1
General Manager Message...
Despite the innovation and challenges that occur in our current
era, Sahab occupies a unique position in the Engineering
Consulting field and the Safety/Firefighting Consultancy inside
the Kingdom of Saudi Arabia and the Arab nations. Since Sahab
was founded in 1993 over (24 years), it has been always deter-
mined to achieve its projects for both the private and the
governmental sector on a highly productive manner, whether in
designing works, construction supervision, urban planning,
projects management and safety/firefighting engineering
taking in to account the modern scientific methods.
We proved our identity by mastering a complete professional
operations and hardworking through an integrated work team
that includes all the engineering professions; which has the
honor to possess the trust and the preference of highly
important clients. Furthermore, providing solutions is one of
our main goals. Therefore, we have been always committed to
accomplish our projects assuring the highest quality and
continuance development to significantly sustain with the
modern era.
We are pleased to provide you a summary of Sahab profile and
its achievements within the urban development that is taking
place in the country. Sahab has been able to contribute in many
fields of engineering to the renaissance of this country under
the support of its great leaders.
Sincerely,
Eng. Abdulkareem AL-Sulaiman
General Manager
Maintain the elite status in the Engineering consulting firms
identically with the contemporary growth; through the team
spirit and commitment to the highest quality and safety
standards locally and globally.
Our Vision
Our Values
Sahab based in the capital of Saudi Arabia, Riyadh; is one of the
first national engineering entities who led the engineering
consultancy and a main advisor in the safety and firefighting
domain. Sahab is a member of the Saudi Engineering Committee,
and the National Fire Protection Association (NFPA).
Within all the scientific and the technical growth, Sahab actively
interacts with the largest engineering consultancy agencies and
organizations inside and outside of Saudi Arabia; through long
term plans that ensure continuity and creativity in all areas of
engineering actions.
Sahab today by the grace of God and the confidence of its
customers, is a crucial part of the engineering society for many
ministries, committees, and private sector enterprises with the
outstanding projects whereas it proved a great success in the
architecture, structural design, project management, and the
safety/ firefighting.
About Sahab
2 3Sahab Engineering Consulting
• Perform with excellence to exceed the clients’ expectations
• Sustainable-high-quality services
• Unique evolvement
• Professionality, Commitment and Teamwork
Work Methodology
• Maintain providing the highest quality in our engineering
services and solutions through the competent technical team
and the admin expertise to ensure the satisfaction of our
valued clients.
• Deliver inclusive services and solutions to guarantee
excellence in the engineering consulting industry, and the
safety /firefighting advisory for a continuance contribution in
evolving the Kingdom of Saudi Arabia.
• Pursue constantly the projects achievement on time and
within the allocated budget to exceed the clients’
expectations.
• Prepare comprehensive studies of various kinds of the
engineering projects, unify and facilitate the work procedures
using a clear organized manner with an economical
methodology.
• Evaluate and improve the existing engineering projects to
fulfill the requirements of the modern growth.
• Elevate the manpower level with the best expertise and
qualifying Saudi employees in particular to enable them to
participate and compete in the renaissance development to
serve our country.
• Actively interacts with the clients to discuss the projects
requirements considering their views and comments.
• Detailed analysis to specify the required resource and
determine the strengths, weaknesses and the possible risks of
the project.
• Cost analysis and estimation with suitable time frame for
finishing.
• High quality & control standards in implementation and
mentoring; accordance with the regulations of the projects’
engineering and the governmental laws.
• Execution contracts’ preparation and the commitment to
deliver within the agreed time frame.
• Planning, designing and obtaining the governmental licenses
and authorizations.
• Prepration for the quantities and technical specifications
tables.
• Finishing designs and the finalization of the tender documents.
• Trade-off offers received from contractors technically and
financially.
• Project management and supervision.
Our Mission
4 5Sahab Engineering Consulting
The following services are the primary fields of expertise at
Sahab:
Surveying Engineering
Specialist surveyors are available at Sahab to provide
cadastral surveys to study terrestrial dimensions and the
geographical sites by using sophisticated surveying
techniques and equipment for accurate result.
Architectural Engineering
Correct architectural design reflects positively and directly
on the society and the culture of our civilization; hence we
always assure at Sahab to present sustainable architectural
solutions that suit the community conditions and the nature
of the projects, considering every slight detail.
Urban Design
Sahab is keen to improve the economic growth and enhance
the urban life by presenting sustainable plans and alternative
solutions for either the occurred or expected complications
within an organized, flexible, comprehensive and achievable
framework taking into account the capabilities and resources
available.
Civil Engineering
The core of this profession is providing suitable engineering
solutions for the civil progression. Thus, our expert team are
committed to study and analyze the constructional designs
for all projects emphasizing the local and worldwide
standards for a modern and sophisticated production.
Mechanical Engineering
Sahab is strongly emphasizing to apply high quality standard
in all designs and studies as well as the projects that has a
mechanical nature to deliver best solutions and innovative
alternatives.
Electrical Engineering
Nowadays the massive organizational growth and its
diversity led to a primary-daily-usage of electricity. Thus,
Sahab has to deliver technical solutions and electrical system
designs, particularly in the fire alarm systems and the
supervision of the electrical distribution works.
Safety and Firefighting
Safety and firefighting Engineering has become a field that is
rapidly growing with its constantly updated requirements.
Sahab today, is in the front of the leading organizations in
the safety/ firefighting designs and its credentials,
complying with the standards and requirements stated
internationally in NFPA, GCC, and locally in the governmental
agencies as Ministry of Interior and General Directorate of
Civil Defense (Kingdom-wide); and this is taking place in all
classifications and sizes of our projects.
Our Services
6 7Sahab Engineering Consulting
8 9Sahab Engineering Consulting
Functional StructureOur Clients
Deputy of GM
Admin. Team
Human Resources
Marketing &
Customer Service
Accounting
Admin. Follow Ups
Technical Support &
Maintenance
Civil Engineering
Safety & Firefighting Eng.
Architecture & Planning
Surveying Eng.Electromechanical
Technical Team
Electrical
Engineering
Mechanical
Engineering
Secretary
General Manager
Ministry of Labour
Ministry of Finance
Ministry of Health
Saudi Ports Authority
National Commercial Bank (NCB)
Saudi German Company
United Electronics Company (EXTRA)
Rifai Engineering Consultancy Office
Alshaya Group for Real Estate Investment
PAN Emirates for Home Furnishing
Rabie Saudi Foods Co., Ltd.
ALTawary Arab Corporation
Charitable Society for the memorization of the Koran
Herfy Food Services
Buaijan company
ALAjou Group Engineering Consulting
Zawaya Real Estate Company
Etejah Consulting Engineering Office
Saudi Automotive Services Sasco
Shuweir Investment Company
Majid Atiq al-Fawwaz and Co.
Volcano House Contracting Co.
ALTamimi Safety Est.
Nahr Alandls Safety Est.
Stable Tech. Est. (STCO)
Al-Amana Technology Groups
Yasser Abdullah Kadi Plant for Metal Decoration Factory
Factory Arabia Alciobr company
National Manufacturing Furniture Factory Ltd.
Factory Saudi Vetonit Co., Ltd
Farms to Wire tie-down Factory
Sitra Hope Industrial Factory
Al-Babtain Company - Biscuits Factory
National Company for paper-making factory
Client
Supervision
Supervision
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Completed Projects
Government
Government
Government
Government
Private
Private
Private
Private
Private
Private
Private
Private
Private
Private
Private
Private
Private
Private
Private
Private
Private
Industrial
Industrial
Industrial
Industrial
Industrial
Industrial
Industrial
Industrial
Industrial
Industrial
Industrial
Industrial
Industrial
Entity
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
Year
Alamana Technology Factory
Sons of Saleh Mohammed Ayyaf Factory for Rocks & Marbles
Saudi Bilda Company LTD
Arab Company for Chemical Products Factory
SASCO- Saudi Plastic Factory
SABCO - Saudi Plastic Company
Al Rashed Food Co., Ltd.
AL-Ssad ALSaudia Metal Recycling Company
Arab Company for Crystal Glass factory
Saudi Bitumen Industries
Rathath Water Company
Riyadh Company for Metal Industries
Saadi Gronnfeldr Co., Ltd. cgs
Defat Alqarrat Water Factory
Andalus Glass Company
National Water Company (NWC)
Ramah Aluminum & Metal Coating Factory
Technical & Vocational training corporation tvtc of Saudi Arabia
Al-Attia Holding Co.
Adwaa AlJolaan Factory
Technical and Vocational training corporation tvtc of Saudi Arabia
The Cooperation Council for the Arab States of the Gulf
Al-taif Advanced Company
Mohammed Abdullah Ibrahim Almajid
Alrajhi Real Estate Investment Company
Alnojoom United Company
Nabco Group - National Paper Products Company
The Third Fatcory for Refining Oil
Saudi Bitumen Industries
Saudi Ductail Factory
Marwa Mineral Water Factory
Pcard International Card Manufacturer
Rukn Alraseed Plastic Factory
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Other Technical & Engineering Works
Other Technical & Engineering Works
Execution
Supervision
Supervision
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Industrial
Industrial
Industrial
Industrial
Industrial
Industrial
Industrial
Industrial
Industrial
Industrial
Industrial
Industrial
Industrial
Industrial
Industrial
Government
Industrial
Government
Private
Industrial
Government
Government
Private
Private
Private
Private
Industrial
Industrial
Industrial
Industrial
Industrial
Industrial
Industrial
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2016
2015
2015
2015
2015
2015
2015
2015
2015
2015
2015
2015
2015
2015
2015
2015
Defat Alqarrat Water Factory
Defat Alqarrat Water Factory
Ministry of Justice
Alabdullatif Furniture
Zawaya Real Estate Company
Al-Obaikan Company
High Commission for the Development of Al-Riyadh
King Abdulaziz University Hospital (KAU)
Ministry of Social Affairs
Ministry of Labour
Amlak International for Real Estate Development & Finance Co.
Al-Maskan Company
Al-Othaim Company
Alriyadh International Food Services Company
Hashem Contracting and Trading Company
Baghlaf Alzafer Holding Group
Al-Ayuni Group for Investments and Contracting
Al-Nashmi for Development Co. LTD
Al-rawabi Regional Company
Sudair for Energy and Electrical Manufacturing
Nasser Abdullah Alrumaih Factory for Metal Products
BYD Saudi Arabia
Jawdah Cables Factory
Al-Babtain Company - Biscuits Factory
Saudi Ductail Factory
Al-Amana Technology Groups
Bed Quarter Company
Aala Factory - Ayedh Almutairi
Commission for Real Property Contribution-Ministry of Commerce
National Water Company (NWC)
Leejam Sports Company (Fitnees Time)
SABCO - Saudi Plastic Company
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Other Technical & Engineering Works
Other Technical & Engineering Works
Other Technical & Engineering Works
Supervision
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Reviews, Designs & Authorizations
Other Technical & Engineering Works
Other Technical & Engineering Works
Other Technical & Engineering Works
Other Technical & Engineering Works
Industrial
Industrial
Government
Private
Private
Industrial
Government
Government
Government
Government
Private
Private
Private
Private
Private
Private
Private
Private
Private
Industrial
Industrial
Industrial
Industrial
Industrial
Industrial
Industrial
Industrial
Industrial
Government
Government
Private
Industrial
2015
2015
2015
2015
2015
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
2014
Client Completed ProjectsEntityYear Client Completed ProjectsEntityYear
Some of our Achieved Projects (2014-2016)
2015Completed Projects
by %age
2014Completed Projects
by %age
2016Completed Projects
by %age
2014-2016Trend
Completed Projects by Entity Percentage Share (2016 - 2014 Trend)
Private Government Industrial
Industrial,
48%
Private,
37%
Government
15%
48%
36%
18%
52%
36%
13%
41%
37%
22%
8 9Sahab Engineering Consulting
Client Completed ProjectsEntityYear
. Saudi Food & Drug Authority
. Saudi National Water Company
. Human Resources Development Fund
(HRDF)
. King Abdulaziz City for Science and
Technology (KACST)
. King Saud University
. Technical and Vocational Training
Corporation
. Ports Authority
. King Khalid Eye Specialist Hospital
(KKESH)
. National Guard Hospital
. King Abdulaziz University Hospital
. Ministry of Finance
. Ministry of Labour
. Ministry of Interior
. Minisrty of Municipal and Rural
Affairs
. Ministry of Social Affairs
. Ministry of Environment, Water and
Agriculture
. Ministry of Health
. Ministry of Islamic Affairs, Da'wah
and Guidance
. Saudi Industrial Property Authority
. General Directorate of Civil Defense
. General Directorate of Passports
Licenses & MembershipGovernment Qualifications for Agencies
‫اﻟﻬﻨﺪﺳﻴﺔ‬ ‫ﻟﻼﺳﺘﺸﺎرات‬ ‫ﺳﺤﺎب‬ 13 12
Licenses & Membership
‫اﻟﻬﻨﺪﺳﻴﺔ‬ ‫ﻟﻼﺳﺘﺸﺎرات‬ ‫ﺳﺤﺎب‬ 15 14
The Secondary Industrial
Institute Design
Dhahran
Design Residence of the
Technical College
AlNamas
Architect and Safety
Design
Leejam Sports
(FitnessTime)
Architect and Safety
Design
AL-Eissa Car Showrooms
BMW
Mohamed Yousuf Naghi
Automotive
Kattan & Anaam
Furniture
UnitedAutomotive
AlDabbabStreet
King Abdulaziz Road
North
Contact ...
Riyadh. Kingdom of Saudi Arabia
AlDabbab St. The intersection of King Abdul Aziz Road
Building No. 8775 . 3rd Floor . Office No. 27
P.O.Box 27051 Riyadh 11417
Tel. +966 11 465 8181 465 - 463 1969
Fax +966 11 462 5154
For Business: info@sahab.sa
For Employment: job@sahab.sa
www.sahab.sa
24
createdbywww.msoum.com
www.sahab.sa

Sahab English Profile

  • 2.
    1 General Manager Message... Despitethe innovation and challenges that occur in our current era, Sahab occupies a unique position in the Engineering Consulting field and the Safety/Firefighting Consultancy inside the Kingdom of Saudi Arabia and the Arab nations. Since Sahab was founded in 1993 over (24 years), it has been always deter- mined to achieve its projects for both the private and the governmental sector on a highly productive manner, whether in designing works, construction supervision, urban planning, projects management and safety/firefighting engineering taking in to account the modern scientific methods. We proved our identity by mastering a complete professional operations and hardworking through an integrated work team that includes all the engineering professions; which has the honor to possess the trust and the preference of highly important clients. Furthermore, providing solutions is one of our main goals. Therefore, we have been always committed to accomplish our projects assuring the highest quality and continuance development to significantly sustain with the modern era. We are pleased to provide you a summary of Sahab profile and its achievements within the urban development that is taking place in the country. Sahab has been able to contribute in many fields of engineering to the renaissance of this country under the support of its great leaders. Sincerely, Eng. Abdulkareem AL-Sulaiman General Manager
  • 3.
    Maintain the elitestatus in the Engineering consulting firms identically with the contemporary growth; through the team spirit and commitment to the highest quality and safety standards locally and globally. Our Vision Our Values Sahab based in the capital of Saudi Arabia, Riyadh; is one of the first national engineering entities who led the engineering consultancy and a main advisor in the safety and firefighting domain. Sahab is a member of the Saudi Engineering Committee, and the National Fire Protection Association (NFPA). Within all the scientific and the technical growth, Sahab actively interacts with the largest engineering consultancy agencies and organizations inside and outside of Saudi Arabia; through long term plans that ensure continuity and creativity in all areas of engineering actions. Sahab today by the grace of God and the confidence of its customers, is a crucial part of the engineering society for many ministries, committees, and private sector enterprises with the outstanding projects whereas it proved a great success in the architecture, structural design, project management, and the safety/ firefighting. About Sahab 2 3Sahab Engineering Consulting • Perform with excellence to exceed the clients’ expectations • Sustainable-high-quality services • Unique evolvement • Professionality, Commitment and Teamwork
  • 4.
    Work Methodology • Maintainproviding the highest quality in our engineering services and solutions through the competent technical team and the admin expertise to ensure the satisfaction of our valued clients. • Deliver inclusive services and solutions to guarantee excellence in the engineering consulting industry, and the safety /firefighting advisory for a continuance contribution in evolving the Kingdom of Saudi Arabia. • Pursue constantly the projects achievement on time and within the allocated budget to exceed the clients’ expectations. • Prepare comprehensive studies of various kinds of the engineering projects, unify and facilitate the work procedures using a clear organized manner with an economical methodology. • Evaluate and improve the existing engineering projects to fulfill the requirements of the modern growth. • Elevate the manpower level with the best expertise and qualifying Saudi employees in particular to enable them to participate and compete in the renaissance development to serve our country. • Actively interacts with the clients to discuss the projects requirements considering their views and comments. • Detailed analysis to specify the required resource and determine the strengths, weaknesses and the possible risks of the project. • Cost analysis and estimation with suitable time frame for finishing. • High quality & control standards in implementation and mentoring; accordance with the regulations of the projects’ engineering and the governmental laws. • Execution contracts’ preparation and the commitment to deliver within the agreed time frame. • Planning, designing and obtaining the governmental licenses and authorizations. • Prepration for the quantities and technical specifications tables. • Finishing designs and the finalization of the tender documents. • Trade-off offers received from contractors technically and financially. • Project management and supervision. Our Mission 4 5Sahab Engineering Consulting
  • 5.
    The following servicesare the primary fields of expertise at Sahab: Surveying Engineering Specialist surveyors are available at Sahab to provide cadastral surveys to study terrestrial dimensions and the geographical sites by using sophisticated surveying techniques and equipment for accurate result. Architectural Engineering Correct architectural design reflects positively and directly on the society and the culture of our civilization; hence we always assure at Sahab to present sustainable architectural solutions that suit the community conditions and the nature of the projects, considering every slight detail. Urban Design Sahab is keen to improve the economic growth and enhance the urban life by presenting sustainable plans and alternative solutions for either the occurred or expected complications within an organized, flexible, comprehensive and achievable framework taking into account the capabilities and resources available. Civil Engineering The core of this profession is providing suitable engineering solutions for the civil progression. Thus, our expert team are committed to study and analyze the constructional designs for all projects emphasizing the local and worldwide standards for a modern and sophisticated production. Mechanical Engineering Sahab is strongly emphasizing to apply high quality standard in all designs and studies as well as the projects that has a mechanical nature to deliver best solutions and innovative alternatives. Electrical Engineering Nowadays the massive organizational growth and its diversity led to a primary-daily-usage of electricity. Thus, Sahab has to deliver technical solutions and electrical system designs, particularly in the fire alarm systems and the supervision of the electrical distribution works. Safety and Firefighting Safety and firefighting Engineering has become a field that is rapidly growing with its constantly updated requirements. Sahab today, is in the front of the leading organizations in the safety/ firefighting designs and its credentials, complying with the standards and requirements stated internationally in NFPA, GCC, and locally in the governmental agencies as Ministry of Interior and General Directorate of Civil Defense (Kingdom-wide); and this is taking place in all classifications and sizes of our projects. Our Services 6 7Sahab Engineering Consulting
  • 6.
    8 9Sahab EngineeringConsulting Functional StructureOur Clients Deputy of GM Admin. Team Human Resources Marketing & Customer Service Accounting Admin. Follow Ups Technical Support & Maintenance Civil Engineering Safety & Firefighting Eng. Architecture & Planning Surveying Eng.Electromechanical Technical Team Electrical Engineering Mechanical Engineering Secretary General Manager
  • 7.
    Ministry of Labour Ministryof Finance Ministry of Health Saudi Ports Authority National Commercial Bank (NCB) Saudi German Company United Electronics Company (EXTRA) Rifai Engineering Consultancy Office Alshaya Group for Real Estate Investment PAN Emirates for Home Furnishing Rabie Saudi Foods Co., Ltd. ALTawary Arab Corporation Charitable Society for the memorization of the Koran Herfy Food Services Buaijan company ALAjou Group Engineering Consulting Zawaya Real Estate Company Etejah Consulting Engineering Office Saudi Automotive Services Sasco Shuweir Investment Company Majid Atiq al-Fawwaz and Co. Volcano House Contracting Co. ALTamimi Safety Est. Nahr Alandls Safety Est. Stable Tech. Est. (STCO) Al-Amana Technology Groups Yasser Abdullah Kadi Plant for Metal Decoration Factory Factory Arabia Alciobr company National Manufacturing Furniture Factory Ltd. Factory Saudi Vetonit Co., Ltd Farms to Wire tie-down Factory Sitra Hope Industrial Factory Al-Babtain Company - Biscuits Factory National Company for paper-making factory Client Supervision Supervision Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Completed Projects Government Government Government Government Private Private Private Private Private Private Private Private Private Private Private Private Private Private Private Private Private Industrial Industrial Industrial Industrial Industrial Industrial Industrial Industrial Industrial Industrial Industrial Industrial Industrial Entity 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 Year Alamana Technology Factory Sons of Saleh Mohammed Ayyaf Factory for Rocks & Marbles Saudi Bilda Company LTD Arab Company for Chemical Products Factory SASCO- Saudi Plastic Factory SABCO - Saudi Plastic Company Al Rashed Food Co., Ltd. AL-Ssad ALSaudia Metal Recycling Company Arab Company for Crystal Glass factory Saudi Bitumen Industries Rathath Water Company Riyadh Company for Metal Industries Saadi Gronnfeldr Co., Ltd. cgs Defat Alqarrat Water Factory Andalus Glass Company National Water Company (NWC) Ramah Aluminum & Metal Coating Factory Technical & Vocational training corporation tvtc of Saudi Arabia Al-Attia Holding Co. Adwaa AlJolaan Factory Technical and Vocational training corporation tvtc of Saudi Arabia The Cooperation Council for the Arab States of the Gulf Al-taif Advanced Company Mohammed Abdullah Ibrahim Almajid Alrajhi Real Estate Investment Company Alnojoom United Company Nabco Group - National Paper Products Company The Third Fatcory for Refining Oil Saudi Bitumen Industries Saudi Ductail Factory Marwa Mineral Water Factory Pcard International Card Manufacturer Rukn Alraseed Plastic Factory Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Other Technical & Engineering Works Other Technical & Engineering Works Execution Supervision Supervision Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Industrial Industrial Industrial Industrial Industrial Industrial Industrial Industrial Industrial Industrial Industrial Industrial Industrial Industrial Industrial Government Industrial Government Private Industrial Government Government Private Private Private Private Industrial Industrial Industrial Industrial Industrial Industrial Industrial 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2015 2015 2015 2015 2015 2015 2015 2015 2015 2015 2015 2015 2015 2015 2015 Defat Alqarrat Water Factory Defat Alqarrat Water Factory Ministry of Justice Alabdullatif Furniture Zawaya Real Estate Company Al-Obaikan Company High Commission for the Development of Al-Riyadh King Abdulaziz University Hospital (KAU) Ministry of Social Affairs Ministry of Labour Amlak International for Real Estate Development & Finance Co. Al-Maskan Company Al-Othaim Company Alriyadh International Food Services Company Hashem Contracting and Trading Company Baghlaf Alzafer Holding Group Al-Ayuni Group for Investments and Contracting Al-Nashmi for Development Co. LTD Al-rawabi Regional Company Sudair for Energy and Electrical Manufacturing Nasser Abdullah Alrumaih Factory for Metal Products BYD Saudi Arabia Jawdah Cables Factory Al-Babtain Company - Biscuits Factory Saudi Ductail Factory Al-Amana Technology Groups Bed Quarter Company Aala Factory - Ayedh Almutairi Commission for Real Property Contribution-Ministry of Commerce National Water Company (NWC) Leejam Sports Company (Fitnees Time) SABCO - Saudi Plastic Company Reviews, Designs & Authorizations Reviews, Designs & Authorizations Other Technical & Engineering Works Other Technical & Engineering Works Other Technical & Engineering Works Supervision Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Reviews, Designs & Authorizations Other Technical & Engineering Works Other Technical & Engineering Works Other Technical & Engineering Works Other Technical & Engineering Works Industrial Industrial Government Private Private Industrial Government Government Government Government Private Private Private Private Private Private Private Private Private Industrial Industrial Industrial Industrial Industrial Industrial Industrial Industrial Industrial Government Government Private Industrial 2015 2015 2015 2015 2015 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 Client Completed ProjectsEntityYear Client Completed ProjectsEntityYear Some of our Achieved Projects (2014-2016) 2015Completed Projects by %age 2014Completed Projects by %age 2016Completed Projects by %age 2014-2016Trend Completed Projects by Entity Percentage Share (2016 - 2014 Trend) Private Government Industrial Industrial, 48% Private, 37% Government 15% 48% 36% 18% 52% 36% 13% 41% 37% 22% 8 9Sahab Engineering Consulting Client Completed ProjectsEntityYear
  • 8.
    . Saudi Food& Drug Authority . Saudi National Water Company . Human Resources Development Fund (HRDF) . King Abdulaziz City for Science and Technology (KACST) . King Saud University . Technical and Vocational Training Corporation . Ports Authority . King Khalid Eye Specialist Hospital (KKESH) . National Guard Hospital . King Abdulaziz University Hospital . Ministry of Finance . Ministry of Labour . Ministry of Interior . Minisrty of Municipal and Rural Affairs . Ministry of Social Affairs . Ministry of Environment, Water and Agriculture . Ministry of Health . Ministry of Islamic Affairs, Da'wah and Guidance . Saudi Industrial Property Authority . General Directorate of Civil Defense . General Directorate of Passports Licenses & MembershipGovernment Qualifications for Agencies ‫اﻟﻬﻨﺪﺳﻴﺔ‬ ‫ﻟﻼﺳﺘﺸﺎرات‬ ‫ﺳﺤﺎب‬ 13 12
  • 9.
    Licenses & Membership ‫اﻟﻬﻨﺪﺳﻴﺔ‬‫ﻟﻼﺳﺘﺸﺎرات‬ ‫ﺳﺤﺎب‬ 15 14
  • 10.
  • 11.
    Design Residence ofthe Technical College AlNamas
  • 12.
  • 13.
  • 14.
    BMW Mohamed Yousuf Naghi Automotive Kattan& Anaam Furniture UnitedAutomotive AlDabbabStreet King Abdulaziz Road North Contact ... Riyadh. Kingdom of Saudi Arabia AlDabbab St. The intersection of King Abdul Aziz Road Building No. 8775 . 3rd Floor . Office No. 27 P.O.Box 27051 Riyadh 11417 Tel. +966 11 465 8181 465 - 463 1969 Fax +966 11 462 5154 For Business: info@sahab.sa For Employment: job@sahab.sa www.sahab.sa 24
  • 15.