The document contains a student's evaluation and reflection of their final media project (FMP). It summarizes the key points of each section:
1. The student researched editing techniques and applied them in post-production, but was limited by the royalty-free footage available.
2. Planning was negatively impacted by injury and lack of time, hindering efficiency. Technical issues caused delays in rendering.
3. The student is pleased with their improved skills and experimental visuals, but wishes for a longer track length and better footage quality.
4. Motivation issues due to delays were overcome by starting production and support from their tutor.
5. Overall the student feels their intentions were achieved,