   The	
 Arbor	
 at	
 
East	
 Falls	
  
Development	
  Proposal	
  prepared	
  for	
  James	
  Mascaro	
  
	
  
Sustainable	
  Residential	
  Development	
  	
  
4300	
  Ridge	
  Avenue,	
  Philadelphia	
  PA	
  
	
  
August	
  5,	
  2015	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  2	
  
	
  	
  
Table	
  of	
  Contents	
  
	
  
	
  
	
  
Executive	
  Summary………………………………………………………………………………………………….....….….3-­‐4	
  
Company	
  Profile…………………………………………………………………………………………….........................5	
  
Development	
  Team………………………………………………....................……………………..……….......….….5	
  
Introduction...............................................................................................................................6	
  
Objectives............…………………………………………………………………………………………………......……...…7	
  
Project	
  Overview…………………………………………………………………………………………………......…….…...8	
  
Site.........................................................................................................................................9-­‐14	
  
Owner	
  Project	
  Requirements	
  ..............................................................................................15-­‐17	
  
Zoning...................................................................................................................................18-­‐20	
  
Development	
  Proposal	
  Elements.........................................................................................21-­‐27	
  
Market	
  Analysis....................................................................................................................28-­‐37	
  
Sustainability........................................................................................................................38-­‐48	
  
Financial	
  Strategies..............................................................................................................48-­‐52	
  
Conclusions...............................................................................................................................52	
  
	
  
	
  
	
  
	
  
	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  3	
  
	
  	
  
	
  
Executive	
  Summary	
  
	
  
	
  
Team	
  
Our	
  highly	
  accomplished	
  development	
  team	
  comprised	
  of	
  one	
  construction	
  manager	
  with	
  a	
  
background	
  in	
  architecture	
  and	
  three	
  sustainable	
  designers	
  with	
  various	
  backgrounds	
  in	
  business,	
  real	
  
estate,	
  architecture,	
  and	
  policy	
  writing	
  will	
  ensure	
  that	
  The	
  Arbor	
  will	
  not	
  only	
  be	
  an	
  eco-­‐friendly,	
  
aesthetically	
  pleasing	
  addition	
  to	
  the	
  community	
  but	
  an	
  economic	
  destination	
  as	
  well.	
  
	
  
Project	
  Overall	
  
The	
  Arbor	
  at	
  East	
  Falls	
  is	
  a	
  sustainable	
  mixed-­‐used	
  complex	
  located	
  in	
  the	
  Northwest	
  section	
  of	
  
Philadelphia.	
  The	
  Arbor	
  will	
  be	
  comprised	
  of	
  four	
  mixed-­‐use	
  four	
  story	
  buildings	
  totaling	
  115,000	
  
square	
  feet,	
  90,000	
  square	
  feet	
  retail	
  space,	
  and	
  30,000	
  square	
  feet	
  of	
  underground	
  parking	
  structure.	
  
The	
  LEED	
  Gold	
  complex	
  will	
  consist	
  of	
  100	
  rental	
  units	
  that	
  include	
  both	
  market	
  rate	
  and	
  affordable	
  
rate	
  units.	
  
	
  
Residential	
  construction	
  price	
  estimates	
  will	
  be	
  $160/SF	
  totaling	
  $14.4	
  million.	
  Retail	
  construction	
  
estimates	
  will	
  be	
  $125/SF,	
  which	
  equates	
  to	
  $3.13	
  million.	
  Underground	
  structured	
  parking	
  will	
  be	
  
$95/SF	
  coming	
  out	
  to	
  S2.85	
  million.	
  We	
  are	
  seeking	
  LEED	
  Gold,	
  which	
  costs	
  around	
  $80,000.	
  The	
  
project	
  totals	
  $26,690,220.	
  
	
  
Shopping	
  and	
  dining	
  on	
  the	
  ground	
  floor	
  will	
  allow	
  for	
  commercial	
  opportunities	
  that	
  will	
  be	
  supported	
  
by	
  the	
  existing	
  community	
  and	
  the	
  readymade	
  customer	
  base	
  within	
  housing	
  in	
  upper	
  floors.	
  The	
  
Arbor	
  will	
  provide	
  a	
  Public	
  Courtyard,	
  Community	
  Garden	
  and	
  Dog	
  Park	
  that	
  will	
  create	
  a	
  meeting	
  
point	
  for	
  its	
  residents	
  and	
  neighbors.	
  Verde	
  Developers	
  will	
  comply	
  with	
  all	
  C2	
  Philadelphia	
  zoning	
  
codes	
  that	
  pertain	
  to	
  the	
  site	
  as	
  well	
  as	
  the	
  East	
  Falls	
  Overlay.	
  A	
  variance	
  for	
  a	
  height	
  increase	
  will	
  be	
  
requested	
  from	
  the	
  zoning	
  board	
  and	
  we	
  will	
  comply	
  with	
  all	
  the	
  requirements	
  regarding	
  lighting	
  and	
  
façade.	
  	
  
	
  
Development	
  Site	
  
Centrally	
  located,	
  the	
  Rivage	
  sits	
  on	
  1.68	
  acres	
  at	
  Ridge	
  Avenue	
  and	
  Calumet	
  Street	
  in	
  the	
  heart	
  of	
  East	
  
Falls.	
  Kelly	
  Drive;	
  the	
  backbone	
  of	
  Fairmount	
  Park	
  flanks	
  the	
  southern	
  edge	
  of	
  the	
  site	
  making	
  it	
  a	
  very	
  
desirable	
  location.	
  The	
  blighted	
  area	
  is	
  comprised	
  of	
  a	
  concrete	
  lot	
  and	
  a	
  vacant	
  structure;	
  nonetheless	
  
the	
  existing	
  infrastructure	
  is	
  in	
  place	
  to	
  support	
  development.	
  The	
  adjacent	
  neighborhood	
  consists	
  of	
  
Ridge	
  Avenue’s	
  commercial	
  corridor,	
  which	
  includes	
  takeout	
  restaurants,	
  insurance	
  companies,	
  and	
  
light	
  retail.	
  Some	
  businesses	
  are	
  struggling	
  and	
  The	
  Arbor	
  will	
  bring	
  the	
  boost	
  that	
  East	
  Falls	
  needs	
  to	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  4	
  
	
  	
  
stimulate	
  growth	
  and	
  business	
  in	
  the	
  neighborhood.	
  In	
  addition	
  to	
  the	
  commercial	
  segment,	
  a	
  small	
  
residential	
  neighborhood	
  exists	
  which	
  contains	
  both	
  owner	
  and	
  tenant	
  occupied	
  residences.	
  	
  
	
  
Opportunities	
  
East	
  Falls	
  is	
  an	
  up	
  and	
  coming	
  neighborhood	
  with	
  a	
  burgeoning	
  main	
  street	
  scene.	
  The	
  previously	
  
developed	
  Rivage	
  site	
  is	
  nestled	
  right	
  in	
  the	
  heart	
  of	
  the	
  area	
  and	
  has	
  premier	
  access	
  to	
  restaurants,	
  
parks,	
  universities,	
  and	
  gorgeous	
  river	
  views.	
  The	
  existing	
  public	
  transportation	
  options	
  include	
  several	
  
Septa	
  bus	
  routes	
  and	
  Regional	
  Rail	
  access	
  within	
  walking	
  distance.	
  I-­‐76	
  and	
  Route	
  1	
  are	
  easily	
  
accessible	
  from	
  Ridge	
  Avenue.	
  	
  
	
  
The	
  Arbor	
  will	
  be	
  marketed	
  toward	
  students	
  and	
  young	
  professionals	
  who	
  prefer	
  the	
  quiet	
  outskirts	
  of	
  
the	
  city	
  yet	
  still	
  want	
  to	
  have	
  direct	
  access	
  to	
  it.	
  We	
  will	
  provide	
  both	
  market	
  and	
  affordable	
  housing	
  
opportunities	
  for	
  persons	
  of	
  all	
  economic	
  backgrounds.	
  	
  
	
  
Competition	
  
The	
  Arbor	
  will	
  be	
  a	
  unique	
  addition	
  to	
  the	
  East	
  Falls	
  neighborhood.	
  No	
  complexes	
  of	
  this	
  caliber	
  exist	
  
within	
  the	
  area.	
  The	
  closest	
  competition	
  is	
  Dobson	
  Mills	
  apartments	
  on	
  Ridge	
  Avenue	
  &	
  Scotts	
  lane	
  
about	
  a	
  mile	
  from	
  the	
  site.	
  Dobson	
  Mills	
  does	
  not	
  provide	
  sustainable	
  principles	
  in	
  its	
  design	
  and	
  has	
  
limited	
  commercial/retail	
  options.	
  We	
  will	
  attempt	
  to	
  corner	
  the	
  market	
  as	
  an	
  eco-­‐friendly	
  micro	
  
community	
  within	
  East	
  Falls.	
  Marketing	
  towards	
  a	
  different	
  demographic	
  than	
  Dobson	
  Mills,	
  the	
  Arbor	
  
will	
  emphasize	
  sustainability	
  in	
  design.	
  
	
  
Sustainable	
  Development	
  
The	
  Arbor	
  will	
  strive	
  for	
  LEED	
  Gold.	
  The	
  LEED	
  program	
  provides	
  a	
  framework	
  for	
  developing	
  a	
  
sustainable	
  building	
  that	
  will	
  provide	
  benefits	
  to	
  the	
  residents,	
  community,	
  and	
  environment.	
  Locally	
  
sourced	
  materials,	
  photovoltaic	
  solar	
  panels,	
  energy	
  efficient	
  washers/dryers	
  will	
  be	
  will	
  be	
  part	
  of	
  our	
  
building	
  design.	
  Storm	
  water	
  management	
  strategies	
  will	
  include	
  rain	
  gardens	
  and	
  underground	
  
cisterns.	
  Green	
  space	
  on	
  the	
  rooftops	
  of	
  the	
  buildings	
  will	
  unite	
  affordable	
  living	
  with	
  green	
  building	
  
space.	
  The	
  public	
  space	
  between	
  the	
  complex	
  will	
  be	
  tree-­‐lined,	
  providing	
  a	
  canopy	
  and	
  a	
  respite	
  for	
  
residents	
  and	
  inclement	
  weather.	
  Utilizing	
  sustainable	
  techniques	
  will	
  initially	
  increase	
  the	
  cost	
  of	
  
production,	
  however,	
  the	
  return	
  on	
  investment	
  will	
  be	
  seen	
  in	
  higher	
  rents	
  and	
  a	
  quicker	
  lease	
  up.	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  5	
  
	
  	
  
Company	
  Profile	
  
	
  
VERDE	
  Developers	
  is	
  a	
  multidisciplinary	
  development	
  company	
  dedicated	
  to	
  designing	
  environmentally	
  
focused	
  buildings.	
  Located	
  in	
  Philadelphia,	
  Pennsylvania	
  VERDE	
  Developers	
  was	
  founded	
  in	
  2015	
  by	
  
four	
  graduate	
  students	
  looking	
  to	
  provide	
  eco-­‐friendly	
  sustainable	
  solutions	
  for	
  architecture.	
  The	
  
design	
  approach	
  of	
  the	
  company	
  is	
  to	
  create	
  a	
  sense	
  of	
  inclusion	
  with	
  nature	
  and	
  community	
  as	
  well,	
  
integrating	
  the	
  projects	
  to	
  the	
  surrounding	
  neighborhood	
  and	
  providing	
  meeting	
  spaces.	
  	
  
	
  
	
  
Project	
  Team	
  	
  
	
  
Helena	
  Lilley	
  
A	
  Pennsylvania	
  native,	
  Helena	
  has	
  been	
  working	
  for	
  the	
  real	
  estate	
  firm	
  Long	
  &	
  Foster	
  since	
  2008.	
  She	
  
is	
  currently	
  attaining	
  her	
  M.S.	
  in	
  sustainable	
  design	
  with	
  her	
  focus	
  on	
  developing	
  real	
  estate.	
  Her	
  
knowledge	
  of	
  the	
  area	
  and	
  zoning	
  codes	
  makes	
  her	
  an	
  irreplaceable	
  asset	
  to	
  our	
  team.	
  She	
  is	
  active	
  in	
  
the	
  community	
  as	
  a	
  Design	
  Committee	
  Member	
  of	
  the	
  neighboring	
  Roxborough	
  Development	
  
Corporation	
  and	
  was	
  a	
  key	
  player	
  in	
  the	
  reinstated	
  Roxborough	
  commercial	
  corridor	
  zoning	
  overlay.	
  	
  	
  
	
  
Carolina	
  Martinez	
  	
  	
  
Our	
  resident	
  architect	
  and	
  designer	
  hailing	
  from	
  Mexico	
  City,	
  Mexico,	
  Carolina	
  has	
  experience	
  within	
  
the	
  industry	
  working	
  for	
  one	
  of	
  the	
  largest	
  and	
  most	
  successful	
  architectural	
  firms	
  in	
  Mexico.	
  She	
  has	
  a	
  
vast	
  knowledge	
  and	
  experience	
  LEED	
  certified	
  buildings.	
  Her	
  ability	
  to	
  design	
  functionally	
  efficient	
  
buildings	
  is	
  only	
  rivaled	
  by	
  her	
  ability	
  to	
  create	
  aesthetically	
  pleasing	
  buildings.	
  	
  	
  
	
  
Jonathan	
  Vehlow	
  
Originally	
  from	
  Chicago,	
  Illinois,	
  Jonathan’s	
  background	
  is	
  in	
  English.	
  He	
  is	
  currently	
  studying	
  to	
  receive	
  
his	
  M.S.	
  in	
  Sustainable	
  Design	
  with	
  a	
  focus	
  in	
  sustainable	
  systems	
  and	
  landscape	
  design.	
  He	
  is	
  able	
  to	
  
integrate	
  and	
  implement	
  sustainable	
  and	
  eco-­‐friendly	
  systems	
  into	
  both	
  new	
  and	
  pre-­‐existing	
  
buildings.	
  	
  	
  
	
  
Anthony	
  Simonetti	
  
The	
  construction	
  manager	
  of	
  our	
  operation,	
  Anthony	
  comes	
  from	
  an	
  architectural	
  background.	
  
Bridging	
  the	
  gap	
  between	
  design	
  and	
  construction,	
  his	
  knowledge	
  of	
  both	
  these	
  fields	
  allows	
  him	
  to	
  
budget	
  and	
  schedule	
  a	
  project	
  in	
  a	
  realistic	
  fashion.	
  	
  
	
  
	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  6	
  
	
  	
  
Introduction	
  
	
  
	
  
	
  
	
  
	
  
	
  
Kelly	
  Drive	
  flanks	
  the	
  southern	
  border	
  of	
  East	
  
Falls,	
  creating	
  an	
  ideal	
  location	
  for	
  residents	
  
and	
  visitors	
  alike.	
  Fairmount	
  Park	
  creates	
  a	
  
natural	
  boundary,	
  along	
  with	
  major	
  
transportation	
  and	
  commercial	
  arteries.	
  The	
  
charming	
  neighborhood	
  is	
  bordered	
  by	
  
Fairmount	
  Park	
  and	
  major	
  transportation	
  
thoroughfares,	
  which	
  provide	
  an	
  easy	
  
connection	
  to	
  the	
  surrounding	
  city.	
  These	
  
features	
  instill	
  a	
  unique	
  sense	
  of	
  place,	
  but	
  
also	
  hinder	
  outsiders’	
  awareness	
  and	
  
familiarity	
  with	
  the	
  neighborhood.	
  East	
  Falls	
  is	
  
a	
  hidden	
  gem.	
  	
  
	
  
	
  
With	
  the	
  development	
  of	
  The	
  Arbor	
  at	
  East	
  
Falls,	
  Verde	
  Developers	
  aim	
  to	
  build	
  upon	
  and	
  
compliment	
  the	
  surrounding	
  area,	
  creating	
  a	
  
new	
  living,	
  dining	
  and	
  retail	
  option	
  adhering	
  to	
  the	
  LEED	
  Gold	
  standard	
  of	
  building.	
  Our	
  design	
  
emphasis	
  is	
  focused	
  around	
  usable	
  spaces	
  that	
  serve	
  as	
  meeting	
  points,	
  destinations,	
  and	
  shared	
  
workspaces,	
  where	
  residents	
  of	
  diverse	
  backgrounds	
  and	
  lifestyles	
  can	
  interact.	
  The	
  Arbor	
  at	
  East	
  Falls	
  
will	
  cater	
  to	
  a	
  more	
  walkable	
  neighborhood	
  in	
  order	
  to	
  enrich	
  the	
  existing	
  businesses	
  and	
  residents	
  
while	
  avoiding	
  any	
  displacement.	
  	
  
	
  
The	
  incorporation	
  of	
  sustainable	
  principles	
  guides	
  our	
  development	
  and	
  will	
  serve	
  as	
  an	
  eco-­‐friendly	
  
example	
  to	
  become	
  interwoven	
  into	
  the	
  fabric	
  of	
  the	
  community.	
  	
  
	
  
	
  
	
  
	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  7	
  
	
  	
  
Objectives	
  
	
  
Verde	
  Developer’s	
  goal	
  is	
  to	
  provide	
  a	
  destination	
  that	
  both	
  compliments	
  the	
  surrounding	
  area	
  and	
  
retain	
  its	
  own	
  identity	
  as	
  a	
  key	
  focal	
  point	
  in	
  the	
  neighborhood.	
  Through	
  a	
  labor-­‐intensive	
  design	
  
process	
  including	
  a	
  Charrette	
  with	
  the	
  East	
  Falls	
  community	
  our	
  team	
  has	
  achieved	
  just	
  that,	
  creating	
  a	
  
mixed-­‐use	
  residential/commercial	
  complex	
  that	
  is	
  both	
  efficient	
  and	
  aesthetically	
  pleasing	
  called	
  The	
  
Arbor	
  at	
  East	
  Falls.	
  We	
  look	
  to	
  engage	
  and	
  engender	
  the	
  surrounding	
  communities	
  by	
  providing	
  a	
  
welcoming	
  gateway	
  destination	
  between	
  East	
  Fall’s	
  parks,	
  residential,	
  and	
  commercial	
  districts.	
  	
  
	
  
We	
  strive	
  for	
  a	
  holistic	
  approach.	
  In	
  doing	
  so	
  we	
  focus	
  on	
  four	
  objectives:	
  
	
  
● High	
  Quality	
  of	
  Life:	
  We	
  will	
  promote	
  a	
  livable,	
  accessible,	
  vibrant,	
  and	
  active	
  place	
  for	
  existing	
  
and	
  new	
  residents	
  to	
  live,	
  work,	
  and	
  play	
  in	
  a	
  happy	
  healthy	
  way.	
  
● Sense	
  of	
  Place:	
  Building	
  on	
  the	
  proximity	
  to	
  Fairmount	
  and	
  existing	
  neighborhood	
  assets,	
  we	
  
will	
  reveal	
  a	
  hidden	
  unique	
  gathering	
  place	
  where	
  residents	
  and	
  visitors	
  can	
  safely	
  interact	
  
● Integrated:	
  Integrating	
  the	
  pillars	
  of	
  sustainability,	
  the	
  development	
  of	
  The	
  Arbor	
  is	
  intended	
  to	
  
promote	
  the	
  social,	
  economic,	
  and	
  environmental	
  sustainability	
  of	
  the	
  neighborhood.	
  The	
  
Arbor	
  will	
  provide	
  spaces	
  and	
  places	
  for	
  new	
  and	
  existing	
  residents	
  to	
  work	
  and	
  gather,	
  while	
  
providing	
  a	
  safe	
  space	
  for	
  visitors	
  to	
  interact	
  with	
  the	
  neighborhood	
  and	
  support	
  locally	
  owned	
  
businesses.	
  
● Equity:	
  We	
  plan	
  to	
  ensure	
  that	
  all	
  people	
  have	
  the	
  opportunity	
  to	
  live	
  at	
  The	
  Arbor	
  and	
  
affordable	
  options	
  will	
  be	
  offered.	
  We	
  will	
  strive	
  for	
  the	
  best	
  design	
  standards	
  that	
  measure	
  
economic,	
  environmental	
  and	
  social	
  equity	
  benefits.	
  	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  8	
  
	
  	
  
Project	
  Overview	
  
	
  
	
  
The	
  Arbor	
  at	
  East	
  Falls	
  will	
  be	
  comprised	
  of	
  four	
  mixed-­‐use	
  four	
  story	
  buildings	
  totaling	
  115,000	
  square	
  
feet	
  of	
  residential	
  and	
  retail	
  space.	
  The	
  LEED	
  Gold	
  complex	
  will	
  consist	
  of	
  100	
  rental	
  units	
  that	
  include	
  
both	
  market	
  rate	
  and	
  affordable	
  rate	
  units.	
  	
  
	
  
The	
  development	
  will	
  be	
  comprised	
  of	
  four	
  separate	
  buildings	
  that	
  will	
  be	
  named	
  accordingly	
  to	
  the	
  
Arbor	
  theme:	
  Maple,	
  Oak,	
  Birch,	
  and	
  Willow.	
  The	
  Maple	
  building	
  will	
  hold	
  the	
  Affordable	
  Rate	
  units.	
  It	
  
will	
  be	
  comprised	
  of	
  25	
  studio,	
  one,	
  and	
  two	
  bedroom	
  units	
  on	
  three	
  floors.	
  The	
  street	
  level	
  will	
  offer	
  
retail	
  opportunities,	
  community	
  development,	
  as	
  well	
  as	
  educational	
  and	
  assistance	
  organization.	
  A	
  
designated	
  location	
  will	
  be	
  shared	
  and	
  available	
  for	
  community	
  meeting	
  space,	
  or	
  as	
  a	
  price	
  controlled	
  
rental	
  space	
  for	
  organizations	
  to	
  hold	
  conferences,	
  informational	
  sessions,	
  or	
  courses	
  on	
  topics	
  such	
  as	
  
energy	
  efficiency.	
  
	
  
Oak,	
  Birch	
  and	
  Willow	
  with	
  consist	
  of	
  market	
  rate	
  apartments	
  on	
  three	
  floors.	
  Each	
  building	
  will	
  offer	
  
studio,	
  one,	
  and	
  two	
  bedroom	
  units.	
  The	
  ground	
  floor	
  of	
  all	
  the	
  market	
  rate	
  buildings	
  will	
  be	
  occupied	
  
by	
  local	
  East	
  Falls/Philadelphia	
  businesses.	
  With	
  over	
  20,000	
  square	
  feet	
  of	
  retail	
  space	
  available	
  in	
  the	
  
three	
  market	
  rate	
  buildings,	
  and	
  a	
  readymade	
  customer	
  base	
  within	
  housing	
  on	
  upper	
  floors,	
  local	
  
entrepreneurs	
  will	
  clearly	
  see	
  the	
  benefits	
  in	
  establishing	
  new	
  cafes,	
  bistros,	
  clothing	
  boutiques,	
  and	
  
other	
  service	
  related	
  businesses.	
  The	
  mixed-­‐used	
  development	
  will	
  promote	
  jobs	
  in	
  the	
  area	
  and	
  help	
  
East	
  Falls	
  boost	
  its	
  commerce.	
  
	
  
Community	
  space	
  will	
  be	
  in	
  three	
  designated	
  areas:	
  a	
  dog	
  park,	
  community	
  garden,	
  and	
  courtyard.	
  
These	
  areas	
  will	
  not	
  only	
  provide	
  needed	
  amenities	
  for	
  resident	
  families,	
  but	
  also	
  serve	
  as	
  locations	
  
residents	
  can	
  utilize	
  to	
  commune	
  and	
  connect.	
  We	
  designed	
  these	
  areas	
  to	
  be	
  able	
  to	
  serve	
  both	
  the	
  
market	
  rate	
  and	
  affordable	
  units	
  in	
  order	
  to	
  nourish	
  an	
  integrated	
  community	
  thus	
  increasing	
  the	
  
social	
  equity	
  of	
  East	
  Falls.	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  9	
  
	
  	
  
Site	
  Inventory	
  &	
  Analysis	
  
	
  
	
  
	
  
The	
  current	
  Rivage	
  site	
  is	
  urban	
  blight.	
  It’s	
  comprised	
  of	
  a	
  vacant	
  building	
  and	
  a	
  large	
  unkempt	
  parking	
  
lot	
  surrounded	
  by	
  a	
  chain	
  link	
  fence.	
  This	
  area	
  holds	
  potential	
  to	
  add	
  to	
  the	
  burgeoning	
  community	
  
that	
  surrounds	
  it.	
  With	
  a	
  close	
  proximity	
  to	
  downtown	
  transportation	
  lines,	
  the	
  Schuylkill	
  river	
  trails,	
  
and	
  East	
  Falls	
  restaurant	
  district,	
  the	
  Rivage	
  is	
  an	
  ideal	
  place	
  to	
  develop	
  a	
  mixed-­‐use	
  
residential/commercial	
  complex.	
  
	
  
	
  
	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  10	
  
	
  	
  
	
  
• Site	
  located	
  just	
  off	
  the	
  banks	
  of	
  the	
  Schuylkill	
  River	
  	
  between	
  Ridge	
  Avenue	
  and	
  Kelly	
  Drive.	
  
• Five	
  different	
  bus	
  routes	
  have	
  stops	
  on	
  both	
  Kelly	
  and	
  Ridge	
  just	
  a	
  few	
  steps	
  from	
  the	
  site	
  that	
  
provide	
  access	
  to	
  surrounding	
  neighborhoods.	
  
• East	
  Falls	
  Train	
  Station	
  (Manayunk/Norristown	
  line)	
  is	
  located	
  .6	
  miles	
  northeast	
  of	
  the	
  site.	
  
• Wissahickon	
  Transportation	
  Terminal	
  which	
  provides	
  access	
  to	
  satellite	
  neighborhoods	
  is	
  
located	
  to	
  the	
  northwest	
  of	
  the	
  site	
  on	
  Ridge	
  approximately	
  one	
  mile	
  away.	
  
• The	
  Schuylkill	
  River	
  Trail	
  pedestrian	
  path	
  along	
  Kelly	
  Drive	
  is	
  located	
  within	
  walking	
  distance.	
  
• Interstate	
  76	
  and	
  Route	
  1	
  have	
  onramps	
  both	
  accessible	
  from	
  Ridge	
  Avenue	
  less	
  than	
  one	
  mile	
  
away.	
  
• All	
  of	
  these	
  transportation	
  options	
  provide	
  access	
  to	
  surrounding	
  neighborhoods	
  
and	
  downtown	
  Philadelphia.	
  
• Fairmount	
  Park,	
  one	
  of	
  the	
  largest	
  city	
  parks	
  in	
  the	
  United	
  States	
  is	
  located	
  just	
  south	
  of	
  the	
  
site,	
  accessible	
  over	
  the	
  East	
  Falls	
  Bridge.	
  
• The	
  bustling	
  Manayunk	
  neighborhood	
  is	
  accessible	
  from	
  both	
  Kelly	
  Drive	
  and	
  Ridge	
  Avenue.	
  
• East	
  Falls	
  is	
  an	
  up	
  and	
  coming	
  Main	
  Street	
  area	
  and	
  restaurant	
  district	
  is	
  located	
  a	
  few	
  blocks	
  
from	
  the	
  site.	
  
	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  11	
  
	
  	
  
	
  
	
  
The	
  Schuylkill	
  River	
  Trail	
  can	
  be	
  found	
  on	
  both	
  sides	
  of	
  the	
  river	
  running	
  along	
  both	
  Kelly	
  and	
  Martin	
  
Luther	
  King	
  Drive;	
  the	
  latter	
  can	
  be	
  accessed	
  by	
  use	
  of	
  the	
  East	
  Falls	
  Bridge.	
  The	
  Manayunk/Norristown	
  
railway	
  located	
  less	
  than	
  one	
  mile	
  away.	
  All	
  these	
  options	
  provide	
  access	
  to	
  downtown	
  Philadelphia	
  
and	
  surrounding	
  neighborhoods.	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  12	
  
	
  	
  
Existing	
  Conditions	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  
	
  
	
  
Picture	
  2.	
  Ridge	
  Ave	
  and	
  Merrick	
  Road	
  	
  	
  	
  	
  	
  
Site	
  Picture	
  1:	
  Corner	
  Ridge	
  Ave	
  &	
  Calumet	
  St	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  13	
  
	
  	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  	
  
	
  
Site	
  picture	
  4.	
  Kelly	
  Dr.	
  
	
  
	
  	
  	
  	
  	
  	
  	
  	
  Site	
  picture	
  3.	
  From	
  Kelly	
  Dr.	
  and	
  Calumet	
  St.	
  	
  	
  	
  	
  	
  
	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  14	
  
	
  	
  
	
  
	
  
Site	
  picture	
  five:	
  Arial	
  view	
  from	
  Kelly	
  drive	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Site	
  picture	
  5:	
  Aerial	
  view	
  from	
  Kelly	
  drive	
  
Site	
  picture	
  six:	
  Arial	
  of	
  Merrick	
  facing	
  the	
  site	
  
Site	
  Picture	
  6:	
  Aerial	
  from	
  Merrick	
  facing	
  the	
  site	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  15	
  
	
  	
  
	
  
Owner	
  Project	
  Requirements	
  
	
  
	
  
Overall	
  building	
  size	
  (sf)	
   4	
  buildings=	
  115,000	
  sq	
  ft	
  
Functional	
  Uses:	
   Mixed	
  use	
  	
  
Affordable	
  Rate	
  Housing-­‐	
  Building	
  1	
  	
  
Market	
  Rate	
  Housing-­‐	
  Building	
  2,3	
  &	
  4	
  
Ground	
  Floor	
  retail	
  
Occupancy	
  Requirements:	
   Sizes	
  per	
  uses:	
  
Use	
  1	
  -­‐	
  Retail:	
   25,000	
  sq.	
  ft.	
  (total	
  4	
  buildings)	
  
Building	
  One	
  5,000	
  
Building	
  Two	
  7,500	
  
Building	
  Three	
  5,000	
  
Building	
  Four	
  7,500	
  
Use	
  2	
  -­‐	
  Studio/Efficiency:	
  
Use	
  3	
  -­‐	
  1	
  Bedroom:	
  
Use	
  4	
  -­‐	
  	
  1	
  Bedroom	
  with	
  Den:	
  
Use	
  5-­‐	
  2	
  	
  bedroom	
  
Use	
  6-­‐	
  3	
  bedroom	
  
475	
  sq.	
  ft.	
  
750	
  	
  sq.	
  ft.	
  
900	
  sq.	
  ft.	
  
1250	
  sq.	
  ft.	
  
1450	
  sq.	
  ft.	
  
Building	
  Features:	
  	
  Special	
  
Concerns/Uses	
  
	
  
HVAC	
   HVAC	
  systems	
  including	
  furnaces	
  and	
  air	
  conditioners	
  designed	
  to	
  conserve	
  energy	
  and	
  
save	
  money.	
  Air	
  filtrations	
  systems,	
  humidifiers,	
  and	
  dehumidifiers	
  help	
  keep	
  indoor	
  
quality	
  healthy	
  and	
  clean.	
  
Electrical	
   We	
  can	
  incorporate	
  a	
  state	
  of	
  the	
  art	
  system	
  that	
  uses	
  a	
  grid	
  to	
  save	
  energy	
  and	
  
money.	
  	
  New	
  power	
  cell	
  tech	
  can	
  keep	
  us	
  independent	
  from	
  outside	
  sources	
  while	
  also	
  
giving	
  back	
  to	
  reduce	
  costs.	
  	
  
Façade/Envelope	
   In	
  keeping	
  with	
  the	
  community	
  character,	
  the	
  facade	
  will	
  include	
  brick	
  along	
  with	
  other	
  
sustainable	
  materials.	
  We	
  would	
  want	
  the	
  structure	
  to	
  attract	
  potential	
  renters.	
  Having	
  
energy	
  efficient	
  lighting,	
  a	
  design	
  that	
  draws	
  the	
  eye	
  and	
  glass	
  that	
  not	
  only	
  looks	
  good	
  
but	
  also	
  serves	
  to	
  reflect	
  a	
  certain	
  amount	
  of	
  light	
  so	
  the	
  building	
  won't	
  get	
  too	
  hot.	
  	
  
Other	
   We	
  will	
  also	
  have	
  an	
  art	
  piece	
  that	
  reflects	
  upon	
  the	
  structure	
  we	
  end	
  up	
  making.	
  	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  16	
  
	
  	
  
Quality	
  
Requirements/Product	
  Type	
  
In	
  an	
  attempt	
  to	
  protect	
  the	
  health	
  of	
  the	
  residents,	
  we	
  will	
  commit	
  to	
  using	
  100%	
  eco-­‐
friendly	
  materials	
  indoors	
  and	
  when	
  possible	
  outdoors.	
  Special	
  attention	
  will	
  be	
  taken	
  on	
  
interior	
  materials	
  such	
  as	
  no	
  voc	
  &	
  non-­‐carcinogenic	
  materials.	
  
Sustainability	
  Objectives:	
   	
  
Energy	
  Efficiency	
   The	
  project	
  will	
  be	
  net	
  zero	
  energy.	
  This	
  goal	
  will	
  be	
  achieved	
  by	
  passive	
  strategies	
  such	
  
as	
  building	
  orientation,	
  facade	
  shading,	
  green	
  roofs,	
  efficiency	
  glass,	
  and	
  envelope.	
  The	
  
active	
  system	
  that	
  will	
  be	
  used	
  in	
  the	
  project	
  will	
  be:	
  Solar	
  energy	
  as	
  PV	
  arrays	
  for	
  
electricity	
  and	
  solar	
  water	
  heat	
  installation	
  
Lighting	
  Efficiency	
   The	
  lighting	
  system	
  in	
  the	
  building	
  will	
  be	
  designed	
  to	
  guide	
  the	
  user	
  to	
  save	
  energy.	
  
Locating	
  in	
  strategic	
  locations	
  will	
  avoid	
  the	
  use	
  of	
  lighting.	
  All	
  fixtures	
  will	
  be	
  LED	
  which	
  
will	
  save	
  on	
  the	
  energy.	
  Occupancy	
  sensors	
  will	
  be	
  installed	
  in	
  electric	
  rooms,	
  mechanical	
  
rooms,	
  and	
  storage	
  areas.	
  Daylight	
  sensor	
  use	
  in	
  commercial	
  areas	
  will	
  avoid	
  the	
  use	
  of	
  
lighting	
  during	
  the	
  day.	
  The	
  installation	
  of	
  shelves	
  on	
  the	
  facade	
  will	
  allow	
  light	
  to	
  reflect	
  
inside	
  the	
  rooms	
  
Indoor	
  Environmental	
  
Quality	
  
The	
  main	
  goal	
  of	
  the	
  interior	
  design	
  will	
  keep	
  with	
  the	
  users’	
  satisfaction	
  and	
  will	
  
primarily	
  be	
  achieved	
  through	
  climate	
  control.	
  One	
  strategy	
  will	
  provide	
  all	
  rooms	
  with	
  
operable	
  windows	
  so	
  the	
  user	
  can	
  adjust	
  interior	
  temperature.	
  The	
  HVAC	
  system	
  will	
  be	
  
installed	
  on	
  the	
  floor	
  allowing	
  the	
  air	
  to	
  be	
  exhausted	
  as	
  the	
  warm	
  air	
  elevates,	
  thus	
  
creating	
  a	
  microclimate.	
  The	
  interior	
  will	
  seek	
  to	
  fulfill	
  biophillic	
  concepts	
  by	
  bringing	
  
nature	
  into	
  the	
  interior	
  of	
  the	
  building.	
  
Water	
  Efficiency	
   We	
  will	
  attempt	
  net	
  zero	
  water	
  usage,	
  while	
  complying	
  with	
  the	
  Philadelphia	
  water	
  
treatment	
  laws.	
  Low	
  flow	
  fixtures,	
  gray	
  water	
  from	
  sinks	
  and	
  showers	
  will	
  save	
  on	
  water	
  
usage.	
  Rainwater	
  collection	
  from	
  non-­‐pervious	
  surfaces	
  will	
  avoid	
  rain	
  water	
  runoff	
  and	
  
will	
  be	
  used	
  for	
  landscaping	
  
Materials	
   Local	
  materials	
  will	
  be	
  used	
  as	
  much	
  as	
  possible	
  in	
  an	
  attempt	
  to	
  support	
  the	
  local	
  
economy	
  and	
  avoid	
  energy	
  wasted	
  on	
  transportation.	
  Special	
  attention	
  will	
  be	
  taken	
  on	
  
interior	
  materials	
  such	
  as	
  no	
  voc	
  &	
  non-­‐carcinogenic	
  materials.	
  
Operations	
  &	
  Maintenance	
   Property	
  management	
  company	
  will	
  handle	
  all	
  leasing	
  and	
  maintenance	
  issues.	
  
Maintenance	
  staff	
  to	
  maintain	
  and	
  care	
  for	
  the	
  vegetated	
  areas	
  including	
  the	
  green	
  
roofs.	
  
Other	
  Key	
  Goals	
   The	
  sustainability	
  goals	
  will	
  be	
  measured	
  by	
  achieving	
  LEED	
  gold	
  certification.	
  This	
  
international	
  benchmark	
  will	
  allow	
  users	
  to	
  recognize	
  the	
  building	
  as	
  environmentally	
  
driven.	
  Additional	
  goals	
  include	
  creating	
  a	
  sense	
  of	
  community	
  among	
  the	
  users	
  with	
  
amenities	
  in	
  indoor	
  and	
  outdoor	
  areas.	
  Areas	
  commonly	
  forgot	
  such	
  as	
  hallways	
  and	
  
stairways	
  will	
  also	
  be	
  spaces	
  that	
  allow	
  for	
  public	
  interaction	
  among	
  neighbors	
  and	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  17	
  
	
  	
  
friends	
  
Budget	
  Considerations:	
   Site	
  Cleanup.	
  Design	
  Fees.	
  Owner	
  Contingency	
  .FF&E.	
  Swing	
  Space	
  Costs.	
  Underground.	
  
Parking.	
  Landscape	
  Design.	
  Green	
  Roof	
  
Project	
  Schedule:	
   Feasibility	
  Phase	
  
Programming	
  Phase	
  
Schematic	
  Design	
  Phase	
  
East	
  Falls	
  Development	
  Corporation	
  
Design	
  Development	
  Phase	
  
Pre-­‐construction	
  Phase	
  
Construction	
  Phase	
  
Closeout	
  Phase	
  
Other	
  Owner	
  
Restrictions/Limitations	
  
Maximum	
  Building	
  Height:	
  55’	
  
Maximum	
  Width	
  Building	
  Frontage	
  on	
  Ridge	
  Avenue:	
  100’	
  
Minimum	
  Occupied	
  Area:	
  55,599	
  sqft	
  
Minimum	
  Side	
  Yard:	
  5	
  ft	
  
Minimum	
  Bicycle	
  Parking	
  Spaces:51	
  
Minimum	
  Off-­‐Street	
  Loading	
  Spaces:4	
  
Maximum	
  Width	
  of	
  Curb	
  Cut:	
  20	
  ft	
  
Community	
  Requirements	
   Our	
  goal	
  is	
  to	
  positively	
  impact	
  the	
  community	
  by	
  turning	
  a	
  blighted	
  lot	
  into	
  a	
  place	
  to	
  
live,	
  work,	
  and	
  play.	
  The	
  development	
  is	
  intended	
  to	
  build	
  upon	
  and	
  compliment	
  The	
  
East	
  Falls	
  Development	
  Corporation	
  (EDC)	
  master	
  plan.	
  Our	
  intent	
  is	
  to	
  connect	
  with	
  the	
  
Wissahickon	
  Station	
  by	
  creating	
  a	
  new	
  transit	
  oriented	
  development	
  along	
  with	
  other	
  
sustainable	
  investments.	
  We	
  plan	
  to	
  protect,	
  enhance,	
  and	
  promote	
  the	
  East	
  Falls	
  
neighborhood	
  and	
  it’s	
  surrounding	
  areas.	
  	
  	
  
Accessibility	
  Requirements	
   The	
  design	
  will	
  meet	
  all	
  ADA	
  requirements	
  ensuring	
  equitable	
  access	
  for	
  all	
  building	
  
occupants	
  and	
  visitors.	
  All	
  systems	
  requiring	
  routine	
  maintenance	
  will	
  be	
  accessible	
  to	
  
ensure	
  proper	
  operation	
  and	
  maintenance.	
  	
  
Security	
  Requirements	
   In	
  order	
  to	
  protect	
  the	
  safety	
  of	
  the	
  residents,	
  a	
  security	
  system	
  with	
  24/7	
  surveillance	
  
will	
  be	
  enabled.	
  In	
  addition	
  to	
  the	
  security	
  system,	
  gates	
  at	
  both	
  entries	
  (Calumet	
  Ridge-­‐	
  
Ridge	
  &	
  Merrick)	
  will	
  have	
  attended	
  security	
  personnel	
  to	
  guarantee	
  safety.	
  	
  
Aesthetics	
  Requirements	
   To	
  keep	
  with	
  the	
  neighborhood	
  character,	
  brick	
  façade	
  will	
  be	
  used	
  along	
  with	
  other	
  
sustainable	
  materials.	
  All	
  commercial	
  interior	
  and	
  exterior	
  with	
  echo	
  the	
  residential	
  for	
  a	
  
cohesive	
  feel.	
  All	
  lighting	
  will	
  be	
  visually	
  appealing	
  and	
  will	
  not	
  permit	
  the	
  use	
  of	
  neon	
  
lighting	
  or	
  signage	
  
Applicable	
  Codes	
  and	
  
Standards	
  
The	
  buildings	
  shall	
  be	
  designed	
  to	
  comply	
  with	
  Philadelphia	
  zoning	
  code	
  for	
  commercial	
  
mixed	
  use.	
  LEED	
  Gold	
  standard	
  will	
  be	
  achieved	
  in	
  the	
  design.	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  18	
  
	
  	
  
Zoning	
  
	
  
	
  
Verde	
  Developers	
  will	
  comply	
  with	
  all	
  C2	
  
Philadelphia	
  zoning	
  codes	
  that	
  pertain	
  to	
  
the	
  site.	
  In	
  addition	
  to	
  Philadelphia	
  
codes,	
  East	
  Falls	
  has	
  an	
  Overlay	
  that	
  aims	
  
to	
  guide	
  development,	
  provide	
  continuity	
  
for	
  businesses,	
  and	
  maintain	
  the	
  
community	
  aesthetic.	
  These	
  guidelines	
  
entail	
  regulations	
  on	
  height,	
  facades,	
  
parking,	
  and	
  lighting.	
  A	
  variance	
  for	
  a	
  
height	
  increase	
  from	
  35	
  feet	
  to	
  45	
  feet	
  
will	
  be	
  issued	
  from	
  the	
  zoning	
  board.	
  We	
  
will	
  comply	
  with	
  all	
  the	
  requirements	
  
regarding	
  lighting	
  and	
  façade.	
  The	
  
parking	
  falls	
  within	
  the	
  by-­‐right	
  uses	
  and	
  
we	
  will	
  comply	
  with	
  all	
  regulations.	
  To	
  
reduce	
  traffic	
  congestion,	
  a	
  new	
  traffic	
  
lane	
  at	
  Ridge	
  Ave	
  &	
  Calumet	
  Street	
  will	
  be	
  constructed	
  to	
  widen	
  the	
  street.	
  Our	
  landscaped	
  design	
  will	
  
address	
  the	
  Kelly	
  Drive,	
  which	
  mandates	
  a	
  berm	
  to	
  be	
  constructed	
  for	
  site	
  protection	
  from	
  flooding	
  
and	
  erosion.	
  In	
  addition	
  to	
  our	
  landscaped	
  area	
  at	
  Kelly	
  Drive	
  and	
  Calumet	
  St,	
  we	
  will	
  have	
  an	
  art	
  
installation	
  at	
  the	
  entrance.	
  Our	
  goal	
  is	
  to	
  enhance	
  the	
  development	
  standards	
  in	
  which	
  the	
  East	
  Falls	
  
Development	
  Corporation	
  seeks	
  to	
  address	
  within	
  its	
  Overlay.	
  	
  
	
  
	
  	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  19	
  
	
  	
  
Zoning	
  Matrix	
  
	
  
	
  
Use	
   permitted	
   proposed	
   proof	
  
parking	
  (private)	
   yes	
   yes	
  
14-­‐303	
  C2	
  2n	
  +	
  14-­‐
1400	
  
commercial	
   yes	
   bakery,	
  groceries,books?	
   14-­‐303	
  C2	
  2b	
  
residential	
   yes	
   1/2	
  apartments	
   14-­‐303	
  C2	
  2a	
  
	
   	
   	
   	
  
Uses	
   	
   	
   	
  
restaurant	
   yes	
   yes	
   14-­‐303	
  C2	
  2p	
  
Farmers	
  Market	
   yes	
   yes	
   14-­‐303	
  C2	
  2f	
  
Laundry	
  (residential	
  use)	
   yes	
   yes	
   14-­‐303	
  C2	
  2u	
  
	
   	
   	
   	
  
	
   	
   	
   	
  
Bulk	
  &	
  Area	
  Regulations	
   required	
   proposed	
   proof	
  
occupied	
  area	
   <80%	
   comply	
   14-­‐303	
  C2	
  4a	
  
open	
  area	
   >20%	
   comply	
   14-­‐303	
  C2	
  4b	
  
Building	
  Set	
  Back	
  Line	
   Min	
  25ft	
  on	
  Kelly	
  	
   comply	
   14-­‐1616	
  6b	
  
Side	
  yard	
   Min	
  5ft	
  refer	
  to	
  14-­‐10412	
   comply	
   14-­‐303	
  C2	
  4d	
  
Rear	
  Yard	
  Setback	
   9ft	
   comply	
   14-­‐303	
  C2	
  4g.2	
  
Rear	
  Yard	
  Area	
   344ft2	
  +100ft2	
  per	
  family	
  after	
  3	
   comply	
   14-­‐303	
  C2	
  4g.3	
  
	
   	
   	
   	
  
Stories	
   	
   	
   	
  
Height	
  Regulations	
   35ft	
  or	
  3strs	
   45ft	
  4	
  flrs	
  request	
  variance	
  	
   14-­‐303	
  C2	
  5a	
  
Off	
  Street	
  Loading	
  (OSL)	
   1	
  per	
  -­‐100,000-­‐150,001	
  sq	
   comply	
   14.4091	
  
OSL	
  dimensions	
   	
   	
   	
  
Off	
  Street	
  parking	
   no	
   no	
   9-­‐600(f)1	
  
Off	
  Street	
  parking,	
  handicap	
   no	
   no	
   9-­‐600f	
  
Parking	
  Stall	
  Size	
   8.5x18ft	
   comply	
   14-­‐1400	
  3a	
  
Parking	
  Stall	
  Size	
   8.5x18ft	
   smart	
  car	
  spaces	
  6x10ft	
   14-­‐405	
  (4)-­‐A2	
  
Bicycle	
  racks	
   entry	
  way	
  for	
  required	
  #	
  of	
  spaces	
   same	
   14-­‐405-­‐d2	
  
Signs	
   yes	
   i	
  guess?	
   14-­‐1616	
  10	
  
total	
  allowed	
  SF	
   3ft2/ft	
  frontage	
   comply	
   14-­‐1616	
  10d	
  
Sign	
  Height	
  
6ft	
  if	
  free	
  standing	
  <150ft	
  if	
  
iluminated	
   comply	
  
14-­‐1616	
  10e.1.c	
  +	
  14-­‐
303	
  c2	
  8e	
  
	
   	
   	
   	
  
cornice	
  ht	
  	
   >25ft	
   comply	
   14-­‐1616	
  5a	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  20	
  
	
  	
  
curb	
  cuts,	
  number	
   Prohibited	
  on	
  Kelly	
  1	
  every	
  100ft	
   comply	
   14-­‐1616	
  8c	
  
curb	
  cuts,	
  width	
   Max	
  20ft	
   comply	
   14-­‐1616	
  8c	
  
Building	
  Width	
   <100ft	
  on	
  Ridge	
   comply	
   14-­‐1616	
  7a.1	
  
	
   	
   	
   	
  
Garage	
   required	
   proposed	
   proof	
  
accessory	
  garage	
  permitted	
   	
   	
   14-­‐1402a	
  
driveway	
  &	
  aisle	
  
no	
  more	
  than	
  25%	
  of	
  total	
  garage	
  
area	
   same	
   14-­‐403	
  9(a)1	
  
Parking	
   	
   	
   	
  
retail	
   1	
  per	
  1000	
  gsf	
   0.5	
   	
  
residential	
   1	
  per	
  dwelling	
   150	
   14-­‐1402	
  (a)1	
  
Handicap	
  Pkg	
   required	
   proposed	
   proof	
  
retail/office	
   1	
   1	
   14-­‐1401-­‐3	
  
residential	
   5	
   5	
   14-­‐1401-­‐3	
  
parking	
  lot	
   	
   	
   	
  
van	
   19	
   19	
   14-­‐1401a	
  
	
   	
   	
   	
  
Misc	
   required	
   proposed	
   proof	
  
	
   	
   	
   	
  
landscape	
  street	
  
minium	
  18ft	
  wide	
  landscaped	
  area	
  
along	
  entire	
  frontage	
  area	
  of	
  Kelly	
  
Drive	
  
18ft	
  wide	
  landscaped	
  area	
   14-­‐503(2)(b)	
  
landscape	
  interior	
   	
   	
   	
  
lighting	
   	
   	
   	
  
lighting	
   	
   	
   	
  
trash	
  
enclosed	
  trash	
  storage	
  area	
  
located	
  within	
  building	
  or	
  on	
  
building	
  lot	
  
comply	
   14-­‐1616	
  9a	
  
	
   	
   	
   	
  
bikes	
   required	
   proposed	
   proof	
  
Class	
  1	
   1	
  per	
  every	
  3	
  parking	
  spaces	
   3	
  per	
  every	
  3	
  parking	
   14-­‐1401i	
  
Signs	
   sf	
  allowed	
   	
   	
  
accessory	
  signs	
  permitted	
   	
   	
   14.410-­‐(1)a	
  
non-­‐accessory	
  not	
  permitted	
   	
   	
   14.410-­‐(3)i	
  
	
  
	
  
	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  21	
  
	
  	
  
	
  
Design	
  Proposal	
  	
  
	
  
	
  
	
  
	
  
The	
  design	
  proposed	
  for	
  the	
  new	
  apartment	
  complex	
  at	
  the	
  previous	
  Rivage	
  site	
  will	
  be	
  
environmentally	
  oriented,	
  embracing	
  the	
  three	
  branches	
  of	
  Sustainability:	
  Planet,	
  People	
  and	
  Profit.	
  
The	
  Arbor	
  at	
  East	
  Falls	
  will	
  be	
  more	
  efficient	
  by	
  saving	
  energy,	
  water,	
  and	
  using	
  non-­‐harmful	
  materials.	
  
It	
  will	
  include	
  the	
  neighborhood	
  to	
  create	
  a	
  community	
  friendly	
  meeting	
  space,	
  and	
  it	
  will	
  be	
  
economically	
  affordable	
  for	
  both	
  the	
  developer	
  and	
  the	
  end	
  user	
  (utility	
  bills).	
  
Four	
  separate	
  form	
  the	
  complex	
  with	
  an	
  interior	
  courtyard	
  for	
  public	
  use.	
  The	
  courtyard	
  will	
  serve	
  as	
  
an	
  area	
  for	
  ground	
  floor	
  commercial	
  use	
  as	
  well.	
  The	
  separation	
  between	
  buildings	
  will	
  allow	
  people	
  to	
  
walk	
  through	
  the	
  complex,	
  shortening	
  the	
  distances	
  created	
  by	
  mega	
  block	
  cities	
  like	
  Philadelphia.	
  
The	
  south	
  part	
  of	
  the	
  complex	
  will	
  respond	
  to	
  its	
  natural	
  surroundings	
  with	
  a	
  vegetated	
  berm	
  and	
  a	
  
rain	
  garden	
  on	
  the	
  lowest	
  area	
  of	
  the	
  site,	
  these	
  strategies	
  will	
  serve	
  not	
  only	
  for	
  aesthetical	
  purposes	
  
but	
  will	
  help	
  with	
  storm	
  water	
  retention	
  and	
  flooding	
  problems.	
  
	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  22	
  
	
  	
  
Rain	
  garden	
  
Plan	
  Views	
  	
  
	
  
Ground	
  floor	
  -­‐	
  Retail	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
The	
  first	
  floor	
  of	
  the	
  complex	
  will	
  be	
  dedicated	
  to	
  retail,	
  adding	
  a	
  variety	
  of	
  uses	
  to	
  the	
  community.	
  
Coffee	
  shops,	
  restaurants,	
  gym,	
  laundry	
  service,	
  and	
  a	
  grocery	
  store	
  will	
  be	
  among	
  said	
  uses.	
  	
  
All	
  shops	
  and	
  the	
  courtyard	
  will	
  be	
  accessible	
  for	
  the	
  whole	
  community,	
  providing	
  a	
  meeting	
  space	
  
with	
  a	
  small	
  covered	
  area	
  for	
  events.	
  On	
  Kelly	
  Drive,	
  there	
  will	
  be	
  an	
  outdoor	
  terrace	
  using	
  the	
  
required	
  vegetated	
  berm	
  as	
  landscape	
  to	
  be	
  used	
  by	
  restaurants	
  and	
  coffee	
  shops.	
  The	
  main	
  car	
  access	
  
will	
  be	
  through	
  Ridge	
  Avenue,	
  providing	
  access	
  to	
  residents	
  and	
  visitors	
  to	
  the	
  underground	
  parking	
  
which	
  will	
  serve	
  as	
  a	
  loading	
  dock	
  for	
  commercial	
  needs.	
  	
  
	
  
	
  
	
  
	
  
	
  
Loading	
  
Shaded	
  event	
  area	
  
Underground	
  
Parking	
  access	
  
Central	
  Courtyard	
  
Terrace	
  
Vegetated	
  Berm	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  23	
  
	
  	
  
Maple	
  
Willow	
  
Birch	
  
Oak	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
The	
  three	
  residential	
  levels	
   will	
  include	
  studio,	
  
one,	
  two,	
  and	
  three	
  bedroom	
  apartments,	
  which	
  will	
  target	
  the	
  diverse	
  community	
  of	
  East	
  Falls.	
  The	
  
apartment	
  size	
  will	
  remain	
  the	
  same	
  in	
  each	
  building,	
  but	
  larger	
  apartments	
  will	
  be	
  on	
  the	
  corners.	
  The	
  
rental	
  prices	
  will	
  be	
  higher	
  on	
  the	
  exterior	
  façade	
  of	
  Oak	
  and	
  Birch	
  due	
  to	
  the	
  views	
  of	
  the	
  City	
  and	
  
Schuylkill	
  River.	
  Maple	
  building	
  will	
  have	
  a	
  laundry	
  room,	
  laminate	
  floors	
  and	
  quartz	
  countertops.	
  Oak,	
  
Birch	
  and	
  Willow	
  will	
  have	
  a	
  washer/dryer	
  in	
  each	
  unit,	
  wood	
  floors	
  and	
  granite	
  countertops.	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Floors	
  2-­‐4	
  
Residential	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  24	
  
	
  	
  
Underground	
  Parking	
  
	
  
The	
  complex	
  will	
  have	
  two	
  levels	
  of	
  underground	
  
parking:	
  The	
  lower	
  level	
  will	
  be	
  designated	
  for	
  
residents,	
  this	
  way	
  a	
  secure	
  access	
  can	
  be	
  assured.	
  
150	
  spots	
  will	
  make	
  for	
  1.5	
  per	
  dwelling	
  unit;	
  this	
  
will	
  serve	
  guests	
  as	
  well.	
  	
  
	
  
The	
  first	
  level	
  will	
  be	
  for	
  commercial	
  use	
  and	
  
community.	
  We	
  realized	
  that	
  there	
  is	
  an	
  existing	
  
need	
  for	
  parking	
  space	
  in	
  the	
  surrounding	
  areas	
  
where	
  street	
  parking	
  is	
  not	
  enough.	
  135	
  spots	
  at	
  
this	
  level	
  will	
  serve	
  this	
  income	
  opportunity	
  as	
  well	
  
as	
  retail	
  visitors.	
  	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
CalumetSt	
  
Ridge Ave	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  25	
  
	
  	
  
	
  
3D	
  Views	
  	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
View	
  from	
  Kelly	
  Drive	
  and	
  Calumet	
  Street	
  
Interior	
  Courtyard	
  	
  
	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  26	
  
	
  	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
View	
  from	
  Ridge	
  Ave.	
  
	
  
Interior	
  Courtyard	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  27	
  
	
  	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Art	
  piece	
  –	
  shaped	
  as	
  a	
  water	
  drop	
  and	
  made	
  out	
  of	
  wood	
  it	
  symbolizes	
  nature	
  in	
  community	
  	
  
	
  
	
  
Shaded	
  even	
  area	
  
	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  28	
  
	
  	
  
	
  
Market	
  Analysis	
  
	
  
	
  
Demographics	
  
	
  
	
  
East	
  Falls	
  residents	
  are	
  proud	
  of	
  their	
  community	
  and	
  want	
  to	
  enjoy	
  all	
  
the	
  perks	
  that	
  come	
  with	
  living	
  close	
  to	
  Center	
  City.	
  The	
  East	
  Falls	
  
Master	
  Plan	
  is	
  designed	
  for	
  the	
  current	
  and	
  future	
  residents	
  to	
  
promote	
  sustainable	
  growth	
  within	
  the	
  entire	
  East	
  Falls	
  area.	
  As	
  a	
  
result,	
  the	
  following	
  demographic	
  profile	
  is	
  for	
  East	
  Falls	
  area	
  as	
  a	
  
whole.	
  	
  
	
  
The	
  entire	
  East	
  Falls	
  neighborhood	
  is	
  1.45	
  square	
  miles	
  with	
  a	
  
population	
  of	
  14,493.	
  The	
  median	
  age	
  of	
  the	
  population	
  is	
  31	
  years.	
  
Within	
  the	
  past	
  decade,	
  East	
  Falls	
  has	
  seen	
  an	
  increase	
  in	
  residents	
  
between	
  the	
  ages	
  of	
  18	
  –	
  34,	
  making	
  it	
  a	
  growing	
  center	
  for	
  younger	
  professionals.	
  Currently,	
  40%	
  of	
  
its	
  residents	
  fall	
  between	
  these	
  ages	
  (eastfallsdevelopment.org).	
  	
  
	
  
For	
  many	
  of	
  East	
  Falls	
  residents	
  the	
  median	
  household	
  income	
  is	
  almost	
  double	
  for	
  that	
  of	
  Philadelphia	
  
($53,228	
  vs.	
  $30,746).	
  East	
  Falls	
  is	
  centrally	
  located	
  between	
  Center	
  City	
  and	
  the	
  suburbs,	
  making	
  the	
  
neighborhood	
  attractive	
  to	
  working	
  families.	
  East	
  Falls	
  median	
  income	
  is	
  over	
  75,000	
  and	
  many	
  of	
  the	
  
residents	
  have	
  a	
  college	
  degree	
  or	
  higher	
  (eastfallsdevelopment.org).	
  	
  	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  29	
  
	
  	
  
Rental	
  Market	
  
	
  
	
  
The	
  most	
  recent	
  comparison	
  of	
  rental	
  data	
  reveals	
  a	
  strong	
  residential	
  rental	
  market.	
  Rentals	
  are	
  up	
  
compared	
  to	
  Philadelphia	
  County.	
  Even	
  more	
  promising	
  results	
  have	
  been	
  seen	
  in	
  the	
  average	
  
marketing	
  period	
  for	
  a	
  rental	
  listing.	
  Overall,	
  the	
  market	
  is	
  prime	
  for	
  investment	
  and	
  development,	
  and	
  
investors	
  can	
  feel	
  secure	
  in	
  knowing	
  the	
  market	
  has	
  been	
  consistent	
  (city-­‐data.org).
	
  
	
  	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Median	
  rent	
  in	
  2011:	
  
	
  
East	
  Falls:	
   $891	
  
Philadelphia:	
   $691	
  
	
  
	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  30	
  
	
  	
  
	
  
	
  
Rental	
  Comparisons	
  
	
  
Included	
  in	
  the	
  rental	
  comparisons	
  are	
  both	
  single	
  unit	
  rentals	
  and	
  apartment	
  buildings.	
  In	
  order	
  to	
  
grasp	
  a	
  true	
  understanding	
  of	
  the	
  rental	
  market	
  both	
  types	
  of	
  units	
  were	
  considered.	
  Our	
  findings	
  
reveal	
  that	
  single	
  style	
  apartments	
  and	
  houses	
  do	
  not	
  offer	
  the	
  same	
  amenities	
  and	
  will	
  not	
  target	
  our	
  
demographic	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  31	
  
	
  	
  
Apartment	
  Buildings	
  
	
  
Sherman	
  Mills	
  
Sherman	
  Mills	
  is	
  located	
  in	
  East	
  Falls	
  just	
  off	
  
Kelly	
  Drive	
  near	
  the	
  Route	
  1	
  and	
  Ridge	
  
Avenue	
  interchange.	
  This	
  community	
  is	
  
comprised	
  of	
  loft	
  style	
  apartments	
  with	
  an	
  
eclectic	
  style.	
  Due	
  to	
  the	
  distinct	
  nature	
  of	
  
loft	
  style	
  living,	
  we	
  do	
  not	
  feel	
  Sherman	
  Mills	
  
lofts	
  are	
  in	
  direct	
  competition	
  with	
  The	
  Arbor	
  
at	
  East	
  Falls.	
  	
  	
  
	
  
	
  
	
  
Loft	
  Style	
   Square	
  footage	
   Price	
  
Unit	
  1632	
   1,727	
   $1,790	
  
Unit	
  1634	
   1,500	
   $1750	
  
Unit	
  1322	
   724	
   $1,275	
  
Shermanmills.net	
  
	
  
	
  	
  	
  	
  	
  Dobson	
  Mills	
  
	
  
	
  
Located	
  in	
  East	
  Falls	
  and	
  less	
  than	
  a	
  block	
  from	
  Kelly	
  Drive.	
  	
  
Based	
  on	
  the	
  comparison	
  of	
  rental	
  units	
  within	
  one	
  mile	
  of	
  
the	
  site;	
  all	
  amenities,	
  utilities	
  and	
  location	
  were	
  
considered;	
  Dobson	
  Mills	
  is	
  most	
  comparable	
  in	
  pricing	
  
The	
  Arbor	
  at	
  East	
  Falls.	
  	
  
	
  
	
  
	
  
	
  
	
  
	
  
dobsonmills.net	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  32	
  
	
  	
  
	
  
Rental	
  Prices	
  for	
  The	
  Arbor	
  
	
  
Maple:	
  
Affordable	
  Rate	
  Housing	
  
Bedrooms	
   Square	
  footage	
   Rental	
  Price	
  
Studio	
   475	
  sq	
  ft	
   $895	
  
One	
  Bedroom	
   750	
  sq	
  ft	
   $1495	
  
Two	
  Bedroom	
   1250	
  sq	
  ft	
   $1995	
  
	
  
Oak	
  and	
  Willow:	
  
Market	
  Rate	
  Housing	
  
Bedrooms	
   Square	
  footage	
   Rental	
  Price	
  
Studio	
   475	
  sq	
  ft	
   $895	
  
One	
  Bedroom	
   750	
  sq	
  ft	
   $1495	
  
One	
  Bedroom	
  w/	
  
den	
  
900	
  sq	
  ft	
   $1795	
  
Two	
  Bedroom	
   1250	
  sq	
  ft	
   $1995	
  
	
  
Birch:	
  
Market	
  Rate	
  Housing	
  
Bedrooms	
   Square	
  footage	
   Rental	
  Price	
  
Studio	
   475	
  sq	
  ft	
   $895	
  
One	
  Bedroom	
   750	
  sq	
  ft	
   $1495	
  
Two	
  Bedroom	
   1250	
  sq	
  ft	
   $1995	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  33	
  
	
  	
  
	
  
Transportation	
  Analysis	
  
	
  
	
  
The	
  site	
  is	
  accessible	
  by	
  both	
  Septa	
  Bus	
  and	
  Regional	
  Rail	
  as	
  well	
  as	
  Indego	
  bike	
  share.	
  Although	
  the	
  
primary	
  mode	
  of	
  transportation	
  is	
  by	
  vehicle	
  and	
  we	
  aim	
  to	
  modify	
  this	
  substantially.	
  By	
  utilizing	
  the	
  
access	
  to	
  the	
  bus,	
  rail	
  and	
  bicycle	
  the	
  project	
  plans	
  to	
  interconnect	
  East	
  Falls	
  with	
  Wisshahickon	
  
transfer	
  station,	
  Manayunk	
  and	
  Roxborough.	
  This	
  focus	
  on	
  transit	
  access	
  will	
  provide	
  the	
  vehicle	
  from	
  
which	
  investors	
  can	
  spawn	
  opportunities	
  for	
  sustainable	
  growth	
  and	
  development.	
  	
  
	
  
Bus	
  Lines:	
  	
  
•	
  61	
  –	
  9th	
  market	
  to	
  Manayunk	
  	
  
•	
  R	
  –	
  Henry	
  Ave-­‐Midvale	
  and	
  Wissahickon	
  Transportation	
  Center	
  to	
  
Frankford	
  Transportation	
  Center	
  
•	
  K	
  –	
  Ridge	
  Ave	
  -­‐Midvale	
  to	
  Arrott	
  Transportation	
  Center	
  
The	
  Wissahickon	
  Transfer	
  Station	
  is	
  nearby	
  as	
  well	
  
Two	
  Regional	
  Rail	
  stops	
  provide	
  access	
  to	
  East	
  Falls.	
  
(eastfallsdevelopment.org)	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  34	
  
	
  	
  
Transportation	
  Map	
  
	
  
	
  
	
  
	
  
Commute	
  times	
  to	
  Philadelphia	
  Center	
  City	
  	
  
	
  
	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  35	
  
	
  	
  
walkscore.com	
  
	
  
Transportation	
  times	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Distance	
  traveled	
  in	
  20min	
  by:	
  Bicycle	
  
	
  
	
  
Distance	
  traveled	
  in	
  20min	
  by:	
  
Walking	
  
	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  36	
  
	
  	
  
walkscore.com	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Distance	
  traveled	
  in	
  20min	
  by:	
  Bus	
  
	
  
Distance	
  traveled	
  in	
  20min	
  by:	
  Car	
  
	
  
	
  
Walkscore.com	
  
	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  37	
  
	
  	
  
Community	
  Services	
  
	
  
	
  
	
  
The	
  Arbor	
  at	
  East	
  Falls	
  is	
  conveniently	
  located	
  a	
  short	
  distance	
  from	
  several	
  diverse	
  services.	
  Residents	
  
could	
  easily	
  run	
  most	
  errands	
  on	
  foot	
  or	
  bicycle	
  since	
  the	
  community	
  has	
  excellent	
  biking	
  lanes	
  and	
  will	
  
be	
  soon	
  included	
  in	
  the	
  Bike	
  Share	
  program.	
  As	
  shown	
  in	
  the	
  previous	
  map,	
  the	
  site	
  also	
  has	
  
accessibility	
  to	
  public	
  transportation	
  such	
  as	
  5	
  bus	
  lines	
  and	
  2	
  rail	
  lines.	
  
	
  
The	
  variety	
  of	
  uses	
  around	
  the	
  site	
  makes	
  it	
  the	
  perfect	
  spot	
  to	
  live,	
  work,	
  and	
  play.	
  
	
  
	
  
	
  
	
  
	
  
	
  
walkscore.com	
  
	
  
	
  
	
  
	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  38	
  
	
  	
  
Sustainability	
  	
  
	
  
The	
  apartment	
  complex	
  will	
  be	
  designed	
  around	
  sustainable	
  strategies,	
  some	
  of	
  the	
  passive	
  
applications	
  responding	
  to	
  the	
  local	
  climate	
  and	
  other	
  active	
  devices,	
  such	
  as	
  solar	
  PV	
  arrays,	
  to	
  help	
  
the	
  residences	
  be	
  environmentally	
  aware.	
  To	
  fully	
  achieve	
  sustainability	
  the	
  building	
  will	
  be	
  LEED	
  Gold	
  
certified,	
  which	
  will	
  decrease	
  energy,	
  water	
  usage,	
  and	
  waste.	
  	
  
	
  
LEED	
  certification	
  will	
  increase	
  the	
  market	
  value	
  of	
  the	
  property;	
  users	
  nowadays	
  seek	
  for	
  this	
  type	
  of	
  
credentials	
  in	
  buildings	
  and	
  studies	
  show	
  that	
  LEED	
  certified	
  buildings	
  are	
  occupied	
  up	
  to	
  98%.	
  
These	
  sustainability	
  strategies	
  will	
  be	
  implemented:	
  
Passive	
  Strategies	
  
•	
  East	
  –	
  West	
  Orientation	
  will	
  minimize	
  heat	
  gain	
  during	
  sun	
  lowest	
  hours.	
  
•	
  Use	
  of	
  external	
  shading	
  will	
  block	
  the	
  sun	
  during	
  the	
  summer	
  when	
  the	
  sun	
  is	
  higher,	
  and	
  will	
  still	
  
allow	
  the	
  rays	
  to	
  heat	
  during	
  the	
  winter	
  low	
  sun	
  angles.	
  
•	
  The	
  courtyard	
  will	
  be	
  shaded	
  to	
  create	
  a	
  comfortable	
  outdoor	
  space	
  
	
  
Water	
  Efficiency	
  
•	
  Green	
  Roofs	
  will	
  contribute	
  to	
  the	
  storm	
  water	
  management	
  of	
  the	
  site,	
  as	
  well	
  as	
  provide	
  
recreational	
  areas	
  with	
  great	
  views	
  for	
  residents.	
  
•	
  Rain	
  garden	
  will	
  serve	
  as	
  storm	
  water	
  management	
  as	
  well	
  as	
  flooding	
  prevention,	
  and	
  will	
  give	
  a	
  
nice	
  view	
  of	
  the	
  complex	
  from	
  Kelly	
  drive.	
  
•	
  40%	
  water	
  use	
  reduction	
  through	
  low-­‐flow	
  fixtures	
  installed	
  in	
  all	
  units.	
  
- Reuse	
  of	
  rainwater	
  collected	
  from	
  impervious	
  surfaces	
  for	
  WC	
  and	
  landscape.	
  
	
  
Energy	
  
•	
  High	
  performance	
  building	
  envelope,	
  creating	
  an	
  interior	
  microclimate	
  keeping	
  a	
  comfortable	
  
indoor	
  temperature	
  and	
  humidity	
  with	
  less	
  HVAC	
  usage.	
  
•	
  High	
  efficiency	
  mechanical	
  systems,	
  which	
  will	
  save	
  C02	
  emissions	
  and	
  utility	
  fees.	
  
•	
  Programmable	
  thermostats	
  in	
  each	
  unit.	
  
•	
  Sub-­‐meters	
  for	
  electrical	
  utility.	
  
•	
  ENERGY	
  STAR®	
  lighting	
  and	
  appliances.	
  
•	
  Solar	
  panels.	
  
	
  
Indoor	
  Air	
  Quality	
  
•	
  Low-­‐VOC	
  paints,	
  primers	
  and	
  finishes.	
  
•	
  High	
  efficiency	
  operable	
  triple	
  glazed	
  and	
  low-­‐E	
  windows.	
  
•	
  Green	
  Label	
  carpets.	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  39	
  
	
  	
  
LEED	
  Scorecard	
  +	
  Backup	
  files	
  
	
   	
  
	
  
	
  
	
  
	
  	
  
	
   	
   	
   	
   	
   	
   	
   	
  
	
   	
   	
   	
   	
   	
  
	
   	
   	
   	
  
LEED v4 for BD+C: New Construction and Major
Renovation	
   	
   	
   	
   	
  
	
   	
   	
   	
   VERDE developers	
   	
   	
   	
   Project Name:	
   The Arbor at East Falls	
  
	
   	
   	
   	
   	
   	
   	
   	
   	
   	
   Date:	
   16-Jul 15	
   	
  
	
  
	
  
	
   Y	
   ?	
   N	
   	
  
	
  1	
   	
   	
   Credit	
   Integrative Process	
   1	
  
	
   	
   	
   	
   	
   	
   	
   	
   	
  
	
   1
2	
   4	
   1
6	
   Location and Transportation	
   	
   16	
  
	
   	
   	
   1
6	
   Credit	
   LEED for Neighborhood Development
Location	
   16	
  
	
   	
   1	
   	
   Credit	
   Sensitive Land Protection	
   1	
  
	
   	
   2	
   	
   Credit	
   High Priority Site	
   2	
  
	
   5	
   	
   	
   Credit	
   Surrounding Density and Diverse Uses	
   5	
  
	
   5	
   	
   	
   Credit	
   Access to Quality Transit	
   5	
  
	
   1	
   	
   	
   Credit	
   Bicycle Facilities	
   1	
  
	
   1	
   	
   	
   Credit	
   Reduced Parking Footprint	
   1	
  
	
   	
   1	
   	
   Credit	
   Green Vehicles	
   	
   1	
  
	
   	
   	
   	
   	
   	
   	
   	
   	
  
	
   7	
   1	
   0	
   Sustainable Sites	
   	
   10	
  
	
   Y	
   	
   	
   Prereq	
   Construction Activity Pollution Prevention	
   Required	
  
	
   1	
   	
   	
   Credit	
   Site Assessment	
   1	
  
	
   	
   1	
   	
   Credit	
   Site Development - Protect or Restore
Habitat	
   2	
  
	
   1	
   	
   	
   Credit	
   Open Space	
   1	
  
	
   2	
   	
   	
   Credit	
   Rainwater Management	
   3	
  
	
   2	
   	
   	
   Credit	
   Heat Island Reduction	
   2	
  
	
   1	
   	
   	
   Credit	
   Light Pollution Reduction	
   1	
  
	
   	
   	
   	
   	
   	
   	
   	
   	
  
	
   8	
   0	
   0	
   Water Efficiency	
   	
   11	
  
	
   Y	
   	
   	
   Prereq	
   Outdoor Water Use Reduction	
   Required	
  
	
   Y	
   	
   	
   Prereq	
   Indoor Water Use Reduction	
   Required	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  40	
  
	
  	
  
	
   Y	
   	
   	
   Prereq	
   Building-Level Water
Metering	
   	
   Required	
  
	
   1	
   	
   	
   Credit	
   Outdoor Water Use Reduction	
   2	
  
	
   4	
   	
   	
   Credit	
   Indoor Water Use Reduction	
   6	
  
	
   2	
   	
   	
   Credit	
   Cooling Tower Water Use	
   2	
  
	
   1	
   	
   	
   Credit	
   Water Metering	
   	
   1	
  
	
   	
   	
   	
   	
   	
   	
   	
   	
  
	
   1
6	
   9	
   3	
   Energy and Atmosphere	
   	
   33	
  
	
   Y	
   	
   	
   Prereq	
   Fundamental Commissioning and
Verification	
   Required	
  
	
   Y	
   	
   	
   Prereq	
   Minimum Energy Performance	
   Required	
  
	
   Y	
   	
   	
   Prereq	
   Building-Level Energy Metering	
   Required	
  
	
   Y	
   	
   	
   Prereq	
   Fundamental Refrigerant Management	
   Required	
  
	
   3	
   3	
   	
   Credit	
   Enhanced Commissioning	
   6	
  
	
   9	
   6	
   	
   Credit	
   Optimize Energy Performance	
   18	
  
	
   	
   	
   1	
   Credit	
   Advanced Energy Metering	
   1	
  
	
   	
   	
   2	
   Credit	
   Demand Response	
   2	
  
	
   2	
   	
   	
   Credit	
   Renewable Energy Production	
   3	
  
	
   1	
   	
   	
   Credit	
   Enhanced Refrigerant Management	
   1	
  
	
   1	
   	
   	
   Credit	
   Green Power and Carbon Offsets	
   2	
  
	
  
	
  
5	
   0	
   5	
   Materials and Resources	
   	
   13	
  
Y	
   	
   	
   Prereq	
   Storage and Collection of Recyclables	
   Required	
  
Y	
   	
   	
   Prereq	
   Construction and Demolition Waste
Management Planning	
   Required	
  
	
   	
   5	
   Credit	
   Building Life-Cycle Impact Reduction	
   5	
  
1	
   	
   	
   Credit	
  
Building Product Disclosure and
Optimization - Environmental Product
Declarations	
  
2	
  
1	
   	
   	
   Credit	
   Building Product Disclosure and
Optimization - Sourcing of Raw Materials	
   2	
  
1	
   	
   	
   Credit	
   Building Product Disclosure and
Optimization - Material Ingredients 	
   2	
  
2	
   	
   	
   Credit	
   Construction and Demolition Waste
Management 	
   2	
  
	
   	
   	
   	
   	
   	
   	
   	
  
1
6	
   0	
   0	
   Indoor Environmental Quality	
   	
   16	
  
Y	
   	
   	
   Prereq	
   Minimum Indoor Air Quality Performance	
   Required	
  
Y	
   	
   	
   Prereq	
   Environmental Tobacco Smoke Control	
   Required	
  
2	
   	
   	
   Credit	
   Enhanced Indoor Air Quality Strategies	
   2	
  
3	
   	
   	
   Credit	
   Low-Emitting Materials	
   3	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  41	
  
	
  	
  
1	
   	
   	
   Credit	
   Construction Indoor Air Quality
Management Plan	
   	
   1	
  
2	
   	
   	
   Credit	
   Indoor Air Quality Assessment	
   2	
  
1	
   	
   	
   Credit	
   Thermal Comfort	
   1	
  
2	
   	
   	
   Credit	
   Interior Lighting	
   2	
  
3	
   	
   	
   Credit	
   Daylight	
   3	
  
1	
   	
   	
   Credit	
   Quality Views	
   1	
  
1	
   	
   	
   Credit	
   Acoustic Performance	
   1	
  
	
   	
   	
   	
   	
   	
   	
   	
  
0	
   0	
   6	
   Innovation	
   	
   	
   6	
  
	
   	
   5	
   Credit	
   Innovation 	
   5	
  
	
   	
   1	
   Credit	
   LEED Accredited Professional	
   1	
  
	
   	
   	
   	
   	
   	
   	
   	
  
0	
   0	
   4	
   Regional Priority	
   	
   	
   4	
  
	
   	
   1	
   Credit	
   Regional Priority: Specific Credit	
   	
   1	
  
	
   	
   1	
   Credit	
   Regional Priority: Specific Credit	
   	
   1	
  
	
   	
   1	
   Credit	
   Regional Priority: Specific Credit	
   	
   1	
  
	
   	
   1	
   Credit	
   Regional Priority: Specific Credit	
   	
   1	
  
	
   	
   	
   	
   	
   	
   	
   	
  
65	
   14	
   34	
   TOTALS	
   	
   Possible
Points: 	
   110	
  
Location	
  and	
  Transportation	
  
Credit	
  –	
  Surrounding	
  Density	
  and	
  Diverse	
  Uses	
  
	
   This	
  credit	
  will	
  be	
  achieved	
  by	
  the	
  great	
  diversity	
  of	
  existing	
  uses	
  surrounding	
  the	
  site.	
  	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  42	
  
	
  	
  
Credit	
  -­‐	
  Access	
  to	
  Quality	
  Transit	
  
	
   The	
  site	
  has	
  access	
  to	
  5	
  bus	
  lines	
  and	
  1	
  regional	
  rail	
  line	
  in	
  less	
  than	
  5mi.	
  	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Commute	
  times	
  to	
  Philadelphia	
  Center	
  City	
  	
  
	
  
	
  
	
  
	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  43	
  
	
  	
  
	
  
	
  
	
  
Credit	
  -­‐Bicycle	
  Facilities	
  
The	
  project	
  will	
  achieve	
  this	
  credit	
  providing	
  2.5%	
  of	
  retail	
  visitors	
  with	
  short-­‐term	
  bike	
  racks.	
  For	
  
residential,	
  the	
  project	
  will	
  follow	
  the	
  4	
  spaces	
  min	
  per	
  building,	
  totaling	
  12	
  spaces	
  for	
  guests.	
  Long-­‐
term	
  bicycle	
  storage	
  will	
  be	
  provided	
  for	
  30%	
  of	
  the	
  buildings	
  residences.	
  	
  
	
  
No	
  showers	
  for	
  public	
  use	
  will	
  be	
  provided	
  since	
  the	
  commercial	
  use	
  is	
  mainly	
  short	
  stay	
  shopping.	
  
Said	
  bike	
  racks	
  will	
  be	
  strategically	
  located	
  in	
  the	
  entrance	
  to	
  the	
  buildings,	
  100	
  yards	
  away	
  from	
  either	
  
Ridge	
  Avenue	
  or	
  Kelly	
  Drive.	
  Designated	
  bike	
  lanes	
  are	
  less	
  than	
  200	
  yards	
  on	
  Kelly	
  Drive	
  and	
  they	
  
connect	
  to	
  the	
  bike	
  lane	
  grid	
  of	
  Philadelphia.	
  
	
  
East	
  Falls	
  is	
  considered	
  for	
  next	
  phase	
  of	
  Philly	
  Bike	
  Share	
  program	
  Indego,	
  which	
  will	
  benefit	
  the	
  
growing	
  and	
  maintenance	
  of	
  the	
  biking	
  infrastructure.	
  
	
  
Credit	
  -­‐	
  Reduced	
  Parking	
  Footprint	
  
This	
  credit	
  will	
  be	
  achieved	
  by	
  not	
  exceeding	
  the	
  Philadelphia	
  code	
  for	
  parking	
  spaces.	
  (One	
  space	
  per	
  
dwelling	
  units)	
  and	
  locate	
  the	
  entire	
  parking	
  structure	
  underground.	
  This	
  will	
  minimize	
  the	
  total	
  
footprint	
  of	
  the	
  project,	
  decrease	
  the	
  amount	
  of	
  impervious	
  materials,	
  and	
  will	
  help	
  to	
  decrease	
  the	
  
heat	
  island	
  effect.	
  Apart	
  from	
  the	
  spaces	
  designated	
  for	
  wheelchair	
  use,	
  there	
  will	
  be	
  spaces	
  for	
  car	
  
pool	
  and	
  5%	
  of	
  spots	
  for	
  alternative	
  fuel	
  cars	
  in	
  preferred	
  locations.	
  
	
  
	
  
Sustainable	
  Sites	
  
	
  
Credit	
  -­‐	
  Site	
  Assessment	
  
Site	
  analysis	
  was	
  engaged	
  early	
  in	
  the	
  of	
  the	
  project	
  process.	
  This	
  will	
  alow	
  the	
  architects	
  to	
  use	
  the	
  
existing	
  infrastructure	
  and	
  orient	
  the	
  buildings	
  correctly.	
  	
  
	
  
Credit	
  -­‐	
  Open	
  Space	
  
35%	
  of	
  the	
  space	
  is	
  open	
  in	
  the	
  project.	
  Most	
  of	
  the	
  open	
  space	
  is	
  on	
  Kelly	
  Drive	
  facing	
  the	
  Schuylkill	
  
River	
  used	
  by	
  a	
  vegetated	
  berm,	
  rain	
  garden	
  and	
  terrace,	
  and	
  the	
  rest	
  is	
  in	
  the	
  courtyard,	
  allowing	
  the	
  
complex	
  to	
  have	
  its	
  own	
  microclimate	
  because	
  of	
  the	
  vegetation	
  and	
  shade,	
  also	
  helps	
  to	
  provide	
  
natural	
  lighting	
  to	
  all	
  the	
  apartments.	
  	
  
Half	
  of	
  the	
  rooftop	
  space	
  on	
  each	
  building	
  will	
  be	
  used	
  as	
  a	
  vegetated	
  roof	
  garden	
  for	
  the	
  residents.	
  	
  
All	
  the	
  plants	
  and	
  trees	
  used	
  in	
  the	
  landscape	
  will	
  be	
  native	
  to	
  the	
  region.	
  	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  44	
  
	
  	
  
	
  
	
  
	
  
Credit	
  -­‐	
  Rainwater	
  Management	
  
The	
  project	
  has	
  a	
  rain	
  garden	
  in	
  the	
  lowest	
  area	
  of	
  the	
  site	
  where	
  the	
  water	
  naturally	
  flows.	
  This	
  
garden	
  and	
  the	
  green	
  rooftop	
  are	
  designed	
  to	
  collect	
  storm	
  water	
  and	
  help	
  replenish	
  the	
  water	
  basin.	
  
The	
  water	
  collected	
  by	
  impervious	
  surface,	
  such	
  as	
  stone	
  and	
  tile	
  in	
  the	
  outdoor	
  corridors,	
  will	
  be	
  
stored	
  in	
  an	
  underground	
  cistern	
  and	
  will	
  be	
  used	
  for	
  landscape	
  irrigation	
  and	
  water	
  collection	
  
discharge.	
  These	
  strategies	
  will	
  help	
  to	
  mitigate	
  the	
  effect	
  of	
  a	
  flooding	
  event.	
  
	
  
Credit	
  -­‐	
  Heat	
  Island	
  Reduction	
  
- All	
  parking	
  will	
  be	
  underground.	
  
- 50%	
  of	
  the	
  roof	
  will	
  be	
  vegetated,	
  50%	
  will	
  be	
  covered	
  by	
  energy	
  generation	
  systems.	
  
- Impervious	
  materials	
  will	
  be	
  light	
  colored	
  and	
  high	
  albedo	
  (SR	
  0.33).	
  
	
  
	
  
Credit	
  -­‐	
  Light	
  Pollution	
  Reduction	
  
The	
  site	
  will	
  be	
  internally	
  illuminated	
  and	
  all	
  signage	
  for	
  retail	
  will	
  be	
  regulated	
  to	
  be	
  not	
  more	
  than	
  
200cd/m3	
  at	
  night.	
  Since	
  the	
  site	
  is	
  located	
  in	
  a	
  LZ3	
  the	
  up	
  light	
  fixtures	
  will	
  be	
  U3	
  and	
  the	
  percentage	
  
above	
  horizontal	
  will	
  be	
  3%.	
  No	
  upright	
  lighting	
  or	
  will	
  be	
  permitted.	
  
Lighting	
  boundaries	
  will	
  be	
  closely	
  monitored	
  on	
  Kelly	
  Drive	
  for	
  vegetation	
  and	
  animal	
  life	
  on	
  the	
  
Schuylkill	
  River.	
  
	
  
Water	
  Efficiency	
  
	
  
Credit	
  -­‐	
  Outdoor	
  Water	
  Use	
  Reduction	
  
- Native	
  species	
  require	
  less	
  maintenance.	
  
- 100%	
  of	
  landscape	
  need	
  will	
  be	
  satisfied	
  by	
  rain	
  water.	
  
- Drop	
  irrigation	
  systems	
  will	
  be	
  installed	
  for	
  better	
  water	
  efficiency.	
  
	
  
	
  
Credit	
  -­‐	
  Indoor	
  Water	
  Use	
  Reduction	
  
- High	
  efficiency	
  devices	
  and	
  low	
  flow	
  fixtures	
  will	
  be	
  installed	
  in	
  private	
  and	
  public	
  spaces.	
  
- Waterless	
  urinals	
  will	
  be	
  installed	
  in	
  commercial	
  areas.	
  
- Rain	
  water	
  will	
  be	
  treated	
  and	
  re	
  use	
  for	
  wc	
  flushing.	
  
- 40%	
  reduction	
  from	
  baseline.	
  
	
  
 
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
	
  	
  	
  Development	
  Proposal The	
  Arbor	
  at	
  East	
  Falls	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  45	
  
	
  	
  
Credit	
  –	
  Cooling	
  Tower	
  Water	
  Use	
  
This	
  credit	
  will	
  be	
  achieved	
  by	
  using	
  20%	
  of	
  recycled	
  water	
  for	
  cooling	
  towers	
  and	
  installing	
  high	
  
efficiency	
  HVAC	
  systems.	
  	
  
	
  
Credit	
  -­‐	
  Water	
  Metering	
  
- Meters	
  will	
  be	
  installed	
  in	
  all	
  buildings	
  and	
  outdoor	
  areas.	
  
- Tracking	
  of	
  collected	
  water	
  and	
  water	
  use.	
  
- Data	
  will	
  be	
  shares	
  with	
  USGBC	
  for	
  5	
  years	
  
	
  
Energy	
  and	
  Atmosphere	
  
	
  
Credit	
  –	
  Enhanced	
  Commissioning	
  
- The	
  project	
  will	
  have	
  an	
  Operation	
  and	
  Maintenance	
  Plan	
  
- The	
  verification	
  process	
  will	
  include:	
  Manual	
  updated	
  and	
  delivery,	
  Operator	
  training	
  and	
  
effectiveness,	
  seasonal	
  testing.	
  
- Review	
  of	
  building	
  operations	
  will	
  be	
  performed	
  10	
  months	
  after	
  completion.	
  
- An	
  ongoing	
  commissioning	
  plan	
  will	
  be	
  developed.	
  	
  
- Thermal	
  envelope	
  will	
  be	
  included	
  as	
  part	
  of	
  commissioning	
  and	
  ongoing	
  plan.	
  	
  
	
  
Credit	
  –	
  Optimize	
  Energy	
  Performance	
  
Energy	
  model	
  will	
  be	
  done	
  using	
  eQuest,	
  this	
  program	
  shows	
  graphic	
  and	
  numerical	
  outputs	
  of	
  savings	
  
comparing	
  a	
  regular	
  building	
  against	
  the	
  strategies	
  used	
  to	
  achieve	
  energy	
  reduction.	
  This	
  process	
  will	
  
comply	
  with	
  ASHRAE	
  90.1-­‐2010	
  
	
  
Credit	
  –	
  Renewable	
  Energy	
  Production	
  
Solar	
  array	
  on	
  roof	
  tops	
  (50%	
  of	
  area)	
  will	
  generate	
  up	
  to	
  5%	
  of	
  the	
  buildings	
  energy	
  requirements.	
  
	
  
Credit	
  –	
  Enhanced	
  Refrigerant	
  Management	
  
- No	
  use	
  of	
  CFC	
  refrigerants.	
  
- Used	
  refrigerant	
  will	
  be	
  ODP	
  zero	
  and	
  GWP	
  of	
  less	
  than	
  50.	
  
- 15%	
  or	
  less	
  store-­‐wide	
  annual	
  refrigerant	
  emission	
  rate.	
  
- A	
  leak	
  test	
  will	
  be	
  conducted	
  using	
  Green	
  Chills	
  guideline.	
  
	
  
Credit	
  –	
  Green	
  Power	
  and	
  Carbon	
  Offsets	
  
- 100%	
  of	
  the	
  buildings	
  remaining	
  energy	
  (not	
  harvested	
  by	
  solar	
  means)	
  will	
  be	
  purchased	
  from	
  
Green	
  Power.	
  
	
  
The Arbor-Verde Developers
The Arbor-Verde Developers
The Arbor-Verde Developers
The Arbor-Verde Developers
The Arbor-Verde Developers
The Arbor-Verde Developers
The Arbor-Verde Developers

More Related Content

Similar to The Arbor-Verde Developers

Downtown RENAISSANCE Redevelopment Streetscape Report
Downtown RENAISSANCE Redevelopment Streetscape ReportDowntown RENAISSANCE Redevelopment Streetscape Report
Downtown RENAISSANCE Redevelopment Streetscape Report
City of Salina
 
Sre design
Sre designSre design
Sre design
jamelmoyano
 
Orange Avenue Overlay Final Report
Orange Avenue Overlay Final ReportOrange Avenue Overlay Final Report
Orange Avenue Overlay Final Report
Brendan O'Connor
 
Ameriholdings LakePoint Brochure FINAL 3.2.15 hi-res READER
Ameriholdings LakePoint Brochure FINAL 3.2.15 hi-res READERAmeriholdings LakePoint Brochure FINAL 3.2.15 hi-res READER
Ameriholdings LakePoint Brochure FINAL 3.2.15 hi-res READER
Michael Woyan
 
CBE400
CBE400CBE400
CBE400
Lina Ghalib
 
Banker's Hill Development in San Diego, CA
Banker's Hill Development in San Diego, CABanker's Hill Development in San Diego, CA
Banker's Hill Development in San Diego, CA
Melissa Day
 
Arroyo Seco RIO Design Plan
Arroyo Seco RIO Design PlanArroyo Seco RIO Design Plan
Arroyo Seco RIO Design Plan
Meredith McKenzie
 
12 EQUALIZING DESIGN PRINCIPLES TO REVERSE SEGREGATION IN THE CHICAGO REGION;...
12 EQUALIZING DESIGN PRINCIPLES TO REVERSE SEGREGATION IN THE CHICAGO REGION;...12 EQUALIZING DESIGN PRINCIPLES TO REVERSE SEGREGATION IN THE CHICAGO REGION;...
12 EQUALIZING DESIGN PRINCIPLES TO REVERSE SEGREGATION IN THE CHICAGO REGION;...
Gabriel A. Nagy - Urban Development, PMP, MSc
 
F tower2
F tower2F tower2
F tower2
S M
 
Crescent Bay Brochure - L&T Realty
Crescent Bay Brochure - L&T RealtyCrescent Bay Brochure - L&T Realty
Crescent Bay Brochure - L&T Realty
L&T Realty
 
Presentation Sample
Presentation SamplePresentation Sample
Presentation Sample
Sandra Duncan
 
Trending developments vol 3, issue 9
Trending developments vol 3, issue 9Trending developments vol 3, issue 9
Trending developments vol 3, issue 9
froed
 
2016_Work_Samp_MFriehauf-Stonefly-md
2016_Work_Samp_MFriehauf-Stonefly-md2016_Work_Samp_MFriehauf-Stonefly-md
2016_Work_Samp_MFriehauf-Stonefly-md
Mike Friehauf
 
O&A Bio-Sketch
O&A Bio-SketchO&A Bio-Sketch
O&A Bio-Sketch
RaulOcampo
 
Jdavisarchitectsbook
JdavisarchitectsbookJdavisarchitectsbook
Jdavisarchitectsbook
DarylCarrington
 
JDavis Architects Brochure
JDavis Architects BrochureJDavis Architects Brochure
JDavis Architects Brochure
jdavisarchitects
 
DRC_2012_SustainabilityReport PDF
DRC_2012_SustainabilityReport PDFDRC_2012_SustainabilityReport PDF
DRC_2012_SustainabilityReport PDF
Kristin Gumper
 
Northside Stranger's Home For Sale - Part of Cabrini-Green Re-Development
Northside Stranger's Home For Sale - Part of Cabrini-Green Re-DevelopmentNorthside Stranger's Home For Sale - Part of Cabrini-Green Re-Development
Northside Stranger's Home For Sale - Part of Cabrini-Green Re-Development
Ivona Kutermankiewicz
 
Matthew Hill - SeniorProject(InProgress)
Matthew Hill - SeniorProject(InProgress)Matthew Hill - SeniorProject(InProgress)
Matthew Hill - SeniorProject(InProgress)
Matthew Hill
 
Matthew Hill - SeniorProject(InProgress)
Matthew Hill - SeniorProject(InProgress)Matthew Hill - SeniorProject(InProgress)
Matthew Hill - SeniorProject(InProgress)
Matthew Hill
 

Similar to The Arbor-Verde Developers (20)

Downtown RENAISSANCE Redevelopment Streetscape Report
Downtown RENAISSANCE Redevelopment Streetscape ReportDowntown RENAISSANCE Redevelopment Streetscape Report
Downtown RENAISSANCE Redevelopment Streetscape Report
 
Sre design
Sre designSre design
Sre design
 
Orange Avenue Overlay Final Report
Orange Avenue Overlay Final ReportOrange Avenue Overlay Final Report
Orange Avenue Overlay Final Report
 
Ameriholdings LakePoint Brochure FINAL 3.2.15 hi-res READER
Ameriholdings LakePoint Brochure FINAL 3.2.15 hi-res READERAmeriholdings LakePoint Brochure FINAL 3.2.15 hi-res READER
Ameriholdings LakePoint Brochure FINAL 3.2.15 hi-res READER
 
CBE400
CBE400CBE400
CBE400
 
Banker's Hill Development in San Diego, CA
Banker's Hill Development in San Diego, CABanker's Hill Development in San Diego, CA
Banker's Hill Development in San Diego, CA
 
Arroyo Seco RIO Design Plan
Arroyo Seco RIO Design PlanArroyo Seco RIO Design Plan
Arroyo Seco RIO Design Plan
 
12 EQUALIZING DESIGN PRINCIPLES TO REVERSE SEGREGATION IN THE CHICAGO REGION;...
12 EQUALIZING DESIGN PRINCIPLES TO REVERSE SEGREGATION IN THE CHICAGO REGION;...12 EQUALIZING DESIGN PRINCIPLES TO REVERSE SEGREGATION IN THE CHICAGO REGION;...
12 EQUALIZING DESIGN PRINCIPLES TO REVERSE SEGREGATION IN THE CHICAGO REGION;...
 
F tower2
F tower2F tower2
F tower2
 
Crescent Bay Brochure - L&T Realty
Crescent Bay Brochure - L&T RealtyCrescent Bay Brochure - L&T Realty
Crescent Bay Brochure - L&T Realty
 
Presentation Sample
Presentation SamplePresentation Sample
Presentation Sample
 
Trending developments vol 3, issue 9
Trending developments vol 3, issue 9Trending developments vol 3, issue 9
Trending developments vol 3, issue 9
 
2016_Work_Samp_MFriehauf-Stonefly-md
2016_Work_Samp_MFriehauf-Stonefly-md2016_Work_Samp_MFriehauf-Stonefly-md
2016_Work_Samp_MFriehauf-Stonefly-md
 
O&A Bio-Sketch
O&A Bio-SketchO&A Bio-Sketch
O&A Bio-Sketch
 
Jdavisarchitectsbook
JdavisarchitectsbookJdavisarchitectsbook
Jdavisarchitectsbook
 
JDavis Architects Brochure
JDavis Architects BrochureJDavis Architects Brochure
JDavis Architects Brochure
 
DRC_2012_SustainabilityReport PDF
DRC_2012_SustainabilityReport PDFDRC_2012_SustainabilityReport PDF
DRC_2012_SustainabilityReport PDF
 
Northside Stranger's Home For Sale - Part of Cabrini-Green Re-Development
Northside Stranger's Home For Sale - Part of Cabrini-Green Re-DevelopmentNorthside Stranger's Home For Sale - Part of Cabrini-Green Re-Development
Northside Stranger's Home For Sale - Part of Cabrini-Green Re-Development
 
Matthew Hill - SeniorProject(InProgress)
Matthew Hill - SeniorProject(InProgress)Matthew Hill - SeniorProject(InProgress)
Matthew Hill - SeniorProject(InProgress)
 
Matthew Hill - SeniorProject(InProgress)
Matthew Hill - SeniorProject(InProgress)Matthew Hill - SeniorProject(InProgress)
Matthew Hill - SeniorProject(InProgress)
 

The Arbor-Verde Developers

  • 1. Helena  Lilley  |  Carolina  Martinez  |  Jonathan  Vehlow  |  Anthony  Simonetti                                                     The Arbor at East Falls   Development  Proposal  prepared  for  James  Mascaro     Sustainable  Residential  Development     4300  Ridge  Avenue,  Philadelphia  PA     August  5,  2015  
  • 2.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            2       Table  of  Contents         Executive  Summary………………………………………………………………………………………………….....….….3-­‐4   Company  Profile…………………………………………………………………………………………….........................5   Development  Team………………………………………………....................……………………..……….......….….5   Introduction...............................................................................................................................6   Objectives............…………………………………………………………………………………………………......……...…7   Project  Overview…………………………………………………………………………………………………......…….…...8   Site.........................................................................................................................................9-­‐14   Owner  Project  Requirements  ..............................................................................................15-­‐17   Zoning...................................................................................................................................18-­‐20   Development  Proposal  Elements.........................................................................................21-­‐27   Market  Analysis....................................................................................................................28-­‐37   Sustainability........................................................................................................................38-­‐48   Financial  Strategies..............................................................................................................48-­‐52   Conclusions...............................................................................................................................52            
  • 3.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            3         Executive  Summary       Team   Our  highly  accomplished  development  team  comprised  of  one  construction  manager  with  a   background  in  architecture  and  three  sustainable  designers  with  various  backgrounds  in  business,  real   estate,  architecture,  and  policy  writing  will  ensure  that  The  Arbor  will  not  only  be  an  eco-­‐friendly,   aesthetically  pleasing  addition  to  the  community  but  an  economic  destination  as  well.     Project  Overall   The  Arbor  at  East  Falls  is  a  sustainable  mixed-­‐used  complex  located  in  the  Northwest  section  of   Philadelphia.  The  Arbor  will  be  comprised  of  four  mixed-­‐use  four  story  buildings  totaling  115,000   square  feet,  90,000  square  feet  retail  space,  and  30,000  square  feet  of  underground  parking  structure.   The  LEED  Gold  complex  will  consist  of  100  rental  units  that  include  both  market  rate  and  affordable   rate  units.     Residential  construction  price  estimates  will  be  $160/SF  totaling  $14.4  million.  Retail  construction   estimates  will  be  $125/SF,  which  equates  to  $3.13  million.  Underground  structured  parking  will  be   $95/SF  coming  out  to  S2.85  million.  We  are  seeking  LEED  Gold,  which  costs  around  $80,000.  The   project  totals  $26,690,220.     Shopping  and  dining  on  the  ground  floor  will  allow  for  commercial  opportunities  that  will  be  supported   by  the  existing  community  and  the  readymade  customer  base  within  housing  in  upper  floors.  The   Arbor  will  provide  a  Public  Courtyard,  Community  Garden  and  Dog  Park  that  will  create  a  meeting   point  for  its  residents  and  neighbors.  Verde  Developers  will  comply  with  all  C2  Philadelphia  zoning   codes  that  pertain  to  the  site  as  well  as  the  East  Falls  Overlay.  A  variance  for  a  height  increase  will  be   requested  from  the  zoning  board  and  we  will  comply  with  all  the  requirements  regarding  lighting  and   façade.       Development  Site   Centrally  located,  the  Rivage  sits  on  1.68  acres  at  Ridge  Avenue  and  Calumet  Street  in  the  heart  of  East   Falls.  Kelly  Drive;  the  backbone  of  Fairmount  Park  flanks  the  southern  edge  of  the  site  making  it  a  very   desirable  location.  The  blighted  area  is  comprised  of  a  concrete  lot  and  a  vacant  structure;  nonetheless   the  existing  infrastructure  is  in  place  to  support  development.  The  adjacent  neighborhood  consists  of   Ridge  Avenue’s  commercial  corridor,  which  includes  takeout  restaurants,  insurance  companies,  and   light  retail.  Some  businesses  are  struggling  and  The  Arbor  will  bring  the  boost  that  East  Falls  needs  to  
  • 4.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            4       stimulate  growth  and  business  in  the  neighborhood.  In  addition  to  the  commercial  segment,  a  small   residential  neighborhood  exists  which  contains  both  owner  and  tenant  occupied  residences.       Opportunities   East  Falls  is  an  up  and  coming  neighborhood  with  a  burgeoning  main  street  scene.  The  previously   developed  Rivage  site  is  nestled  right  in  the  heart  of  the  area  and  has  premier  access  to  restaurants,   parks,  universities,  and  gorgeous  river  views.  The  existing  public  transportation  options  include  several   Septa  bus  routes  and  Regional  Rail  access  within  walking  distance.  I-­‐76  and  Route  1  are  easily   accessible  from  Ridge  Avenue.       The  Arbor  will  be  marketed  toward  students  and  young  professionals  who  prefer  the  quiet  outskirts  of   the  city  yet  still  want  to  have  direct  access  to  it.  We  will  provide  both  market  and  affordable  housing   opportunities  for  persons  of  all  economic  backgrounds.       Competition   The  Arbor  will  be  a  unique  addition  to  the  East  Falls  neighborhood.  No  complexes  of  this  caliber  exist   within  the  area.  The  closest  competition  is  Dobson  Mills  apartments  on  Ridge  Avenue  &  Scotts  lane   about  a  mile  from  the  site.  Dobson  Mills  does  not  provide  sustainable  principles  in  its  design  and  has   limited  commercial/retail  options.  We  will  attempt  to  corner  the  market  as  an  eco-­‐friendly  micro   community  within  East  Falls.  Marketing  towards  a  different  demographic  than  Dobson  Mills,  the  Arbor   will  emphasize  sustainability  in  design.     Sustainable  Development   The  Arbor  will  strive  for  LEED  Gold.  The  LEED  program  provides  a  framework  for  developing  a   sustainable  building  that  will  provide  benefits  to  the  residents,  community,  and  environment.  Locally   sourced  materials,  photovoltaic  solar  panels,  energy  efficient  washers/dryers  will  be  will  be  part  of  our   building  design.  Storm  water  management  strategies  will  include  rain  gardens  and  underground   cisterns.  Green  space  on  the  rooftops  of  the  buildings  will  unite  affordable  living  with  green  building   space.  The  public  space  between  the  complex  will  be  tree-­‐lined,  providing  a  canopy  and  a  respite  for   residents  and  inclement  weather.  Utilizing  sustainable  techniques  will  initially  increase  the  cost  of   production,  however,  the  return  on  investment  will  be  seen  in  higher  rents  and  a  quicker  lease  up.              
  • 5.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            5       Company  Profile     VERDE  Developers  is  a  multidisciplinary  development  company  dedicated  to  designing  environmentally   focused  buildings.  Located  in  Philadelphia,  Pennsylvania  VERDE  Developers  was  founded  in  2015  by   four  graduate  students  looking  to  provide  eco-­‐friendly  sustainable  solutions  for  architecture.  The   design  approach  of  the  company  is  to  create  a  sense  of  inclusion  with  nature  and  community  as  well,   integrating  the  projects  to  the  surrounding  neighborhood  and  providing  meeting  spaces.         Project  Team       Helena  Lilley   A  Pennsylvania  native,  Helena  has  been  working  for  the  real  estate  firm  Long  &  Foster  since  2008.  She   is  currently  attaining  her  M.S.  in  sustainable  design  with  her  focus  on  developing  real  estate.  Her   knowledge  of  the  area  and  zoning  codes  makes  her  an  irreplaceable  asset  to  our  team.  She  is  active  in   the  community  as  a  Design  Committee  Member  of  the  neighboring  Roxborough  Development   Corporation  and  was  a  key  player  in  the  reinstated  Roxborough  commercial  corridor  zoning  overlay.         Carolina  Martinez       Our  resident  architect  and  designer  hailing  from  Mexico  City,  Mexico,  Carolina  has  experience  within   the  industry  working  for  one  of  the  largest  and  most  successful  architectural  firms  in  Mexico.  She  has  a   vast  knowledge  and  experience  LEED  certified  buildings.  Her  ability  to  design  functionally  efficient   buildings  is  only  rivaled  by  her  ability  to  create  aesthetically  pleasing  buildings.         Jonathan  Vehlow   Originally  from  Chicago,  Illinois,  Jonathan’s  background  is  in  English.  He  is  currently  studying  to  receive   his  M.S.  in  Sustainable  Design  with  a  focus  in  sustainable  systems  and  landscape  design.  He  is  able  to   integrate  and  implement  sustainable  and  eco-­‐friendly  systems  into  both  new  and  pre-­‐existing   buildings.         Anthony  Simonetti   The  construction  manager  of  our  operation,  Anthony  comes  from  an  architectural  background.   Bridging  the  gap  between  design  and  construction,  his  knowledge  of  both  these  fields  allows  him  to   budget  and  schedule  a  project  in  a  realistic  fashion.        
  • 6.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            6       Introduction               Kelly  Drive  flanks  the  southern  border  of  East   Falls,  creating  an  ideal  location  for  residents   and  visitors  alike.  Fairmount  Park  creates  a   natural  boundary,  along  with  major   transportation  and  commercial  arteries.  The   charming  neighborhood  is  bordered  by   Fairmount  Park  and  major  transportation   thoroughfares,  which  provide  an  easy   connection  to  the  surrounding  city.  These   features  instill  a  unique  sense  of  place,  but   also  hinder  outsiders’  awareness  and   familiarity  with  the  neighborhood.  East  Falls  is   a  hidden  gem.         With  the  development  of  The  Arbor  at  East   Falls,  Verde  Developers  aim  to  build  upon  and   compliment  the  surrounding  area,  creating  a   new  living,  dining  and  retail  option  adhering  to  the  LEED  Gold  standard  of  building.  Our  design   emphasis  is  focused  around  usable  spaces  that  serve  as  meeting  points,  destinations,  and  shared   workspaces,  where  residents  of  diverse  backgrounds  and  lifestyles  can  interact.  The  Arbor  at  East  Falls   will  cater  to  a  more  walkable  neighborhood  in  order  to  enrich  the  existing  businesses  and  residents   while  avoiding  any  displacement.       The  incorporation  of  sustainable  principles  guides  our  development  and  will  serve  as  an  eco-­‐friendly   example  to  become  interwoven  into  the  fabric  of  the  community.            
  • 7.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            7       Objectives     Verde  Developer’s  goal  is  to  provide  a  destination  that  both  compliments  the  surrounding  area  and   retain  its  own  identity  as  a  key  focal  point  in  the  neighborhood.  Through  a  labor-­‐intensive  design   process  including  a  Charrette  with  the  East  Falls  community  our  team  has  achieved  just  that,  creating  a   mixed-­‐use  residential/commercial  complex  that  is  both  efficient  and  aesthetically  pleasing  called  The   Arbor  at  East  Falls.  We  look  to  engage  and  engender  the  surrounding  communities  by  providing  a   welcoming  gateway  destination  between  East  Fall’s  parks,  residential,  and  commercial  districts.       We  strive  for  a  holistic  approach.  In  doing  so  we  focus  on  four  objectives:     ● High  Quality  of  Life:  We  will  promote  a  livable,  accessible,  vibrant,  and  active  place  for  existing   and  new  residents  to  live,  work,  and  play  in  a  happy  healthy  way.   ● Sense  of  Place:  Building  on  the  proximity  to  Fairmount  and  existing  neighborhood  assets,  we   will  reveal  a  hidden  unique  gathering  place  where  residents  and  visitors  can  safely  interact   ● Integrated:  Integrating  the  pillars  of  sustainability,  the  development  of  The  Arbor  is  intended  to   promote  the  social,  economic,  and  environmental  sustainability  of  the  neighborhood.  The   Arbor  will  provide  spaces  and  places  for  new  and  existing  residents  to  work  and  gather,  while   providing  a  safe  space  for  visitors  to  interact  with  the  neighborhood  and  support  locally  owned   businesses.   ● Equity:  We  plan  to  ensure  that  all  people  have  the  opportunity  to  live  at  The  Arbor  and   affordable  options  will  be  offered.  We  will  strive  for  the  best  design  standards  that  measure   economic,  environmental  and  social  equity  benefits.                                
  • 8.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            8       Project  Overview       The  Arbor  at  East  Falls  will  be  comprised  of  four  mixed-­‐use  four  story  buildings  totaling  115,000  square   feet  of  residential  and  retail  space.  The  LEED  Gold  complex  will  consist  of  100  rental  units  that  include   both  market  rate  and  affordable  rate  units.       The  development  will  be  comprised  of  four  separate  buildings  that  will  be  named  accordingly  to  the   Arbor  theme:  Maple,  Oak,  Birch,  and  Willow.  The  Maple  building  will  hold  the  Affordable  Rate  units.  It   will  be  comprised  of  25  studio,  one,  and  two  bedroom  units  on  three  floors.  The  street  level  will  offer   retail  opportunities,  community  development,  as  well  as  educational  and  assistance  organization.  A   designated  location  will  be  shared  and  available  for  community  meeting  space,  or  as  a  price  controlled   rental  space  for  organizations  to  hold  conferences,  informational  sessions,  or  courses  on  topics  such  as   energy  efficiency.     Oak,  Birch  and  Willow  with  consist  of  market  rate  apartments  on  three  floors.  Each  building  will  offer   studio,  one,  and  two  bedroom  units.  The  ground  floor  of  all  the  market  rate  buildings  will  be  occupied   by  local  East  Falls/Philadelphia  businesses.  With  over  20,000  square  feet  of  retail  space  available  in  the   three  market  rate  buildings,  and  a  readymade  customer  base  within  housing  on  upper  floors,  local   entrepreneurs  will  clearly  see  the  benefits  in  establishing  new  cafes,  bistros,  clothing  boutiques,  and   other  service  related  businesses.  The  mixed-­‐used  development  will  promote  jobs  in  the  area  and  help   East  Falls  boost  its  commerce.     Community  space  will  be  in  three  designated  areas:  a  dog  park,  community  garden,  and  courtyard.   These  areas  will  not  only  provide  needed  amenities  for  resident  families,  but  also  serve  as  locations   residents  can  utilize  to  commune  and  connect.  We  designed  these  areas  to  be  able  to  serve  both  the   market  rate  and  affordable  units  in  order  to  nourish  an  integrated  community  thus  increasing  the   social  equity  of  East  Falls.                    
  • 9.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            9       Site  Inventory  &  Analysis         The  current  Rivage  site  is  urban  blight.  It’s  comprised  of  a  vacant  building  and  a  large  unkempt  parking   lot  surrounded  by  a  chain  link  fence.  This  area  holds  potential  to  add  to  the  burgeoning  community   that  surrounds  it.  With  a  close  proximity  to  downtown  transportation  lines,  the  Schuylkill  river  trails,   and  East  Falls  restaurant  district,  the  Rivage  is  an  ideal  place  to  develop  a  mixed-­‐use   residential/commercial  complex.        
  • 10.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            10         • Site  located  just  off  the  banks  of  the  Schuylkill  River    between  Ridge  Avenue  and  Kelly  Drive.   • Five  different  bus  routes  have  stops  on  both  Kelly  and  Ridge  just  a  few  steps  from  the  site  that   provide  access  to  surrounding  neighborhoods.   • East  Falls  Train  Station  (Manayunk/Norristown  line)  is  located  .6  miles  northeast  of  the  site.   • Wissahickon  Transportation  Terminal  which  provides  access  to  satellite  neighborhoods  is   located  to  the  northwest  of  the  site  on  Ridge  approximately  one  mile  away.   • The  Schuylkill  River  Trail  pedestrian  path  along  Kelly  Drive  is  located  within  walking  distance.   • Interstate  76  and  Route  1  have  onramps  both  accessible  from  Ridge  Avenue  less  than  one  mile   away.   • All  of  these  transportation  options  provide  access  to  surrounding  neighborhoods   and  downtown  Philadelphia.   • Fairmount  Park,  one  of  the  largest  city  parks  in  the  United  States  is  located  just  south  of  the   site,  accessible  over  the  East  Falls  Bridge.   • The  bustling  Manayunk  neighborhood  is  accessible  from  both  Kelly  Drive  and  Ridge  Avenue.   • East  Falls  is  an  up  and  coming  Main  Street  area  and  restaurant  district  is  located  a  few  blocks   from  the  site.    
  • 11.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            11           The  Schuylkill  River  Trail  can  be  found  on  both  sides  of  the  river  running  along  both  Kelly  and  Martin   Luther  King  Drive;  the  latter  can  be  accessed  by  use  of  the  East  Falls  Bridge.  The  Manayunk/Norristown   railway  located  less  than  one  mile  away.  All  these  options  provide  access  to  downtown  Philadelphia   and  surrounding  neighborhoods.                            
  • 12.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            12       Existing  Conditions                                                             Picture  2.  Ridge  Ave  and  Merrick  Road             Site  Picture  1:  Corner  Ridge  Ave  &  Calumet  St  
  • 13.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            13                                               Site  picture  4.  Kelly  Dr.                    Site  picture  3.  From  Kelly  Dr.  and  Calumet  St.              
  • 14.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            14           Site  picture  five:  Arial  view  from  Kelly  drive                                 Site  picture  5:  Aerial  view  from  Kelly  drive   Site  picture  six:  Arial  of  Merrick  facing  the  site   Site  Picture  6:  Aerial  from  Merrick  facing  the  site  
  • 15.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            15         Owner  Project  Requirements       Overall  building  size  (sf)   4  buildings=  115,000  sq  ft   Functional  Uses:   Mixed  use     Affordable  Rate  Housing-­‐  Building  1     Market  Rate  Housing-­‐  Building  2,3  &  4   Ground  Floor  retail   Occupancy  Requirements:   Sizes  per  uses:   Use  1  -­‐  Retail:   25,000  sq.  ft.  (total  4  buildings)   Building  One  5,000   Building  Two  7,500   Building  Three  5,000   Building  Four  7,500   Use  2  -­‐  Studio/Efficiency:   Use  3  -­‐  1  Bedroom:   Use  4  -­‐    1  Bedroom  with  Den:   Use  5-­‐  2    bedroom   Use  6-­‐  3  bedroom   475  sq.  ft.   750    sq.  ft.   900  sq.  ft.   1250  sq.  ft.   1450  sq.  ft.   Building  Features:    Special   Concerns/Uses     HVAC   HVAC  systems  including  furnaces  and  air  conditioners  designed  to  conserve  energy  and   save  money.  Air  filtrations  systems,  humidifiers,  and  dehumidifiers  help  keep  indoor   quality  healthy  and  clean.   Electrical   We  can  incorporate  a  state  of  the  art  system  that  uses  a  grid  to  save  energy  and   money.    New  power  cell  tech  can  keep  us  independent  from  outside  sources  while  also   giving  back  to  reduce  costs.     Façade/Envelope   In  keeping  with  the  community  character,  the  facade  will  include  brick  along  with  other   sustainable  materials.  We  would  want  the  structure  to  attract  potential  renters.  Having   energy  efficient  lighting,  a  design  that  draws  the  eye  and  glass  that  not  only  looks  good   but  also  serves  to  reflect  a  certain  amount  of  light  so  the  building  won't  get  too  hot.     Other   We  will  also  have  an  art  piece  that  reflects  upon  the  structure  we  end  up  making.    
  • 16.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            16       Quality   Requirements/Product  Type   In  an  attempt  to  protect  the  health  of  the  residents,  we  will  commit  to  using  100%  eco-­‐ friendly  materials  indoors  and  when  possible  outdoors.  Special  attention  will  be  taken  on   interior  materials  such  as  no  voc  &  non-­‐carcinogenic  materials.   Sustainability  Objectives:     Energy  Efficiency   The  project  will  be  net  zero  energy.  This  goal  will  be  achieved  by  passive  strategies  such   as  building  orientation,  facade  shading,  green  roofs,  efficiency  glass,  and  envelope.  The   active  system  that  will  be  used  in  the  project  will  be:  Solar  energy  as  PV  arrays  for   electricity  and  solar  water  heat  installation   Lighting  Efficiency   The  lighting  system  in  the  building  will  be  designed  to  guide  the  user  to  save  energy.   Locating  in  strategic  locations  will  avoid  the  use  of  lighting.  All  fixtures  will  be  LED  which   will  save  on  the  energy.  Occupancy  sensors  will  be  installed  in  electric  rooms,  mechanical   rooms,  and  storage  areas.  Daylight  sensor  use  in  commercial  areas  will  avoid  the  use  of   lighting  during  the  day.  The  installation  of  shelves  on  the  facade  will  allow  light  to  reflect   inside  the  rooms   Indoor  Environmental   Quality   The  main  goal  of  the  interior  design  will  keep  with  the  users’  satisfaction  and  will   primarily  be  achieved  through  climate  control.  One  strategy  will  provide  all  rooms  with   operable  windows  so  the  user  can  adjust  interior  temperature.  The  HVAC  system  will  be   installed  on  the  floor  allowing  the  air  to  be  exhausted  as  the  warm  air  elevates,  thus   creating  a  microclimate.  The  interior  will  seek  to  fulfill  biophillic  concepts  by  bringing   nature  into  the  interior  of  the  building.   Water  Efficiency   We  will  attempt  net  zero  water  usage,  while  complying  with  the  Philadelphia  water   treatment  laws.  Low  flow  fixtures,  gray  water  from  sinks  and  showers  will  save  on  water   usage.  Rainwater  collection  from  non-­‐pervious  surfaces  will  avoid  rain  water  runoff  and   will  be  used  for  landscaping   Materials   Local  materials  will  be  used  as  much  as  possible  in  an  attempt  to  support  the  local   economy  and  avoid  energy  wasted  on  transportation.  Special  attention  will  be  taken  on   interior  materials  such  as  no  voc  &  non-­‐carcinogenic  materials.   Operations  &  Maintenance   Property  management  company  will  handle  all  leasing  and  maintenance  issues.   Maintenance  staff  to  maintain  and  care  for  the  vegetated  areas  including  the  green   roofs.   Other  Key  Goals   The  sustainability  goals  will  be  measured  by  achieving  LEED  gold  certification.  This   international  benchmark  will  allow  users  to  recognize  the  building  as  environmentally   driven.  Additional  goals  include  creating  a  sense  of  community  among  the  users  with   amenities  in  indoor  and  outdoor  areas.  Areas  commonly  forgot  such  as  hallways  and   stairways  will  also  be  spaces  that  allow  for  public  interaction  among  neighbors  and  
  • 17.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            17       friends   Budget  Considerations:   Site  Cleanup.  Design  Fees.  Owner  Contingency  .FF&E.  Swing  Space  Costs.  Underground.   Parking.  Landscape  Design.  Green  Roof   Project  Schedule:   Feasibility  Phase   Programming  Phase   Schematic  Design  Phase   East  Falls  Development  Corporation   Design  Development  Phase   Pre-­‐construction  Phase   Construction  Phase   Closeout  Phase   Other  Owner   Restrictions/Limitations   Maximum  Building  Height:  55’   Maximum  Width  Building  Frontage  on  Ridge  Avenue:  100’   Minimum  Occupied  Area:  55,599  sqft   Minimum  Side  Yard:  5  ft   Minimum  Bicycle  Parking  Spaces:51   Minimum  Off-­‐Street  Loading  Spaces:4   Maximum  Width  of  Curb  Cut:  20  ft   Community  Requirements   Our  goal  is  to  positively  impact  the  community  by  turning  a  blighted  lot  into  a  place  to   live,  work,  and  play.  The  development  is  intended  to  build  upon  and  compliment  The   East  Falls  Development  Corporation  (EDC)  master  plan.  Our  intent  is  to  connect  with  the   Wissahickon  Station  by  creating  a  new  transit  oriented  development  along  with  other   sustainable  investments.  We  plan  to  protect,  enhance,  and  promote  the  East  Falls   neighborhood  and  it’s  surrounding  areas.       Accessibility  Requirements   The  design  will  meet  all  ADA  requirements  ensuring  equitable  access  for  all  building   occupants  and  visitors.  All  systems  requiring  routine  maintenance  will  be  accessible  to   ensure  proper  operation  and  maintenance.     Security  Requirements   In  order  to  protect  the  safety  of  the  residents,  a  security  system  with  24/7  surveillance   will  be  enabled.  In  addition  to  the  security  system,  gates  at  both  entries  (Calumet  Ridge-­‐   Ridge  &  Merrick)  will  have  attended  security  personnel  to  guarantee  safety.     Aesthetics  Requirements   To  keep  with  the  neighborhood  character,  brick  façade  will  be  used  along  with  other   sustainable  materials.  All  commercial  interior  and  exterior  with  echo  the  residential  for  a   cohesive  feel.  All  lighting  will  be  visually  appealing  and  will  not  permit  the  use  of  neon   lighting  or  signage   Applicable  Codes  and   Standards   The  buildings  shall  be  designed  to  comply  with  Philadelphia  zoning  code  for  commercial   mixed  use.  LEED  Gold  standard  will  be  achieved  in  the  design.  
  • 18.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            18       Zoning       Verde  Developers  will  comply  with  all  C2   Philadelphia  zoning  codes  that  pertain  to   the  site.  In  addition  to  Philadelphia   codes,  East  Falls  has  an  Overlay  that  aims   to  guide  development,  provide  continuity   for  businesses,  and  maintain  the   community  aesthetic.  These  guidelines   entail  regulations  on  height,  facades,   parking,  and  lighting.  A  variance  for  a   height  increase  from  35  feet  to  45  feet   will  be  issued  from  the  zoning  board.  We   will  comply  with  all  the  requirements   regarding  lighting  and  façade.  The   parking  falls  within  the  by-­‐right  uses  and   we  will  comply  with  all  regulations.  To   reduce  traffic  congestion,  a  new  traffic   lane  at  Ridge  Ave  &  Calumet  Street  will  be  constructed  to  widen  the  street.  Our  landscaped  design  will   address  the  Kelly  Drive,  which  mandates  a  berm  to  be  constructed  for  site  protection  from  flooding   and  erosion.  In  addition  to  our  landscaped  area  at  Kelly  Drive  and  Calumet  St,  we  will  have  an  art   installation  at  the  entrance.  Our  goal  is  to  enhance  the  development  standards  in  which  the  East  Falls   Development  Corporation  seeks  to  address  within  its  Overlay.                        
  • 19.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            19       Zoning  Matrix       Use   permitted   proposed   proof   parking  (private)   yes   yes   14-­‐303  C2  2n  +  14-­‐ 1400   commercial   yes   bakery,  groceries,books?   14-­‐303  C2  2b   residential   yes   1/2  apartments   14-­‐303  C2  2a           Uses         restaurant   yes   yes   14-­‐303  C2  2p   Farmers  Market   yes   yes   14-­‐303  C2  2f   Laundry  (residential  use)   yes   yes   14-­‐303  C2  2u                   Bulk  &  Area  Regulations   required   proposed   proof   occupied  area   <80%   comply   14-­‐303  C2  4a   open  area   >20%   comply   14-­‐303  C2  4b   Building  Set  Back  Line   Min  25ft  on  Kelly     comply   14-­‐1616  6b   Side  yard   Min  5ft  refer  to  14-­‐10412   comply   14-­‐303  C2  4d   Rear  Yard  Setback   9ft   comply   14-­‐303  C2  4g.2   Rear  Yard  Area   344ft2  +100ft2  per  family  after  3   comply   14-­‐303  C2  4g.3           Stories         Height  Regulations   35ft  or  3strs   45ft  4  flrs  request  variance     14-­‐303  C2  5a   Off  Street  Loading  (OSL)   1  per  -­‐100,000-­‐150,001  sq   comply   14.4091   OSL  dimensions         Off  Street  parking   no   no   9-­‐600(f)1   Off  Street  parking,  handicap   no   no   9-­‐600f   Parking  Stall  Size   8.5x18ft   comply   14-­‐1400  3a   Parking  Stall  Size   8.5x18ft   smart  car  spaces  6x10ft   14-­‐405  (4)-­‐A2   Bicycle  racks   entry  way  for  required  #  of  spaces   same   14-­‐405-­‐d2   Signs   yes   i  guess?   14-­‐1616  10   total  allowed  SF   3ft2/ft  frontage   comply   14-­‐1616  10d   Sign  Height   6ft  if  free  standing  <150ft  if   iluminated   comply   14-­‐1616  10e.1.c  +  14-­‐ 303  c2  8e           cornice  ht     >25ft   comply   14-­‐1616  5a  
  • 20.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            20       curb  cuts,  number   Prohibited  on  Kelly  1  every  100ft   comply   14-­‐1616  8c   curb  cuts,  width   Max  20ft   comply   14-­‐1616  8c   Building  Width   <100ft  on  Ridge   comply   14-­‐1616  7a.1           Garage   required   proposed   proof   accessory  garage  permitted       14-­‐1402a   driveway  &  aisle   no  more  than  25%  of  total  garage   area   same   14-­‐403  9(a)1   Parking         retail   1  per  1000  gsf   0.5     residential   1  per  dwelling   150   14-­‐1402  (a)1   Handicap  Pkg   required   proposed   proof   retail/office   1   1   14-­‐1401-­‐3   residential   5   5   14-­‐1401-­‐3   parking  lot         van   19   19   14-­‐1401a           Misc   required   proposed   proof           landscape  street   minium  18ft  wide  landscaped  area   along  entire  frontage  area  of  Kelly   Drive   18ft  wide  landscaped  area   14-­‐503(2)(b)   landscape  interior         lighting         lighting         trash   enclosed  trash  storage  area   located  within  building  or  on   building  lot   comply   14-­‐1616  9a           bikes   required   proposed   proof   Class  1   1  per  every  3  parking  spaces   3  per  every  3  parking   14-­‐1401i   Signs   sf  allowed       accessory  signs  permitted       14.410-­‐(1)a   non-­‐accessory  not  permitted       14.410-­‐(3)i        
  • 21.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            21         Design  Proposal             The  design  proposed  for  the  new  apartment  complex  at  the  previous  Rivage  site  will  be   environmentally  oriented,  embracing  the  three  branches  of  Sustainability:  Planet,  People  and  Profit.   The  Arbor  at  East  Falls  will  be  more  efficient  by  saving  energy,  water,  and  using  non-­‐harmful  materials.   It  will  include  the  neighborhood  to  create  a  community  friendly  meeting  space,  and  it  will  be   economically  affordable  for  both  the  developer  and  the  end  user  (utility  bills).   Four  separate  form  the  complex  with  an  interior  courtyard  for  public  use.  The  courtyard  will  serve  as   an  area  for  ground  floor  commercial  use  as  well.  The  separation  between  buildings  will  allow  people  to   walk  through  the  complex,  shortening  the  distances  created  by  mega  block  cities  like  Philadelphia.   The  south  part  of  the  complex  will  respond  to  its  natural  surroundings  with  a  vegetated  berm  and  a   rain  garden  on  the  lowest  area  of  the  site,  these  strategies  will  serve  not  only  for  aesthetical  purposes   but  will  help  with  storm  water  retention  and  flooding  problems.    
  • 22.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            22       Rain  garden   Plan  Views       Ground  floor  -­‐  Retail                                           The  first  floor  of  the  complex  will  be  dedicated  to  retail,  adding  a  variety  of  uses  to  the  community.   Coffee  shops,  restaurants,  gym,  laundry  service,  and  a  grocery  store  will  be  among  said  uses.     All  shops  and  the  courtyard  will  be  accessible  for  the  whole  community,  providing  a  meeting  space   with  a  small  covered  area  for  events.  On  Kelly  Drive,  there  will  be  an  outdoor  terrace  using  the   required  vegetated  berm  as  landscape  to  be  used  by  restaurants  and  coffee  shops.  The  main  car  access   will  be  through  Ridge  Avenue,  providing  access  to  residents  and  visitors  to  the  underground  parking   which  will  serve  as  a  loading  dock  for  commercial  needs.               Loading   Shaded  event  area   Underground   Parking  access   Central  Courtyard   Terrace   Vegetated  Berm  
  • 23.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            23       Maple   Willow   Birch   Oak                                               The  three  residential  levels   will  include  studio,   one,  two,  and  three  bedroom  apartments,  which  will  target  the  diverse  community  of  East  Falls.  The   apartment  size  will  remain  the  same  in  each  building,  but  larger  apartments  will  be  on  the  corners.  The   rental  prices  will  be  higher  on  the  exterior  façade  of  Oak  and  Birch  due  to  the  views  of  the  City  and   Schuylkill  River.  Maple  building  will  have  a  laundry  room,  laminate  floors  and  quartz  countertops.  Oak,   Birch  and  Willow  will  have  a  washer/dryer  in  each  unit,  wood  floors  and  granite  countertops.                     Floors  2-­‐4   Residential  
  • 24.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            24       Underground  Parking     The  complex  will  have  two  levels  of  underground   parking:  The  lower  level  will  be  designated  for   residents,  this  way  a  secure  access  can  be  assured.   150  spots  will  make  for  1.5  per  dwelling  unit;  this   will  serve  guests  as  well.       The  first  level  will  be  for  commercial  use  and   community.  We  realized  that  there  is  an  existing   need  for  parking  space  in  the  surrounding  areas   where  street  parking  is  not  enough.  135  spots  at   this  level  will  serve  this  income  opportunity  as  well   as  retail  visitors.                                             CalumetSt   Ridge Ave  
  • 25.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            25         3D  Views                   View  from  Kelly  Drive  and  Calumet  Street   Interior  Courtyard      
  • 26.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            26                       View  from  Ridge  Ave.     Interior  Courtyard  
  • 27.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            27                       Art  piece  –  shaped  as  a  water  drop  and  made  out  of  wood  it  symbolizes  nature  in  community         Shaded  even  area    
  • 28.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            28         Market  Analysis       Demographics       East  Falls  residents  are  proud  of  their  community  and  want  to  enjoy  all   the  perks  that  come  with  living  close  to  Center  City.  The  East  Falls   Master  Plan  is  designed  for  the  current  and  future  residents  to   promote  sustainable  growth  within  the  entire  East  Falls  area.  As  a   result,  the  following  demographic  profile  is  for  East  Falls  area  as  a   whole.       The  entire  East  Falls  neighborhood  is  1.45  square  miles  with  a   population  of  14,493.  The  median  age  of  the  population  is  31  years.   Within  the  past  decade,  East  Falls  has  seen  an  increase  in  residents   between  the  ages  of  18  –  34,  making  it  a  growing  center  for  younger  professionals.  Currently,  40%  of   its  residents  fall  between  these  ages  (eastfallsdevelopment.org).       For  many  of  East  Falls  residents  the  median  household  income  is  almost  double  for  that  of  Philadelphia   ($53,228  vs.  $30,746).  East  Falls  is  centrally  located  between  Center  City  and  the  suburbs,  making  the   neighborhood  attractive  to  working  families.  East  Falls  median  income  is  over  75,000  and  many  of  the   residents  have  a  college  degree  or  higher  (eastfallsdevelopment.org).                                
  • 29.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            29       Rental  Market       The  most  recent  comparison  of  rental  data  reveals  a  strong  residential  rental  market.  Rentals  are  up   compared  to  Philadelphia  County.  Even  more  promising  results  have  been  seen  in  the  average   marketing  period  for  a  rental  listing.  Overall,  the  market  is  prime  for  investment  and  development,  and   investors  can  feel  secure  in  knowing  the  market  has  been  consistent  (city-­‐data.org).                                       Median  rent  in  2011:     East  Falls:   $891   Philadelphia:   $691      
  • 30.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            30           Rental  Comparisons     Included  in  the  rental  comparisons  are  both  single  unit  rentals  and  apartment  buildings.  In  order  to   grasp  a  true  understanding  of  the  rental  market  both  types  of  units  were  considered.  Our  findings   reveal  that  single  style  apartments  and  houses  do  not  offer  the  same  amenities  and  will  not  target  our   demographic                          
  • 31.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            31       Apartment  Buildings     Sherman  Mills   Sherman  Mills  is  located  in  East  Falls  just  off   Kelly  Drive  near  the  Route  1  and  Ridge   Avenue  interchange.  This  community  is   comprised  of  loft  style  apartments  with  an   eclectic  style.  Due  to  the  distinct  nature  of   loft  style  living,  we  do  not  feel  Sherman  Mills   lofts  are  in  direct  competition  with  The  Arbor   at  East  Falls.             Loft  Style   Square  footage   Price   Unit  1632   1,727   $1,790   Unit  1634   1,500   $1750   Unit  1322   724   $1,275   Shermanmills.net              Dobson  Mills       Located  in  East  Falls  and  less  than  a  block  from  Kelly  Drive.     Based  on  the  comparison  of  rental  units  within  one  mile  of   the  site;  all  amenities,  utilities  and  location  were   considered;  Dobson  Mills  is  most  comparable  in  pricing   The  Arbor  at  East  Falls.                 dobsonmills.net  
  • 32.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            32         Rental  Prices  for  The  Arbor     Maple:   Affordable  Rate  Housing   Bedrooms   Square  footage   Rental  Price   Studio   475  sq  ft   $895   One  Bedroom   750  sq  ft   $1495   Two  Bedroom   1250  sq  ft   $1995     Oak  and  Willow:   Market  Rate  Housing   Bedrooms   Square  footage   Rental  Price   Studio   475  sq  ft   $895   One  Bedroom   750  sq  ft   $1495   One  Bedroom  w/   den   900  sq  ft   $1795   Two  Bedroom   1250  sq  ft   $1995     Birch:   Market  Rate  Housing   Bedrooms   Square  footage   Rental  Price   Studio   475  sq  ft   $895   One  Bedroom   750  sq  ft   $1495   Two  Bedroom   1250  sq  ft   $1995                
  • 33.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            33         Transportation  Analysis       The  site  is  accessible  by  both  Septa  Bus  and  Regional  Rail  as  well  as  Indego  bike  share.  Although  the   primary  mode  of  transportation  is  by  vehicle  and  we  aim  to  modify  this  substantially.  By  utilizing  the   access  to  the  bus,  rail  and  bicycle  the  project  plans  to  interconnect  East  Falls  with  Wisshahickon   transfer  station,  Manayunk  and  Roxborough.  This  focus  on  transit  access  will  provide  the  vehicle  from   which  investors  can  spawn  opportunities  for  sustainable  growth  and  development.       Bus  Lines:     •  61  –  9th  market  to  Manayunk     •  R  –  Henry  Ave-­‐Midvale  and  Wissahickon  Transportation  Center  to   Frankford  Transportation  Center   •  K  –  Ridge  Ave  -­‐Midvale  to  Arrott  Transportation  Center   The  Wissahickon  Transfer  Station  is  nearby  as  well   Two  Regional  Rail  stops  provide  access  to  East  Falls.   (eastfallsdevelopment.org)                                  
  • 34.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            34       Transportation  Map           Commute  times  to  Philadelphia  Center  City        
  • 35.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            35       walkscore.com     Transportation  times                   Distance  traveled  in  20min  by:  Bicycle       Distance  traveled  in  20min  by:   Walking    
  • 36.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            36       walkscore.com                 Distance  traveled  in  20min  by:  Bus     Distance  traveled  in  20min  by:  Car       Walkscore.com    
  • 37.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            37       Community  Services         The  Arbor  at  East  Falls  is  conveniently  located  a  short  distance  from  several  diverse  services.  Residents   could  easily  run  most  errands  on  foot  or  bicycle  since  the  community  has  excellent  biking  lanes  and  will   be  soon  included  in  the  Bike  Share  program.  As  shown  in  the  previous  map,  the  site  also  has   accessibility  to  public  transportation  such  as  5  bus  lines  and  2  rail  lines.     The  variety  of  uses  around  the  site  makes  it  the  perfect  spot  to  live,  work,  and  play.               walkscore.com          
  • 38.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            38       Sustainability       The  apartment  complex  will  be  designed  around  sustainable  strategies,  some  of  the  passive   applications  responding  to  the  local  climate  and  other  active  devices,  such  as  solar  PV  arrays,  to  help   the  residences  be  environmentally  aware.  To  fully  achieve  sustainability  the  building  will  be  LEED  Gold   certified,  which  will  decrease  energy,  water  usage,  and  waste.       LEED  certification  will  increase  the  market  value  of  the  property;  users  nowadays  seek  for  this  type  of   credentials  in  buildings  and  studies  show  that  LEED  certified  buildings  are  occupied  up  to  98%.   These  sustainability  strategies  will  be  implemented:   Passive  Strategies   •  East  –  West  Orientation  will  minimize  heat  gain  during  sun  lowest  hours.   •  Use  of  external  shading  will  block  the  sun  during  the  summer  when  the  sun  is  higher,  and  will  still   allow  the  rays  to  heat  during  the  winter  low  sun  angles.   •  The  courtyard  will  be  shaded  to  create  a  comfortable  outdoor  space     Water  Efficiency   •  Green  Roofs  will  contribute  to  the  storm  water  management  of  the  site,  as  well  as  provide   recreational  areas  with  great  views  for  residents.   •  Rain  garden  will  serve  as  storm  water  management  as  well  as  flooding  prevention,  and  will  give  a   nice  view  of  the  complex  from  Kelly  drive.   •  40%  water  use  reduction  through  low-­‐flow  fixtures  installed  in  all  units.   - Reuse  of  rainwater  collected  from  impervious  surfaces  for  WC  and  landscape.     Energy   •  High  performance  building  envelope,  creating  an  interior  microclimate  keeping  a  comfortable   indoor  temperature  and  humidity  with  less  HVAC  usage.   •  High  efficiency  mechanical  systems,  which  will  save  C02  emissions  and  utility  fees.   •  Programmable  thermostats  in  each  unit.   •  Sub-­‐meters  for  electrical  utility.   •  ENERGY  STAR®  lighting  and  appliances.   •  Solar  panels.     Indoor  Air  Quality   •  Low-­‐VOC  paints,  primers  and  finishes.   •  High  efficiency  operable  triple  glazed  and  low-­‐E  windows.   •  Green  Label  carpets.  
  • 39.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            39       LEED  Scorecard  +  Backup  files                                                     LEED v4 for BD+C: New Construction and Major Renovation                   VERDE developers         Project Name:   The Arbor at East Falls                       Date:   16-Jul 15           Y   ?   N      1       Credit   Integrative Process   1                       1 2   4   1 6   Location and Transportation     16         1 6   Credit   LEED for Neighborhood Development Location   16       1     Credit   Sensitive Land Protection   1       2     Credit   High Priority Site   2     5       Credit   Surrounding Density and Diverse Uses   5     5       Credit   Access to Quality Transit   5     1       Credit   Bicycle Facilities   1     1       Credit   Reduced Parking Footprint   1       1     Credit   Green Vehicles     1                       7   1   0   Sustainable Sites     10     Y       Prereq   Construction Activity Pollution Prevention   Required     1       Credit   Site Assessment   1       1     Credit   Site Development - Protect or Restore Habitat   2     1       Credit   Open Space   1     2       Credit   Rainwater Management   3     2       Credit   Heat Island Reduction   2     1       Credit   Light Pollution Reduction   1                       8   0   0   Water Efficiency     11     Y       Prereq   Outdoor Water Use Reduction   Required     Y       Prereq   Indoor Water Use Reduction   Required  
  • 40.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            40         Y       Prereq   Building-Level Water Metering     Required     1       Credit   Outdoor Water Use Reduction   2     4       Credit   Indoor Water Use Reduction   6     2       Credit   Cooling Tower Water Use   2     1       Credit   Water Metering     1                       1 6   9   3   Energy and Atmosphere     33     Y       Prereq   Fundamental Commissioning and Verification   Required     Y       Prereq   Minimum Energy Performance   Required     Y       Prereq   Building-Level Energy Metering   Required     Y       Prereq   Fundamental Refrigerant Management   Required     3   3     Credit   Enhanced Commissioning   6     9   6     Credit   Optimize Energy Performance   18         1   Credit   Advanced Energy Metering   1         2   Credit   Demand Response   2     2       Credit   Renewable Energy Production   3     1       Credit   Enhanced Refrigerant Management   1     1       Credit   Green Power and Carbon Offsets   2       5   0   5   Materials and Resources     13   Y       Prereq   Storage and Collection of Recyclables   Required   Y       Prereq   Construction and Demolition Waste Management Planning   Required       5   Credit   Building Life-Cycle Impact Reduction   5   1       Credit   Building Product Disclosure and Optimization - Environmental Product Declarations   2   1       Credit   Building Product Disclosure and Optimization - Sourcing of Raw Materials   2   1       Credit   Building Product Disclosure and Optimization - Material Ingredients   2   2       Credit   Construction and Demolition Waste Management   2                   1 6   0   0   Indoor Environmental Quality     16   Y       Prereq   Minimum Indoor Air Quality Performance   Required   Y       Prereq   Environmental Tobacco Smoke Control   Required   2       Credit   Enhanced Indoor Air Quality Strategies   2   3       Credit   Low-Emitting Materials   3  
  • 41.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            41       1       Credit   Construction Indoor Air Quality Management Plan     1   2       Credit   Indoor Air Quality Assessment   2   1       Credit   Thermal Comfort   1   2       Credit   Interior Lighting   2   3       Credit   Daylight   3   1       Credit   Quality Views   1   1       Credit   Acoustic Performance   1                   0   0   6   Innovation       6       5   Credit   Innovation   5       1   Credit   LEED Accredited Professional   1                   0   0   4   Regional Priority       4       1   Credit   Regional Priority: Specific Credit     1       1   Credit   Regional Priority: Specific Credit     1       1   Credit   Regional Priority: Specific Credit     1       1   Credit   Regional Priority: Specific Credit     1                   65   14   34   TOTALS     Possible Points:   110   Location  and  Transportation   Credit  –  Surrounding  Density  and  Diverse  Uses     This  credit  will  be  achieved  by  the  great  diversity  of  existing  uses  surrounding  the  site.                                    
  • 42.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            42       Credit  -­‐  Access  to  Quality  Transit     The  site  has  access  to  5  bus  lines  and  1  regional  rail  line  in  less  than  5mi.                   Commute  times  to  Philadelphia  Center  City            
  • 43.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            43             Credit  -­‐Bicycle  Facilities   The  project  will  achieve  this  credit  providing  2.5%  of  retail  visitors  with  short-­‐term  bike  racks.  For   residential,  the  project  will  follow  the  4  spaces  min  per  building,  totaling  12  spaces  for  guests.  Long-­‐ term  bicycle  storage  will  be  provided  for  30%  of  the  buildings  residences.       No  showers  for  public  use  will  be  provided  since  the  commercial  use  is  mainly  short  stay  shopping.   Said  bike  racks  will  be  strategically  located  in  the  entrance  to  the  buildings,  100  yards  away  from  either   Ridge  Avenue  or  Kelly  Drive.  Designated  bike  lanes  are  less  than  200  yards  on  Kelly  Drive  and  they   connect  to  the  bike  lane  grid  of  Philadelphia.     East  Falls  is  considered  for  next  phase  of  Philly  Bike  Share  program  Indego,  which  will  benefit  the   growing  and  maintenance  of  the  biking  infrastructure.     Credit  -­‐  Reduced  Parking  Footprint   This  credit  will  be  achieved  by  not  exceeding  the  Philadelphia  code  for  parking  spaces.  (One  space  per   dwelling  units)  and  locate  the  entire  parking  structure  underground.  This  will  minimize  the  total   footprint  of  the  project,  decrease  the  amount  of  impervious  materials,  and  will  help  to  decrease  the   heat  island  effect.  Apart  from  the  spaces  designated  for  wheelchair  use,  there  will  be  spaces  for  car   pool  and  5%  of  spots  for  alternative  fuel  cars  in  preferred  locations.       Sustainable  Sites     Credit  -­‐  Site  Assessment   Site  analysis  was  engaged  early  in  the  of  the  project  process.  This  will  alow  the  architects  to  use  the   existing  infrastructure  and  orient  the  buildings  correctly.       Credit  -­‐  Open  Space   35%  of  the  space  is  open  in  the  project.  Most  of  the  open  space  is  on  Kelly  Drive  facing  the  Schuylkill   River  used  by  a  vegetated  berm,  rain  garden  and  terrace,  and  the  rest  is  in  the  courtyard,  allowing  the   complex  to  have  its  own  microclimate  because  of  the  vegetation  and  shade,  also  helps  to  provide   natural  lighting  to  all  the  apartments.     Half  of  the  rooftop  space  on  each  building  will  be  used  as  a  vegetated  roof  garden  for  the  residents.     All  the  plants  and  trees  used  in  the  landscape  will  be  native  to  the  region.    
  • 44.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            44             Credit  -­‐  Rainwater  Management   The  project  has  a  rain  garden  in  the  lowest  area  of  the  site  where  the  water  naturally  flows.  This   garden  and  the  green  rooftop  are  designed  to  collect  storm  water  and  help  replenish  the  water  basin.   The  water  collected  by  impervious  surface,  such  as  stone  and  tile  in  the  outdoor  corridors,  will  be   stored  in  an  underground  cistern  and  will  be  used  for  landscape  irrigation  and  water  collection   discharge.  These  strategies  will  help  to  mitigate  the  effect  of  a  flooding  event.     Credit  -­‐  Heat  Island  Reduction   - All  parking  will  be  underground.   - 50%  of  the  roof  will  be  vegetated,  50%  will  be  covered  by  energy  generation  systems.   - Impervious  materials  will  be  light  colored  and  high  albedo  (SR  0.33).       Credit  -­‐  Light  Pollution  Reduction   The  site  will  be  internally  illuminated  and  all  signage  for  retail  will  be  regulated  to  be  not  more  than   200cd/m3  at  night.  Since  the  site  is  located  in  a  LZ3  the  up  light  fixtures  will  be  U3  and  the  percentage   above  horizontal  will  be  3%.  No  upright  lighting  or  will  be  permitted.   Lighting  boundaries  will  be  closely  monitored  on  Kelly  Drive  for  vegetation  and  animal  life  on  the   Schuylkill  River.     Water  Efficiency     Credit  -­‐  Outdoor  Water  Use  Reduction   - Native  species  require  less  maintenance.   - 100%  of  landscape  need  will  be  satisfied  by  rain  water.   - Drop  irrigation  systems  will  be  installed  for  better  water  efficiency.       Credit  -­‐  Indoor  Water  Use  Reduction   - High  efficiency  devices  and  low  flow  fixtures  will  be  installed  in  private  and  public  spaces.   - Waterless  urinals  will  be  installed  in  commercial  areas.   - Rain  water  will  be  treated  and  re  use  for  wc  flushing.   - 40%  reduction  from  baseline.    
  • 45.                            Development  Proposal The  Arbor  at  East  Falls                                                                                                                            45       Credit  –  Cooling  Tower  Water  Use   This  credit  will  be  achieved  by  using  20%  of  recycled  water  for  cooling  towers  and  installing  high   efficiency  HVAC  systems.       Credit  -­‐  Water  Metering   - Meters  will  be  installed  in  all  buildings  and  outdoor  areas.   - Tracking  of  collected  water  and  water  use.   - Data  will  be  shares  with  USGBC  for  5  years     Energy  and  Atmosphere     Credit  –  Enhanced  Commissioning   - The  project  will  have  an  Operation  and  Maintenance  Plan   - The  verification  process  will  include:  Manual  updated  and  delivery,  Operator  training  and   effectiveness,  seasonal  testing.   - Review  of  building  operations  will  be  performed  10  months  after  completion.   - An  ongoing  commissioning  plan  will  be  developed.     - Thermal  envelope  will  be  included  as  part  of  commissioning  and  ongoing  plan.       Credit  –  Optimize  Energy  Performance   Energy  model  will  be  done  using  eQuest,  this  program  shows  graphic  and  numerical  outputs  of  savings   comparing  a  regular  building  against  the  strategies  used  to  achieve  energy  reduction.  This  process  will   comply  with  ASHRAE  90.1-­‐2010     Credit  –  Renewable  Energy  Production   Solar  array  on  roof  tops  (50%  of  area)  will  generate  up  to  5%  of  the  buildings  energy  requirements.     Credit  –  Enhanced  Refrigerant  Management   - No  use  of  CFC  refrigerants.   - Used  refrigerant  will  be  ODP  zero  and  GWP  of  less  than  50.   - 15%  or  less  store-­‐wide  annual  refrigerant  emission  rate.   - A  leak  test  will  be  conducted  using  Green  Chills  guideline.     Credit  –  Green  Power  and  Carbon  Offsets   - 100%  of  the  buildings  remaining  energy  (not  harvested  by  solar  means)  will  be  purchased  from   Green  Power.