TEC Group International
AboutTEC Group International …………………………………… 3
Where we operate ………………………………………………….. 4
What we do …………………………………………………………. 5
Subsea Engineering .………………………………………………. 6
Surface ……………………………………………………………… 7
Subsurface Engineering and Project …………………………….. 8
Project Controls ……………………………………………………. 9
EPC …………………………………………………………………. 10
Drilling and Completions ………………………………………….. 11
Our Services …………………………………………………………
Candidates ………………………………………… 12
Clients ……………………………………………… 13
Why TEC Group International …………………………………….. 14
TEC Group International Board of Directors …………………….. 15
Contact Us ………………………………………………………….. 16
3.
3
About TEC GroupInternational
Established for more than 12 years, we are recognised in the Oil &
Energy industry as an expert recruiting partner. We have taken the
time to understand our market, our candidates and the challenges
faced.
We are used to providing advice throughout the Our clientele is truly diverse and ranges
entire recruitment lifecycle. Our consultants’ expert from the largest international E&P
knowledge of their respective sectors means that operators to highly-specialised consultants
our candidates and clients can be sure that we and advisory firms.
know what we’re talking about.
With offices in London, Manchester and
TEC Group International understands that energy Scotland, as well as a number of associate
is a global industry. We have teams providing offices around the world, TEC Group
solutions across various regions of the world. International is the energy recruiter of
choice.
4.
4
Where we operate
TECGroup International represents companies throughout most oil-
producing regions of the world. The main areas in which we are
active include;
• Europe • Central Asia • India
• North America • Russia and FSU • South East Asia
• Latin and South America • South East Asia • Australasia
• Caribbean • Africa
• Middle East and North Africa
5.
5
What we do…
Withteams across the UK and internationally, we are able to support
our clients’ needs in various skills areas.
Subsea Surface Engineering EPC
Project Drilling &
Subsurface
Controls Completions
6.
6
Subsea Engineering
TEC GroupInternational has a team of specialist consultants
dedicated to the Subsea Oil & Gas sector. Our client base ranges
greatly from large multinational operators, to engineering contractors
and specialist consultancies.
Our dedicated Subsea division is made-up of expert consultants who truly understand the sector.
This ensures that clients and candidates always receive relevant and informed advice. Our team
represents the following types of engineer:
• Pipeline Engineers • Process Engineers
• Pipeline Designers • Project Engineers/Managers
• Structural Engineers • Umbilical Engineers
• Subsea Designers • Finite Element Analysis Engineers
• Flow Assurance Engineers
7.
7
Subsurface
There is anincreasing industry-wide shortage of Geologists,
Geophysicists, Reservoir Engineers, Petrophysicists and other
highly-skilled professionals.
TEC Group International’s approach is unique.
Talented Individuals
We see the individuals we represent as our primary focus, rather than just the companies within the
industry. Through highly-competent consultants - their expertise and knowledge of the sector - we
are uniquely positioned to advise and guide individuals through an often complicated and difficult
process.
We believe in creating meaningful, long-lasting relationships that benefit everybody concerned.
Unlike many companies in our field, we don’t see everyone as a placement; we recognise that there
are many more ways to add value to someone’s career than simply finding them a job. It is this
principle that has allowed us to build quality networks across specialist market sectors.
Quality Employers
Apart from representing the best and most sought-after talent within the Petroleum Industry, TEC
Group International has long-standing relationships with many of the leading organisations. In the
same way that we work only with the best professionals, our approach to which companies we work
with is the same.
We believe strongly in only representing organisations that truly offer our candidates the right type of
career potential. We are proud to be associated with clients who are not only regarded as leading
businesses, but also as leading employers.
8.
8
Surface Engineering andProjects
TEC Group International’s Surface Engineering and Projects division
works with leading Oil & Gas operators and service companies
across the UK, Europe and Africa. Specifically focussed on mid-to-
senior level hires, we advise at all stages of the recruitment lifecycle.
‘Surface Engineering and Projects’ refers to the capability to deliver world-class projects that are
safe, competitive and predictive. The challenge for modern oil companies is to ensure they have the
organizational capabilities, processes and technologies required for managing and executing asset
developments that will fuel production growth. There is a shortage of talented Executives,
Management and Engineers in the Surface Engineering and Projects field and a great demand for
their skills.
TEC Group International locates talented individuals via our rigorous research methods, our
specialist networks and through progressive and targeted advertising and marketing campaigns. It is
because of this approach that we locate and move future market leaders in Surface Engineering and
Projects. Discipline areas we are most associated with include:
• Project Management and Controls
• Process/Surface Facilities Engineering
• Development Engineering
• Operations, Maintenance and Reliability
9.
9
Project Controls
Our ProjectControls team works with some of the leading
organisations in the industry. Led by a highly-experienced
management team, we are proud to offer clients and candidates
an exceptional level of sound advice and support in their career
move.
TEC Group International undertakes contract and staff assignments for a broad selection of our
clients in Europe, Africa, Middle East, Central Asia and the Far East.
Project controls is a broad range of engineering and commercial skillsets. Our teams cover (but are
not limited) to the following disciplines:
• Project Planners • Cost Engineers
• Asset Planners • Contracts Engineers
• Materials Controllers • Document Controllers
10.
10
Drilling and Completions
Drillingtechniques and completion technology have changed
significantly in the past 10 years. With the number of suitably-
qualified engineers remaining low, competition for drilling and
completions professionals has never been higher.
TEC Group International works globally with Drilling Contractors and Operating Companies to
provide staff and contractors for all manner of assignment. Our team consists of highly-experienced
recruiters and our network of skilled candidates means we can react quickly and efficiently to our
clients’ needs. Our team represents the following candidates:
• Drilling Engineers
• Completion Engineers
• Well Engineers
• Workover Engineers
• Directional Drillers
11.
11
Engineering Procurement &Construction
TEC Group International represents highly-skilled professionals
within the Engineering, Procurement and Construction sector. Our
diverse client base includes E&P Operators, leading EPC
organisations and specialist consultancies.
With over 12 years' expertise in the Oil & Gas Engineering sector, our consultants can advise
candidates from the following backgrounds:
• Piping • Quality Assurance/ Control
• Pipeline • HVAC
• Control & Instrumentation • Mechanical & Electrical
• Structural • Contracts & Documentation
• Procurement • Project Engineering/ Management
• Process • Commissioning/De-commissioning
• Safety/ HSE/ Environmental
12.
12
Our Services -Candidates
TEC Group International supports petroleum engineers in many
international locations. From in-country contract solutions to payroll
and tax advice, we pride ourselves on being a true recruiting partner.
International Relocation Expert Consultancy
Our consultants have regional focus, which means TEC Group International’s structure
that they can advise on all aspects of relocation, ensures that consultants are focussed
ensuring your peace of mind. From cost of living within discipline areas. We don’t do
comparison to climate, our team will offer you the everything. This means that the
best advice specific to the location of the job. consultant you deal with knows your
part of the industry, offering the most
Overseas Contractors reliable advice and guidance.
TEC Group International, its subsidiaries and Our training and selection process is
partner companies, are able facilitate contractor designed to maintain this quality. A
placements in most countries. Our services range large majority of our candidate base
from ‘meet and great’ services to in-country comes through referrals.
compliance and taxation advice.
13.
13
Our Services –Clients
We’ve been in the business for more than 12 years. Throughout this
time TEC Group International has added significantly to the talent
pool of some of the industry’s leading names.
Permanent Staff Contract Workers
From junior staff to the most critical Hiring the right staff within a short period of time
strategic moves. TEC Group International can be critical to the success of a project. Coupled
partners our clients to provide access to the with the challenges presented by international
most sought-after talent. projects, our clients look to us to react efficiently
and with the right skills.
We manage permanent hires in the
following way: Our network of international offices, subsidiaries
• Full job specification and profiling and partner companies allows us to provide the
following services:
• Detailed search process
• Liaison throughout the entire process
• Internal network
• Global database of over 50,000 • Full job specification and profiling
engineers
• CV shortlist within 24 hours, fully-qualified and
• Headhunting and advanced
committed candidates
networking
• Specialist job websites • Arrange interviews, face to face, video or telephone
• Conduct in-depth interviews • All compliance in country, including taxation, local
payrolling, referencing
• Entire process management from interview
preparation to offer management and
placement
• Post placement care
14.
14
Why TEC GroupInternational?
Our proposition is simple. To provide time and cost-efficient staffing
solutions to our clients and to offer our candidates expert and
informed career advice. We call this ‘Our Principles’ .
Expert Consultants Leading Clients
Each of our consultants goes through an intensive In the same way we only represent quality
training program when they join us. This covers engineers, we believe in consistency in our
engineering disciplines and advanced recruitment approach to the clients we represent. TEC Group
techniques. International is proud to be associated with only
the best organisations within the sector.
When a client instructs us on a new role, or when a
candidate discusses their work history, TEC Group Candidates represented by TEC Group
International’s expert teams are able to advise and International will have access to only the best
respond appropriately. This saves time and money employers in their industry.
for our clients and it reassures candidates that they
are being supported by a professional who ‘speaks Exceptional Recruiting Processes
their language’.
TEC Group International has invested heavily in
having the right infrastructure to respond to the
Highly-Skilled Candidates
work we do. This includes state-of-the-art
TEC Group International has built a reputation on recruitment software, a database that our
the strength of our candidates. We only represent consultants can access from anywhere in the
highly-skilled and qualified engineers. We believe world and an internal staff structure that ensures
that when paying a recruitment fee for our services, our clients receive the best response.
our clients should only have access to the best
This, coupled with an intensive training course,
talent in the industry.
ensures the best response times, the most
relevant candidates presented and the highest fill-
rates.
15.
15
TEC Group InternationalBoard of Directors
John Hailstone: Chairman
John has spent 25 years in the Recruitment Industry in a number of consulting and
directorship roles and is the majority owner of Compello Staffing Group, the parent of TGI.
John was the driver behind the acquisitions and subsequent merger of Tudor Personnel
and Jobact Petrochem which laid the foundations of what is now TGI.
John is responsible for the appointment of the board and working with it on strategic and
business planning matters. When not acting as an adviser and sounding board he spends
his time supporting other group firms.
James Harding: Managing Director
James graduated with a Business degree from City University and immediately began
his recruitment career with Eden Brown in 1993, where he spent several years building
recruitment teams servicing the professional construction sector. James spent a number
of years in a corporate business development role, before moving to a city based
recruiter as their Head of Sales.
He spent four years with the US based CDI Corporation, responsible for running their
recruiting business in London, before coming to TEC Group in 2010, as Managing
Director following the company's reorganisation as an owner-managed business.
Will Atkinson: Executive Director
Will read European Economic Studies at Durham University before starting his career in
2003 for a specialist legal and financial recruiter in the City. After moving to Hydrogen PLC,
a leading international player in 2006, he was involved in establishing the global
construction and energy division, managing the Middle East and North Africa team.
He joined TEC Group International to enhance the company's growth, particularly into
international markets. Will has a strong background managing complex international moves
for senior level executives in the energy sector and has built a reputation as an expert in
his sector.
16.
16
Contact Us
London Manchester
Crosspoint House 19 Spring Gardens
28 Stafford Road City Centre
Greater London Manchester
SM9 3AA M2 1FB
Telephone: +44(0)20 8544 3400 Telephone: +44(0)161 839 1010