Secure financial sources for the rest of initial cost • Consult about project with JCM Mongolia secretariat • Work with Business Council Mongolia and IGES on business matchmaking and project development • Business forums, trade associations, websites e.g. http://ibo.jcci.or.jp/ Japanese entity submits application (in Japanese)
  • 12. 12Institute for Global Environmental Strategies 1212 Thank You IGES Climate and Energy Area Market Mechanisms 2108-11 Kamiyamaguchi, Hayama, Kanagawa, 240-0115 Japan Tel: +81-46-826-9592 Fax: +81-46-855-3809 E-mail: mm-info@iges.or.jp JCM Mongolia secretariat http://www.jcm-mongolia.com/
  • 13. 13Institute for Global Environmental Strategies Company matching Application to JCM Financing Programme Methodology development PDD development Measurement, reporting and verification Credit Issuance Validation (by TPE) Creation of International Consortium (for JCM Model Projects) Technical support from MOEJ, IGES, the host country JCM Secretariat and (optional) a consultant Verification (by TPE) Overview of JCM Project Development Project approval, start of funding and operations Methodology approval (by the Joint Committee) JCM Project registration (by the Joint Committee)  Validation report  Verification report Before project beginning From project beginning to official registration as JCM project Continuous measurement, reporting and verification of GHG emissions for credit issuance Monitoring report* By project participants *Support for monitoring report first time only Technical support from OECC and IGES
  • 14. 14Institute for Global Environmental Strategies 14Percentage of Financial Support: White: 0 project = Up to 50% | Yellow: 1-3 project(s) = Up to 40% | Orange: more than 4 projects = Up to 30% Yellow Orange Sector Technology Mong olia Bangla desh Ethiopi a Kenya Maldiv es Viet Nam Lao PDR Indon esia Costa Rica Palau Camb odia Mexic o Saudi Arabia Chile Myan mar Thaila nd Malay sia Total Energy efficiency Boiler 1 2 2 5 Regenerative Burners 1 1 Gas Fired Furnace 1 1 Electric Furnace 1 1 Air Conditioning System 2 1 1 4 Chiller 2 1 4 1 1 3 12 Refrigerator 1 1 3 5 Absorption Chiller Using Waste Heat 1 1 2 Swirling Induction Type Air conditioning System 1 1 Air Conditioning Control System 1 1 2 Heat Pump 1 1 2 Fridge and Freezer Showcase 1 1 2 Compressor 1 1 Loom 1 2 1 4 Old Corrugated Cartons Process 1 1 Battery Case Forming Device 1 1 Electrolyzer in Chlorine Production 1 1 2 Transformer 3 3 LED lighting 2 1 3 LED Street Lighting with Dimming System 1 1 2 Pump 1 1 Aeration System 1 1 Water Heater Using Exhaust Heat 1 1 Exhaust Heat Recovery 1 1 Wire Stranding Machines 1 1 Evaporator with Mechanical Vapor Recompression 1 1 Energy industries (renewable- /non renewable sources) Solar Power Plant 3 2 1 1 1 1 1 3 3 3 1 20 Solar Power Plant with Battery 1 1 2 Small Hydropower Plan 1 1 2 Power Generation by Waste Heat Recovery 1 1 1 3 Gas Co-generation 1 2 3 Biomass Co-generation 1 1 Waste handling and disposal Waste to Energy Plant 1 1 Power Generation by Methane Recovery 1 1 Transportation Digital Tachograph System 1 1 4 6 1 3 1 16 0 24 3 3 5 1 1 0 5 21 1 95 Maximum percentage of financial support by applied technology type and number of JCM model project by each country 29/08/2016