SlideShare a Scribd company logo
1 of 22
Future State Analysis
Date
© 2008 BearingPoint, Inc. 2
Client Name Here INDUSTRY
Author and Version History
This document is protected under the copyright laws of the United States and/or other countries as an unpublished work. This document
contains information that is proprietary and confidential to BearingPoint, Inc. and/or affiliates or its technical alliance partners, which shall not be
duplicated, used, or disclosed in whole or in part without BearingPoint's express written permission.
© 2008 BearingPoint, Inc. and/or its affiliate(s) (Unpublished). All rights reserved.
BearingPoint® is a registered trademark of BearingPoint, Inc., or its affiliates, in the United States and other countries.
First Name Last Name, Title
BearingPoint
1676 International Drive
McLean, VA 22102
Tel: 703-747-1111
Fax: 703-747-1112
E-mail: john.doe@bearingpoint.com
First Name Last Name, Title
BearingPoint
1676 International Drive
McLean, VA 22102
Tel: 703-747-1111
Fax: 703-747-1112
E-mail: john.doe@bearingpoint.com
First Name Last Name, Title
BearingPoint
1676 International Drive
McLean, VA 22102
Tel: 703-747-1111
Fax: 703-747-1112
E-mail: john.doe@bearingpoint.com
Draft Final
Description Version Draft
Date
Author Approval
Date
Approver
Version History
Authors
BLUE ITALICS are special instructions for
completing the template. When creating a
template, use blue italics to provide detailed
instruction.
•Select View>>Slide Master to adjust
Headers/Footers
•This template may be used for print
deliverables, as well as presentations. For
Print Deliverables, utilize pages 3-4 as an
example of font and style and adapt your
deliverable accordingly. For Presentations,
utilize page 4-7 as an example of font and
style, and adapt your presentation
accordingly. Select Insert>>Duplicate Slide
to create a copy of a page.
• Images on pages 8-18 can be used for
either Print Deliverables or Presentations.
Verify BearingPoint owns the copyright on
any text or graphics you insert into this
template. Insertion of Client material or
logo requires the Client's written
permission. If ownership cannot be verified,
do not use.
DELETE all blue italic text boxes, pages
and instructions before finalizing
deliverables and presentations
© 2008 BearingPoint, Inc. 3
Client Name Here INDUSTRY
Table of Contents
Introduction/Executive Summary
Future State Objectives
Future State Organization
Future State Projects/Initiatives
Benefits Estimate
Program Interdependencies
Business Value & Ability to Implement
<The specific contents of this deliverable may vary depending on the level of detail required by the client
and the level of knowledge of team members. Edit, add and revise as appropriate.>
Introduction/Executive Summary
© 2008 BearingPoint, Inc. 5
Client Name Here INDUSTRY
Introduction
<The Future State Analysis deliverable Strategic Vision, Mission & Values deliverable helps
develop a future state concept of operations including people, process and technology
changes based on the opportunities identified in the Identify Areas for Strategic
Improvements activity and/or the new strategy and ensuring that this future state is aligned
with the organization's vision and strategy.
The future state strategic design is at the organizational level for the areas for improvement
identified previously. The detailed implementation of the future state strategic design
initiatives would be conducted within subsequent the BearingPoint Delivery Framework
streams such as Business Process and Packaged Application.
The deliverable outlines the future state objectives and organization, as well as the proposed
projects and initiatives necessary that should be launched in order to achieve the future
state. These initiatives or projects should then undergo a high-level benefits estimate in
order to evaluate and quantify the potential gains or improvements identified. If there are
multiple projects or initiatives, the interdependencies between them should be identified in
order to understand how these projects need to be rolled out. The business value can then
be further detailed in terms of the time required and ability for the organization to
implement the proposed initiatives or projects. This can enable a preliminary ranking of
projects and initiatives.>
© 2008 BearingPoint, Inc. 6
Client Name Here INDUSTRY
Executive Summary
<Describe the introduction and scope of this deliverable, introducing the chosen future state and the
elements covered by this deliverable. An example is shown below. An executive summary covering the key
points covered in this deliverable can also be described here.>
─ The future state operating environment has been developed to bridge the gap between the call
center's current level of performance and its desired target state. The transformation program will
involve a transition plan for:
– Improvements in the Team Leader management and staff skills, competencies, productivity and performance
– Re-engineering of the highest cost and biggest impact enquiry process areas
– Optimization of the workforce planning function including the measurement and reporting framework
– Re – design of the call center structure to support the new operating and process environment
– Establishment of a consolidated and automated reporting management framework based on industry and
competitor standards
Example
Current State Gaps
─ Existing IVR/skills-based routing
structure ineffective
─ Process inefficiencies exist across multiple call
centre process areas
─ Existing metrics and reporting inaccurately depict
productivity and performance
─ High staff turnover (26%) and absenteeism (7%)
─ Team leader skills/competencies inadequate
─ CSO knowledge/training insufficient to address
customer/planner needs
─ Ineffective Workforce Planning function
─ Limited communication between Call Centre and
support functions
Future State Vision
─ Effective IVR and routing structures aligned to
customer/planner needs
─ Streamlined and efficient enquiry processes
─ Comprehensive Call Centre Management Reporting
& Measurement Framework
─ Leading Practice indicators in the areas of staff
productivity, metrics and operating costs
─ Best in Class Team Leaders and Team Leader
development programs
─ CSO's trained, empowered and enabled to
effectively meet customer/planner needs
─ Strategic recruitment plan
─ Formalised Call Centre communication program
Future State Vision & Objectives
© 2008 BearingPoint, Inc. 8
Client Name Here INDUSTRY
Future State Vision
<Describe future state vision depending on what the future state covers (e.g. department,
company vision as a whole, clients). The example below covers the IT strategy vision for
the Department of Justice. For more details refer to the Future State Vision, Mission and
Values deliverable.>
to provide coordinated and cohesive technology and applications
infrastructure which enables staff to work effectively and
closely with other agencies in delivering Justice services in
response to community needs
IT Strategy for Department of Justice Example
Example
© 2008 BearingPoint, Inc. 9
Client Name Here INDUSTRY
Future State Objectives (1/2)
<Describe future state objectives. In the example below, the call center future state objectives have been
identified through 6 separate projects or work streams with each having set objectives.>
Call Centre Improvement Program
6. Reporting &
Analytics
3. Workforce
Planning
Optimisation
5. Technology
Optimisation
1. People
Transformation
2. Business Process
Re-engineering
4. Call Centre
Redesign
─ Develop Call
Centre HR
Strategy
─ Re-design job
profiles
─ Develop a career
path model
─ Assess skills and
competencies
─ Develop team
leader skills and
competencies
─ Develop plans
to reduce
absent. and
lower turnover
─ Re-design
product training
─ Re-engineer
high cost and
impact call
centre enquiry
processes
─ Align where
appropriate
"enquiry"
processes with
process
workstream
end-to-end
─ Optimise call
centre work
force planning
processes
─ Integrate where
appropriate
workforce
planning activity
into Call Centre
─ Establish SLA's
to track and
report on
resource
planning
performance
─ Establish quality
control
mechanisms to
monitor and
track reporting
accuracy
─ Redesign future-
state call centre
structure
─ Consolidate &
streamline
duplicated
functional areas
(e.g. training)
─ Establish
communication
framework with
defined SLA's
between the call
centre and back-
office
─ Redesign the
IVR/routing
structures with
the existing
technology
─ Increase
automated IVR
usage and
migrate
customers to
self-service
channels
─ Minimise caller/
planner
verification
─ Establish a
comprehensive
range of
industry
performance
reporting
─ Develop a
management
reporting
framework
─ Consolidate and
automate
reporting
─ Eliminate
re-work in
reporting
─ Develop
reporting
processes and
quality controls
Objectives
Design & Agree Call Centre Strategy
Example
© 2008 BearingPoint, Inc. 10
Client Name Here INDUSTRY
Future State Objectives (2/2)
<Describe future state objectives. In the example below, future state is compared to current state and best in class to describe
the impact of the future state on particular areas of the organization.>
Example
Pick/Pack/Ship
Available
to
Promise
Pricing
Order
Mgt
Opportunity
Management
Forecasting
─ Direct link to pickers using RF
─ Established Company program
w/minimum number of Companys
to meet business needs
─ Automated exception driven
freight bill processing and auditing
─ Complete transportation cost and
delivery optimization
─ Location confirmation performed
using RF/Hand held terminals
─ Automated, rule-based routing
and scheduling of vehicles
─ Real time Company performance
tracking
─ Limited LTL shipments 100%
compliant with customer ship
dates
─ Picking route is optimized to
minimize material handling
─ Some Company rationalization,
resulting in few Companys
─ Freight bills are paid through PO
system like any other invoice
─ Load consolidation via order
consolidation and/or scheduling
─ Automated notification
─ Split orders by zone/dept
consolidation on dock
─ Use of stand-alone transportation
routing package
─ Difficulty determining most
favorable Company
─ High percentage of LTL and rush
shipments
─ Missed customer shipment dates
─ Picking performed separately for
each order
─ Non-optimized Picking sequence is
sequential and not optimized
─ Freight bills are paid manually and
not audited
─ Large number of Companys, no
formal core Company program
─ Manual routing of vehicles
─ ATP based upon the broadest
supply chain viewpoint
─ ATP extremely responsive to
demand and operations changes
─ Extremely high order fill rates
reflect high accuracy of ATP
─ ATP capabilities are extended to
beyond four walls and consider
supplier capabilities
─ Enterprise-wide visibility to
product through all company and
supplier locations
─ ATP capabilities include all internal
drivers
─ Ability to consider substitute
products/services
─ No ability to consider supply base
impact on ATP
─ Basic ATP capabilities including
some internal drivers but lacking
variables such as Inter transfers
─ Limited visibility to inventory at
alternative sites
─ Manual or no ATP capability
─ High lost sales due to inability to
provide delivery dates with high
level of confidence
─ Limited visibility to product at
alternative locations
─ Pricing is completely dynamic and
based on detailed view of supply
and demand streams
─ No money is "left on the table"
due to limitations in pricing
─ Product price reflects total costs
including all material, labor,
transportation, logistics, etc.
─ Few manual pricing overrides
─ Pricing is reviewed and updated
weekly
─ Pricing considers a broad range of
customer attributes
─ Pricing is finely tuned by sales
channel, customer segment, and
sales office
─ Pricing is reviewed and updated
monthly
─ Pricing includes major costs but
lacks some cost components
─ Standard volume discounts
offered to preferred customers
─ Tools in place to more easily and
frequently maintain pricing
─ Pricing is based on rough cost+
calculations
─ One price for all customers yet
frequent manual discounts and
surcharges
─ Pricing is infrequently reviewed
and difficult to update
─ Totally automated and integrated
using POS/customer info.
─ Immediate order
acknowledgement and order
promising
─ VMI in place for key customers
some use of POS/customer data
─ Timely acknowledgements and
order promising
─ Electronic – seldom requires
rekeying. Some VMI and some
upstream order visibility
─ Order acknowledgement and
promising delayed
─ Primarily Electronic but usually
requires rekeying
─ Limited upstream order visibility
─ Primarily from hard copy some
from fax
─ Defined corporate lead
qualification process
─ Defined std sales methodology
─ Review lost opportunities
─ Ability to work offline and
synchronize
─ Continuously monitor sales
pipeline
─ Quotes are entered electronically
─ Quotes are monitored for
─ expiration
─ Those nearing expiry are reviewed
in an actionable time Frame
─ All quotes are entered in an
integrated OM environment.
─ Quotes link electronically to
customer orders
─ Approval is workflow driven
─ Probabilities influence planning
and scheduling
─ Probable quotes are maintained in
an on-line environment
─ Pricing is reviewed manually and
validated prior to submission
─ Inquiries and quotes are not
tracked
─ Quotes are maintained off line
─ Limited visibility to quotes
─ No impact on forecasting
─ No won/loss review
─ Integrated forecasting tools with
collaborative forecasting and
planning agility
─ Closed loop, 360 degree
continuous forecasting cycle
─ Integrated forecasting tools with
leading indicators, sophisticated
user settings and an effective
S&OP process
─ Basic history based forecasting
system with a limited S&OP
process
─ Use of some market intelligence
for overrides
─ Spreadsheets and/or point
forecasting system usually within
the supply chain functional only
─ Manual with some spreadsheets
Full Value Chain
Limited Integration
Corporate Excellence
Process Focus
Functional Silo
Best-in-class target Company Future State
Company Current State
Future State Organization
© 2008 BearingPoint, Inc. 12
Client Name Here INDUSTRY
Future State Organization
<Describe the future state new organization, taking into account the changes to the current state. A
detailed example is provided below. Refer to the Organizational Assessment deliverable for more
organizational charts examples.>
Customer
Management
Fairgo FoI
Customer
Responsiveness
eLearning
Kiosk
Training
DB
CHRIS
Building Staff
Capabilities
Oracle
Financials
EC4P
GIMS
Managing
Finances &
Assets
SCT
Courts
Ringtail
Jurors
TMS
CaseWorks
Registry
Probate
CCCFM
Cocassis
Courtlink
Access to Equitable Justice
BA
Regal
LifeData
Numerous
Access DB
Business
Specific
Applications
Data
Warehouse
Extract
Tools
OCSC
view
Business
Unit views
Business
Unit views
Business
Unit views
Portfolio
reporting
views
Managing Performance
A Current applications
New applications
Applications being replaced
Applications to be replaced
A
A
A
PIMS
Prison
Facilities Mgt
OASIS
Prisoner
Visitors ID
VRAS
CMS
OPA CMS
Offender Management,
Victims and Client Support
E*Justice
Web Content
Management
Email /
Calendar
Collaboration
Knowledge
repositories
EDMS
Connecting Justice
Online
Lotus Notes
Customer Community Staff
Other agencies
Partners Legal Profn
EAI (JKE)
Presentation, security, and integration
IVR, Web, email, wireless, desktop
E-business Portal
Infrastructure
Customer
Management
Fairgo FoI
Customer
Responsiveness
Customer
Management
Fairgo FoI
Customer
Responsiveness
eLearning
Kiosk
Training
DB
CHRIS
Building Staff
Capabilities
eLearning
Kiosk
Training
DB
CHRIS
Building Staff
Capabilities
Oracle
Financials
EC4P
GIMS
Managing
Finances &
Assets
Oracle
Financials
EC4P
GIMS
Managing
Finances &
Assets
SCT
Courts
Ringtail
Jurors
TMS
CaseWorks
Registry
Probate
CCCFM
Cocassis
Courtlink
Access to Equitable Justice
SCT
Courts
Ringtail
Jurors
TMS
CaseWorks
Registry
Probate
CCCFM
Cocassis
Courtlink
Access to Equitable Justice
BA
Regal
LifeData
Numerous
Access DB
Business
Specific
Applications
BA
Regal
LifeData
Numerous
Access DB
Business
Specific
Applications
Data
Warehouse
Extract
Tools
OCSC
view
Business
Unit views
Business
Unit views
Business
Unit views
Portfolio
reporting
views
Managing Performance
Data
Warehouse
Extract
Tools
OCSC
view
Business
Unit views
Business
Unit views
Business
Unit views
Portfolio
reporting
views
Managing Performance
A Current applications
New applications
Applications being replaced
Applications to be replaced
A
A
A
A Current applications
New applications
Applications being replaced
Applications to be replaced
A
A
A
PIMS
Prison
Facilities Mgt
OASIS
Prisoner
Visitors ID
VRAS
CMS
OPA CMS
Offender Management,
Victims and Client Support
E*Justice
PIMS
Prison
Facilities Mgt
OASIS
Prisoner
Visitors ID
VRAS
CMS
OPA CMS
Offender Management,
Victims and Client Support
E*Justice
Web Content
Management
Email /
Calendar
Collaboration
Knowledge
repositories
EDMS
Connecting Justice
Online
Lotus Notes
Web Content
Management
Email /
Calendar
Collaboration
Knowledge
repositories
EDMS
Connecting Justice
Online
Lotus Notes
Customer Community Staff
Other agencies
Partners Legal Profn
Customer Community Staff
Other agencies
Partners Legal Profn
EAI (JKE)
Presentation, security, and integration
IVR, Web, email, wireless, desktop
E-business Portal
Infrastructure
EAI (JKE)
Presentation, security, and integration
IVR, Web, email, wireless, desktop
E-business Portal
Infrastructure
Example
Future State Projects/Initiatives
© 2008 BearingPoint, Inc. 14
Client Name Here INDUSTRY
Future State Projects/Initiatives
<Identify the major projects or initiatives involved in achieving the required future state.
An example for a call center improvement project is detailed below.>
Call Centre
Improvement
Projects
1. People Transformation
─ Improve Team Leader management and staff skills, competencies,
productivity and performance
2. Business Process Re-engineering
─ Re-engineer the highest cost and biggest impact enquiry process areas
3. Workforce Planning Optimisation
─ Optimise the workforce planning function including the measurement
and reporting framework
4. Call Centre Redesign
─ Redesign the call centre structure to support the new operating and
process environment
5. Technology Optimisation
─ Optimise existing telephony functionality and redesign specific
technology elements
6. Reporting & Analytics
─ Establish a consolidated and automated reporting management
framework based on competitor and leading practice standards by
leveraging the existing reporting engines available at XXX
Design & Agree
Call Centre
Strategy
Example
© 2008 BearingPoint, Inc. 15
Client Name Here INDUSTRY
Future State Projects/Initiatives
<For each Future State project or initiative, fill out the template below describing key activities, objectives,
timelines and brief cost/benefit. Please note that the cost estimate may only be preliminary (as this is
detailed further in the Strategic Requirements deliverable.>
Key Activities
Objectives
Implementation Effort & Timeframe
Benefits
─ E.g Reduce turnover by 6%
─ Reduce absenteeism by 2%
Expected Benefit: $XXXk
─ E.g Call Centre Expert for XX
weeks
─ 1 Methodology Expert for XX
weeks
─ 1 Project Manager – 2 days per
week for XX weeks
Cost Estimate: $XXXk
─ E.g Develop Call Centre HR Strategy
─ Develop specific plans to reduce CSO turnover and manage absenteeism
─ Develop Team Leader skills & competencies
5
Redesign +
IT Required
4
Redesign
Only
3
Improve +
IT Required
2
Improve
Only
1
Minor or
No Change
Expected Timeframe – Design: XX weeks, Implementation: XX weeks
─ E.g. Develop Call Centre HR Strategy
─ Develop tactical means to manage
absenteeism and turnover
─ Review training roles, responsibilities
and content
1. People Transformation
2. Business Process Re-engineering
3. Workforce Planning Optimisation
4. Call Centre Redesign
5. Technology Optimisation
6. Reporting & Analytics
Call Centre
Improvement
Projects
Cost Estimate
Example
Benefits Estimate
© 2008 BearingPoint, Inc. 17
Client Name Here INDUSTRY
Benefits Estimate
<Provide a high-level benefits estimate of the future state design projects or initiatives. In the example
below, the total anticipated benefits are expected to be approximately $4.5 million annually. These were to
be realized through improved operational performance, efficiency and optimization of resources.>
Example
$2,000k
$4,000k
$6,000k
$20,000k
$18,000k
$1.5M
$1.4M
$250k
$294k
$522k
$548k
#3. Workforce
Planning
Optimisation
$4.5M
#1. People
Transformation
#2. Business
Process
Re-engineering
#4. Call
Centre
Redesign
#5.Technology
Optimisation
#6.Reporting
& Analytics
Total
Call Centre
Improvement
Projects
2003
Call Centre
Budget
Call Centre Improvement Projects
$19.83M
Total Potential
Project Benefit of
of $4.55M
Project Interdependencies
© 2008 BearingPoint, Inc. 19
Client Name Here INDUSTRY
<Map a project "critical path" as described below in the example to demonstrate the interdependent nature
of the projects identified, and highlight the requirement for a comprehensive program management
framework to ensure the successful roll-out of the projects to achieve the future state.>
Project Interdependencies
Example
Design & Agree
Call Centre
Strategy
3. Workforce
Planning
Optimisation
2. Business
Process
Re-engineering
1. People
Transformation
5. Technology
Optimisation
4. Call Centre
Re-design
6. Reporting &
Analytics
Foundation
(0 – 6 months)
Medium-Term
(6 – 12 months)
Long-Term
(12 – 24 months)
Yr 1 Yr 2 Yr 3
Business Value &
Ability to Implement
© 2008 BearingPoint, Inc. 21
Client Name Here INDUSTRY
Business Value & Ability to Implement
<Provide a brief outline of the future state strategic design business value &
ability to implement. An example is for a call center improvement project is
provided below.>
Example
Call Centre Improvement Project Ranking
Ability to Implement
Time
to
Implement
High
Low
Easy
Difficult
Longer-term
Opportunities
Short-term
Opportunities
Project #4.
Redesign
Call Centre
Project #2.
Business Process
Re-engineering
Project #6.
Reporting & Analytics
Project #1.
People
Transformation
Project #3.
Workforce Planning
Optimisation
Project #5.
Technology
Optimisation
1
2
3
4
5
6
7
8
9
0 1 2 3 4 5 6 7 8 9 10
$548k
$522k
$1.4M
$1.5M
$293k
$250k
Template for _ future State Analysis.ppt

More Related Content

Similar to Template for _ future State Analysis.ppt

kalafsky Resume 032315
kalafsky Resume 032315 kalafsky Resume 032315
kalafsky Resume 032315 Mark Kalafsky
 
CV for Neil Fulton as of December, 2013
CV for Neil Fulton as of December, 2013CV for Neil Fulton as of December, 2013
CV for Neil Fulton as of December, 2013nwfulton21
 
Framing the business case service provider v1 2
Framing the business case    service provider  v1 2Framing the business case    service provider  v1 2
Framing the business case service provider v1 2pskoularikos
 
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...CHED
 
Hcm benchmark report_september_2018
Hcm benchmark report_september_2018Hcm benchmark report_september_2018
Hcm benchmark report_september_2018Trevor Hewitt
 
MDS.BackupandRecoveryServices.2011.1006.B
MDS.BackupandRecoveryServices.2011.1006.BMDS.BackupandRecoveryServices.2011.1006.B
MDS.BackupandRecoveryServices.2011.1006.BTracy Hawkey
 
Webinar featuring Forrester TEI study: Driving 496% ROI with Tasktop Viz
Webinar featuring Forrester TEI study: Driving 496% ROI with Tasktop VizWebinar featuring Forrester TEI study: Driving 496% ROI with Tasktop Viz
Webinar featuring Forrester TEI study: Driving 496% ROI with Tasktop VizTasktop
 
Geoff Harris - CV_Dec 2016
Geoff Harris - CV_Dec 2016Geoff Harris - CV_Dec 2016
Geoff Harris - CV_Dec 2016Geoffrey Harris
 
Removing the barriers to business transformation with ArchiMate
Removing the barriers to business transformation with ArchiMateRemoving the barriers to business transformation with ArchiMate
Removing the barriers to business transformation with ArchiMateCorso
 
System re-engineering kasb Securities Ltd
System re-engineering kasb Securities LtdSystem re-engineering kasb Securities Ltd
System re-engineering kasb Securities LtdShehroz Adil
 
Sample Assessment SOW Scope
Sample Assessment SOW ScopeSample Assessment SOW Scope
Sample Assessment SOW ScopeJoey Amanchukwu
 
Resume_Vikram_Potnuru
Resume_Vikram_PotnuruResume_Vikram_Potnuru
Resume_Vikram_PotnuruVikram Potnuru
 
Nitin Sharma- Business Analyst
Nitin Sharma- Business AnalystNitin Sharma- Business Analyst
Nitin Sharma- Business AnalystNitin Sharma
 
Zubin_Shahnawaz_CV_August_2016
Zubin_Shahnawaz_CV_August_2016Zubin_Shahnawaz_CV_August_2016
Zubin_Shahnawaz_CV_August_2016Zubin Shahnawaz
 
Resume: Francine Wolfe 2009
Resume:  Francine Wolfe 2009Resume:  Francine Wolfe 2009
Resume: Francine Wolfe 2009fswolfe
 

Similar to Template for _ future State Analysis.ppt (20)

kalafsky Resume 032315
kalafsky Resume 032315 kalafsky Resume 032315
kalafsky Resume 032315
 
CV for Neil Fulton as of December, 2013
CV for Neil Fulton as of December, 2013CV for Neil Fulton as of December, 2013
CV for Neil Fulton as of December, 2013
 
Framing the business case service provider v1 2
Framing the business case    service provider  v1 2Framing the business case    service provider  v1 2
Framing the business case service provider v1 2
 
Joe Ballou Resume
Joe Ballou ResumeJoe Ballou Resume
Joe Ballou Resume
 
Joe Ballou Resume
Joe Ballou ResumeJoe Ballou Resume
Joe Ballou Resume
 
Stephens Christina
Stephens ChristinaStephens Christina
Stephens Christina
 
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...
 
Hcm benchmark report_september_2018
Hcm benchmark report_september_2018Hcm benchmark report_september_2018
Hcm benchmark report_september_2018
 
MDS.BackupandRecoveryServices.2011.1006.B
MDS.BackupandRecoveryServices.2011.1006.BMDS.BackupandRecoveryServices.2011.1006.B
MDS.BackupandRecoveryServices.2011.1006.B
 
Webinar featuring Forrester TEI study: Driving 496% ROI with Tasktop Viz
Webinar featuring Forrester TEI study: Driving 496% ROI with Tasktop VizWebinar featuring Forrester TEI study: Driving 496% ROI with Tasktop Viz
Webinar featuring Forrester TEI study: Driving 496% ROI with Tasktop Viz
 
Geoff Harris - CV_Dec 2016
Geoff Harris - CV_Dec 2016Geoff Harris - CV_Dec 2016
Geoff Harris - CV_Dec 2016
 
17-Dec-2016-CV
17-Dec-2016-CV17-Dec-2016-CV
17-Dec-2016-CV
 
Removing the barriers to business transformation with ArchiMate
Removing the barriers to business transformation with ArchiMateRemoving the barriers to business transformation with ArchiMate
Removing the barriers to business transformation with ArchiMate
 
System re-engineering kasb Securities Ltd
System re-engineering kasb Securities LtdSystem re-engineering kasb Securities Ltd
System re-engineering kasb Securities Ltd
 
Sample Assessment SOW Scope
Sample Assessment SOW ScopeSample Assessment SOW Scope
Sample Assessment SOW Scope
 
Resume_Vikram_Potnuru
Resume_Vikram_PotnuruResume_Vikram_Potnuru
Resume_Vikram_Potnuru
 
Nitin Sharma- Business Analyst
Nitin Sharma- Business AnalystNitin Sharma- Business Analyst
Nitin Sharma- Business Analyst
 
Zubin_Shahnawaz_CV_August_2016
Zubin_Shahnawaz_CV_August_2016Zubin_Shahnawaz_CV_August_2016
Zubin_Shahnawaz_CV_August_2016
 
Resume-MN
Resume-MNResume-MN
Resume-MN
 
Resume: Francine Wolfe 2009
Resume:  Francine Wolfe 2009Resume:  Francine Wolfe 2009
Resume: Francine Wolfe 2009
 

Recently uploaded

W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...panagenda
 
Microsoft AI Transformation Partner Playbook.pdf
Microsoft AI Transformation Partner Playbook.pdfMicrosoft AI Transformation Partner Playbook.pdf
Microsoft AI Transformation Partner Playbook.pdfWilly Marroquin (WillyDevNET)
 
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...MyIntelliSource, Inc.
 
The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...
The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...
The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...ICS
 
Unlocking the Future of AI Agents with Large Language Models
Unlocking the Future of AI Agents with Large Language ModelsUnlocking the Future of AI Agents with Large Language Models
Unlocking the Future of AI Agents with Large Language Modelsaagamshah0812
 
5 Signs You Need a Fashion PLM Software.pdf
5 Signs You Need a Fashion PLM Software.pdf5 Signs You Need a Fashion PLM Software.pdf
5 Signs You Need a Fashion PLM Software.pdfWave PLM
 
Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...
Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...
Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...harshavardhanraghave
 
SyndBuddy AI 2k Review 2024: Revolutionizing Content Syndication with AI
SyndBuddy AI 2k Review 2024: Revolutionizing Content Syndication with AISyndBuddy AI 2k Review 2024: Revolutionizing Content Syndication with AI
SyndBuddy AI 2k Review 2024: Revolutionizing Content Syndication with AIABDERRAOUF MEHENNI
 
Optimizing AI for immediate response in Smart CCTV
Optimizing AI for immediate response in Smart CCTVOptimizing AI for immediate response in Smart CCTV
Optimizing AI for immediate response in Smart CCTVshikhaohhpro
 
How To Use Server-Side Rendering with Nuxt.js
How To Use Server-Side Rendering with Nuxt.jsHow To Use Server-Side Rendering with Nuxt.js
How To Use Server-Side Rendering with Nuxt.jsAndolasoft Inc
 
Diamond Application Development Crafting Solutions with Precision
Diamond Application Development Crafting Solutions with PrecisionDiamond Application Development Crafting Solutions with Precision
Diamond Application Development Crafting Solutions with PrecisionSolGuruz
 
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...kellynguyen01
 
Hand gesture recognition PROJECT PPT.pptx
Hand gesture recognition PROJECT PPT.pptxHand gesture recognition PROJECT PPT.pptx
Hand gesture recognition PROJECT PPT.pptxbodapatigopi8531
 
HR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.comHR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.comFatema Valibhai
 
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️Delhi Call girls
 
CALL ON ➥8923113531 🔝Call Girls Badshah Nagar Lucknow best Female service
CALL ON ➥8923113531 🔝Call Girls Badshah Nagar Lucknow best Female serviceCALL ON ➥8923113531 🔝Call Girls Badshah Nagar Lucknow best Female service
CALL ON ➥8923113531 🔝Call Girls Badshah Nagar Lucknow best Female serviceanilsa9823
 
How To Troubleshoot Collaboration Apps for the Modern Connected Worker
How To Troubleshoot Collaboration Apps for the Modern Connected WorkerHow To Troubleshoot Collaboration Apps for the Modern Connected Worker
How To Troubleshoot Collaboration Apps for the Modern Connected WorkerThousandEyes
 
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...MyIntelliSource, Inc.
 
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...Health
 
The Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdfThe Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdfkalichargn70th171
 

Recently uploaded (20)

W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
 
Microsoft AI Transformation Partner Playbook.pdf
Microsoft AI Transformation Partner Playbook.pdfMicrosoft AI Transformation Partner Playbook.pdf
Microsoft AI Transformation Partner Playbook.pdf
 
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
 
The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...
The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...
The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...
 
Unlocking the Future of AI Agents with Large Language Models
Unlocking the Future of AI Agents with Large Language ModelsUnlocking the Future of AI Agents with Large Language Models
Unlocking the Future of AI Agents with Large Language Models
 
5 Signs You Need a Fashion PLM Software.pdf
5 Signs You Need a Fashion PLM Software.pdf5 Signs You Need a Fashion PLM Software.pdf
5 Signs You Need a Fashion PLM Software.pdf
 
Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...
Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...
Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...
 
SyndBuddy AI 2k Review 2024: Revolutionizing Content Syndication with AI
SyndBuddy AI 2k Review 2024: Revolutionizing Content Syndication with AISyndBuddy AI 2k Review 2024: Revolutionizing Content Syndication with AI
SyndBuddy AI 2k Review 2024: Revolutionizing Content Syndication with AI
 
Optimizing AI for immediate response in Smart CCTV
Optimizing AI for immediate response in Smart CCTVOptimizing AI for immediate response in Smart CCTV
Optimizing AI for immediate response in Smart CCTV
 
How To Use Server-Side Rendering with Nuxt.js
How To Use Server-Side Rendering with Nuxt.jsHow To Use Server-Side Rendering with Nuxt.js
How To Use Server-Side Rendering with Nuxt.js
 
Diamond Application Development Crafting Solutions with Precision
Diamond Application Development Crafting Solutions with PrecisionDiamond Application Development Crafting Solutions with Precision
Diamond Application Development Crafting Solutions with Precision
 
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...
 
Hand gesture recognition PROJECT PPT.pptx
Hand gesture recognition PROJECT PPT.pptxHand gesture recognition PROJECT PPT.pptx
Hand gesture recognition PROJECT PPT.pptx
 
HR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.comHR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.com
 
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
 
CALL ON ➥8923113531 🔝Call Girls Badshah Nagar Lucknow best Female service
CALL ON ➥8923113531 🔝Call Girls Badshah Nagar Lucknow best Female serviceCALL ON ➥8923113531 🔝Call Girls Badshah Nagar Lucknow best Female service
CALL ON ➥8923113531 🔝Call Girls Badshah Nagar Lucknow best Female service
 
How To Troubleshoot Collaboration Apps for the Modern Connected Worker
How To Troubleshoot Collaboration Apps for the Modern Connected WorkerHow To Troubleshoot Collaboration Apps for the Modern Connected Worker
How To Troubleshoot Collaboration Apps for the Modern Connected Worker
 
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
 
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
 
The Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdfThe Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdf
 

Template for _ future State Analysis.ppt

  • 2. © 2008 BearingPoint, Inc. 2 Client Name Here INDUSTRY Author and Version History This document is protected under the copyright laws of the United States and/or other countries as an unpublished work. This document contains information that is proprietary and confidential to BearingPoint, Inc. and/or affiliates or its technical alliance partners, which shall not be duplicated, used, or disclosed in whole or in part without BearingPoint's express written permission. © 2008 BearingPoint, Inc. and/or its affiliate(s) (Unpublished). All rights reserved. BearingPoint® is a registered trademark of BearingPoint, Inc., or its affiliates, in the United States and other countries. First Name Last Name, Title BearingPoint 1676 International Drive McLean, VA 22102 Tel: 703-747-1111 Fax: 703-747-1112 E-mail: john.doe@bearingpoint.com First Name Last Name, Title BearingPoint 1676 International Drive McLean, VA 22102 Tel: 703-747-1111 Fax: 703-747-1112 E-mail: john.doe@bearingpoint.com First Name Last Name, Title BearingPoint 1676 International Drive McLean, VA 22102 Tel: 703-747-1111 Fax: 703-747-1112 E-mail: john.doe@bearingpoint.com Draft Final Description Version Draft Date Author Approval Date Approver Version History Authors BLUE ITALICS are special instructions for completing the template. When creating a template, use blue italics to provide detailed instruction. •Select View>>Slide Master to adjust Headers/Footers •This template may be used for print deliverables, as well as presentations. For Print Deliverables, utilize pages 3-4 as an example of font and style and adapt your deliverable accordingly. For Presentations, utilize page 4-7 as an example of font and style, and adapt your presentation accordingly. Select Insert>>Duplicate Slide to create a copy of a page. • Images on pages 8-18 can be used for either Print Deliverables or Presentations. Verify BearingPoint owns the copyright on any text or graphics you insert into this template. Insertion of Client material or logo requires the Client's written permission. If ownership cannot be verified, do not use. DELETE all blue italic text boxes, pages and instructions before finalizing deliverables and presentations
  • 3. © 2008 BearingPoint, Inc. 3 Client Name Here INDUSTRY Table of Contents Introduction/Executive Summary Future State Objectives Future State Organization Future State Projects/Initiatives Benefits Estimate Program Interdependencies Business Value & Ability to Implement <The specific contents of this deliverable may vary depending on the level of detail required by the client and the level of knowledge of team members. Edit, add and revise as appropriate.>
  • 5. © 2008 BearingPoint, Inc. 5 Client Name Here INDUSTRY Introduction <The Future State Analysis deliverable Strategic Vision, Mission & Values deliverable helps develop a future state concept of operations including people, process and technology changes based on the opportunities identified in the Identify Areas for Strategic Improvements activity and/or the new strategy and ensuring that this future state is aligned with the organization's vision and strategy. The future state strategic design is at the organizational level for the areas for improvement identified previously. The detailed implementation of the future state strategic design initiatives would be conducted within subsequent the BearingPoint Delivery Framework streams such as Business Process and Packaged Application. The deliverable outlines the future state objectives and organization, as well as the proposed projects and initiatives necessary that should be launched in order to achieve the future state. These initiatives or projects should then undergo a high-level benefits estimate in order to evaluate and quantify the potential gains or improvements identified. If there are multiple projects or initiatives, the interdependencies between them should be identified in order to understand how these projects need to be rolled out. The business value can then be further detailed in terms of the time required and ability for the organization to implement the proposed initiatives or projects. This can enable a preliminary ranking of projects and initiatives.>
  • 6. © 2008 BearingPoint, Inc. 6 Client Name Here INDUSTRY Executive Summary <Describe the introduction and scope of this deliverable, introducing the chosen future state and the elements covered by this deliverable. An example is shown below. An executive summary covering the key points covered in this deliverable can also be described here.> ─ The future state operating environment has been developed to bridge the gap between the call center's current level of performance and its desired target state. The transformation program will involve a transition plan for: – Improvements in the Team Leader management and staff skills, competencies, productivity and performance – Re-engineering of the highest cost and biggest impact enquiry process areas – Optimization of the workforce planning function including the measurement and reporting framework – Re – design of the call center structure to support the new operating and process environment – Establishment of a consolidated and automated reporting management framework based on industry and competitor standards Example Current State Gaps ─ Existing IVR/skills-based routing structure ineffective ─ Process inefficiencies exist across multiple call centre process areas ─ Existing metrics and reporting inaccurately depict productivity and performance ─ High staff turnover (26%) and absenteeism (7%) ─ Team leader skills/competencies inadequate ─ CSO knowledge/training insufficient to address customer/planner needs ─ Ineffective Workforce Planning function ─ Limited communication between Call Centre and support functions Future State Vision ─ Effective IVR and routing structures aligned to customer/planner needs ─ Streamlined and efficient enquiry processes ─ Comprehensive Call Centre Management Reporting & Measurement Framework ─ Leading Practice indicators in the areas of staff productivity, metrics and operating costs ─ Best in Class Team Leaders and Team Leader development programs ─ CSO's trained, empowered and enabled to effectively meet customer/planner needs ─ Strategic recruitment plan ─ Formalised Call Centre communication program
  • 7. Future State Vision & Objectives
  • 8. © 2008 BearingPoint, Inc. 8 Client Name Here INDUSTRY Future State Vision <Describe future state vision depending on what the future state covers (e.g. department, company vision as a whole, clients). The example below covers the IT strategy vision for the Department of Justice. For more details refer to the Future State Vision, Mission and Values deliverable.> to provide coordinated and cohesive technology and applications infrastructure which enables staff to work effectively and closely with other agencies in delivering Justice services in response to community needs IT Strategy for Department of Justice Example Example
  • 9. © 2008 BearingPoint, Inc. 9 Client Name Here INDUSTRY Future State Objectives (1/2) <Describe future state objectives. In the example below, the call center future state objectives have been identified through 6 separate projects or work streams with each having set objectives.> Call Centre Improvement Program 6. Reporting & Analytics 3. Workforce Planning Optimisation 5. Technology Optimisation 1. People Transformation 2. Business Process Re-engineering 4. Call Centre Redesign ─ Develop Call Centre HR Strategy ─ Re-design job profiles ─ Develop a career path model ─ Assess skills and competencies ─ Develop team leader skills and competencies ─ Develop plans to reduce absent. and lower turnover ─ Re-design product training ─ Re-engineer high cost and impact call centre enquiry processes ─ Align where appropriate "enquiry" processes with process workstream end-to-end ─ Optimise call centre work force planning processes ─ Integrate where appropriate workforce planning activity into Call Centre ─ Establish SLA's to track and report on resource planning performance ─ Establish quality control mechanisms to monitor and track reporting accuracy ─ Redesign future- state call centre structure ─ Consolidate & streamline duplicated functional areas (e.g. training) ─ Establish communication framework with defined SLA's between the call centre and back- office ─ Redesign the IVR/routing structures with the existing technology ─ Increase automated IVR usage and migrate customers to self-service channels ─ Minimise caller/ planner verification ─ Establish a comprehensive range of industry performance reporting ─ Develop a management reporting framework ─ Consolidate and automate reporting ─ Eliminate re-work in reporting ─ Develop reporting processes and quality controls Objectives Design & Agree Call Centre Strategy Example
  • 10. © 2008 BearingPoint, Inc. 10 Client Name Here INDUSTRY Future State Objectives (2/2) <Describe future state objectives. In the example below, future state is compared to current state and best in class to describe the impact of the future state on particular areas of the organization.> Example Pick/Pack/Ship Available to Promise Pricing Order Mgt Opportunity Management Forecasting ─ Direct link to pickers using RF ─ Established Company program w/minimum number of Companys to meet business needs ─ Automated exception driven freight bill processing and auditing ─ Complete transportation cost and delivery optimization ─ Location confirmation performed using RF/Hand held terminals ─ Automated, rule-based routing and scheduling of vehicles ─ Real time Company performance tracking ─ Limited LTL shipments 100% compliant with customer ship dates ─ Picking route is optimized to minimize material handling ─ Some Company rationalization, resulting in few Companys ─ Freight bills are paid through PO system like any other invoice ─ Load consolidation via order consolidation and/or scheduling ─ Automated notification ─ Split orders by zone/dept consolidation on dock ─ Use of stand-alone transportation routing package ─ Difficulty determining most favorable Company ─ High percentage of LTL and rush shipments ─ Missed customer shipment dates ─ Picking performed separately for each order ─ Non-optimized Picking sequence is sequential and not optimized ─ Freight bills are paid manually and not audited ─ Large number of Companys, no formal core Company program ─ Manual routing of vehicles ─ ATP based upon the broadest supply chain viewpoint ─ ATP extremely responsive to demand and operations changes ─ Extremely high order fill rates reflect high accuracy of ATP ─ ATP capabilities are extended to beyond four walls and consider supplier capabilities ─ Enterprise-wide visibility to product through all company and supplier locations ─ ATP capabilities include all internal drivers ─ Ability to consider substitute products/services ─ No ability to consider supply base impact on ATP ─ Basic ATP capabilities including some internal drivers but lacking variables such as Inter transfers ─ Limited visibility to inventory at alternative sites ─ Manual or no ATP capability ─ High lost sales due to inability to provide delivery dates with high level of confidence ─ Limited visibility to product at alternative locations ─ Pricing is completely dynamic and based on detailed view of supply and demand streams ─ No money is "left on the table" due to limitations in pricing ─ Product price reflects total costs including all material, labor, transportation, logistics, etc. ─ Few manual pricing overrides ─ Pricing is reviewed and updated weekly ─ Pricing considers a broad range of customer attributes ─ Pricing is finely tuned by sales channel, customer segment, and sales office ─ Pricing is reviewed and updated monthly ─ Pricing includes major costs but lacks some cost components ─ Standard volume discounts offered to preferred customers ─ Tools in place to more easily and frequently maintain pricing ─ Pricing is based on rough cost+ calculations ─ One price for all customers yet frequent manual discounts and surcharges ─ Pricing is infrequently reviewed and difficult to update ─ Totally automated and integrated using POS/customer info. ─ Immediate order acknowledgement and order promising ─ VMI in place for key customers some use of POS/customer data ─ Timely acknowledgements and order promising ─ Electronic – seldom requires rekeying. Some VMI and some upstream order visibility ─ Order acknowledgement and promising delayed ─ Primarily Electronic but usually requires rekeying ─ Limited upstream order visibility ─ Primarily from hard copy some from fax ─ Defined corporate lead qualification process ─ Defined std sales methodology ─ Review lost opportunities ─ Ability to work offline and synchronize ─ Continuously monitor sales pipeline ─ Quotes are entered electronically ─ Quotes are monitored for ─ expiration ─ Those nearing expiry are reviewed in an actionable time Frame ─ All quotes are entered in an integrated OM environment. ─ Quotes link electronically to customer orders ─ Approval is workflow driven ─ Probabilities influence planning and scheduling ─ Probable quotes are maintained in an on-line environment ─ Pricing is reviewed manually and validated prior to submission ─ Inquiries and quotes are not tracked ─ Quotes are maintained off line ─ Limited visibility to quotes ─ No impact on forecasting ─ No won/loss review ─ Integrated forecasting tools with collaborative forecasting and planning agility ─ Closed loop, 360 degree continuous forecasting cycle ─ Integrated forecasting tools with leading indicators, sophisticated user settings and an effective S&OP process ─ Basic history based forecasting system with a limited S&OP process ─ Use of some market intelligence for overrides ─ Spreadsheets and/or point forecasting system usually within the supply chain functional only ─ Manual with some spreadsheets Full Value Chain Limited Integration Corporate Excellence Process Focus Functional Silo Best-in-class target Company Future State Company Current State
  • 12. © 2008 BearingPoint, Inc. 12 Client Name Here INDUSTRY Future State Organization <Describe the future state new organization, taking into account the changes to the current state. A detailed example is provided below. Refer to the Organizational Assessment deliverable for more organizational charts examples.> Customer Management Fairgo FoI Customer Responsiveness eLearning Kiosk Training DB CHRIS Building Staff Capabilities Oracle Financials EC4P GIMS Managing Finances & Assets SCT Courts Ringtail Jurors TMS CaseWorks Registry Probate CCCFM Cocassis Courtlink Access to Equitable Justice BA Regal LifeData Numerous Access DB Business Specific Applications Data Warehouse Extract Tools OCSC view Business Unit views Business Unit views Business Unit views Portfolio reporting views Managing Performance A Current applications New applications Applications being replaced Applications to be replaced A A A PIMS Prison Facilities Mgt OASIS Prisoner Visitors ID VRAS CMS OPA CMS Offender Management, Victims and Client Support E*Justice Web Content Management Email / Calendar Collaboration Knowledge repositories EDMS Connecting Justice Online Lotus Notes Customer Community Staff Other agencies Partners Legal Profn EAI (JKE) Presentation, security, and integration IVR, Web, email, wireless, desktop E-business Portal Infrastructure Customer Management Fairgo FoI Customer Responsiveness Customer Management Fairgo FoI Customer Responsiveness eLearning Kiosk Training DB CHRIS Building Staff Capabilities eLearning Kiosk Training DB CHRIS Building Staff Capabilities Oracle Financials EC4P GIMS Managing Finances & Assets Oracle Financials EC4P GIMS Managing Finances & Assets SCT Courts Ringtail Jurors TMS CaseWorks Registry Probate CCCFM Cocassis Courtlink Access to Equitable Justice SCT Courts Ringtail Jurors TMS CaseWorks Registry Probate CCCFM Cocassis Courtlink Access to Equitable Justice BA Regal LifeData Numerous Access DB Business Specific Applications BA Regal LifeData Numerous Access DB Business Specific Applications Data Warehouse Extract Tools OCSC view Business Unit views Business Unit views Business Unit views Portfolio reporting views Managing Performance Data Warehouse Extract Tools OCSC view Business Unit views Business Unit views Business Unit views Portfolio reporting views Managing Performance A Current applications New applications Applications being replaced Applications to be replaced A A A A Current applications New applications Applications being replaced Applications to be replaced A A A PIMS Prison Facilities Mgt OASIS Prisoner Visitors ID VRAS CMS OPA CMS Offender Management, Victims and Client Support E*Justice PIMS Prison Facilities Mgt OASIS Prisoner Visitors ID VRAS CMS OPA CMS Offender Management, Victims and Client Support E*Justice Web Content Management Email / Calendar Collaboration Knowledge repositories EDMS Connecting Justice Online Lotus Notes Web Content Management Email / Calendar Collaboration Knowledge repositories EDMS Connecting Justice Online Lotus Notes Customer Community Staff Other agencies Partners Legal Profn Customer Community Staff Other agencies Partners Legal Profn EAI (JKE) Presentation, security, and integration IVR, Web, email, wireless, desktop E-business Portal Infrastructure EAI (JKE) Presentation, security, and integration IVR, Web, email, wireless, desktop E-business Portal Infrastructure Example
  • 14. © 2008 BearingPoint, Inc. 14 Client Name Here INDUSTRY Future State Projects/Initiatives <Identify the major projects or initiatives involved in achieving the required future state. An example for a call center improvement project is detailed below.> Call Centre Improvement Projects 1. People Transformation ─ Improve Team Leader management and staff skills, competencies, productivity and performance 2. Business Process Re-engineering ─ Re-engineer the highest cost and biggest impact enquiry process areas 3. Workforce Planning Optimisation ─ Optimise the workforce planning function including the measurement and reporting framework 4. Call Centre Redesign ─ Redesign the call centre structure to support the new operating and process environment 5. Technology Optimisation ─ Optimise existing telephony functionality and redesign specific technology elements 6. Reporting & Analytics ─ Establish a consolidated and automated reporting management framework based on competitor and leading practice standards by leveraging the existing reporting engines available at XXX Design & Agree Call Centre Strategy Example
  • 15. © 2008 BearingPoint, Inc. 15 Client Name Here INDUSTRY Future State Projects/Initiatives <For each Future State project or initiative, fill out the template below describing key activities, objectives, timelines and brief cost/benefit. Please note that the cost estimate may only be preliminary (as this is detailed further in the Strategic Requirements deliverable.> Key Activities Objectives Implementation Effort & Timeframe Benefits ─ E.g Reduce turnover by 6% ─ Reduce absenteeism by 2% Expected Benefit: $XXXk ─ E.g Call Centre Expert for XX weeks ─ 1 Methodology Expert for XX weeks ─ 1 Project Manager – 2 days per week for XX weeks Cost Estimate: $XXXk ─ E.g Develop Call Centre HR Strategy ─ Develop specific plans to reduce CSO turnover and manage absenteeism ─ Develop Team Leader skills & competencies 5 Redesign + IT Required 4 Redesign Only 3 Improve + IT Required 2 Improve Only 1 Minor or No Change Expected Timeframe – Design: XX weeks, Implementation: XX weeks ─ E.g. Develop Call Centre HR Strategy ─ Develop tactical means to manage absenteeism and turnover ─ Review training roles, responsibilities and content 1. People Transformation 2. Business Process Re-engineering 3. Workforce Planning Optimisation 4. Call Centre Redesign 5. Technology Optimisation 6. Reporting & Analytics Call Centre Improvement Projects Cost Estimate Example
  • 17. © 2008 BearingPoint, Inc. 17 Client Name Here INDUSTRY Benefits Estimate <Provide a high-level benefits estimate of the future state design projects or initiatives. In the example below, the total anticipated benefits are expected to be approximately $4.5 million annually. These were to be realized through improved operational performance, efficiency and optimization of resources.> Example $2,000k $4,000k $6,000k $20,000k $18,000k $1.5M $1.4M $250k $294k $522k $548k #3. Workforce Planning Optimisation $4.5M #1. People Transformation #2. Business Process Re-engineering #4. Call Centre Redesign #5.Technology Optimisation #6.Reporting & Analytics Total Call Centre Improvement Projects 2003 Call Centre Budget Call Centre Improvement Projects $19.83M Total Potential Project Benefit of of $4.55M
  • 19. © 2008 BearingPoint, Inc. 19 Client Name Here INDUSTRY <Map a project "critical path" as described below in the example to demonstrate the interdependent nature of the projects identified, and highlight the requirement for a comprehensive program management framework to ensure the successful roll-out of the projects to achieve the future state.> Project Interdependencies Example Design & Agree Call Centre Strategy 3. Workforce Planning Optimisation 2. Business Process Re-engineering 1. People Transformation 5. Technology Optimisation 4. Call Centre Re-design 6. Reporting & Analytics Foundation (0 – 6 months) Medium-Term (6 – 12 months) Long-Term (12 – 24 months) Yr 1 Yr 2 Yr 3
  • 20. Business Value & Ability to Implement
  • 21. © 2008 BearingPoint, Inc. 21 Client Name Here INDUSTRY Business Value & Ability to Implement <Provide a brief outline of the future state strategic design business value & ability to implement. An example is for a call center improvement project is provided below.> Example Call Centre Improvement Project Ranking Ability to Implement Time to Implement High Low Easy Difficult Longer-term Opportunities Short-term Opportunities Project #4. Redesign Call Centre Project #2. Business Process Re-engineering Project #6. Reporting & Analytics Project #1. People Transformation Project #3. Workforce Planning Optimisation Project #5. Technology Optimisation 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 10 $548k $522k $1.4M $1.5M $293k $250k