OUR VISION

ULTIMATE
Total Engine Support
TES Aviation Group
2013
A Joint Venture Company ofā€¦

35%

40%

25%
TES Powerplant
Consultants
worldwide

Shop Visits,
Deliveries/
Consultancy Projects
managed in last 18
months

Engines Torn down in
the last 18 months

Stub Time Lease
Engines

Engines under TES
Management

Sq ft of Worldwide
Facilities ā€“ UK, Singapore,
USA, New Zealand,
Amsterdam
Engine Type Summary

CF6-80E

CF6-80C2

CF34-10
CF34-3

CFM56-3

Total APU

CFM56-5A
V2500-A5

CFM56-5B

V2500-A1
CFM56-5C
RR Trent 700

TRR Trent 500
RB211-535E4
CFM56-7
PW6000
PW4000-100
GE90

PW4000-94
PW120

PW127
PW125B
30,000 sq ft corporate office
space combined with a 100,000
sq ft warehouse and operations
area

9,000 sq ft facility providing
warehousing, logistics, parts and
engine storage

State of the art facility providing
support to the Asia Pacific region

The 10,000 sq ft Dallas office is the latest TES franchise to open and will play a major part in supporting the
delivery of innovative fleet management solutions, quality overhauled material supply and stub-time lease
engine provision all aimed at driving down the cost of ownership for the growing TES client base.
With offices opening around the globe, TES gets one step closer to its vision of providing the Ultimate
Total Engine Support while continuing its mission of providing platform solutions to global aircraft
engine partners underpinned by organisational excellence.
Providing Platform Solutions To Global Aircraft Engine
Partners Underpinned By Organisational Excellence
TES
PRODUCT
FOCUS
Category 1 Products

Internal focus of all aspects of aero engine ownership allows TES
to be innovative in our support of customers
CFM56-3

Category 2 Products
PW4000 (100ā€&112ā€)
CF6ā€“80E
CFM56-5A
CFM56-5C

PW4000 (94ā€)
CF6ā€“80C2
CFM56-3
CFM56-5B
CFM56-7B
RB211-535E4
V2500 A5/D5

CFM56-5B
CF6-80C2

CFM56-7B
RB211-535E4

V2500

PW4000
TES
ASSET
PURCHASE
TES are actively sourcing and reviewing all current and projected opportunities of
asset purchaseā€¦.
TES work closely with managed Fleet customers to evaluate planned lease and
material requirements. TES utilise this transparency to secure assets in support of
all planned maintenance activities in support of customer needs.
Many global opportunities are highlighted through relationship with DVB.
TES have been and desire to further expand our reaches in an attractive
exit strategy for all fleet phase out and renewal goals.
TES are interested in and welcome discussions on all
opportunities!
TES
IT
SYSTEMS

IT Systems help reduce risk and error by minimising
human interfaceā€¦..

- Engine Fleet Planning and Costing

- Quantum Component Inventory Management

- Financial System Management

- Project Management System

- Q Pulse Quality Management System
EFPAC Customers
- Rolls Royce
- Aeromexico
- Snecma
- Willis
- Air New Zealand
- KLM City Hopper
- Jet2.com
- Monarch
- TES Aviation Group
The custom built engine fleet planning and costing software,
providing excellence in the technical and financial
management of aircraft engines.

The Aircraft Engine
Management System

Specifically designed for power plant engineers and finance departments, EFPAC's integrated financial and technical data allows
easy engine removal planning and financial forecasting in addition to the following:- Knowledge management system software offering complete asset risk management.
- Lease engine portfolio management system
- Residual planning and engine condition value analysis
- Integrated with TES customer programs and systems
- Maintenance reserve and cash flow management
- Invoice analysis and engine cost modelling
- Material scrap rates and demand forecasting

EFPAC comes complete with a full suite of financial and technical reports, ensuring that all essential
information is readily available.
EFPAC Reports include:
- Cash flow forecast charts
- Individual detailed shop visit cost predictions
- Full 5 year engine removal plans (or any other period you wish to see)
- CPH analysis
- Maintenance reserve accrual charts
TES
SALES
CONSIGNMENT

The Material Operations department at TES offer complete
management and re-marketing of customer surplus aircraft
engine and component material available for re-sale

Full Service Support including:
- Management of inspection, repair and modification process for all components using internal
and external resources to maximise re-marketability

- Compilation of all necessary trace and regulatory paperwork associated with each
component
- Management of all logistical requirements
- Storage of all material in secured bonded stores

- Maintenance of accurate inventory listings through specialised software, detailing
location and condition of each component
- Regular communication and monthly reporting to each customer, detailing sales
prices achieved, costs incurred, and current/remaining inventory listing
TES
PORTFOLIO
MANAGEMENT

Designed to produce Lower Cost of Ownership for all
Operators and Lessorsā€¦.

ENGINE SPECIALISTS Offering Complete Engineering Solutions in:

- Long term client Fleet Management Programs ā€“ Airlines/Lessor
- Aircraft Transitions (Engines) ā€“ Deliveries/Redeliveries

- Shop Visit Management (SVM)
- ā€˜Ad Hocā€™ Consultancy
TES
ENGINE
LEASE

Airlines are increasingly implementing fleet renewals through operating
leases rather than shoulder the burden of direct purchase which invariably
restricts operating cash-flow.
Greatest Asset in TESā€™ Portfolioā€¦.Experienced Staff and Established
processes, backed by trusted financial support from DVB

TES focus on core products for lease support in the RB211-535E4, CF6-80C2,
CFM56-3B and PW4000
TES
ENGINE
TEARDOWN
- Full teardown capabilities controlled in an EASA145 approved facility for RB211-535E4
- Component change and borescope capability for:

RB211-535E4, PW4000, CFM56 and
CFM6-80

- Additional products teardown capability under review

- Full engine storage capability including preservation and logistics
- TES have available engine shipping stands for the RB211-535E4,
CFM56-3, CFM56-5C, CF6-80C2, V2500, and PW4000
- EASA 145 Approved Maintenance Organisation
- Approval No. UK.145.01226
TES
PARTS
REPAIR

Why Consider TES
for Repair Vendor
Management?

TES vendor repair management services are utilised on TES owned assets. Vendor repair
managers communicate frequently with the material sales team to ensure priority components
are dispositioned accordingly in a cost/time effective manner.
TES repair engineers have extensive MRO experience, allowing for effective AD,
SB and P/N upgradeability control allowing for accurate cost modelling and
marketability

TES have established solid relationships with many MROā€™s through
experience on owned assets, with the likes of AMECO, HAESL,
ESA, MTU, LHT, SRT, IBERIA etc.

Brokered Repair Management services - Caters for lack of in-house
expertise or frees up internal resources if present. Operating on a
ā€˜nothing to loseā€™ philosophy, all stages of component repair are managed
with minimal, in any, input required from customer.
TESā€™ diverse portfolio of Approved Vendors are tailored for EASA, FAA and CAAC requirements and
provide customers with a single source for all repair needs. To name a few ATI, TAT, IAT, TOS,
CHROMOLLOY, HONEYWELL, TRIUMPH, HAMILTON SUNSTRAND.
TES
CLIENT
ACTION PLANS
TES Aviation Group is continually working with clients to
enhance their operation and support in the drive to
reduce the cost of their operation.
This is achieved through various methods but one of the
key initiatives is the Power Plant Review Board (PPRB)

This regular forum looks at all aspects of the operation of
engines covered by a Fleet Management Programme not
only from a technical view point but also commercial.

This interaction with customers is expanded to look at
fleet expansion or renewal projects to provide, once
again, detailed technical aspects combined with
commercial considerations
TES
PARTS
SALES

WIN - WIN
Can be achieved for both parties through
effective material procurement and
management

TES Aviation Group prides itself on the high standard of all
certification and trace paperwork, managed in accordance with
stringent internal quality procedures.

A significant number of engine and piece part consignment projects have
been undertaken on behalf of our customers, with material being sold
through our extensive network of sales outlets built up over years of
trading.
All material is certified with FAA/EASA/CAAC
certification as required by the customer.
All material is sold in serviceable/overhauled condition to our
customers utilising TES comprehensive fleet management, MROā€™s,
Airlines and independent suppliers.

Due to visibility of Shop Visit material requirements for TES Fleet Management customers, TES
actively pursues the market for all opportunities of Asset purchase to support future SVā€™s through
material supply
TES
QUALITY
SYSTEMS

Industry Certifications show a commitment to Quality that
other organisations and customers can rely onā€¦..

The majority of accreditations are voluntarily implemented, highlighting TESā€™s desire to provide and
operate under safe and effective working practices.

TES are currently certified with the following:ISO 9001 - Quality management system
FAA AC 00-56A - A voluntary industry distributor accreditation programme
EASA 145 approved to carry out:
ļƒ˜Borescope inspections on RB211-535E4, PW4000-94ā€ series, CF6-80C2
and CFM56 series
ļƒ˜Component removal and replacement
ļƒ˜Fan blade changes
ļƒ˜Fan modules changes
ļƒ˜Gearbox module changes

Approval No. UK.145.01226
Engine Fleet Management - Reporting
Monthly Report
ā€¢ Fleet Summary table
ā€¢ Engine Condition and Health Monitoring
ā€¢ Critical Airworthiness Document Inspection & Tracking
ā€¢ Life Limited Parts Status
ā€¢ Fleet Campaign Status
Quarterly Report
ā€¢ Detailed engine removal plan
ā€¢ Cash Flow Forecast / Maintenance Budget Forecast

Quarterly PPRBTM agenda and minutes (Powerplant Review Board)
ā€¢ Customer Operational Review vs Worldwide Fleet
ā€¢ Shop Visit Summary
ā€¢ Engine Management Program Control and update
ā€¢ ETOPS and Fleet Campaigns
CASE STUDY - Savings through Active Fleet Management
TES saved an operator $2M of lost revenue through active fleet management services

The Scenario
The operator had leased 2 aircraft (4 engines) across a 5 year lease term. The lease return conditions for the
aircraft required that all engines were to have operated less than X hours and X cycles since performance
restoration shop visit at the point of lease return. The aircraft had been leased prior to the introduction of the TES
Fleet management Program, and as the operator had little experience with the engine model concerned, had
agreed lease terms which were not in their favour. As a result, the operator was faced with approximately $2M in
exposure of which they were unaware.

TESā€™s Service
Following a review of the lease agreement and using TES experience of the engine model concerned, TES
subsequently identified that the lease return conditions previously agreed were unnecessary. Based on the onwing performance of the engines and the projected condition at lease return, TES advised the operator that the
shop visits required to meet return conditions were unnecessary and subsequently renegotiated successfully the
return conditions with the Lessor on behalf of the operator in order to eliminate the shop visit requirement.

The Outcome
As a result of the maintenance reserve rates that had been previously agreed, and the
premature removal of the engines driven by the return conditions, the expected
shortfall in maintenance reserves of approximately $500K per engine was eliminated
completely, removing $2M of unexpected cash liability from the operator.
Shop Visit Management ā€“ TES Service
Engine Maintenance Contract Negotiation.
Removal reason / technical status review (Maintenance and Performance).
Engine Workscope definition to achieve build and lease objectives.
Engine shop incoming inspection oversight.
Disassembly control ā€œDirty Condition inspectionā€ ā€“ Workscope amendment.
Material Management ā€“ 80% of maintenance cost.
Timely technical, commercial and financial decision making.

Test Cell overview / review.
Engine Release paperwork verification.
Invoice Review and Negotiation, Warranty Claims, Material
Scrap Review

Case Study
Shop Visit Management ā€“ TES Objectives
Management by experienced and professional engineering staff.
Complete logistic, technical, financial and commercial control.
Optimisation of Engine Workscopes ā€“ Operating and Lease Conditions.
Optimisation of build material objectives ā€“ ā€œRun Vs Newā€
Minimise Engine Maintenance Cost Exposure ā€“ Cost of Ownership
Removal of operational burden from the airlines Senior Management.

Main Objective = Maintain reliability and reduce cost exposure
Shop Visit Management - Reporting
Detailed Engine Workscope ā€“ Optimised and Controlled
Cost estimation and update.
Regular shop visit status reporting (Financial risks, logistics, TAT etc)
Dirty Condition Reporting ā€“ At point of engine disassembly
Invoice Review document - amounts authorised and disputed

Detailed Post Shop Visit Report ā€“ Technical, Financial and Commercial

Comprehensive Reporting throughout the Shop Visit process to
ensure 100% visibility
CASE STUDY - Savings through Engine Shop Contract Negotiation / Tender
TES saved an operator over $2M through negotiation of the terms of an MRO repair contract.
The Scenario
The operator had recently introduced a new engine type into their fleet and was looking to implement a long term
repair contract with a single MRO for the future maintenance of their engines. The operator was not experienced
with the engine type concerned and mindful of TES experience in successfully negotiating terms of repair
agreements, requested TES to conduct a tender process to include negotiation of contract terms on the operatorā€™s
behalf.

TESā€™s Service
TES contacted each of the MROā€™s which held approvals for repair of the engine model concerned and requested a
commercially competitive proposal based on fleet size and anticipated shop visit schedule, which TES had previously
defined. Upon receipt of each proposal, TES compared the different terms using a pre-defined model and TES
experience of each MRO and prepared a shortlist of potential candidates for the operator. Following an agreement of
the shortlist, TES undertook a phased negotiation process advising each MRO of the shortfalls in their proposed
terms, and negotiating in each area until the desired outcome was achieved. Following a pre-agreed period of
negotiation with all short listed MROā€™s, the successful MRO was identified and terms were agreed that presented
both limited risk to the operator and reduced cash outlay at each shop visit event.

The Outcome
As a result of the improved contract terms negotiated by TES in the final agreed contract, a
total of approximately $2M in reduced maintenance cost across the operators shop visit
program was achieved.
ā€œAd Hocā€ Consultancy
Access to TES knowledge and experience beyond the contract.
Provide flexibility to contract TES ā€œproject by projectā€.
Typical Projects :
ā€¢ On site technical inspections ā€“ Aircraft Transitions
ā€¢ Engine Shop Quality Audits
ā€¢ Engine Repair Contract Negotiation
ā€¢ Engine Valuations etc

Flexibility to benefit from TES extensive knowledge base

Consultancy Helpdesk
TES can tailor a flexible ā€œhelpdeskā€ package which offers clients the opportunity to draw
on the wide range of TES experience on an ad-hoc basis. All clients also benefit from a
dedicated Program Manager who as a single and focused point of contact, is well placed
to be responsive to all the needs of the client.

Case Study
Savings through Documentation Inspection
TES saved a leasing company $870K through diligent inspection of engine documentation.

The Scenario
A Lessor had recently deployed TES to overview an engine shop visit that was being performed by one of their
Lessees. This was to ensure that the workscope carried out by the Lessee met their obligations in accordance with
the terms previously agreed between both parties. The engine completed repair and the MRO shop visit records
were provided to TES by the Lessor for review.

TESā€™ Service
TES conducted a full review of the post-shop visit documentation, checking all areas of the paperwork for accuracy,
including the AD status, LLP status, SB status, LLP back to birth trace, on-off logs and test cell results.
Following this review, TES discovered that a turbine blade had been installed that did not meet the build goal for the
engine. TES had previously agreed the maximum threshold for turbine blade life with the MRO, although the MRO had
not followed this agreement and only upon inspection of the post shop visit documentation was it identified that this
was the case. The number of hours and cycles accumulated on the blade at installation did not conform to the soft life
management program currently in place for this part and therefore TES recommended that the blade be removed
from the engine and replaced with a suitable part at the expense of the MRO.

The Outcome
As a direct result of TESā€™ documentation review, a premature engine removal for HPT blade
deterioration was avoided at an anticipated cost of $870K.
Transition Management & Repossessions of A/C Engines
TES understands that from a Lessor perspective, ensuring a seamless transition of
serviceable aircraft between parties is vital to realise maximum operational value
from both the engines and aircraft asset as a whole
TES possesses considerable experience in the management of commercial conditions
associated with engine transitions.

Case Study

TES can provide support with technical interpretation of commercial conditions attached to a lease or
sale/purchase agreement.
TES provides operators reassurance that all technical and commercial considerations required to mitigate exposure
to the airline during the transition process are addressed.
TES is able to draw on extensive experience in the field of transition management performed for both Airlines and
Lessors alike
TES engineering team consists of seasoned professionals with the skills necessary to ensure that all physical and
documentation requirements necessary to ensure a seamless transition are met.
In unfortunate circumstances where an aircraft has been, or is expected to be repossessed, TES has
the necessary experience to provide the required level of engine support, whilst
simultaneously demonstrating an appreciation of the sensitive issues associated with
the transition.
Savings through A/C Engine Transition Management
TES saved a Lessor $1.5M through management of an aircraft transition.

The Scenario
The Lessor was in the process of taking redelivery of an aircraft in preparation for onward lease to another operator. TES
were contracted to manage the transition of the engines ensuring that all contractual return conditions were satisfied and
that the engines were in the condition required to meet the delivery conditions agreed between the Lessor and the next
operator.

TES' Service
TES conducted a thorough review of all engine documentation for accuracy and completeness, producing an engine
delivery documentation package that the Lessor could provide to the next operator to facilitate the transition. TES also
provided on site presence during the transition process, including overview of engine ground runs, borescope inspections,
external hardware inspections and component inventory checks.

The Outcome
During the inspections, TES discovered documentary evidence pointing to an internal oil leak. Following further on wing
tests, it was confirmed that an internal oil leak had occurred and as a result the engine would not satisfy the lease return
conditions. The engine was subsequently routed to shop in order to rectify the leak at the expense of the operator. The
resulting shop visit cost was approximately $1.5M, which had the leak remained undetected during the transition process,
would have been the responsibility of the Lessor during the next lease term.
Airline/Lessor
Customer

Engine Fleet
Management

Overhauled
Material Support

Lease Engine
Support
Engine Fleet Management Programs
ā€œTurn-keyā€ solution with an experienced team that can take over management IMMEDIATELY
Engine Records
Manager
Documentation
& Control

Program Manager
(For each Airline/Lessor
Customer)
Material
Management
Parts Sourcing &
Supply

EFPAC
Technical &
Commercial
Forecasting

Asset
Management
Engine Lease

Engine Specialists
Rolls Royce

Pratt & Whitney

GE /CF6/CF34

CFM56-3/5/7

IAE-V2500

APUā€™s

35
Engineers in support from OEM, MRO and
Airline backgrounds

Resource flexibility to ā€œramp up supportā€ when the pressure is on & adapt to changing
engine fleet profiles - without the in-house costs & structure
Reliability Program
Engine Management Program
Engine Fleet Planning & Costing
System forecasting

A/C Lease Contract
Negotiation

SV Forecast
MRO Contract
Negotiation
SV Management
Material Support

Spare Engine
Provisioning

A/C delivery/re-delivery
forecast
Delivery/Re-delivery
Compliance
Reliability Program

Inputs

Outputs

SB / AD Status
Monthly Utilisation
Thrust ratings
BSI reports
EGTM, vibration, N1/2/3
speeds and fuel flow
Oil consumption rates
On-wing maintenance data

Engine health/trend
monitoring & recommendations
Quarterly Powerplant Review Board forum (AD &
SB incorporation recommendations)
ETOPS Status
Assessing fleet trends and Corrective on wing and
off wing actions (Fleet Campaigns)

Benefits
Trends highlighted and trouble shooting facilitated to prevent UERā€™s ā€“ $500k+ per event
Reliability Statistics managed below industry rates to maintain competitive edge. (Dispatch Reliability/UER/ABTO/IFSD etc)
Cost vs benefit justification made for each SB recommended for inclusion in the EMP (Decisions recorded at PPRB Mtg)
TES OEM GTAā€™s (CFMi) permit TES to interact directly with OEM Tech Support and lessons the burden on the client.
TES are EASA145 approved for Engine Borescoping (CFM Series ; PW4000, RB211-535, CF6-80C2).
Our systems and procedures are compliant with Part M, Sub Part G regulations.
Engine Management
Program (EMP)

Inputs

Outputs
Baseline workscope for engine
maintenance
Baseline service bulletin standard
for engine maintenance
Definition of the standard
practices, processes and
procedures to be employed
during engine maintenance

OEM conference attendance
OEM GTA subscription
Chapter 5 limits
TES Engine guidelines documents
TES knowledge base (IP)

Benefits
EMP built on TES ā€œTotalā€ Experience (Engine Portfolio : 600+ engines ; 100+ Maintenance Events/Yr)
EMP Optimised for Clients needs and tailored to their individual operation (Regulatory Compliance and Commercial Sense)
Baseline SB definition can save $50k per engine maintenance event through elimination of unnecessary application.
Material Hardware standards fully understood and documented to drive reliability and lower cost of operation $$$$
TES investment in OEM GTAā€™s ensures the experience of our team grows to be able to provide the most current
advise and recommendations. (Direct access to conferences, training, manuals and OEM technical support)
Compliance with regulatory obligations to demonstrate maintenance standards compliance
Engine Fleet Planning and Costing
system forecasting

Inputs

Outputs

Technical :
Utilisation Hrs & Cyc
Thrust rating
Trend Monitoring
LLP Stack
Tech Publications ā€“ ADā€™s etc
Engine Condition ā€“ BSI
Detailed EFPAC Workscoping Models
Operational :
C-Check / D-Check Slots
Aircraft Availability

Removal / Maintenance Schedule
Staggered for lease engine availability
Scheduled to fit aircraft down time
Optimised based on technical condition
Scheduled to deliver end of lease objective
Clarity of Lease engine requirements & policy

Removal/SV
Forecast

High level Workscope per event
Workscope to deliver future operation.
Optimised to fit MR levels / Lease conditions
Optimised for P&L considerations

Commercial :
Lease Return Conditions
Lease Engine Availability

Maintenance costs per event
Material scrap rates defined based on known
condition
Costing models deliver costs by workscope

Financial :
Maintenance Reserve Provision
P&L Considerations
Lease engine rates
Detailed EFPAC Costing Models

Financial Projections:
Maintenance Budget Cash Flow Reports
Engine Lease Costs
Maintenance Reserve Status and Draw down
Cost per hour

TES Intellectual Property (IP)
Engine Fleet Planning and Costing
system forecasting Contdā€¦

Benefits

EFPAC system ā€œBuilt on TES Expertiseā€ provides a secure centralised source for all engine technical and commercial data
Proprietary costing models ensure accurate projection and PREDICTABILITY of future maintenance exposure ā€“ NO SURPRISES
TES expertise delivers optimised and adaptable removal programs to ensure lowest cost of operation $$$$
Lease engine reduction by appropriate removal stagger based on known conditions (approx $250k per lease per event)
Lease Redelivery Planning to ensure compliance with end of lease conditions ā€“ Unforeseen maintenance ($1M+ per event)
Lease negotiation ā€“ Eliminate need for a shop visit or obtain MR ā€œTop Upsā€ based on forecast ($500k to $1.5M per event)
Proactively projects shortfalls in Maintenance Reserves ā€“ to plan additional accrual or work scope change to mitigate shortfall
Advanced visibility of fleet requirements to facilitate advanced discounted material procurement
Negotiation of VERY competitive lease terms ā€“ We provide the tools through accurate forecasting to establish the best deal
Financial considerations can be made according to operator preference ā€“ P&L impact etc
MRO Contract
Negotiation

Inputs

Outputs
Structured proposal assessment process
Negotiation and assessment of relative benefits being
offered.
Bottom line financial analysis and impact over the term
of the contract
Assessment of relative benefit of T&M vs. CPH
TES experience with the maintenance providers ability to
deliver the clients priorities

Shop Visit Schedule
Detailed workscopes per event
Detailed RFQ document
Marking matrix based on RFQ
Weighting based upon Clients Priorities

Benefits
Presentation of SV forecasts as part of the RFQ entices MROā€™s to submit competitive bids based on known facts.
Removal plan & workscope knowledge utilised to negotiate key terms with maximum financial impact.
Accurate maintenance projections enable TES to present the pitfalls or advantages of CPH contracts over T&M
Market knowledge gained through numerous RFQ projects performed for a range of clients across a spectrum of
engine types
Negotiation of a contract mindful of Client priorities (Cost/Quality/TAT etc.)

$Saving per event of TES negotiated contract = $110k
SV Management

Inputs

Outputs
Detailed engine workscope tailored to meet build objectives.
Ongoing Management by experienced Powerplant
Consultants.
Workscoping decisions based on technical / commercial and
financial awareness.
Documentation and technical assessment of material supply.
Communication of budget/estimate status and impact of
decisions throughout the shop visit
Onsite presence during key phases of maintenance
Detailed invoice review and negotiation
Scrap material assessment
Regular reporting

Technical condition at removal
Build life objectives
Engine Removal Records
Engine Airworthiness Records (AD / SB / LLP
etc)
On watch items
Engine Management Program (EMP)
Financial and MR Status
Commercial lease conditions
Pre-provisioned material

Benefits
Repair process proactively managed, not left in total control of repair facility ā€“ (potential $500k + escalation if left unmanaged)
Workscopes optimised and disassembly controlled to meet operational need (Lease obligations, time on wing requirement etc.)
Technical findings throughout the management process analysed with consideration for the best commercial outcome.
Hardware standards and repairability of material assessed based on actual condition and durability required for future
Continual visibility of the financial position of your asset within the MRO ā€“ ā€œBig pictureā€ commercial decisions made
Maintenance of TRT focus, limiting lease engine costs

$100k (Average saving per ESV event)
Material Support

Inputs

Outputs

Expected Material Scrap Rates per event
Material volume expectation defined
Material Supply agreements finalised
Material supply policy defined (Direct to MRO / Client)
Pre provisioning policy agreed
TES asset purchases to deliver client requirements

Pre ā€“ Provisioning of material
Material documentation fully verified to TES Standard
Logistics & Quality control
TES Program Manager not conflicted to buy TES Material
Material supplied to deliver program objectives otherwise not
offered.
Deliver WIN-WIN-WIN product

Benefits
Flexibility to accommodate changes in material requirement due to altered redelivery dates, workscope
escalation, OEM imposed limitations on LLPā€™s etc.
TES has and continues to purchase whole engine assets for teardown to support future material
requirements of Clients (aided by DVB support)
Ability for provision of Category 2 and 3 parts in addition to Category 1, in order to fit maximum USM for
delivery of lowest maintenance cost achievable
Can supply direct to MRO through strategic alliances to improve cash flow for operator

$150k
(Very conservative saving per ESV event)
Spare Engine
Provisioning

Inputs

Outputs
Technical needs assessment (Life, standard etc)
Location & provision of spare engines (TES or Others)
Negotiation of lease conditions with other providers
Establishment of a TES lease engine GTA
Potential Guaranteed access agreements
Logistics management

Shop Visit Schedule
Long / Short Term Requirement

Benefits
Low ā€˜greenā€™ time remaining tear down candidate engines allow TES to offer very flexible return conditions
(based on SV forecast)
Advance spare engine requirements highlighted and provisioned in time for requirement
All engines serviceable under EASA/FAA 145 requirements
Logistics headaches taken care of by TES experienced team
GTA arrangements create ease of re-leasing

$30K
(Example saving of using TES lease engine
against current market rates, per ESV event)
A/C Lease Contract
Negotiation

Inputs

Outputs

Pre Purchase LOIā€™s
Lease contracts
Pre ā€“ Purchase Engine Records
SV forecast and Removal Schedule

Negotiation of Technical Delivery and Redelivery terms based
upon actual condition.
Negotiation of MR rates and structure based upon know
maintenance schedule throughout lease.
Verification of documentation standard requirements based
upon condition of those delivered with the aircraft.
Assessment of Engine Standard and suitability and durability
for the clients operation

Benefits
Lease commencement safe in the knowledge you have the best deal and major liabilities limited.
Terms defined that reflect asset condition not general market rates.
Terms that permit sensible draw down of agreed Maintenance Reserves
Clarity of expected return condition with which to accurately project maintenance cost exposure across the lease

Huge Financial Exposure of getting it wrong - $1M+ per engine
Delivery/Re-delivery
Compliance

Inputs

Outputs
Assessment of Engine standard and suitability and
durability for the clients operation
Verification that technical delivery condition matches that
in the LOI
Detailed records review to ensure airworthiness and
confirm re-delivery requirements match those presented
at delivery.
Physical engine inspections, performance runs and test
flightsā€¦confirm current airworthiness and future on wing
capability
Identification of issues with high technical / commercial
and financial impact to the client for negotiation.
Definition of Exceptions to the lease prior to aircraft
acceptance
Compilation of an Engine Delivery File

Signed LOIā€™s / Lease Agreement
Detailed Historical Engine Records
SV forecast and Removal Schedule

Benefits
Verification and resolution that the assets condition being received match the terms of the lease and
definition of any exceptions
Technical acceptance by experienced staff to mitigate clients liability across the lease (Technical and
Commercial)
Burden of such resource intensive activity taken by TES

Potential Liability Huge - $500k +

(i.e. Damage out of or close to AMM not captured prior to delivery causing early engine removal)
TES Aviation Group ā€“
Providing platform solutions to global aircraft
engine partners underpinned by
organisational excellence
www.tes-uk.com

More Related Content

What's hot

Sepang Aircraft Engineering Corporate Presentation 2018
Sepang Aircraft Engineering Corporate Presentation 2018Sepang Aircraft Engineering Corporate Presentation 2018
Sepang Aircraft Engineering Corporate Presentation 2018Praveen R Rajagopal
Ā 
Airbus military customer services update 2012
Airbus military customer services update 2012Airbus military customer services update 2012
Airbus military customer services update 2012ICSA, LLC
Ā 
A400 m training 2012
A400 m training 2012A400 m training 2012
A400 m training 2012ICSA, LLC
Ā 
NNRAviatech
NNRAviatechNNRAviatech
NNRAviatechN. Islam
Ā 
Fltechnics 120121110859-phpapp01
Fltechnics 120121110859-phpapp01Fltechnics 120121110859-phpapp01
Fltechnics 120121110859-phpapp01andy928
Ā 
An Update on Airbus Military Training Programs, May 2013
An Update on Airbus Military Training Programs, May 2013An Update on Airbus Military Training Programs, May 2013
An Update on Airbus Military Training Programs, May 2013ICSA, LLC
Ā 
robert resume 4-11-16
robert resume 4-11-16robert resume 4-11-16
robert resume 4-11-16Robert Pearson
Ā 
Mclarens Article
Mclarens ArticleMclarens Article
Mclarens ArticleMark Rogers
Ā 
Requirements quality management within the airbus group v3
Requirements quality management within the airbus group v3Requirements quality management within the airbus group v3
Requirements quality management within the airbus group v3The REUSE Company
Ā 
Osman Butt Resume
Osman Butt ResumeOsman Butt Resume
Osman Butt ResumeOsman Butt
Ā 
AirFleet Managers
AirFleet ManagersAirFleet Managers
AirFleet ManagersVimalPriya3
Ā 
Aviation spare parts supply chain management optimization at Cathay Pacific a...
Aviation spare parts supply chain management optimization at Cathay Pacific a...Aviation spare parts supply chain management optimization at Cathay Pacific a...
Aviation spare parts supply chain management optimization at Cathay Pacific a...Monzer Osama Alchikh WARAK
Ā 
CV Werner Rothenbaecher_20151029
CV Werner Rothenbaecher_20151029CV Werner Rothenbaecher_20151029
CV Werner Rothenbaecher_20151029Werner Rothenbaecher
Ā 
Dragon aviation capital presentation v04 latest 08 sep2019
Dragon aviation capital presentation v04 latest 08 sep2019 Dragon aviation capital presentation v04 latest 08 sep2019
Dragon aviation capital presentation v04 latest 08 sep2019 JeffersonDing2
Ā 
Aviation Recruiting Power Point
Aviation Recruiting Power PointAviation Recruiting Power Point
Aviation Recruiting Power PointMarc Ballgae
Ā 

What's hot (16)

Sepang Aircraft Engineering Corporate Presentation 2018
Sepang Aircraft Engineering Corporate Presentation 2018Sepang Aircraft Engineering Corporate Presentation 2018
Sepang Aircraft Engineering Corporate Presentation 2018
Ā 
Airbus military customer services update 2012
Airbus military customer services update 2012Airbus military customer services update 2012
Airbus military customer services update 2012
Ā 
A400 m training 2012
A400 m training 2012A400 m training 2012
A400 m training 2012
Ā 
NNRAviatech
NNRAviatechNNRAviatech
NNRAviatech
Ā 
Fltechnics 120121110859-phpapp01
Fltechnics 120121110859-phpapp01Fltechnics 120121110859-phpapp01
Fltechnics 120121110859-phpapp01
Ā 
Aviation Recruiting
Aviation Recruiting Aviation Recruiting
Aviation Recruiting
Ā 
An Update on Airbus Military Training Programs, May 2013
An Update on Airbus Military Training Programs, May 2013An Update on Airbus Military Training Programs, May 2013
An Update on Airbus Military Training Programs, May 2013
Ā 
robert resume 4-11-16
robert resume 4-11-16robert resume 4-11-16
robert resume 4-11-16
Ā 
Mclarens Article
Mclarens ArticleMclarens Article
Mclarens Article
Ā 
Requirements quality management within the airbus group v3
Requirements quality management within the airbus group v3Requirements quality management within the airbus group v3
Requirements quality management within the airbus group v3
Ā 
Osman Butt Resume
Osman Butt ResumeOsman Butt Resume
Osman Butt Resume
Ā 
AirFleet Managers
AirFleet ManagersAirFleet Managers
AirFleet Managers
Ā 
Aviation spare parts supply chain management optimization at Cathay Pacific a...
Aviation spare parts supply chain management optimization at Cathay Pacific a...Aviation spare parts supply chain management optimization at Cathay Pacific a...
Aviation spare parts supply chain management optimization at Cathay Pacific a...
Ā 
CV Werner Rothenbaecher_20151029
CV Werner Rothenbaecher_20151029CV Werner Rothenbaecher_20151029
CV Werner Rothenbaecher_20151029
Ā 
Dragon aviation capital presentation v04 latest 08 sep2019
Dragon aviation capital presentation v04 latest 08 sep2019 Dragon aviation capital presentation v04 latest 08 sep2019
Dragon aviation capital presentation v04 latest 08 sep2019
Ā 
Aviation Recruiting Power Point
Aviation Recruiting Power PointAviation Recruiting Power Point
Aviation Recruiting Power Point
Ā 

Viewers also liked

IAEA - ENGINE MRO PLANNING 04032012
IAEA - ENGINE MRO PLANNING 04032012IAEA - ENGINE MRO PLANNING 04032012
IAEA - ENGINE MRO PLANNING 04032012rezaeiho
Ā 
Corporate Aviation Motion Products / VIP Market
Corporate Aviation Motion Products / VIP MarketCorporate Aviation Motion Products / VIP Market
Corporate Aviation Motion Products / VIP Marketedtichy
Ā 
Piston Engines: Overview and Mechanical Arrangement
Piston Engines: Overview and Mechanical ArrangementPiston Engines: Overview and Mechanical Arrangement
Piston Engines: Overview and Mechanical ArrangementJess Peters
Ā 
Basics of Flight and Aerodynamics (Groups B/D)
Basics of Flight and Aerodynamics (Groups B/D)Basics of Flight and Aerodynamics (Groups B/D)
Basics of Flight and Aerodynamics (Groups B/D)Logan Nielsen
Ā 
Engine stock control article
Engine stock control article Engine stock control article
Engine stock control article Mohammed Hadi
Ā 
Po f lo5 p1
Po f lo5 p1Po f lo5 p1
Po f lo5 p1sin2s
Ā 
Piston Engines: Propellers
Piston Engines: PropellersPiston Engines: Propellers
Piston Engines: PropellersJess Peters
Ā 
Pistones
PistonesPistones
Pistonesjhongplata
Ā 
Diapositiva Drones
Diapositiva DronesDiapositiva Drones
Diapositiva DronesEdson Galindo
Ā 
Piston Engines Types
Piston Engines TypesPiston Engines Types
Piston Engines TypesJess Peters
Ā 
Far 23 PROPELLER ENGINE INTERFERENCE DESIGN
Far 23 PROPELLER  ENGINE INTERFERENCE  DESIGN Far 23 PROPELLER  ENGINE INTERFERENCE  DESIGN
Far 23 PROPELLER ENGINE INTERFERENCE DESIGN Paul Raj
Ā 
Piston- Internal Combustion Engine
Piston- Internal Combustion EnginePiston- Internal Combustion Engine
Piston- Internal Combustion EngineDanny Joel
Ā 

Viewers also liked (19)

Loss of Control Series: MultiEngnie
Loss of Control Series: MultiEngnieLoss of Control Series: MultiEngnie
Loss of Control Series: MultiEngnie
Ā 
Situaciones de aprendizaje
Situaciones de aprendizajeSituaciones de aprendizaje
Situaciones de aprendizaje
Ā 
IAEA - ENGINE MRO PLANNING 04032012
IAEA - ENGINE MRO PLANNING 04032012IAEA - ENGINE MRO PLANNING 04032012
IAEA - ENGINE MRO PLANNING 04032012
Ā 
Drones
DronesDrones
Drones
Ā 
Corporate Aviation Motion Products / VIP Market
Corporate Aviation Motion Products / VIP MarketCorporate Aviation Motion Products / VIP Market
Corporate Aviation Motion Products / VIP Market
Ā 
Piston Engines: Overview and Mechanical Arrangement
Piston Engines: Overview and Mechanical ArrangementPiston Engines: Overview and Mechanical Arrangement
Piston Engines: Overview and Mechanical Arrangement
Ā 
Airworthiness: Potential for Propeller Failures
Airworthiness: Potential for Propeller FailuresAirworthiness: Potential for Propeller Failures
Airworthiness: Potential for Propeller Failures
Ā 
Basics of Flight and Aerodynamics (Groups B/D)
Basics of Flight and Aerodynamics (Groups B/D)Basics of Flight and Aerodynamics (Groups B/D)
Basics of Flight and Aerodynamics (Groups B/D)
Ā 
Engine stock control article
Engine stock control article Engine stock control article
Engine stock control article
Ā 
Po f lo5 p1
Po f lo5 p1Po f lo5 p1
Po f lo5 p1
Ā 
Piston Engines: Propellers
Piston Engines: PropellersPiston Engines: Propellers
Piston Engines: Propellers
Ā 
Pistones
PistonesPistones
Pistones
Ā 
HĆ©lice
HĆ©liceHĆ©lice
HĆ©lice
Ā 
Diapositiva Drones
Diapositiva DronesDiapositiva Drones
Diapositiva Drones
Ā 
Piston Engines Types
Piston Engines TypesPiston Engines Types
Piston Engines Types
Ā 
LA HELICE
LA HELICELA HELICE
LA HELICE
Ā 
Far 23 PROPELLER ENGINE INTERFERENCE DESIGN
Far 23 PROPELLER  ENGINE INTERFERENCE  DESIGN Far 23 PROPELLER  ENGINE INTERFERENCE  DESIGN
Far 23 PROPELLER ENGINE INTERFERENCE DESIGN
Ā 
Piston- Internal Combustion Engine
Piston- Internal Combustion EnginePiston- Internal Combustion Engine
Piston- Internal Combustion Engine
Ā 
Helices
HelicesHelices
Helices
Ā 

Similar to TES Aviation Group General Presentation

Seetek company profile 2015
Seetek company profile 2015Seetek company profile 2015
Seetek company profile 2015Rubina Kaufmann A.
Ā 
Aircraft Rotable Components - MRO Cost Models_v17_Final_Slideshare
Aircraft Rotable Components - MRO Cost Models_v17_Final_SlideshareAircraft Rotable Components - MRO Cost Models_v17_Final_Slideshare
Aircraft Rotable Components - MRO Cost Models_v17_Final_SlideshareFrank Alfieri
Ā 
Aircraft Rotable Components - MRO Cost Models / SAP Preventive and Predictive...
Aircraft Rotable Components - MRO Cost Models / SAP Preventive and Predictive...Aircraft Rotable Components - MRO Cost Models / SAP Preventive and Predictive...
Aircraft Rotable Components - MRO Cost Models / SAP Preventive and Predictive...Frank A.
Ā 
Services project (rrb)
Services project (rrb)Services project (rrb)
Services project (rrb)Michael Davies
Ā 
TAC Profile D2
TAC Profile D2TAC Profile D2
TAC Profile D2Rahul Jain
Ā 
Resume Vijai Nair
Resume Vijai NairResume Vijai Nair
Resume Vijai NairVijai Nair
Ā 
Presentation on Airbus
Presentation on AirbusPresentation on Airbus
Presentation on Airbuslaxman kunwor
Ā 
Manufacturing & Quality coordinator 5yrs exp
Manufacturing & Quality coordinator 5yrs expManufacturing & Quality coordinator 5yrs exp
Manufacturing & Quality coordinator 5yrs expYann PARENT
Ā 
Accelya kale
Accelya kaleAccelya kale
Accelya kaletdjariwala
Ā 
Presentation CSC (dd January 2010)
Presentation CSC (dd January 2010)Presentation CSC (dd January 2010)
Presentation CSC (dd January 2010)RenneStavinga
Ā 
Helitech - Leonardo Helicopters Division: Through-Life approach to the customer
Helitech - Leonardo Helicopters Division: Through-Life approach to the customerHelitech - Leonardo Helicopters Division: Through-Life approach to the customer
Helitech - Leonardo Helicopters Division: Through-Life approach to the customerLeonardo
Ā 
CV SHAIK_SHAFI SALES & SERVICES MANAGER
CV SHAIK_SHAFI SALES & SERVICES MANAGERCV SHAIK_SHAFI SALES & SERVICES MANAGER
CV SHAIK_SHAFI SALES & SERVICES MANAGERShaik Shafi
Ā 

Similar to TES Aviation Group General Presentation (20)

Seetek company profile 2015
Seetek company profile 2015Seetek company profile 2015
Seetek company profile 2015
Ā 
Seetek company profile
Seetek company profile Seetek company profile
Seetek company profile
Ā 
Aircraft Rotable Components - MRO Cost Models_v17_Final_Slideshare
Aircraft Rotable Components - MRO Cost Models_v17_Final_SlideshareAircraft Rotable Components - MRO Cost Models_v17_Final_Slideshare
Aircraft Rotable Components - MRO Cost Models_v17_Final_Slideshare
Ā 
Aircraft Rotable Components - MRO Cost Models / SAP Preventive and Predictive...
Aircraft Rotable Components - MRO Cost Models / SAP Preventive and Predictive...Aircraft Rotable Components - MRO Cost Models / SAP Preventive and Predictive...
Aircraft Rotable Components - MRO Cost Models / SAP Preventive and Predictive...
Ā 
Services project (rrb)
Services project (rrb)Services project (rrb)
Services project (rrb)
Ā 
MIDASSEVERITY4
MIDASSEVERITY4MIDASSEVERITY4
MIDASSEVERITY4
Ā 
TAC Profile D2
TAC Profile D2TAC Profile D2
TAC Profile D2
Ā 
Company Profile
Company ProfileCompany Profile
Company Profile
Ā 
OpenERP / Odoo Fleet management
OpenERP / Odoo Fleet managementOpenERP / Odoo Fleet management
OpenERP / Odoo Fleet management
Ā 
Global aviation asset management services
Global aviation asset management servicesGlobal aviation asset management services
Global aviation asset management services
Ā 
Resume Vijai Nair
Resume Vijai NairResume Vijai Nair
Resume Vijai Nair
Ā 
Presentation on Airbus
Presentation on AirbusPresentation on Airbus
Presentation on Airbus
Ā 
Manufacturing & Quality coordinator 5yrs exp
Manufacturing & Quality coordinator 5yrs expManufacturing & Quality coordinator 5yrs exp
Manufacturing & Quality coordinator 5yrs exp
Ā 
Accelya kale
Accelya kaleAccelya kale
Accelya kale
Ā 
Accelya Kale
Accelya KaleAccelya Kale
Accelya Kale
Ā 
Presentation CSC (dd January 2010)
Presentation CSC (dd January 2010)Presentation CSC (dd January 2010)
Presentation CSC (dd January 2010)
Ā 
CV 25May2016
CV 25May2016CV 25May2016
CV 25May2016
Ā 
CV 25May2016
CV 25May2016CV 25May2016
CV 25May2016
Ā 
Helitech - Leonardo Helicopters Division: Through-Life approach to the customer
Helitech - Leonardo Helicopters Division: Through-Life approach to the customerHelitech - Leonardo Helicopters Division: Through-Life approach to the customer
Helitech - Leonardo Helicopters Division: Through-Life approach to the customer
Ā 
CV SHAIK_SHAFI SALES & SERVICES MANAGER
CV SHAIK_SHAFI SALES & SERVICES MANAGERCV SHAIK_SHAFI SALES & SERVICES MANAGER
CV SHAIK_SHAFI SALES & SERVICES MANAGER
Ā 

Recently uploaded

Top 10 Traditional Indian Handicrafts.pptx
Top 10 Traditional Indian Handicrafts.pptxTop 10 Traditional Indian Handicrafts.pptx
Top 10 Traditional Indian Handicrafts.pptxdishha99
Ā 
Study Consultants in Lahore || šŸ“ž03094429236
Study Consultants in Lahore || šŸ“ž03094429236Study Consultants in Lahore || šŸ“ž03094429236
Study Consultants in Lahore || šŸ“ž03094429236Sherazi Tours
Ā 
08448380779 Call Girls In Shahdara Women Seeking Men
08448380779 Call Girls In Shahdara Women Seeking Men08448380779 Call Girls In Shahdara Women Seeking Men
08448380779 Call Girls In Shahdara Women Seeking MenDelhi Call girls
Ā 
visa consultant | šŸ“žšŸ“ž 03094429236 || Best Study Visa Consultant
visa consultant | šŸ“žšŸ“ž 03094429236 || Best Study Visa Consultantvisa consultant | šŸ“žšŸ“ž 03094429236 || Best Study Visa Consultant
visa consultant | šŸ“žšŸ“ž 03094429236 || Best Study Visa ConsultantSherazi Tours
Ā 
VIP Call Girls in Noida 9711199012 Escorts in Greater Noida,Ms
VIP Call Girls in Noida 9711199012 Escorts in Greater Noida,MsVIP Call Girls in Noida 9711199012 Escorts in Greater Noida,Ms
VIP Call Girls in Noida 9711199012 Escorts in Greater Noida,Msankitnayak356677
Ā 
best weekend places near delhi where you should visit.pdf
best weekend places near delhi where you should visit.pdfbest weekend places near delhi where you should visit.pdf
best weekend places near delhi where you should visit.pdftour guide
Ā 
"Fly with Ease: Booking Your Flights with Air Europa"
"Fly with Ease: Booking Your Flights with Air Europa""Fly with Ease: Booking Your Flights with Air Europa"
"Fly with Ease: Booking Your Flights with Air Europa"flyn goo
Ā 
Exploring Sicily Your Comprehensive Ebook Travel Guide
Exploring Sicily Your Comprehensive Ebook Travel GuideExploring Sicily Your Comprehensive Ebook Travel Guide
Exploring Sicily Your Comprehensive Ebook Travel GuideTime for Sicily
Ā 
Call Girls šŸ«¤ Connaught Place āž”ļø 9999965857 āž”ļø Delhi šŸ«¦ Russian Escorts FULL ...
Call Girls šŸ«¤ Connaught Place āž”ļø 9999965857  āž”ļø Delhi šŸ«¦  Russian Escorts FULL ...Call Girls šŸ«¤ Connaught Place āž”ļø 9999965857  āž”ļø Delhi šŸ«¦  Russian Escorts FULL ...
Call Girls šŸ«¤ Connaught Place āž”ļø 9999965857 āž”ļø Delhi šŸ«¦ Russian Escorts FULL ...Call Girls In Delhi Whatsup 9873940964 Enjoy Unlimited Pleasure
Ā 
BERMUDA Triangle the mystery of life.pptx
BERMUDA Triangle the mystery of life.pptxBERMUDA Triangle the mystery of life.pptx
BERMUDA Triangle the mystery of life.pptxseribangash
Ā 
08448380779 Call Girls In Chhattarpur Women Seeking Men
08448380779 Call Girls In Chhattarpur Women Seeking Men08448380779 Call Girls In Chhattarpur Women Seeking Men
08448380779 Call Girls In Chhattarpur Women Seeking MenDelhi Call girls
Ā 
Visa Consultant in Lahore || šŸ“ž03094429236
Visa Consultant in Lahore || šŸ“ž03094429236Visa Consultant in Lahore || šŸ“ž03094429236
Visa Consultant in Lahore || šŸ“ž03094429236Sherazi Tours
Ā 
Night 7k Call Girls Noida Sector 93 Escorts Call Me: 8448380779
Night 7k Call Girls Noida Sector 93 Escorts Call Me: 8448380779Night 7k Call Girls Noida Sector 93 Escorts Call Me: 8448380779
Night 7k Call Girls Noida Sector 93 Escorts Call Me: 8448380779Delhi Call girls
Ā 
DARK TRAVEL AGENCY presented by Khuda Bux
DARK TRAVEL AGENCY presented by Khuda BuxDARK TRAVEL AGENCY presented by Khuda Bux
DARK TRAVEL AGENCY presented by Khuda BuxBeEducate
Ā 
Hoi An Ancient Town, Vietnam (č¶Šå— ęœƒå®‰å¤éŽ®).ppsx
Hoi An Ancient Town, Vietnam (č¶Šå— ęœƒå®‰å¤éŽ®).ppsxHoi An Ancient Town, Vietnam (č¶Šå— ęœƒå®‰å¤éŽ®).ppsx
Hoi An Ancient Town, Vietnam (č¶Šå— ęœƒå®‰å¤éŽ®).ppsxChung Yen Chang
Ā 
How can I fly with the British Airways Unaccompanied Minor Policy?
How can I fly with the British Airways Unaccompanied Minor Policy?How can I fly with the British Airways Unaccompanied Minor Policy?
How can I fly with the British Airways Unaccompanied Minor Policy?flightsvillacom
Ā 
LPC Transport Presentation introduction to PLC
LPC Transport Presentation introduction to PLCLPC Transport Presentation introduction to PLC
LPC Transport Presentation introduction to PLCthomas851723
Ā 
08448380779 Call Girls In Bhikaji Cama Palace Women Seeking Men
08448380779 Call Girls In Bhikaji Cama Palace Women Seeking Men08448380779 Call Girls In Bhikaji Cama Palace Women Seeking Men
08448380779 Call Girls In Bhikaji Cama Palace Women Seeking MenDelhi Call girls
Ā 

Recently uploaded (20)

Top 10 Traditional Indian Handicrafts.pptx
Top 10 Traditional Indian Handicrafts.pptxTop 10 Traditional Indian Handicrafts.pptx
Top 10 Traditional Indian Handicrafts.pptx
Ā 
Study Consultants in Lahore || šŸ“ž03094429236
Study Consultants in Lahore || šŸ“ž03094429236Study Consultants in Lahore || šŸ“ž03094429236
Study Consultants in Lahore || šŸ“ž03094429236
Ā 
08448380779 Call Girls In Shahdara Women Seeking Men
08448380779 Call Girls In Shahdara Women Seeking Men08448380779 Call Girls In Shahdara Women Seeking Men
08448380779 Call Girls In Shahdara Women Seeking Men
Ā 
visa consultant | šŸ“žšŸ“ž 03094429236 || Best Study Visa Consultant
visa consultant | šŸ“žšŸ“ž 03094429236 || Best Study Visa Consultantvisa consultant | šŸ“žšŸ“ž 03094429236 || Best Study Visa Consultant
visa consultant | šŸ“žšŸ“ž 03094429236 || Best Study Visa Consultant
Ā 
VIP Call Girls in Noida 9711199012 Escorts in Greater Noida,Ms
VIP Call Girls in Noida 9711199012 Escorts in Greater Noida,MsVIP Call Girls in Noida 9711199012 Escorts in Greater Noida,Ms
VIP Call Girls in Noida 9711199012 Escorts in Greater Noida,Ms
Ā 
best weekend places near delhi where you should visit.pdf
best weekend places near delhi where you should visit.pdfbest weekend places near delhi where you should visit.pdf
best weekend places near delhi where you should visit.pdf
Ā 
"Fly with Ease: Booking Your Flights with Air Europa"
"Fly with Ease: Booking Your Flights with Air Europa""Fly with Ease: Booking Your Flights with Air Europa"
"Fly with Ease: Booking Your Flights with Air Europa"
Ā 
Exploring Sicily Your Comprehensive Ebook Travel Guide
Exploring Sicily Your Comprehensive Ebook Travel GuideExploring Sicily Your Comprehensive Ebook Travel Guide
Exploring Sicily Your Comprehensive Ebook Travel Guide
Ā 
Call Girls šŸ«¤ Connaught Place āž”ļø 9999965857 āž”ļø Delhi šŸ«¦ Russian Escorts FULL ...
Call Girls šŸ«¤ Connaught Place āž”ļø 9999965857  āž”ļø Delhi šŸ«¦  Russian Escorts FULL ...Call Girls šŸ«¤ Connaught Place āž”ļø 9999965857  āž”ļø Delhi šŸ«¦  Russian Escorts FULL ...
Call Girls šŸ«¤ Connaught Place āž”ļø 9999965857 āž”ļø Delhi šŸ«¦ Russian Escorts FULL ...
Ā 
BERMUDA Triangle the mystery of life.pptx
BERMUDA Triangle the mystery of life.pptxBERMUDA Triangle the mystery of life.pptx
BERMUDA Triangle the mystery of life.pptx
Ā 
08448380779 Call Girls In Chhattarpur Women Seeking Men
08448380779 Call Girls In Chhattarpur Women Seeking Men08448380779 Call Girls In Chhattarpur Women Seeking Men
08448380779 Call Girls In Chhattarpur Women Seeking Men
Ā 
Call Girls Service !! New Friends Colony!! @9999965857 Delhi šŸ«¦ No Advance VV...
Call Girls Service !! New Friends Colony!! @9999965857 Delhi šŸ«¦ No Advance  VV...Call Girls Service !! New Friends Colony!! @9999965857 Delhi šŸ«¦ No Advance  VV...
Call Girls Service !! New Friends Colony!! @9999965857 Delhi šŸ«¦ No Advance VV...
Ā 
Visa Consultant in Lahore || šŸ“ž03094429236
Visa Consultant in Lahore || šŸ“ž03094429236Visa Consultant in Lahore || šŸ“ž03094429236
Visa Consultant in Lahore || šŸ“ž03094429236
Ā 
Night 7k Call Girls Noida Sector 93 Escorts Call Me: 8448380779
Night 7k Call Girls Noida Sector 93 Escorts Call Me: 8448380779Night 7k Call Girls Noida Sector 93 Escorts Call Me: 8448380779
Night 7k Call Girls Noida Sector 93 Escorts Call Me: 8448380779
Ā 
DARK TRAVEL AGENCY presented by Khuda Bux
DARK TRAVEL AGENCY presented by Khuda BuxDARK TRAVEL AGENCY presented by Khuda Bux
DARK TRAVEL AGENCY presented by Khuda Bux
Ā 
Hoi An Ancient Town, Vietnam (č¶Šå— ęœƒå®‰å¤éŽ®).ppsx
Hoi An Ancient Town, Vietnam (č¶Šå— ęœƒå®‰å¤éŽ®).ppsxHoi An Ancient Town, Vietnam (č¶Šå— ęœƒå®‰å¤éŽ®).ppsx
Hoi An Ancient Town, Vietnam (č¶Šå— ęœƒå®‰å¤éŽ®).ppsx
Ā 
How can I fly with the British Airways Unaccompanied Minor Policy?
How can I fly with the British Airways Unaccompanied Minor Policy?How can I fly with the British Airways Unaccompanied Minor Policy?
How can I fly with the British Airways Unaccompanied Minor Policy?
Ā 
Call Girls In Munirka šŸ“± 9999965857 šŸ¤© Delhi šŸ«¦ HOT AND SEXY VVIP šŸŽ SERVICE
Call Girls In Munirka šŸ“±  9999965857  šŸ¤© Delhi šŸ«¦ HOT AND SEXY VVIP šŸŽ SERVICECall Girls In Munirka šŸ“±  9999965857  šŸ¤© Delhi šŸ«¦ HOT AND SEXY VVIP šŸŽ SERVICE
Call Girls In Munirka šŸ“± 9999965857 šŸ¤© Delhi šŸ«¦ HOT AND SEXY VVIP šŸŽ SERVICE
Ā 
LPC Transport Presentation introduction to PLC
LPC Transport Presentation introduction to PLCLPC Transport Presentation introduction to PLC
LPC Transport Presentation introduction to PLC
Ā 
08448380779 Call Girls In Bhikaji Cama Palace Women Seeking Men
08448380779 Call Girls In Bhikaji Cama Palace Women Seeking Men08448380779 Call Girls In Bhikaji Cama Palace Women Seeking Men
08448380779 Call Girls In Bhikaji Cama Palace Women Seeking Men
Ā 

TES Aviation Group General Presentation

  • 2.
  • 3. TES Aviation Group 2013 A Joint Venture Company ofā€¦ 35% 40% 25%
  • 4. TES Powerplant Consultants worldwide Shop Visits, Deliveries/ Consultancy Projects managed in last 18 months Engines Torn down in the last 18 months Stub Time Lease Engines Engines under TES Management Sq ft of Worldwide Facilities ā€“ UK, Singapore, USA, New Zealand, Amsterdam
  • 5. Engine Type Summary CF6-80E CF6-80C2 CF34-10 CF34-3 CFM56-3 Total APU CFM56-5A V2500-A5 CFM56-5B V2500-A1 CFM56-5C RR Trent 700 TRR Trent 500 RB211-535E4 CFM56-7 PW6000 PW4000-100 GE90 PW4000-94 PW120 PW127 PW125B
  • 6.
  • 7. 30,000 sq ft corporate office space combined with a 100,000 sq ft warehouse and operations area 9,000 sq ft facility providing warehousing, logistics, parts and engine storage State of the art facility providing support to the Asia Pacific region The 10,000 sq ft Dallas office is the latest TES franchise to open and will play a major part in supporting the delivery of innovative fleet management solutions, quality overhauled material supply and stub-time lease engine provision all aimed at driving down the cost of ownership for the growing TES client base. With offices opening around the globe, TES gets one step closer to its vision of providing the Ultimate Total Engine Support while continuing its mission of providing platform solutions to global aircraft engine partners underpinned by organisational excellence.
  • 8.
  • 9.
  • 10. Providing Platform Solutions To Global Aircraft Engine Partners Underpinned By Organisational Excellence
  • 11. TES PRODUCT FOCUS Category 1 Products Internal focus of all aspects of aero engine ownership allows TES to be innovative in our support of customers CFM56-3 Category 2 Products PW4000 (100ā€&112ā€) CF6ā€“80E CFM56-5A CFM56-5C PW4000 (94ā€) CF6ā€“80C2 CFM56-3 CFM56-5B CFM56-7B RB211-535E4 V2500 A5/D5 CFM56-5B CF6-80C2 CFM56-7B RB211-535E4 V2500 PW4000
  • 12. TES ASSET PURCHASE TES are actively sourcing and reviewing all current and projected opportunities of asset purchaseā€¦. TES work closely with managed Fleet customers to evaluate planned lease and material requirements. TES utilise this transparency to secure assets in support of all planned maintenance activities in support of customer needs. Many global opportunities are highlighted through relationship with DVB. TES have been and desire to further expand our reaches in an attractive exit strategy for all fleet phase out and renewal goals. TES are interested in and welcome discussions on all opportunities!
  • 13. TES IT SYSTEMS IT Systems help reduce risk and error by minimising human interfaceā€¦.. - Engine Fleet Planning and Costing - Quantum Component Inventory Management - Financial System Management - Project Management System - Q Pulse Quality Management System
  • 14. EFPAC Customers - Rolls Royce - Aeromexico - Snecma - Willis - Air New Zealand - KLM City Hopper - Jet2.com - Monarch - TES Aviation Group
  • 15. The custom built engine fleet planning and costing software, providing excellence in the technical and financial management of aircraft engines. The Aircraft Engine Management System Specifically designed for power plant engineers and finance departments, EFPAC's integrated financial and technical data allows easy engine removal planning and financial forecasting in addition to the following:- Knowledge management system software offering complete asset risk management. - Lease engine portfolio management system - Residual planning and engine condition value analysis - Integrated with TES customer programs and systems - Maintenance reserve and cash flow management - Invoice analysis and engine cost modelling - Material scrap rates and demand forecasting EFPAC comes complete with a full suite of financial and technical reports, ensuring that all essential information is readily available. EFPAC Reports include: - Cash flow forecast charts - Individual detailed shop visit cost predictions - Full 5 year engine removal plans (or any other period you wish to see) - CPH analysis - Maintenance reserve accrual charts
  • 16. TES SALES CONSIGNMENT The Material Operations department at TES offer complete management and re-marketing of customer surplus aircraft engine and component material available for re-sale Full Service Support including: - Management of inspection, repair and modification process for all components using internal and external resources to maximise re-marketability - Compilation of all necessary trace and regulatory paperwork associated with each component - Management of all logistical requirements - Storage of all material in secured bonded stores - Maintenance of accurate inventory listings through specialised software, detailing location and condition of each component - Regular communication and monthly reporting to each customer, detailing sales prices achieved, costs incurred, and current/remaining inventory listing
  • 17. TES PORTFOLIO MANAGEMENT Designed to produce Lower Cost of Ownership for all Operators and Lessorsā€¦. ENGINE SPECIALISTS Offering Complete Engineering Solutions in: - Long term client Fleet Management Programs ā€“ Airlines/Lessor - Aircraft Transitions (Engines) ā€“ Deliveries/Redeliveries - Shop Visit Management (SVM) - ā€˜Ad Hocā€™ Consultancy
  • 18. TES ENGINE LEASE Airlines are increasingly implementing fleet renewals through operating leases rather than shoulder the burden of direct purchase which invariably restricts operating cash-flow. Greatest Asset in TESā€™ Portfolioā€¦.Experienced Staff and Established processes, backed by trusted financial support from DVB TES focus on core products for lease support in the RB211-535E4, CF6-80C2, CFM56-3B and PW4000
  • 19. TES ENGINE TEARDOWN - Full teardown capabilities controlled in an EASA145 approved facility for RB211-535E4 - Component change and borescope capability for: RB211-535E4, PW4000, CFM56 and CFM6-80 - Additional products teardown capability under review - Full engine storage capability including preservation and logistics - TES have available engine shipping stands for the RB211-535E4, CFM56-3, CFM56-5C, CF6-80C2, V2500, and PW4000 - EASA 145 Approved Maintenance Organisation - Approval No. UK.145.01226
  • 20. TES PARTS REPAIR Why Consider TES for Repair Vendor Management? TES vendor repair management services are utilised on TES owned assets. Vendor repair managers communicate frequently with the material sales team to ensure priority components are dispositioned accordingly in a cost/time effective manner. TES repair engineers have extensive MRO experience, allowing for effective AD, SB and P/N upgradeability control allowing for accurate cost modelling and marketability TES have established solid relationships with many MROā€™s through experience on owned assets, with the likes of AMECO, HAESL, ESA, MTU, LHT, SRT, IBERIA etc. Brokered Repair Management services - Caters for lack of in-house expertise or frees up internal resources if present. Operating on a ā€˜nothing to loseā€™ philosophy, all stages of component repair are managed with minimal, in any, input required from customer. TESā€™ diverse portfolio of Approved Vendors are tailored for EASA, FAA and CAAC requirements and provide customers with a single source for all repair needs. To name a few ATI, TAT, IAT, TOS, CHROMOLLOY, HONEYWELL, TRIUMPH, HAMILTON SUNSTRAND.
  • 21. TES CLIENT ACTION PLANS TES Aviation Group is continually working with clients to enhance their operation and support in the drive to reduce the cost of their operation. This is achieved through various methods but one of the key initiatives is the Power Plant Review Board (PPRB) This regular forum looks at all aspects of the operation of engines covered by a Fleet Management Programme not only from a technical view point but also commercial. This interaction with customers is expanded to look at fleet expansion or renewal projects to provide, once again, detailed technical aspects combined with commercial considerations
  • 22. TES PARTS SALES WIN - WIN Can be achieved for both parties through effective material procurement and management TES Aviation Group prides itself on the high standard of all certification and trace paperwork, managed in accordance with stringent internal quality procedures. A significant number of engine and piece part consignment projects have been undertaken on behalf of our customers, with material being sold through our extensive network of sales outlets built up over years of trading. All material is certified with FAA/EASA/CAAC certification as required by the customer. All material is sold in serviceable/overhauled condition to our customers utilising TES comprehensive fleet management, MROā€™s, Airlines and independent suppliers. Due to visibility of Shop Visit material requirements for TES Fleet Management customers, TES actively pursues the market for all opportunities of Asset purchase to support future SVā€™s through material supply
  • 23. TES QUALITY SYSTEMS Industry Certifications show a commitment to Quality that other organisations and customers can rely onā€¦.. The majority of accreditations are voluntarily implemented, highlighting TESā€™s desire to provide and operate under safe and effective working practices. TES are currently certified with the following:ISO 9001 - Quality management system FAA AC 00-56A - A voluntary industry distributor accreditation programme EASA 145 approved to carry out: ļƒ˜Borescope inspections on RB211-535E4, PW4000-94ā€ series, CF6-80C2 and CFM56 series ļƒ˜Component removal and replacement ļƒ˜Fan blade changes ļƒ˜Fan modules changes ļƒ˜Gearbox module changes Approval No. UK.145.01226
  • 24. Engine Fleet Management - Reporting Monthly Report ā€¢ Fleet Summary table ā€¢ Engine Condition and Health Monitoring ā€¢ Critical Airworthiness Document Inspection & Tracking ā€¢ Life Limited Parts Status ā€¢ Fleet Campaign Status Quarterly Report ā€¢ Detailed engine removal plan ā€¢ Cash Flow Forecast / Maintenance Budget Forecast Quarterly PPRBTM agenda and minutes (Powerplant Review Board) ā€¢ Customer Operational Review vs Worldwide Fleet ā€¢ Shop Visit Summary ā€¢ Engine Management Program Control and update ā€¢ ETOPS and Fleet Campaigns
  • 25. CASE STUDY - Savings through Active Fleet Management TES saved an operator $2M of lost revenue through active fleet management services The Scenario The operator had leased 2 aircraft (4 engines) across a 5 year lease term. The lease return conditions for the aircraft required that all engines were to have operated less than X hours and X cycles since performance restoration shop visit at the point of lease return. The aircraft had been leased prior to the introduction of the TES Fleet management Program, and as the operator had little experience with the engine model concerned, had agreed lease terms which were not in their favour. As a result, the operator was faced with approximately $2M in exposure of which they were unaware. TESā€™s Service Following a review of the lease agreement and using TES experience of the engine model concerned, TES subsequently identified that the lease return conditions previously agreed were unnecessary. Based on the onwing performance of the engines and the projected condition at lease return, TES advised the operator that the shop visits required to meet return conditions were unnecessary and subsequently renegotiated successfully the return conditions with the Lessor on behalf of the operator in order to eliminate the shop visit requirement. The Outcome As a result of the maintenance reserve rates that had been previously agreed, and the premature removal of the engines driven by the return conditions, the expected shortfall in maintenance reserves of approximately $500K per engine was eliminated completely, removing $2M of unexpected cash liability from the operator.
  • 26. Shop Visit Management ā€“ TES Service Engine Maintenance Contract Negotiation. Removal reason / technical status review (Maintenance and Performance). Engine Workscope definition to achieve build and lease objectives. Engine shop incoming inspection oversight. Disassembly control ā€œDirty Condition inspectionā€ ā€“ Workscope amendment. Material Management ā€“ 80% of maintenance cost. Timely technical, commercial and financial decision making. Test Cell overview / review. Engine Release paperwork verification. Invoice Review and Negotiation, Warranty Claims, Material Scrap Review Case Study
  • 27. Shop Visit Management ā€“ TES Objectives Management by experienced and professional engineering staff. Complete logistic, technical, financial and commercial control. Optimisation of Engine Workscopes ā€“ Operating and Lease Conditions. Optimisation of build material objectives ā€“ ā€œRun Vs Newā€ Minimise Engine Maintenance Cost Exposure ā€“ Cost of Ownership Removal of operational burden from the airlines Senior Management. Main Objective = Maintain reliability and reduce cost exposure
  • 28. Shop Visit Management - Reporting Detailed Engine Workscope ā€“ Optimised and Controlled Cost estimation and update. Regular shop visit status reporting (Financial risks, logistics, TAT etc) Dirty Condition Reporting ā€“ At point of engine disassembly Invoice Review document - amounts authorised and disputed Detailed Post Shop Visit Report ā€“ Technical, Financial and Commercial Comprehensive Reporting throughout the Shop Visit process to ensure 100% visibility
  • 29. CASE STUDY - Savings through Engine Shop Contract Negotiation / Tender TES saved an operator over $2M through negotiation of the terms of an MRO repair contract. The Scenario The operator had recently introduced a new engine type into their fleet and was looking to implement a long term repair contract with a single MRO for the future maintenance of their engines. The operator was not experienced with the engine type concerned and mindful of TES experience in successfully negotiating terms of repair agreements, requested TES to conduct a tender process to include negotiation of contract terms on the operatorā€™s behalf. TESā€™s Service TES contacted each of the MROā€™s which held approvals for repair of the engine model concerned and requested a commercially competitive proposal based on fleet size and anticipated shop visit schedule, which TES had previously defined. Upon receipt of each proposal, TES compared the different terms using a pre-defined model and TES experience of each MRO and prepared a shortlist of potential candidates for the operator. Following an agreement of the shortlist, TES undertook a phased negotiation process advising each MRO of the shortfalls in their proposed terms, and negotiating in each area until the desired outcome was achieved. Following a pre-agreed period of negotiation with all short listed MROā€™s, the successful MRO was identified and terms were agreed that presented both limited risk to the operator and reduced cash outlay at each shop visit event. The Outcome As a result of the improved contract terms negotiated by TES in the final agreed contract, a total of approximately $2M in reduced maintenance cost across the operators shop visit program was achieved.
  • 30. ā€œAd Hocā€ Consultancy Access to TES knowledge and experience beyond the contract. Provide flexibility to contract TES ā€œproject by projectā€. Typical Projects : ā€¢ On site technical inspections ā€“ Aircraft Transitions ā€¢ Engine Shop Quality Audits ā€¢ Engine Repair Contract Negotiation ā€¢ Engine Valuations etc Flexibility to benefit from TES extensive knowledge base Consultancy Helpdesk TES can tailor a flexible ā€œhelpdeskā€ package which offers clients the opportunity to draw on the wide range of TES experience on an ad-hoc basis. All clients also benefit from a dedicated Program Manager who as a single and focused point of contact, is well placed to be responsive to all the needs of the client. Case Study
  • 31. Savings through Documentation Inspection TES saved a leasing company $870K through diligent inspection of engine documentation. The Scenario A Lessor had recently deployed TES to overview an engine shop visit that was being performed by one of their Lessees. This was to ensure that the workscope carried out by the Lessee met their obligations in accordance with the terms previously agreed between both parties. The engine completed repair and the MRO shop visit records were provided to TES by the Lessor for review. TESā€™ Service TES conducted a full review of the post-shop visit documentation, checking all areas of the paperwork for accuracy, including the AD status, LLP status, SB status, LLP back to birth trace, on-off logs and test cell results. Following this review, TES discovered that a turbine blade had been installed that did not meet the build goal for the engine. TES had previously agreed the maximum threshold for turbine blade life with the MRO, although the MRO had not followed this agreement and only upon inspection of the post shop visit documentation was it identified that this was the case. The number of hours and cycles accumulated on the blade at installation did not conform to the soft life management program currently in place for this part and therefore TES recommended that the blade be removed from the engine and replaced with a suitable part at the expense of the MRO. The Outcome As a direct result of TESā€™ documentation review, a premature engine removal for HPT blade deterioration was avoided at an anticipated cost of $870K.
  • 32. Transition Management & Repossessions of A/C Engines TES understands that from a Lessor perspective, ensuring a seamless transition of serviceable aircraft between parties is vital to realise maximum operational value from both the engines and aircraft asset as a whole TES possesses considerable experience in the management of commercial conditions associated with engine transitions. Case Study TES can provide support with technical interpretation of commercial conditions attached to a lease or sale/purchase agreement. TES provides operators reassurance that all technical and commercial considerations required to mitigate exposure to the airline during the transition process are addressed. TES is able to draw on extensive experience in the field of transition management performed for both Airlines and Lessors alike TES engineering team consists of seasoned professionals with the skills necessary to ensure that all physical and documentation requirements necessary to ensure a seamless transition are met. In unfortunate circumstances where an aircraft has been, or is expected to be repossessed, TES has the necessary experience to provide the required level of engine support, whilst simultaneously demonstrating an appreciation of the sensitive issues associated with the transition.
  • 33. Savings through A/C Engine Transition Management TES saved a Lessor $1.5M through management of an aircraft transition. The Scenario The Lessor was in the process of taking redelivery of an aircraft in preparation for onward lease to another operator. TES were contracted to manage the transition of the engines ensuring that all contractual return conditions were satisfied and that the engines were in the condition required to meet the delivery conditions agreed between the Lessor and the next operator. TES' Service TES conducted a thorough review of all engine documentation for accuracy and completeness, producing an engine delivery documentation package that the Lessor could provide to the next operator to facilitate the transition. TES also provided on site presence during the transition process, including overview of engine ground runs, borescope inspections, external hardware inspections and component inventory checks. The Outcome During the inspections, TES discovered documentary evidence pointing to an internal oil leak. Following further on wing tests, it was confirmed that an internal oil leak had occurred and as a result the engine would not satisfy the lease return conditions. The engine was subsequently routed to shop in order to rectify the leak at the expense of the operator. The resulting shop visit cost was approximately $1.5M, which had the leak remained undetected during the transition process, would have been the responsibility of the Lessor during the next lease term.
  • 35. Engine Fleet Management Programs ā€œTurn-keyā€ solution with an experienced team that can take over management IMMEDIATELY Engine Records Manager Documentation & Control Program Manager (For each Airline/Lessor Customer) Material Management Parts Sourcing & Supply EFPAC Technical & Commercial Forecasting Asset Management Engine Lease Engine Specialists Rolls Royce Pratt & Whitney GE /CF6/CF34 CFM56-3/5/7 IAE-V2500 APUā€™s 35 Engineers in support from OEM, MRO and Airline backgrounds Resource flexibility to ā€œramp up supportā€ when the pressure is on & adapt to changing engine fleet profiles - without the in-house costs & structure
  • 36. Reliability Program Engine Management Program Engine Fleet Planning & Costing System forecasting A/C Lease Contract Negotiation SV Forecast MRO Contract Negotiation SV Management Material Support Spare Engine Provisioning A/C delivery/re-delivery forecast Delivery/Re-delivery Compliance
  • 37. Reliability Program Inputs Outputs SB / AD Status Monthly Utilisation Thrust ratings BSI reports EGTM, vibration, N1/2/3 speeds and fuel flow Oil consumption rates On-wing maintenance data Engine health/trend monitoring & recommendations Quarterly Powerplant Review Board forum (AD & SB incorporation recommendations) ETOPS Status Assessing fleet trends and Corrective on wing and off wing actions (Fleet Campaigns) Benefits Trends highlighted and trouble shooting facilitated to prevent UERā€™s ā€“ $500k+ per event Reliability Statistics managed below industry rates to maintain competitive edge. (Dispatch Reliability/UER/ABTO/IFSD etc) Cost vs benefit justification made for each SB recommended for inclusion in the EMP (Decisions recorded at PPRB Mtg) TES OEM GTAā€™s (CFMi) permit TES to interact directly with OEM Tech Support and lessons the burden on the client. TES are EASA145 approved for Engine Borescoping (CFM Series ; PW4000, RB211-535, CF6-80C2). Our systems and procedures are compliant with Part M, Sub Part G regulations.
  • 38. Engine Management Program (EMP) Inputs Outputs Baseline workscope for engine maintenance Baseline service bulletin standard for engine maintenance Definition of the standard practices, processes and procedures to be employed during engine maintenance OEM conference attendance OEM GTA subscription Chapter 5 limits TES Engine guidelines documents TES knowledge base (IP) Benefits EMP built on TES ā€œTotalā€ Experience (Engine Portfolio : 600+ engines ; 100+ Maintenance Events/Yr) EMP Optimised for Clients needs and tailored to their individual operation (Regulatory Compliance and Commercial Sense) Baseline SB definition can save $50k per engine maintenance event through elimination of unnecessary application. Material Hardware standards fully understood and documented to drive reliability and lower cost of operation $$$$ TES investment in OEM GTAā€™s ensures the experience of our team grows to be able to provide the most current advise and recommendations. (Direct access to conferences, training, manuals and OEM technical support) Compliance with regulatory obligations to demonstrate maintenance standards compliance
  • 39. Engine Fleet Planning and Costing system forecasting Inputs Outputs Technical : Utilisation Hrs & Cyc Thrust rating Trend Monitoring LLP Stack Tech Publications ā€“ ADā€™s etc Engine Condition ā€“ BSI Detailed EFPAC Workscoping Models Operational : C-Check / D-Check Slots Aircraft Availability Removal / Maintenance Schedule Staggered for lease engine availability Scheduled to fit aircraft down time Optimised based on technical condition Scheduled to deliver end of lease objective Clarity of Lease engine requirements & policy Removal/SV Forecast High level Workscope per event Workscope to deliver future operation. Optimised to fit MR levels / Lease conditions Optimised for P&L considerations Commercial : Lease Return Conditions Lease Engine Availability Maintenance costs per event Material scrap rates defined based on known condition Costing models deliver costs by workscope Financial : Maintenance Reserve Provision P&L Considerations Lease engine rates Detailed EFPAC Costing Models Financial Projections: Maintenance Budget Cash Flow Reports Engine Lease Costs Maintenance Reserve Status and Draw down Cost per hour TES Intellectual Property (IP)
  • 40. Engine Fleet Planning and Costing system forecasting Contdā€¦ Benefits EFPAC system ā€œBuilt on TES Expertiseā€ provides a secure centralised source for all engine technical and commercial data Proprietary costing models ensure accurate projection and PREDICTABILITY of future maintenance exposure ā€“ NO SURPRISES TES expertise delivers optimised and adaptable removal programs to ensure lowest cost of operation $$$$ Lease engine reduction by appropriate removal stagger based on known conditions (approx $250k per lease per event) Lease Redelivery Planning to ensure compliance with end of lease conditions ā€“ Unforeseen maintenance ($1M+ per event) Lease negotiation ā€“ Eliminate need for a shop visit or obtain MR ā€œTop Upsā€ based on forecast ($500k to $1.5M per event) Proactively projects shortfalls in Maintenance Reserves ā€“ to plan additional accrual or work scope change to mitigate shortfall Advanced visibility of fleet requirements to facilitate advanced discounted material procurement Negotiation of VERY competitive lease terms ā€“ We provide the tools through accurate forecasting to establish the best deal Financial considerations can be made according to operator preference ā€“ P&L impact etc
  • 41. MRO Contract Negotiation Inputs Outputs Structured proposal assessment process Negotiation and assessment of relative benefits being offered. Bottom line financial analysis and impact over the term of the contract Assessment of relative benefit of T&M vs. CPH TES experience with the maintenance providers ability to deliver the clients priorities Shop Visit Schedule Detailed workscopes per event Detailed RFQ document Marking matrix based on RFQ Weighting based upon Clients Priorities Benefits Presentation of SV forecasts as part of the RFQ entices MROā€™s to submit competitive bids based on known facts. Removal plan & workscope knowledge utilised to negotiate key terms with maximum financial impact. Accurate maintenance projections enable TES to present the pitfalls or advantages of CPH contracts over T&M Market knowledge gained through numerous RFQ projects performed for a range of clients across a spectrum of engine types Negotiation of a contract mindful of Client priorities (Cost/Quality/TAT etc.) $Saving per event of TES negotiated contract = $110k
  • 42. SV Management Inputs Outputs Detailed engine workscope tailored to meet build objectives. Ongoing Management by experienced Powerplant Consultants. Workscoping decisions based on technical / commercial and financial awareness. Documentation and technical assessment of material supply. Communication of budget/estimate status and impact of decisions throughout the shop visit Onsite presence during key phases of maintenance Detailed invoice review and negotiation Scrap material assessment Regular reporting Technical condition at removal Build life objectives Engine Removal Records Engine Airworthiness Records (AD / SB / LLP etc) On watch items Engine Management Program (EMP) Financial and MR Status Commercial lease conditions Pre-provisioned material Benefits Repair process proactively managed, not left in total control of repair facility ā€“ (potential $500k + escalation if left unmanaged) Workscopes optimised and disassembly controlled to meet operational need (Lease obligations, time on wing requirement etc.) Technical findings throughout the management process analysed with consideration for the best commercial outcome. Hardware standards and repairability of material assessed based on actual condition and durability required for future Continual visibility of the financial position of your asset within the MRO ā€“ ā€œBig pictureā€ commercial decisions made Maintenance of TRT focus, limiting lease engine costs $100k (Average saving per ESV event)
  • 43. Material Support Inputs Outputs Expected Material Scrap Rates per event Material volume expectation defined Material Supply agreements finalised Material supply policy defined (Direct to MRO / Client) Pre provisioning policy agreed TES asset purchases to deliver client requirements Pre ā€“ Provisioning of material Material documentation fully verified to TES Standard Logistics & Quality control TES Program Manager not conflicted to buy TES Material Material supplied to deliver program objectives otherwise not offered. Deliver WIN-WIN-WIN product Benefits Flexibility to accommodate changes in material requirement due to altered redelivery dates, workscope escalation, OEM imposed limitations on LLPā€™s etc. TES has and continues to purchase whole engine assets for teardown to support future material requirements of Clients (aided by DVB support) Ability for provision of Category 2 and 3 parts in addition to Category 1, in order to fit maximum USM for delivery of lowest maintenance cost achievable Can supply direct to MRO through strategic alliances to improve cash flow for operator $150k (Very conservative saving per ESV event)
  • 44. Spare Engine Provisioning Inputs Outputs Technical needs assessment (Life, standard etc) Location & provision of spare engines (TES or Others) Negotiation of lease conditions with other providers Establishment of a TES lease engine GTA Potential Guaranteed access agreements Logistics management Shop Visit Schedule Long / Short Term Requirement Benefits Low ā€˜greenā€™ time remaining tear down candidate engines allow TES to offer very flexible return conditions (based on SV forecast) Advance spare engine requirements highlighted and provisioned in time for requirement All engines serviceable under EASA/FAA 145 requirements Logistics headaches taken care of by TES experienced team GTA arrangements create ease of re-leasing $30K (Example saving of using TES lease engine against current market rates, per ESV event)
  • 45. A/C Lease Contract Negotiation Inputs Outputs Pre Purchase LOIā€™s Lease contracts Pre ā€“ Purchase Engine Records SV forecast and Removal Schedule Negotiation of Technical Delivery and Redelivery terms based upon actual condition. Negotiation of MR rates and structure based upon know maintenance schedule throughout lease. Verification of documentation standard requirements based upon condition of those delivered with the aircraft. Assessment of Engine Standard and suitability and durability for the clients operation Benefits Lease commencement safe in the knowledge you have the best deal and major liabilities limited. Terms defined that reflect asset condition not general market rates. Terms that permit sensible draw down of agreed Maintenance Reserves Clarity of expected return condition with which to accurately project maintenance cost exposure across the lease Huge Financial Exposure of getting it wrong - $1M+ per engine
  • 46. Delivery/Re-delivery Compliance Inputs Outputs Assessment of Engine standard and suitability and durability for the clients operation Verification that technical delivery condition matches that in the LOI Detailed records review to ensure airworthiness and confirm re-delivery requirements match those presented at delivery. Physical engine inspections, performance runs and test flightsā€¦confirm current airworthiness and future on wing capability Identification of issues with high technical / commercial and financial impact to the client for negotiation. Definition of Exceptions to the lease prior to aircraft acceptance Compilation of an Engine Delivery File Signed LOIā€™s / Lease Agreement Detailed Historical Engine Records SV forecast and Removal Schedule Benefits Verification and resolution that the assets condition being received match the terms of the lease and definition of any exceptions Technical acceptance by experienced staff to mitigate clients liability across the lease (Technical and Commercial) Burden of such resource intensive activity taken by TES Potential Liability Huge - $500k + (i.e. Damage out of or close to AMM not captured prior to delivery causing early engine removal)
  • 47. TES Aviation Group ā€“ Providing platform solutions to global aircraft engine partners underpinned by organisational excellence www.tes-uk.com