Submit Search
Upload
Template for _ future State Analysis.ppt
•
Download as PPT, PDF
•
0 likes
•
5 views
S
scharique01
Follow
document
Read less
Read more
Software
Report
Share
Report
Share
1 of 22
Download now
Recommended
PAC Fast Track Implementation Program
PAC Fast Track Implementation Program
Performance Analytics Corporation
Â
Chandrashekhar resume
Chandrashekhar resume
Chandrashekhar Potula
Â
Business Case Templatewww.ProjectManagementDocs.comBusines.docx
Business Case Templatewww.ProjectManagementDocs.comBusines.docx
humphrieskalyn
Â
Business Case Templatewww.ProjectManagementDocs.comBusines.docx
Business Case Templatewww.ProjectManagementDocs.comBusines.docx
RAHUL126667
Â
CV for Neil Fulton as of 10_2013
CV for Neil Fulton as of 10_2013
Neil Fulton
Â
Business case-template
Business case-template
Jo Padilha
Â
Inside the Enterprise Case Studies of Customer Apps
Inside the Enterprise Case Studies of Customer Apps
dreamforce2006
Â
Batog
Batog
MuratSelcuk
Â
Recommended
PAC Fast Track Implementation Program
PAC Fast Track Implementation Program
Performance Analytics Corporation
Â
Chandrashekhar resume
Chandrashekhar resume
Chandrashekhar Potula
Â
Business Case Templatewww.ProjectManagementDocs.comBusines.docx
Business Case Templatewww.ProjectManagementDocs.comBusines.docx
humphrieskalyn
Â
Business Case Templatewww.ProjectManagementDocs.comBusines.docx
Business Case Templatewww.ProjectManagementDocs.comBusines.docx
RAHUL126667
Â
CV for Neil Fulton as of 10_2013
CV for Neil Fulton as of 10_2013
Neil Fulton
Â
Business case-template
Business case-template
Jo Padilha
Â
Inside the Enterprise Case Studies of Customer Apps
Inside the Enterprise Case Studies of Customer Apps
dreamforce2006
Â
Batog
Batog
MuratSelcuk
Â
kalafsky Resume 032315
kalafsky Resume 032315
Mark Kalafsky
Â
CV for Neil Fulton as of December, 2013
CV for Neil Fulton as of December, 2013
nwfulton21
Â
Framing the business case service provider v1 2
Framing the business case service provider v1 2
pskoularikos
Â
Joe Ballou Resume
Joe Ballou Resume
Joseph Ballou, CBA
Â
Joe Ballou Resume
Joe Ballou Resume
Joseph Ballou, CBA
Â
Stephens Christina
Stephens Christina
Christina Stephens, CSPO
Â
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...
CHED
Â
Hcm benchmark report_september_2018
Hcm benchmark report_september_2018
Trevor Hewitt
Â
MDS.BackupandRecoveryServices.2011.1006.B
MDS.BackupandRecoveryServices.2011.1006.B
Tracy Hawkey
Â
Webinar featuring Forrester TEI study: Driving 496% ROI with Tasktop Viz
Webinar featuring Forrester TEI study: Driving 496% ROI with Tasktop Viz
Tasktop
Â
Geoff Harris - CV_Dec 2016
Geoff Harris - CV_Dec 2016
Geoffrey Harris
Â
17-Dec-2016-CV
17-Dec-2016-CV
Steve Croucher
Â
Removing the barriers to business transformation with ArchiMate
Removing the barriers to business transformation with ArchiMate
Corso
Â
System re-engineering kasb Securities Ltd
System re-engineering kasb Securities Ltd
Shehroz Adil
Â
Sample Assessment SOW Scope
Sample Assessment SOW Scope
Joey Amanchukwu
Â
Resume_Vikram_Potnuru
Resume_Vikram_Potnuru
Vikram Potnuru
Â
Nitin Sharma- Business Analyst
Nitin Sharma- Business Analyst
Nitin Sharma
Â
Zubin_Shahnawaz_CV_August_2016
Zubin_Shahnawaz_CV_August_2016
Zubin Shahnawaz
Â
Resume-MN
Resume-MN
Malatesh Nadger
Â
Resume: Francine Wolfe 2009
Resume: Francine Wolfe 2009
fswolfe
Â
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
panagenda
Â
Microsoft AI Transformation Partner Playbook.pdf
Microsoft AI Transformation Partner Playbook.pdf
Willy Marroquin (WillyDevNET)
Â
More Related Content
Similar to Template for _ future State Analysis.ppt
kalafsky Resume 032315
kalafsky Resume 032315
Mark Kalafsky
Â
CV for Neil Fulton as of December, 2013
CV for Neil Fulton as of December, 2013
nwfulton21
Â
Framing the business case service provider v1 2
Framing the business case service provider v1 2
pskoularikos
Â
Joe Ballou Resume
Joe Ballou Resume
Joseph Ballou, CBA
Â
Joe Ballou Resume
Joe Ballou Resume
Joseph Ballou, CBA
Â
Stephens Christina
Stephens Christina
Christina Stephens, CSPO
Â
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...
CHED
Â
Hcm benchmark report_september_2018
Hcm benchmark report_september_2018
Trevor Hewitt
Â
MDS.BackupandRecoveryServices.2011.1006.B
MDS.BackupandRecoveryServices.2011.1006.B
Tracy Hawkey
Â
Webinar featuring Forrester TEI study: Driving 496% ROI with Tasktop Viz
Webinar featuring Forrester TEI study: Driving 496% ROI with Tasktop Viz
Tasktop
Â
Geoff Harris - CV_Dec 2016
Geoff Harris - CV_Dec 2016
Geoffrey Harris
Â
17-Dec-2016-CV
17-Dec-2016-CV
Steve Croucher
Â
Removing the barriers to business transformation with ArchiMate
Removing the barriers to business transformation with ArchiMate
Corso
Â
System re-engineering kasb Securities Ltd
System re-engineering kasb Securities Ltd
Shehroz Adil
Â
Sample Assessment SOW Scope
Sample Assessment SOW Scope
Joey Amanchukwu
Â
Resume_Vikram_Potnuru
Resume_Vikram_Potnuru
Vikram Potnuru
Â
Nitin Sharma- Business Analyst
Nitin Sharma- Business Analyst
Nitin Sharma
Â
Zubin_Shahnawaz_CV_August_2016
Zubin_Shahnawaz_CV_August_2016
Zubin Shahnawaz
Â
Resume-MN
Resume-MN
Malatesh Nadger
Â
Resume: Francine Wolfe 2009
Resume: Francine Wolfe 2009
fswolfe
Â
Similar to Template for _ future State Analysis.ppt
(20)
kalafsky Resume 032315
kalafsky Resume 032315
Â
CV for Neil Fulton as of December, 2013
CV for Neil Fulton as of December, 2013
Â
Framing the business case service provider v1 2
Framing the business case service provider v1 2
Â
Joe Ballou Resume
Joe Ballou Resume
Â
Joe Ballou Resume
Joe Ballou Resume
Â
Stephens Christina
Stephens Christina
Â
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...
Â
Hcm benchmark report_september_2018
Hcm benchmark report_september_2018
Â
MDS.BackupandRecoveryServices.2011.1006.B
MDS.BackupandRecoveryServices.2011.1006.B
Â
Webinar featuring Forrester TEI study: Driving 496% ROI with Tasktop Viz
Webinar featuring Forrester TEI study: Driving 496% ROI with Tasktop Viz
Â
Geoff Harris - CV_Dec 2016
Geoff Harris - CV_Dec 2016
Â
17-Dec-2016-CV
17-Dec-2016-CV
Â
Removing the barriers to business transformation with ArchiMate
Removing the barriers to business transformation with ArchiMate
Â
System re-engineering kasb Securities Ltd
System re-engineering kasb Securities Ltd
Â
Sample Assessment SOW Scope
Sample Assessment SOW Scope
Â
Resume_Vikram_Potnuru
Resume_Vikram_Potnuru
Â
Nitin Sharma- Business Analyst
Nitin Sharma- Business Analyst
Â
Zubin_Shahnawaz_CV_August_2016
Zubin_Shahnawaz_CV_August_2016
Â
Resume-MN
Resume-MN
Â
Resume: Francine Wolfe 2009
Resume: Francine Wolfe 2009
Â
Recently uploaded
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
panagenda
Â
Microsoft AI Transformation Partner Playbook.pdf
Microsoft AI Transformation Partner Playbook.pdf
Willy Marroquin (WillyDevNET)
Â
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
MyIntelliSource, Inc.
Â
The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...
The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...
ICS
Â
Unlocking the Future of AI Agents with Large Language Models
Unlocking the Future of AI Agents with Large Language Models
aagamshah0812
Â
5 Signs You Need a Fashion PLM Software.pdf
5 Signs You Need a Fashion PLM Software.pdf
Wave PLM
Â
Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...
Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...
harshavardhanraghave
Â
SyndBuddy AI 2k Review 2024: Revolutionizing Content Syndication with AI
SyndBuddy AI 2k Review 2024: Revolutionizing Content Syndication with AI
ABDERRAOUF MEHENNI
Â
Optimizing AI for immediate response in Smart CCTV
Optimizing AI for immediate response in Smart CCTV
shikhaohhpro
Â
How To Use Server-Side Rendering with Nuxt.js
How To Use Server-Side Rendering with Nuxt.js
Andolasoft Inc
Â
Diamond Application Development Crafting Solutions with Precision
Diamond Application Development Crafting Solutions with Precision
SolGuruz
Â
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...
kellynguyen01
Â
Hand gesture recognition PROJECT PPT.pptx
Hand gesture recognition PROJECT PPT.pptx
bodapatigopi8531
Â
HR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.com
Fatema Valibhai
Â
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
Delhi Call girls
Â
CALL ON ➥8923113531 🔝Call Girls Badshah Nagar Lucknow best Female service
CALL ON ➥8923113531 🔝Call Girls Badshah Nagar Lucknow best Female service
anilsa9823
Â
How To Troubleshoot Collaboration Apps for the Modern Connected Worker
How To Troubleshoot Collaboration Apps for the Modern Connected Worker
ThousandEyes
Â
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
MyIntelliSource, Inc.
Â
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
Health
Â
The Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdf
kalichargn70th171
Â
Recently uploaded
(20)
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
Â
Microsoft AI Transformation Partner Playbook.pdf
Microsoft AI Transformation Partner Playbook.pdf
Â
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Â
The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...
The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...
Â
Unlocking the Future of AI Agents with Large Language Models
Unlocking the Future of AI Agents with Large Language Models
Â
5 Signs You Need a Fashion PLM Software.pdf
5 Signs You Need a Fashion PLM Software.pdf
Â
Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...
Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...
Â
SyndBuddy AI 2k Review 2024: Revolutionizing Content Syndication with AI
SyndBuddy AI 2k Review 2024: Revolutionizing Content Syndication with AI
Â
Optimizing AI for immediate response in Smart CCTV
Optimizing AI for immediate response in Smart CCTV
Â
How To Use Server-Side Rendering with Nuxt.js
How To Use Server-Side Rendering with Nuxt.js
Â
Diamond Application Development Crafting Solutions with Precision
Diamond Application Development Crafting Solutions with Precision
Â
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...
Â
Hand gesture recognition PROJECT PPT.pptx
Hand gesture recognition PROJECT PPT.pptx
Â
HR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.com
Â
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
Â
CALL ON ➥8923113531 🔝Call Girls Badshah Nagar Lucknow best Female service
CALL ON ➥8923113531 🔝Call Girls Badshah Nagar Lucknow best Female service
Â
How To Troubleshoot Collaboration Apps for the Modern Connected Worker
How To Troubleshoot Collaboration Apps for the Modern Connected Worker
Â
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Â
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
Â
The Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdf
Â
Template for _ future State Analysis.ppt
1.
Future State Analysis Date
2.
© 2008 BearingPoint,
Inc. 2 Client Name Here INDUSTRY Author and Version History This document is protected under the copyright laws of the United States and/or other countries as an unpublished work. This document contains information that is proprietary and confidential to BearingPoint, Inc. and/or affiliates or its technical alliance partners, which shall not be duplicated, used, or disclosed in whole or in part without BearingPoint's express written permission. © 2008 BearingPoint, Inc. and/or its affiliate(s) (Unpublished). All rights reserved. BearingPoint® is a registered trademark of BearingPoint, Inc., or its affiliates, in the United States and other countries. First Name Last Name, Title BearingPoint 1676 International Drive McLean, VA 22102 Tel: 703-747-1111 Fax: 703-747-1112 E-mail: john.doe@bearingpoint.com First Name Last Name, Title BearingPoint 1676 International Drive McLean, VA 22102 Tel: 703-747-1111 Fax: 703-747-1112 E-mail: john.doe@bearingpoint.com First Name Last Name, Title BearingPoint 1676 International Drive McLean, VA 22102 Tel: 703-747-1111 Fax: 703-747-1112 E-mail: john.doe@bearingpoint.com Draft Final Description Version Draft Date Author Approval Date Approver Version History Authors BLUE ITALICS are special instructions for completing the template. When creating a template, use blue italics to provide detailed instruction. •Select View>>Slide Master to adjust Headers/Footers •This template may be used for print deliverables, as well as presentations. For Print Deliverables, utilize pages 3-4 as an example of font and style and adapt your deliverable accordingly. For Presentations, utilize page 4-7 as an example of font and style, and adapt your presentation accordingly. Select Insert>>Duplicate Slide to create a copy of a page. • Images on pages 8-18 can be used for either Print Deliverables or Presentations. Verify BearingPoint owns the copyright on any text or graphics you insert into this template. Insertion of Client material or logo requires the Client's written permission. If ownership cannot be verified, do not use. DELETE all blue italic text boxes, pages and instructions before finalizing deliverables and presentations
3.
© 2008 BearingPoint,
Inc. 3 Client Name Here INDUSTRY Table of Contents Introduction/Executive Summary Future State Objectives Future State Organization Future State Projects/Initiatives Benefits Estimate Program Interdependencies Business Value & Ability to Implement <The specific contents of this deliverable may vary depending on the level of detail required by the client and the level of knowledge of team members. Edit, add and revise as appropriate.>
4.
Introduction/Executive Summary
5.
© 2008 BearingPoint,
Inc. 5 Client Name Here INDUSTRY Introduction <The Future State Analysis deliverable Strategic Vision, Mission & Values deliverable helps develop a future state concept of operations including people, process and technology changes based on the opportunities identified in the Identify Areas for Strategic Improvements activity and/or the new strategy and ensuring that this future state is aligned with the organization's vision and strategy. The future state strategic design is at the organizational level for the areas for improvement identified previously. The detailed implementation of the future state strategic design initiatives would be conducted within subsequent the BearingPoint Delivery Framework streams such as Business Process and Packaged Application. The deliverable outlines the future state objectives and organization, as well as the proposed projects and initiatives necessary that should be launched in order to achieve the future state. These initiatives or projects should then undergo a high-level benefits estimate in order to evaluate and quantify the potential gains or improvements identified. If there are multiple projects or initiatives, the interdependencies between them should be identified in order to understand how these projects need to be rolled out. The business value can then be further detailed in terms of the time required and ability for the organization to implement the proposed initiatives or projects. This can enable a preliminary ranking of projects and initiatives.>
6.
© 2008 BearingPoint,
Inc. 6 Client Name Here INDUSTRY Executive Summary <Describe the introduction and scope of this deliverable, introducing the chosen future state and the elements covered by this deliverable. An example is shown below. An executive summary covering the key points covered in this deliverable can also be described here.> ─ The future state operating environment has been developed to bridge the gap between the call center's current level of performance and its desired target state. The transformation program will involve a transition plan for: – Improvements in the Team Leader management and staff skills, competencies, productivity and performance – Re-engineering of the highest cost and biggest impact enquiry process areas – Optimization of the workforce planning function including the measurement and reporting framework – Re – design of the call center structure to support the new operating and process environment – Establishment of a consolidated and automated reporting management framework based on industry and competitor standards Example Current State Gaps ─ Existing IVR/skills-based routing structure ineffective ─ Process inefficiencies exist across multiple call centre process areas ─ Existing metrics and reporting inaccurately depict productivity and performance ─ High staff turnover (26%) and absenteeism (7%) ─ Team leader skills/competencies inadequate ─ CSO knowledge/training insufficient to address customer/planner needs ─ Ineffective Workforce Planning function ─ Limited communication between Call Centre and support functions Future State Vision ─ Effective IVR and routing structures aligned to customer/planner needs ─ Streamlined and efficient enquiry processes ─ Comprehensive Call Centre Management Reporting & Measurement Framework ─ Leading Practice indicators in the areas of staff productivity, metrics and operating costs ─ Best in Class Team Leaders and Team Leader development programs ─ CSO's trained, empowered and enabled to effectively meet customer/planner needs ─ Strategic recruitment plan ─ Formalised Call Centre communication program
7.
Future State Vision
& Objectives
8.
© 2008 BearingPoint,
Inc. 8 Client Name Here INDUSTRY Future State Vision <Describe future state vision depending on what the future state covers (e.g. department, company vision as a whole, clients). The example below covers the IT strategy vision for the Department of Justice. For more details refer to the Future State Vision, Mission and Values deliverable.> to provide coordinated and cohesive technology and applications infrastructure which enables staff to work effectively and closely with other agencies in delivering Justice services in response to community needs IT Strategy for Department of Justice Example Example
9.
© 2008 BearingPoint,
Inc. 9 Client Name Here INDUSTRY Future State Objectives (1/2) <Describe future state objectives. In the example below, the call center future state objectives have been identified through 6 separate projects or work streams with each having set objectives.> Call Centre Improvement Program 6. Reporting & Analytics 3. Workforce Planning Optimisation 5. Technology Optimisation 1. People Transformation 2. Business Process Re-engineering 4. Call Centre Redesign ─ Develop Call Centre HR Strategy ─ Re-design job profiles ─ Develop a career path model ─ Assess skills and competencies ─ Develop team leader skills and competencies ─ Develop plans to reduce absent. and lower turnover ─ Re-design product training ─ Re-engineer high cost and impact call centre enquiry processes ─ Align where appropriate "enquiry" processes with process workstream end-to-end ─ Optimise call centre work force planning processes ─ Integrate where appropriate workforce planning activity into Call Centre ─ Establish SLA's to track and report on resource planning performance ─ Establish quality control mechanisms to monitor and track reporting accuracy ─ Redesign future- state call centre structure ─ Consolidate & streamline duplicated functional areas (e.g. training) ─ Establish communication framework with defined SLA's between the call centre and back- office ─ Redesign the IVR/routing structures with the existing technology ─ Increase automated IVR usage and migrate customers to self-service channels ─ Minimise caller/ planner verification ─ Establish a comprehensive range of industry performance reporting ─ Develop a management reporting framework ─ Consolidate and automate reporting ─ Eliminate re-work in reporting ─ Develop reporting processes and quality controls Objectives Design & Agree Call Centre Strategy Example
10.
© 2008 BearingPoint,
Inc. 10 Client Name Here INDUSTRY Future State Objectives (2/2) <Describe future state objectives. In the example below, future state is compared to current state and best in class to describe the impact of the future state on particular areas of the organization.> Example Pick/Pack/Ship Available to Promise Pricing Order Mgt Opportunity Management Forecasting ─ Direct link to pickers using RF ─ Established Company program w/minimum number of Companys to meet business needs ─ Automated exception driven freight bill processing and auditing ─ Complete transportation cost and delivery optimization ─ Location confirmation performed using RF/Hand held terminals ─ Automated, rule-based routing and scheduling of vehicles ─ Real time Company performance tracking ─ Limited LTL shipments 100% compliant with customer ship dates ─ Picking route is optimized to minimize material handling ─ Some Company rationalization, resulting in few Companys ─ Freight bills are paid through PO system like any other invoice ─ Load consolidation via order consolidation and/or scheduling ─ Automated notification ─ Split orders by zone/dept consolidation on dock ─ Use of stand-alone transportation routing package ─ Difficulty determining most favorable Company ─ High percentage of LTL and rush shipments ─ Missed customer shipment dates ─ Picking performed separately for each order ─ Non-optimized Picking sequence is sequential and not optimized ─ Freight bills are paid manually and not audited ─ Large number of Companys, no formal core Company program ─ Manual routing of vehicles ─ ATP based upon the broadest supply chain viewpoint ─ ATP extremely responsive to demand and operations changes ─ Extremely high order fill rates reflect high accuracy of ATP ─ ATP capabilities are extended to beyond four walls and consider supplier capabilities ─ Enterprise-wide visibility to product through all company and supplier locations ─ ATP capabilities include all internal drivers ─ Ability to consider substitute products/services ─ No ability to consider supply base impact on ATP ─ Basic ATP capabilities including some internal drivers but lacking variables such as Inter transfers ─ Limited visibility to inventory at alternative sites ─ Manual or no ATP capability ─ High lost sales due to inability to provide delivery dates with high level of confidence ─ Limited visibility to product at alternative locations ─ Pricing is completely dynamic and based on detailed view of supply and demand streams ─ No money is "left on the table" due to limitations in pricing ─ Product price reflects total costs including all material, labor, transportation, logistics, etc. ─ Few manual pricing overrides ─ Pricing is reviewed and updated weekly ─ Pricing considers a broad range of customer attributes ─ Pricing is finely tuned by sales channel, customer segment, and sales office ─ Pricing is reviewed and updated monthly ─ Pricing includes major costs but lacks some cost components ─ Standard volume discounts offered to preferred customers ─ Tools in place to more easily and frequently maintain pricing ─ Pricing is based on rough cost+ calculations ─ One price for all customers yet frequent manual discounts and surcharges ─ Pricing is infrequently reviewed and difficult to update ─ Totally automated and integrated using POS/customer info. ─ Immediate order acknowledgement and order promising ─ VMI in place for key customers some use of POS/customer data ─ Timely acknowledgements and order promising ─ Electronic – seldom requires rekeying. Some VMI and some upstream order visibility ─ Order acknowledgement and promising delayed ─ Primarily Electronic but usually requires rekeying ─ Limited upstream order visibility ─ Primarily from hard copy some from fax ─ Defined corporate lead qualification process ─ Defined std sales methodology ─ Review lost opportunities ─ Ability to work offline and synchronize ─ Continuously monitor sales pipeline ─ Quotes are entered electronically ─ Quotes are monitored for ─ expiration ─ Those nearing expiry are reviewed in an actionable time Frame ─ All quotes are entered in an integrated OM environment. ─ Quotes link electronically to customer orders ─ Approval is workflow driven ─ Probabilities influence planning and scheduling ─ Probable quotes are maintained in an on-line environment ─ Pricing is reviewed manually and validated prior to submission ─ Inquiries and quotes are not tracked ─ Quotes are maintained off line ─ Limited visibility to quotes ─ No impact on forecasting ─ No won/loss review ─ Integrated forecasting tools with collaborative forecasting and planning agility ─ Closed loop, 360 degree continuous forecasting cycle ─ Integrated forecasting tools with leading indicators, sophisticated user settings and an effective S&OP process ─ Basic history based forecasting system with a limited S&OP process ─ Use of some market intelligence for overrides ─ Spreadsheets and/or point forecasting system usually within the supply chain functional only ─ Manual with some spreadsheets Full Value Chain Limited Integration Corporate Excellence Process Focus Functional Silo Best-in-class target Company Future State Company Current State
11.
Future State Organization
12.
© 2008 BearingPoint,
Inc. 12 Client Name Here INDUSTRY Future State Organization <Describe the future state new organization, taking into account the changes to the current state. A detailed example is provided below. Refer to the Organizational Assessment deliverable for more organizational charts examples.> Customer Management Fairgo FoI Customer Responsiveness eLearning Kiosk Training DB CHRIS Building Staff Capabilities Oracle Financials EC4P GIMS Managing Finances & Assets SCT Courts Ringtail Jurors TMS CaseWorks Registry Probate CCCFM Cocassis Courtlink Access to Equitable Justice BA Regal LifeData Numerous Access DB Business Specific Applications Data Warehouse Extract Tools OCSC view Business Unit views Business Unit views Business Unit views Portfolio reporting views Managing Performance A Current applications New applications Applications being replaced Applications to be replaced A A A PIMS Prison Facilities Mgt OASIS Prisoner Visitors ID VRAS CMS OPA CMS Offender Management, Victims and Client Support E*Justice Web Content Management Email / Calendar Collaboration Knowledge repositories EDMS Connecting Justice Online Lotus Notes Customer Community Staff Other agencies Partners Legal Profn EAI (JKE) Presentation, security, and integration IVR, Web, email, wireless, desktop E-business Portal Infrastructure Customer Management Fairgo FoI Customer Responsiveness Customer Management Fairgo FoI Customer Responsiveness eLearning Kiosk Training DB CHRIS Building Staff Capabilities eLearning Kiosk Training DB CHRIS Building Staff Capabilities Oracle Financials EC4P GIMS Managing Finances & Assets Oracle Financials EC4P GIMS Managing Finances & Assets SCT Courts Ringtail Jurors TMS CaseWorks Registry Probate CCCFM Cocassis Courtlink Access to Equitable Justice SCT Courts Ringtail Jurors TMS CaseWorks Registry Probate CCCFM Cocassis Courtlink Access to Equitable Justice BA Regal LifeData Numerous Access DB Business Specific Applications BA Regal LifeData Numerous Access DB Business Specific Applications Data Warehouse Extract Tools OCSC view Business Unit views Business Unit views Business Unit views Portfolio reporting views Managing Performance Data Warehouse Extract Tools OCSC view Business Unit views Business Unit views Business Unit views Portfolio reporting views Managing Performance A Current applications New applications Applications being replaced Applications to be replaced A A A A Current applications New applications Applications being replaced Applications to be replaced A A A PIMS Prison Facilities Mgt OASIS Prisoner Visitors ID VRAS CMS OPA CMS Offender Management, Victims and Client Support E*Justice PIMS Prison Facilities Mgt OASIS Prisoner Visitors ID VRAS CMS OPA CMS Offender Management, Victims and Client Support E*Justice Web Content Management Email / Calendar Collaboration Knowledge repositories EDMS Connecting Justice Online Lotus Notes Web Content Management Email / Calendar Collaboration Knowledge repositories EDMS Connecting Justice Online Lotus Notes Customer Community Staff Other agencies Partners Legal Profn Customer Community Staff Other agencies Partners Legal Profn EAI (JKE) Presentation, security, and integration IVR, Web, email, wireless, desktop E-business Portal Infrastructure EAI (JKE) Presentation, security, and integration IVR, Web, email, wireless, desktop E-business Portal Infrastructure Example
13.
Future State Projects/Initiatives
14.
© 2008 BearingPoint,
Inc. 14 Client Name Here INDUSTRY Future State Projects/Initiatives <Identify the major projects or initiatives involved in achieving the required future state. An example for a call center improvement project is detailed below.> Call Centre Improvement Projects 1. People Transformation ─ Improve Team Leader management and staff skills, competencies, productivity and performance 2. Business Process Re-engineering ─ Re-engineer the highest cost and biggest impact enquiry process areas 3. Workforce Planning Optimisation ─ Optimise the workforce planning function including the measurement and reporting framework 4. Call Centre Redesign ─ Redesign the call centre structure to support the new operating and process environment 5. Technology Optimisation ─ Optimise existing telephony functionality and redesign specific technology elements 6. Reporting & Analytics ─ Establish a consolidated and automated reporting management framework based on competitor and leading practice standards by leveraging the existing reporting engines available at XXX Design & Agree Call Centre Strategy Example
15.
© 2008 BearingPoint,
Inc. 15 Client Name Here INDUSTRY Future State Projects/Initiatives <For each Future State project or initiative, fill out the template below describing key activities, objectives, timelines and brief cost/benefit. Please note that the cost estimate may only be preliminary (as this is detailed further in the Strategic Requirements deliverable.> Key Activities Objectives Implementation Effort & Timeframe Benefits ─ E.g Reduce turnover by 6% ─ Reduce absenteeism by 2% Expected Benefit: $XXXk ─ E.g Call Centre Expert for XX weeks ─ 1 Methodology Expert for XX weeks ─ 1 Project Manager – 2 days per week for XX weeks Cost Estimate: $XXXk ─ E.g Develop Call Centre HR Strategy ─ Develop specific plans to reduce CSO turnover and manage absenteeism ─ Develop Team Leader skills & competencies 5 Redesign + IT Required 4 Redesign Only 3 Improve + IT Required 2 Improve Only 1 Minor or No Change Expected Timeframe – Design: XX weeks, Implementation: XX weeks ─ E.g. Develop Call Centre HR Strategy ─ Develop tactical means to manage absenteeism and turnover ─ Review training roles, responsibilities and content 1. People Transformation 2. Business Process Re-engineering 3. Workforce Planning Optimisation 4. Call Centre Redesign 5. Technology Optimisation 6. Reporting & Analytics Call Centre Improvement Projects Cost Estimate Example
16.
Benefits Estimate
17.
© 2008 BearingPoint,
Inc. 17 Client Name Here INDUSTRY Benefits Estimate <Provide a high-level benefits estimate of the future state design projects or initiatives. In the example below, the total anticipated benefits are expected to be approximately $4.5 million annually. These were to be realized through improved operational performance, efficiency and optimization of resources.> Example $2,000k $4,000k $6,000k $20,000k $18,000k $1.5M $1.4M $250k $294k $522k $548k #3. Workforce Planning Optimisation $4.5M #1. People Transformation #2. Business Process Re-engineering #4. Call Centre Redesign #5.Technology Optimisation #6.Reporting & Analytics Total Call Centre Improvement Projects 2003 Call Centre Budget Call Centre Improvement Projects $19.83M Total Potential Project Benefit of of $4.55M
18.
Project Interdependencies
19.
© 2008 BearingPoint,
Inc. 19 Client Name Here INDUSTRY <Map a project "critical path" as described below in the example to demonstrate the interdependent nature of the projects identified, and highlight the requirement for a comprehensive program management framework to ensure the successful roll-out of the projects to achieve the future state.> Project Interdependencies Example Design & Agree Call Centre Strategy 3. Workforce Planning Optimisation 2. Business Process Re-engineering 1. People Transformation 5. Technology Optimisation 4. Call Centre Re-design 6. Reporting & Analytics Foundation (0 – 6 months) Medium-Term (6 – 12 months) Long-Term (12 – 24 months) Yr 1 Yr 2 Yr 3
20.
Business Value & Ability
to Implement
21.
© 2008 BearingPoint,
Inc. 21 Client Name Here INDUSTRY Business Value & Ability to Implement <Provide a brief outline of the future state strategic design business value & ability to implement. An example is for a call center improvement project is provided below.> Example Call Centre Improvement Project Ranking Ability to Implement Time to Implement High Low Easy Difficult Longer-term Opportunities Short-term Opportunities Project #4. Redesign Call Centre Project #2. Business Process Re-engineering Project #6. Reporting & Analytics Project #1. People Transformation Project #3. Workforce Planning Optimisation Project #5. Technology Optimisation 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 10 $548k $522k $1.4M $1.5M $293k $250k
Download now