This document provides pricing information for various construction materials from PIVITA, S.A. including aggregates, sand, cement, and mortars. It lists material codes, descriptions, and prices per tonne depending on the source zone and type of truck used for transport. The zones refer to distance ranges from the factory. Expiration dates are provided for some pricing periods.
The document is a product catalog listing tools and their codes, descriptions, and units. It includes categories such as fasteners, locks, electrical, plumbing, and painting. Under the tools section, it lists various hand tools such as wrenches, pliers, hammers, saws, drills and more along with product codes and pricing units.
The document is a vintage guide for wines from 1970-2010 that provides quality ratings for different regions and vintages. It rates vintages on a qualitative scale from excellent (E) to poor (P) for regions in Bordeaux, Burgundy, Rhone Valley, Italy, Germany, Spain and other areas. The guide aims to help consumers choose the best quality wines based on evaluations of individual growing seasons.
El documento explica los términos relacionados con los enfoscados y revocos de cal, como enfoscado, revoco y estuco. Describe que un enfoscado moderno consta de tres manos o capas de mortero aplicadas con diferencia de tiempo, y que un revoco puede ser la tercera mano de un enfoscado. También discute las dosificaciones adecuadas de cal y arena para diferentes tipos de mortero y la importancia de aplicar el mortero correctamente.
The document contains a parts list for a cylinder head assembly. It lists 30 individual parts with descriptions and quantities needed. These include bolts, gaskets, seals, covers, and other cylinder head components.
This document is a budget for an irrigation project called "Riego por Aspersion Carhuquero - Sector Tandal Eucalipto" in Los Baños del Inca, Cajamarca, Peru. It provides itemized costs for various elements of the project, including preliminary works, earthworks, and pipe installation. The total direct cost of the project is listed as 32,942.04 New Soles.
This document contains medical information on 18 patients, including their name, age, vital signs, anthropometric measurements, and echocardiogram results assessing heart structures like the aortic and mitral valves. Key details reported for each patient include their name, age, height, weight, blood pressure, and measurements of various heart structures compared to normal ranges.
This document provides a list of materials, labor costs, and schedule for a school improvement and expansion project. It includes line items for various construction materials, labor costs for officials, operators, laborers, and a foreman, as well as a schedule indicating which materials will be acquired in each of 4 months. The total cost for labor is $119,614.38 and the total cost for materials is $168,384.79. A Gantt chart at the bottom schedules material acquisition across the 4 month period.
This document contains a parts list for a cylinder head assembly and related components. It includes 28 items with descriptions and quantities needed. The parts listed are primarily for the cylinder head, valves, camshaft, crankshaft, pistons, connecting rods, and carburetor joints. Quantities range from 1 to 4 for most parts.
The document is a product catalog listing tools and their codes, descriptions, and units. It includes categories such as fasteners, locks, electrical, plumbing, and painting. Under the tools section, it lists various hand tools such as wrenches, pliers, hammers, saws, drills and more along with product codes and pricing units.
The document is a vintage guide for wines from 1970-2010 that provides quality ratings for different regions and vintages. It rates vintages on a qualitative scale from excellent (E) to poor (P) for regions in Bordeaux, Burgundy, Rhone Valley, Italy, Germany, Spain and other areas. The guide aims to help consumers choose the best quality wines based on evaluations of individual growing seasons.
El documento explica los términos relacionados con los enfoscados y revocos de cal, como enfoscado, revoco y estuco. Describe que un enfoscado moderno consta de tres manos o capas de mortero aplicadas con diferencia de tiempo, y que un revoco puede ser la tercera mano de un enfoscado. También discute las dosificaciones adecuadas de cal y arena para diferentes tipos de mortero y la importancia de aplicar el mortero correctamente.
The document contains a parts list for a cylinder head assembly. It lists 30 individual parts with descriptions and quantities needed. These include bolts, gaskets, seals, covers, and other cylinder head components.
This document is a budget for an irrigation project called "Riego por Aspersion Carhuquero - Sector Tandal Eucalipto" in Los Baños del Inca, Cajamarca, Peru. It provides itemized costs for various elements of the project, including preliminary works, earthworks, and pipe installation. The total direct cost of the project is listed as 32,942.04 New Soles.
This document contains medical information on 18 patients, including their name, age, vital signs, anthropometric measurements, and echocardiogram results assessing heart structures like the aortic and mitral valves. Key details reported for each patient include their name, age, height, weight, blood pressure, and measurements of various heart structures compared to normal ranges.
This document provides a list of materials, labor costs, and schedule for a school improvement and expansion project. It includes line items for various construction materials, labor costs for officials, operators, laborers, and a foreman, as well as a schedule indicating which materials will be acquired in each of 4 months. The total cost for labor is $119,614.38 and the total cost for materials is $168,384.79. A Gantt chart at the bottom schedules material acquisition across the 4 month period.
This document contains a parts list for a cylinder head assembly and related components. It includes 28 items with descriptions and quantities needed. The parts listed are primarily for the cylinder head, valves, camshaft, crankshaft, pistons, connecting rods, and carburetor joints. Quantities range from 1 to 4 for most parts.
This document is a transcript of delinquent land available for sale in Talladega County, Alabama. It lists the names of owners who owe property taxes, the amounts owed for state, county, municipal taxes, fees, interest and administrative costs. It also provides parcel numbers and legal property descriptions for each delinquent land record.
This document provides wage rates for construction projects in California. It lists rates for various construction types including building, heavy construction, highway construction, and dredging projects. The rates are broken down by county and cover occupations such as asbestos workers, boilermakers, bricklayers, carpenters, divers, electricians, modular furniture installers, sound and communication technicians, and terrazzo workers. The document was last modified on May 8, 2009 and provides an overview of construction wage rates across multiple northern and central California counties.
This document lists 41 yachts registered to participate in the 14th Costa Azahar Regatta from June 24-27, 2010. It provides details like the boat name, owner, home club, boat model, and time correction factors. The yachts are from clubs in Spain, France, the US, and South Africa and represent a variety of sailboat classes from 30 to 47 feet in length.
This document is a budget or cost estimate for the construction of TORRES DE CAYMA towers in Arequipa, Peru. It provides itemized estimates for materials, labor, and costs for excavation, concrete work, reinforced concrete structures like columns, slabs, stairs, and a cistern. The direct cost is estimated at over 4 million soles, with additional costs for overhead, profit, and taxes bringing the total estimated cost to nearly 6 million soles.
This document is a transcript of delinquent land available for sale in Shelby County, Alabama. It lists the parcel number, owner name, years delinquent, taxes owed by category (state, county, municipal, fees, interest, administrative costs), total owed, property class, municipal code, acreage valued, and property description for each delinquent parcel.
This document summarizes the results of the 2016 DELTA REGATA sailing race held from PORT GINESTA to SANT CARLES MARINA. It lists the finishing position, sail number, boat name, skipper/owner, boat model, club, rating, finish time, corrected time, and penalty points for each participant. The top finishing boat was the DON'T ASK, skippered by ALBERTO FUCALE on a FIRST 50, with a corrected finishing time of 15:18:31.
This document appears to be a catalog from a Mexican steel company called Aceros Alcalde. It lists the company's contact information and locations, and provides a detailed catalog of the various steel products it offers for sale, including angles, flats, structural shapes, pipes, plates, wire, and other items. It also includes specifications like dimensions, weights, and technical information for the different products.
Calendario valorizado sistema de recreacion amotapeEdikson Soto
This document is a progress report for a construction project in Amotape, Peru. It summarizes the progress made in month 2, including 70.43% completion of structural works and partial completion of various other items like excavation, concrete works, and reinforced concrete works. The report provides details of progress payments made for each item of the project based on percentage of work completed.
Loran-C is a hyperbolic radio navigation system developed by the US Coast Guard. It works by measuring the difference in arrival time of radio signals transmitted from two synchronized stations. By obtaining time differences from multiple station pairs, a receiver can calculate its position on the globe. The system uses a network of transmission stations around the world to broadcast low frequency radio pulses that are precisely timed using atomic clocks. Loran-C provides positioning accuracy within a few miles and was an important maritime and aviation navigation system before being replaced by GPS.
This document contains results from several athletic competitions organized by category, gender, and event. Diego Ordoñez placed first in the Men's Category SX A with a total of 394 points. Juan Guzman placed first in the Men's Expert Category B with a total of 352 points. Hector Cifuentes placed first in the Men's Expert Category C with a total of 363 points.
This document contains a comparison of results from 2006 to 2007 for various SGCC locations. It shows the CAF scores for each location in both years and the difference. It also includes rankings for locations in 2007 based on factors like customer satisfaction surveys, inventories, and overall CAF scores. The top performers for 2007 are also listed.
The document discusses the geometric design of roads, including determining design elements like the road category, design speed, maximum grades, horizontal curves, and vertical curves. It also includes plans showing the curve of levels and design of horizontal curves for specific roads within the project. Calculations are shown for the longitudinal profile and mass diagram of some streets.
1. The document contains a table of station (STA), angle, correction, and log sine values.
2. Angles are adjusted in two steps using correction values to calculate adjusted degrees, minutes, and seconds.
3. Log sine values are calculated and compared at each adjustment step to check calculations.
The document summarizes the dynamic analysis of the XYZ wellhead platform based on API RP2A WSD. It includes redesign details, main data used in the analysis such as soil properties, wave and earthquake information. It then covers the steps of the seismic, fatigue and load out analyses including determination of critical members. The maximum member and joint utilisation checks are reported. Load out analysis is also presented for the BOA BARGE 21/22 carrying containers. Final ballasting steps to achieve the desired draft are provided.
Rallye du Condroz 2016 : le timing des spécialeslavenir
This document outlines the itinerary and timing schedule for a rally event over two days. It provides details on the stages, liaison sections, refueling zones, and service areas. There will be 16 special stages on the first day covering 122.86 km, and 8 stages on the second day covering 97.20 km, for a total of 24 stages and 668.63 km overall. The schedule includes estimated drive times between locations as well as 30-45 minute windows for refueling and servicing between stages and legs of the event.
This document provides equivalent diameter factors to be applied in unit pricing for welding and installation of piping systems with wall thicknesses other than standard. It contains tables listing the nominal pipe diameter, pipe schedule/class, wall thickness, and equivalent diameter factor for various pipe sizes. The factors are used to determine the equivalent diameter for non-standard wall thickness pipes when charging for installation.
This document contains engineering plans and details for a box culvert structure located at station 2+168.70, including plans, sections, elevations, and reinforcement details. It provides dimensions, scales, materials, and other information for the construction of the culvert. The plans were developed by Marco Ramirez for the 'Improvement of the road connection between the highway to Santa Ana (CA: 1) and the highway to Sonsonate (CA: 8)' project under contract number 2361/2019.
This document discusses two problems involving gradually varied flow in open channels. For the first problem, it calculates the normal depth, critical depth, and flow profile for flow in a trapezoidal channel. It determines the profile is a M1 curve. For the second problem, it analyzes flow under a sluice gate and calculates the flow profile downstream, determining it is a M3 curve.
1. Alex Ojeda finished in first place in the 2nd race of the 2009 Campeonato held at Club Espycar on March 14, 2009, completing 49 laps in a time of 20:06.324 and averaging a lap time of 22.255 seconds.
2. Paco Bethancort finished second completing 45 laps in 20:03.430 averaging 24.141 seconds per lap.
3. Jose Luis Garcia finished third completing 43 laps in 20:09.962 averaging 25.703 seconds per lap.
This document provides race information for the 1,400M race at MMTC on Friday January 20, 2023. It lists the post time as 6:05 PM, with races 2 through 8 being weighted according to time average (WTA). There are 9 runners listed in the race. For each runner, it provides the latest run date and time, best time, average rating, and other past performance details.
A review of the growth of the Israel Genealogy Research Association Database Collection for the last 12 months. Our collection is now passed the 3 million mark and still growing. See which archives have contributed the most. See the different types of records we have, and which years have had records added. You can also see what we have for the future.
This document is a transcript of delinquent land available for sale in Talladega County, Alabama. It lists the names of owners who owe property taxes, the amounts owed for state, county, municipal taxes, fees, interest and administrative costs. It also provides parcel numbers and legal property descriptions for each delinquent land record.
This document provides wage rates for construction projects in California. It lists rates for various construction types including building, heavy construction, highway construction, and dredging projects. The rates are broken down by county and cover occupations such as asbestos workers, boilermakers, bricklayers, carpenters, divers, electricians, modular furniture installers, sound and communication technicians, and terrazzo workers. The document was last modified on May 8, 2009 and provides an overview of construction wage rates across multiple northern and central California counties.
This document lists 41 yachts registered to participate in the 14th Costa Azahar Regatta from June 24-27, 2010. It provides details like the boat name, owner, home club, boat model, and time correction factors. The yachts are from clubs in Spain, France, the US, and South Africa and represent a variety of sailboat classes from 30 to 47 feet in length.
This document is a budget or cost estimate for the construction of TORRES DE CAYMA towers in Arequipa, Peru. It provides itemized estimates for materials, labor, and costs for excavation, concrete work, reinforced concrete structures like columns, slabs, stairs, and a cistern. The direct cost is estimated at over 4 million soles, with additional costs for overhead, profit, and taxes bringing the total estimated cost to nearly 6 million soles.
This document is a transcript of delinquent land available for sale in Shelby County, Alabama. It lists the parcel number, owner name, years delinquent, taxes owed by category (state, county, municipal, fees, interest, administrative costs), total owed, property class, municipal code, acreage valued, and property description for each delinquent parcel.
This document summarizes the results of the 2016 DELTA REGATA sailing race held from PORT GINESTA to SANT CARLES MARINA. It lists the finishing position, sail number, boat name, skipper/owner, boat model, club, rating, finish time, corrected time, and penalty points for each participant. The top finishing boat was the DON'T ASK, skippered by ALBERTO FUCALE on a FIRST 50, with a corrected finishing time of 15:18:31.
This document appears to be a catalog from a Mexican steel company called Aceros Alcalde. It lists the company's contact information and locations, and provides a detailed catalog of the various steel products it offers for sale, including angles, flats, structural shapes, pipes, plates, wire, and other items. It also includes specifications like dimensions, weights, and technical information for the different products.
Calendario valorizado sistema de recreacion amotapeEdikson Soto
This document is a progress report for a construction project in Amotape, Peru. It summarizes the progress made in month 2, including 70.43% completion of structural works and partial completion of various other items like excavation, concrete works, and reinforced concrete works. The report provides details of progress payments made for each item of the project based on percentage of work completed.
Loran-C is a hyperbolic radio navigation system developed by the US Coast Guard. It works by measuring the difference in arrival time of radio signals transmitted from two synchronized stations. By obtaining time differences from multiple station pairs, a receiver can calculate its position on the globe. The system uses a network of transmission stations around the world to broadcast low frequency radio pulses that are precisely timed using atomic clocks. Loran-C provides positioning accuracy within a few miles and was an important maritime and aviation navigation system before being replaced by GPS.
This document contains results from several athletic competitions organized by category, gender, and event. Diego Ordoñez placed first in the Men's Category SX A with a total of 394 points. Juan Guzman placed first in the Men's Expert Category B with a total of 352 points. Hector Cifuentes placed first in the Men's Expert Category C with a total of 363 points.
This document contains a comparison of results from 2006 to 2007 for various SGCC locations. It shows the CAF scores for each location in both years and the difference. It also includes rankings for locations in 2007 based on factors like customer satisfaction surveys, inventories, and overall CAF scores. The top performers for 2007 are also listed.
The document discusses the geometric design of roads, including determining design elements like the road category, design speed, maximum grades, horizontal curves, and vertical curves. It also includes plans showing the curve of levels and design of horizontal curves for specific roads within the project. Calculations are shown for the longitudinal profile and mass diagram of some streets.
1. The document contains a table of station (STA), angle, correction, and log sine values.
2. Angles are adjusted in two steps using correction values to calculate adjusted degrees, minutes, and seconds.
3. Log sine values are calculated and compared at each adjustment step to check calculations.
The document summarizes the dynamic analysis of the XYZ wellhead platform based on API RP2A WSD. It includes redesign details, main data used in the analysis such as soil properties, wave and earthquake information. It then covers the steps of the seismic, fatigue and load out analyses including determination of critical members. The maximum member and joint utilisation checks are reported. Load out analysis is also presented for the BOA BARGE 21/22 carrying containers. Final ballasting steps to achieve the desired draft are provided.
Rallye du Condroz 2016 : le timing des spécialeslavenir
This document outlines the itinerary and timing schedule for a rally event over two days. It provides details on the stages, liaison sections, refueling zones, and service areas. There will be 16 special stages on the first day covering 122.86 km, and 8 stages on the second day covering 97.20 km, for a total of 24 stages and 668.63 km overall. The schedule includes estimated drive times between locations as well as 30-45 minute windows for refueling and servicing between stages and legs of the event.
This document provides equivalent diameter factors to be applied in unit pricing for welding and installation of piping systems with wall thicknesses other than standard. It contains tables listing the nominal pipe diameter, pipe schedule/class, wall thickness, and equivalent diameter factor for various pipe sizes. The factors are used to determine the equivalent diameter for non-standard wall thickness pipes when charging for installation.
This document contains engineering plans and details for a box culvert structure located at station 2+168.70, including plans, sections, elevations, and reinforcement details. It provides dimensions, scales, materials, and other information for the construction of the culvert. The plans were developed by Marco Ramirez for the 'Improvement of the road connection between the highway to Santa Ana (CA: 1) and the highway to Sonsonate (CA: 8)' project under contract number 2361/2019.
This document discusses two problems involving gradually varied flow in open channels. For the first problem, it calculates the normal depth, critical depth, and flow profile for flow in a trapezoidal channel. It determines the profile is a M1 curve. For the second problem, it analyzes flow under a sluice gate and calculates the flow profile downstream, determining it is a M3 curve.
1. Alex Ojeda finished in first place in the 2nd race of the 2009 Campeonato held at Club Espycar on March 14, 2009, completing 49 laps in a time of 20:06.324 and averaging a lap time of 22.255 seconds.
2. Paco Bethancort finished second completing 45 laps in 20:03.430 averaging 24.141 seconds per lap.
3. Jose Luis Garcia finished third completing 43 laps in 20:09.962 averaging 25.703 seconds per lap.
This document provides race information for the 1,400M race at MMTC on Friday January 20, 2023. It lists the post time as 6:05 PM, with races 2 through 8 being weighted according to time average (WTA). There are 9 runners listed in the race. For each runner, it provides the latest run date and time, best time, average rating, and other past performance details.
A review of the growth of the Israel Genealogy Research Association Database Collection for the last 12 months. Our collection is now passed the 3 million mark and still growing. See which archives have contributed the most. See the different types of records we have, and which years have had records added. You can also see what we have for the future.
Strategies for Effective Upskilling is a presentation by Chinwendu Peace in a Your Skill Boost Masterclass organisation by the Excellence Foundation for South Sudan on 08th and 09th June 2024 from 1 PM to 3 PM on each day.
This slide is special for master students (MIBS & MIFB) in UUM. Also useful for readers who are interested in the topic of contemporary Islamic banking.
Assessment and Planning in Educational technology.pptxKavitha Krishnan
In an education system, it is understood that assessment is only for the students, but on the other hand, the Assessment of teachers is also an important aspect of the education system that ensures teachers are providing high-quality instruction to students. The assessment process can be used to provide feedback and support for professional development, to inform decisions about teacher retention or promotion, or to evaluate teacher effectiveness for accountability purposes.
Main Java[All of the Base Concepts}.docxadhitya5119
This is part 1 of my Java Learning Journey. This Contains Custom methods, classes, constructors, packages, multithreading , try- catch block, finally block and more.
How to Add Chatter in the odoo 17 ERP ModuleCeline George
In Odoo, the chatter is like a chat tool that helps you work together on records. You can leave notes and track things, making it easier to talk with your team and partners. Inside chatter, all communication history, activity, and changes will be displayed.
How to Manage Your Lost Opportunities in Odoo 17 CRMCeline George
Odoo 17 CRM allows us to track why we lose sales opportunities with "Lost Reasons." This helps analyze our sales process and identify areas for improvement. Here's how to configure lost reasons in Odoo 17 CRM
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...PECB
Denis is a dynamic and results-driven Chief Information Officer (CIO) with a distinguished career spanning information systems analysis and technical project management. With a proven track record of spearheading the design and delivery of cutting-edge Information Management solutions, he has consistently elevated business operations, streamlined reporting functions, and maximized process efficiency.
Certified as an ISO/IEC 27001: Information Security Management Systems (ISMS) Lead Implementer, Data Protection Officer, and Cyber Risks Analyst, Denis brings a heightened focus on data security, privacy, and cyber resilience to every endeavor.
His expertise extends across a diverse spectrum of reporting, database, and web development applications, underpinned by an exceptional grasp of data storage and virtualization technologies. His proficiency in application testing, database administration, and data cleansing ensures seamless execution of complex projects.
What sets Denis apart is his comprehensive understanding of Business and Systems Analysis technologies, honed through involvement in all phases of the Software Development Lifecycle (SDLC). From meticulous requirements gathering to precise analysis, innovative design, rigorous development, thorough testing, and successful implementation, he has consistently delivered exceptional results.
Throughout his career, he has taken on multifaceted roles, from leading technical project management teams to owning solutions that drive operational excellence. His conscientious and proactive approach is unwavering, whether he is working independently or collaboratively within a team. His ability to connect with colleagues on a personal level underscores his commitment to fostering a harmonious and productive workplace environment.
Date: May 29, 2024
Tags: Information Security, ISO/IEC 27001, ISO/IEC 42001, Artificial Intelligence, GDPR
-------------------------------------------------------------------------------
Find out more about ISO training and certification services
Training: ISO/IEC 27001 Information Security Management System - EN | PECB
ISO/IEC 42001 Artificial Intelligence Management System - EN | PECB
General Data Protection Regulation (GDPR) - Training Courses - EN | PECB
Webinars: https://pecb.com/webinars
Article: https://pecb.com/article
-------------------------------------------------------------------------------
For more information about PECB:
Website: https://pecb.com/
LinkedIn: https://www.linkedin.com/company/pecb/
Facebook: https://www.facebook.com/PECBInternational/
Slideshare: http://www.slideshare.net/PECBCERTIFICATION
Thinking of getting a dog? Be aware that breeds like Pit Bulls, Rottweilers, and German Shepherds can be loyal and dangerous. Proper training and socialization are crucial to preventing aggressive behaviors. Ensure safety by understanding their needs and always supervising interactions. Stay safe, and enjoy your furry friends!
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Dr. Vinod Kumar Kanvaria
Exploiting Artificial Intelligence for Empowering Researchers and Faculty,
International FDP on Fundamentals of Research in Social Sciences
at Integral University, Lucknow, 06.06.2024
By Dr. Vinod Kumar Kanvaria
10. UNICMALL ENERO 2008
PINTURES UNIDAD KG
C03-24-00 PINTURA MINERAL DE CAL 5 KGS COLOR BLANCO…………………. 2,44,-
COLOR SUAVE……………………. 2,55,-
COLOR MEDIO………………… 2,64,-
COLOR INTENSO……………… 2,74,-
PINTURA MINERAL DE CAL 18 KGS COLOR BLANCO…………….. 2,34,-
COLOR SUAVE………………………. 2,44,-
COLOR MEDIO………………………. 2,55,-
COLOR INTENSO……………… 2,64,-
PINTURA MINERAL SILICAT BOTE 5 KGS COLOR BLANCO……….. 4,92,-
COLOR SUAVE…………… 5,01,-
COLOR MEDIO…………… 5,12,-
COLOR INTENSO………. 5,21,-
PINTURA MINERAL SILICAT BOTE 20 KGS. COLOR BLANCO……… 4,78,-
COLOR SUAVE…………… 4,87,-
COLOR MEDIO…………… 4,96,-
COLOR INTENSO………. 5,07,-
LITROS
C03-25-00 IMPRIMACION ENCIMA YESO BOTE 4 LTS…………………………….. 1,06,-
IMPRIMACION ENCIMA YESO BOTE 17 LTS…………………………….. 0,95,-
CERA PASTA BOTE 0,60 KGS……………………………………………. 7,73,-
CONSOLIDANT TRANSPARENTE BOTE 4 LTS……………………….. 8,48,-
CONSOLIDANT TRANSPARENTE BOTE 17 LTS……………………….. 7,53,-
CONSOLIDANT HIDROFUGANT BOTE 4 LTS………………………….. 17,68,-
CONSOLIDANT HIDROFUGANT BOTE 17 LTS………………………….. 14,20,-
LIQUIDO HIDROGUGANTE BOTE 4 LTS……………………………… 14,74,-
LIQUIDO HIDROGUGANTE BOTE 17 LTS……………………………… 12,28,-
LLANA INOXIDABLE MEDIANA 24-11……………………………………. 25,98,-UD
LLANA INOXIDABLE PEQUEÑA 20-8……...……………………….. 24,39,-UD
C03-20-00 CAL VIVA BOLSA 1 KGS…………………………………………………… 1,10,-UD
CAL VIVA BOLSA 5 KGS…………………………………………………… 4,45,-UD
CAL VIVA BOLSA 20 KGS…………………………………………………… 12,37,-UD
CAL GRASSA BOLSA 2 KGS…………………………………………….. 1,65,-UD
CAL GRASSA BOLSA 5 KGS…………………………………………….. 3,33,-UD
CAL GRASSA BOLSA 10 KGS…………………………………………….. 6,00,-UD
CAL GRASSA BOLSA 20 KGS…………………………………………….. 10,42,-UD
CAL GRASSA BOTE 5 KGS…………………………………………….. 5,65,-UD
CAL GRASSA BOTE 20 KGS…………………………………………….. 16,11,-UD
CAL EN POLVO SACO 25 KGS…………………………………………… 6,52,-SC
CAL EN POLVO SACO 12 KGS…………………………………………. 4,25,-SC
CAL EN PASTA ANTIGUA BOTE 20 KGS………………………………… 23,39,-UD
CAL EN PASTA ANTIGUA BIDON 120 KGS…………………………….. 108,47,-UD
11. UNICMALL ENERO 2008
C03-21-00 MORTERO DE ARENA GRANEL…………………………… 102,33,-TN
MORTERO DE ARENA EN CUBETA……………………… 104,40,-TN
MORTERO DE ARENA SACO 25 KGS……………………… 4,94,-SC
MORTERO ESTÁNDAR 25 KGS COLOR BEIX…………… 0,32,-KG
MORTERO DE RECRECER SACO 25 KGS BEIG CLA 0,32,-KG
ATARRACADO DE BASE Y O ACABADO S/25 BLANCO.. 0,69,-KG
ATARRACADO DE BASE Y O ACABADO S/25 SUAU… 0,71,-KG
ATARRACADO DE BASE Y O ACABADO S/25 MIG. 0,76,-KG
ATARRACADO DE BASE Y O ACABADO S/25 INTENS… 0,78,-KG
C03-22-00 ESTUCO VENECIANO BASE, BOTE 7 KGS COLOR BLANCO……… 3,75,-KG
ESTUCO VENECIANO BASE, BOTE 7 KGS COLOR CARTA……… 4,41,-KG
ESTUCO VENECIANO BASE, BOTE 25 KGS COLOR BLANCO……… 3,00,-KG
ESTUCO VENECIANO BASE, BOTE 25 KGS COLOR CARTA……… 3,67,-KG
ESTUCO VENECIANO ACABADO, BOTE 6 KGS COLOR BLANCO……… 5,25,-KG
ESTUCO VENECIANO ACABADO, BOTE 6 KGS COLOR CARTA……… 5,92,-KG
ESTUCO VENECIANO ACABADO, BOTE 25 KGS COLOR BLANCO……… 4,49,-KG
ESTUCO VENECIANO ACABADO, BOTE 25 KGS COLOR CARTA……… 5,18,-KG
ESTUCO PROVENCAL BOTE 6 KGS COLOR BLANCO…………….. 2,98,-KG
ESTUCO PROVENCAL BOTE 6 KGS CARTA CALÇESTUC…………….. 3,34,-KG
ESTUCO PROVENCAL BOTE 25 KGS COLOR BLANCO…………….. 2,87,-KG
ESTUCO PROVENCAL BOTE 25 KGS CARTA CALÇESTUC…………….. 3,22,-KG
24. P.V.P.
VIBRADOS.- 4 ENERO 2007
BLOQUES SPLIT COLOR GRIS EN FABRICA
BLOQUE SPLIT COLOR GRIS EURO/UD
C04-13-00 BLOQUE COLOR GRIS 20-20-40.......................................................... 2.026
MEDIOS "DOBLE SPLIT" GRIS
C04-13-04 MEDIOS 20-20-40................................................................................. 2.323
C04-13-05 PLAQUETAS 6-20-40............................................................................... 1.506
C04-13-06 6-20-20.................................................................................. 1.506
ESQUINAS "DOBLE SPLIT" GRIS
C04-13-02 ESQUINAS 20-20-40................................................................................. 2.345
ZUNCHOS "DOBLE SPLIT" GRIS
C04-13-03 ZUNCHOS 20-20-40................................................................................. 3.139
BLOQUES SPLIT COLOR GRIS EN OBRA
BLOQUE SPLIT COLOR GRIS EURO/UD
C04-13-00 BLOQUE COLOR GRIS 20-20-40.......................................................... 2.170
MEDIOS "DOBLE SPLIT" GRIS
C04-13-04 MEDIOS 20-20-40................................................................................. 2.394
C04-13-05 PLAQUETAS 6-20-40............................................................................... 1.583
C04-13-06 6-20-20.................................................................................. 1.583
ESQUINAS "DOBLE SPLIT" GRIS
C04-13-02 ESQUINAS 20-20-40................................................................................. 2.531
ZUNCHOS "DOBLE SPLIT" GRIS
C04-13-03 ZUNCHOS 20-20-40................................................................................. 3.302
25. P.V.P. COLOR ARENA
VIBRADOS.- 4 ENERO 2008
BLOQUES SPLIT COLORES OSCUROS EN FABRICA
BLOQUE SPLIT COLOR OSCURO EURO/UD
BLOQUE COLOR OSCURO 20-20-40.......................................................... 2.302
MEDIOS "DOBLE SPLIT" OSCURO
C04-13-04 MEDIOS 20-20-40................................................................................. 2.767
C04-13-05 PLAQUETAS 6-20-40............................................................................... 1.837
C04-13-06 6-20-20.................................................................................. 1.837
ESQUINAS "DOBLE SPLIT" OSCURO
C04-13-02 ESQUINAS 20-20-40................................................................................. 2.676
ZUNCHOS "DOBLE SPLIT" OSCURO
C04-13-03 ZUNCHOS 20-20-40................................................................................. 3.470
BLOQUES SPLIT COLOR OSCURO EN OBRA
BLOQUE SPLIT COLOR OSCURO EURO/UD
C04-13-00 BLOQUE COLOR GRIS 20-20-40.......................................................... 2.446
MEDIOS "DOBLE SPLIT" OSCURO
C04-13-04 MEDIOS 20-20-40................................................................................. 2.838
C04-13-05 PLAQUETAS 6-20-40............................................................................... 1.914
C04-13-06 6-20-20.................................................................................. 1.914
ESQUINAS "DOBLE SPLIT" OSCURO
C04-13-02 ESQUINAS 20-20-40................................................................................. 2.862
ZUNCHOS "DOBLE SPLIT" OSCURO
C04-13-03 ZUNCHOS 20-20-40................................................................................. 3.633
26. P.V.P. COLOR BLANCO - CREMA
VIBRADOS.- 4 ENERO 2008
BLOQUES SPLIT COLORES CLAROS EN FABRICA
BLOQUE SPLIT COLOR CLARO EURO/UD
BLOQUE COLOR CLARO 20-20-40.......................................................... 2.415
MEDIOS "DOBLE SPLIT" CLARO
C04-13-04 MEDIOS 20-20-40................................................................................. 2.654
C04-13-05 PLAQUETAS 6-20-40............................................................................... 1.950
C04-13-06 6-20-20.................................................................................. 1.950
ESQUINAS "DOBLE SPLIT" CLARO
C04-13-02 ESQUINAS 20-20-40................................................................................. 2.790
ZUNCHOS "DOBLE SPLIT" CLARO
C04-13-03 ZUNCHOS 20-20-40................................................................................. 3.583
BLOQUES SPLIT COLOR CLARO EN OBRA
BLOQUE SPLIT COLOR CLARO EURO/UD
C04-13-00 BLOQUE COLOR CLARO 20-20-40.......................................................... 2.560
MEDIOS "DOBLE SPLIT" CLARO
C04-13-04 MEDIOS 20-20-40................................................................................. 2.724
C04-13-05 PLAQUETAS 6-20-40............................................................................... 2.027
C04-13-06 6-20-20.................................................................................. 2.027
ESQUINAS "DOBLE SPLIT" CLARO
C04-13-02 ESQUINAS 20-20-40................................................................................. 2.975
ZUNCHOS "DOBLE SPLIT" CLARO
C04-13-03 ZUNCHOS 20-20-40................................................................................. 3.746
27. VIBRADOS.-4 ENERO 2008
BLOQUE CARA VISTA P.V.P. EN FABRICA EURO/UD
COLOR GRIS
C04-15-00 BLOQUE COLOR GRIS 20-20-40.......................................................... 1.406
C04-15-01 ZUNCHO COLOR GRIS........................................................................... 1.916
COLOR OSCURO - ARENA
C04-15-10 BLOQUE COLOR OSCURO 20-20-40............................................ 1.871
C04-15-11 ZUNCHO COLOR OSCURO.............................................................................. 2.381
COLOR CLARO - BLANCO - ARENA
C04-15-30 BLOQUE COLOR CLARO 20-20-40......................................... 1.950
C04-15-31 ZUNCHO COLOR CLARO.................................................................. 2.461
BLOQUE CARA VISTA EN OBRA EURO/UD
COLOR GRIS
C04-15-00 BLOQUE COLOR GRIS 20-20-40.......................................................... 1.551
C04-15-01 ZUNCHO COLOR GRIS........................................................................... 2.061
COLOR OSCURO - ARENA
C04-15-10 BLOQUE COLOR OSCURO 20-20-40............................................ 2.016
C04-15-11 ZUNCHO COLOR OSCURO.............................................................................. 2.544
COLOR CLARO - BLANCO - ARENA
C04-15-30 BLOQUE COLOR CLARO 20-20-40......................................... 2.095
C04-15-31 ZUNCHO COLOR CLARO.................................................................. 2.623
28. ENERO 2008
VIGUETA SEMI-RESISTENTE
CODIGO LONGITUD TIPO M.F.
M.F. PRECIO FABRICA
EUROS
C05-01-00 HASTA 2.00 T-1 321 8.618
2.25 T-1 398 8.618
2.50 T-1 482 10.055
2.75 T-1 575 10.055
3.00 T-2 676 10.055
3.25 T-2 784 10.681
3.50 T-3 901 10.681
3.75 T-3 1,027 11.459
4.00 T-4 1,160 11.459
4.25 T-4 1,301 12.517
4.50 T-5 1,451 12.517
4.75 T-6 1,608 13.198
5.00 T-7 1,774 14.083
5.25 T-7 1,948 14.882
5.50 T-8 2,130 14.882
5.75 T-9 2,320 15.271
6.00 T-9 2,518 15.271
C05-02-01 PIEZAS DE ALERO -------
C05-02-02 PIEZAS DE ESQUINA -------
BOVEDILLA PLANA DE HORMIGON
C05-09-00 100 X 50 4.241
C05-09-01 80 X 40 ---------
C05-09-02 100 X 40 ---------
C05-09-03 80 X 50 3.731
DINTELES Y CARGADEROS DE HORMIGON DE 12x4
C05-10-00 CARGADEROS DESDE 1,80 M. 2Ø8 10.702
MINIMO 1 ANILLA
CARGADEROS HASTA 2,50 M. 2Ø8 10.702
MINIMO 2 ANILLAS
CARGADEROS DE 2,50 M. HASTA 3,50 M. 2Ø10 11.503
MINIMO 2 ANILLAS
CARGADEROS DE 3,50 M. HASTA 4,50 M. 2Ø12 12.899
MINIMO 3 ANILLAS
LOS CARGADEROS MAYORES DE 1,80 MTS. DEBEN TENER TANTOS TIRANTES
COMO ANILLAS TIENEN LOS MISMOS.
29. ENERO 2008
C06-00 ARMADOS PRETENSADOS
VIGUETAS DE 20 CMS DE ALTURA 500 KGS/ML
CODIGO LONGITUD EN MTS. TIPO M.F.M.F. PRECIO POR M.L.
EUROS
C06-01-00 HASTA 2,70 V-1 13 8.641
de 2,80 a 2,90 V-1 13 8.800
de 3,00 a 3,20 V-2 18.5 8.970
de 3,30 a 3,40 V-2 18.5 9.174
de 3,50 V-2 18.5 9.299
de 3,60 a 3,70 V-3 23.9 9.299
de 3,80 a 3,90 V-3 23.9 9.492
de 4,00 V-4 23.9 9.786
de 4,10 a 4,20 v-4 31.20 9.786
de 4,30 a 4,40 v-4 31.20 9.968
de 4,50 v-4 31.20 10.104
de 4,60 a 4,70 v-5 36.10 10.104
de 4,80 a 4,90 v-5 36.10 10.263
de 5,00 a 5,20 v-6 41.30 10.478
de 5,30 a 5,40 v-7 46.00 10.818
de 5,50 v-7 46.00 11.011
de 5,60 a 5,70 v-8 54.00 11.011
de 5,80 v-8 54.00 11.204
de 5,90 v-8 54.00 11.204
de 6,00 v-8 54.00 11.408
de 6,10 a 6,20 v-8* 57.00 11.408
de 6,30 v-8* 57.00 11.612
P-15 VIGUETAS DE 15 CMS. DE ALTURA 350 KGS/ML
Hasta 2,80 V-1 10.90 7.904
Hasta 2,90 v-1 10.90 8.108
de 3,00 a 3,20 v-2 15.40 8.108
de 3,30 a 3,40 v-2 15.40 8.312
de 3,50 a 3,70 v-3 19.80 8.312
de 3,80 a 3,90 v-3 19.80 8.528
de 4,00 a 4,30 v-4 26.00 8.528
de 4,40 v-4 26.00 8.732
de 4,50 a 4,80 v-5 30.00 8.732
de 4,90 v-6 33.90 8.732
de 5,00 v-6 33.90 8.959
de 5,10 v-6 33.90 8.959
de 5,20 a 5,30 v-7 37.50 9.185
de 5,40 a 5,50 v-8 37.50 9.185
de 5,60 v-8 37.50 9.344
de 5,70 v-8 43.20 9.344
de 5,80 v-8 43.20 9.594
30. ENERO 2008
VIGUETA TIPO "T"
FORJADO SEMIRESISTENTE PRETENSADO
ALTURA 12 CMS.
CODIGO TIPO MOMENTO ULTIMO LONGITUD MTS PRECIO ML
C06-05-00 V-1 15 HASTA 3,00 7.144
V-2 20.5 DE 3,05 A 3,50 7.711
V-3 25.9 DE 3,55 A 3,90 8.051
V-4 35.2 DE 3,95 A 4,60 8.494
V-5 40.5 DE 4,65 A 4,90 8.800
V-6 45.3 DE 4,95 A 5,20 9.027
V-7 54.2 DE 5,25 A 5,50 9.480
V-8 58 DE 5,55 A 5,80 9.843
V-8 58 DE 5,85 A 5,90 10.251
31. ENERO 2008
VIGUETA TABLON
EUROS
C06-02-00 VIGUETA HASTA 2,74 13.528
C06-02-01 VIGUETA DE 2.75 A 2.99 13.894 1.409
C06-02-02 VIGUETA DE 3,00 A 3,24 14.272 1.445
C06-02-03 VIGUETA DE 3,25 A 3,49 14.581
C06-02-04 VIGUETA DE 3,50 A 3,74 14.627
C06-02-05 VIGUETA DE 3,75 A 3.99 15.142
C06-02-06 VIGUETA DE 4,00 A 4,24 15.542
C06-02-07 VIGUETA DE 4,25 A 4,49 15.863
C06-02-08 VIGUETA DE 4,50 A 4,74 16.241
C06-02-09 VIGUETA DE 4,75 A 4,99 16.549
C06-02-10 VIGUETA DE 5,00 A 5,24 17.030
C06-02-11 VIGUETA DE 5,25 A 5.49 17.294
C06-02-12 VIGUETA DE 5,50 A 5,74 17.614
C06-02-13 VIGUETA DE 5,75 A 5,99 17.969
C06-02-14 VIGUETA DE 6.00 A 6,24 18.529
JACENA 16X20 EURO / ML 38.295
JACENA 24X20 EURO/ ML 45.723
32. ENERO 2008
VIGUETAS DE HORMIGON TIPO "MADERA".- COLOR CLARO
COLOR OSCURO
VIGUETAS DE 8 x 20 EURO/M.L.
C06-06-00 VIGUETAS HASTA 2.00 M..................................................... 22.284
C06-06-01 VIGUETA DE 2.01 A 3.00 M.................................................. 22.592
C06-06-02 VIGUETA DE 3.01 A 4.00 M.................................................. 23.188
C06-06-03 VIGUETA DE 4.01 A 5.00 M.................................................. 24.229
C06-06-04 VIGUETA DE 5.01 A 6.00 M.................................................. 25.225
EURO/M.L.
C06-06-10 JACENAS 16 X 20 HASTA 4,50 M. 44.613
C06-06-12 JACENAS 24 X 20 HASTA 4,50 M. 51.652
33. ENERO 2008
VIGUETAS DE HORMIGON "SIN PINTAR".-
VIGUETAS DE 8 x 20 EURO/M.L.
C06-06-50 VIGUETAS HASTA 2.00 M..................................................... 17.820
C06-06-51 VIGUETA DE 2.01 A 3.00 M.................................................. 18.070
C06-06-52 VIGUETA DE 3.01 A 4.00 M.................................................. 18.541
C06-06-53 VIGUETA DE 4.01 A 5.00 M.................................................. 19.400
C06-06-54 VIGUETA DE 5.01 A 6.00 M.................................................. 20.177
EURO/M.L.
C06-06-60 JACENAS 16 X 20 HASTA 4,50 M. 35.686
C06-06-62 JACENAS 24 X 20 HASTA 4,50 M. 41.306
34. ENERO 2010
TARIFA DE PRECIOS DE TEJAS
TEJAS BORJA
TEJA CURVA DE 40-19
EUROS
C07-06-00 TEJA ROJA 0.48
C07-06-01 TEJA ROJA ENVEJECIDA 0.57
C07-06-04 TEJA BLANCA "EN EXISTENCIA" 0.57
C07-06-05 TEJA BLANCA ENVEJECIDA "EN EXISTENCIA" 0.57
C07-06-07 TEJA VILAVELLA 0.62
C07-06-08 TEJA ROSARENA 0.62
TEJA CELLER 50-21
TEJA ROJA 0.57
TEJA BLANCA 0.62
TEJA VILAVELLA 0.71
TEJA ROSARENA 0.71
TEJA MANOIR 0.71
TEJA MIXTA TB12
C07-06-24 TEJA MIXTA ROJA 0.95
C07-06-27 TEJA MIXTA BLANCA 1.05
C07-06-28 TEJA MIXTA BLANCA ENVEJECIDA 1.05
C07-06-29 TEJA MIXTA ROSARENA 1.28
C07-06-26 TEJA MIXTA VILAVELLA 1.28
C07-06-67 DECOCURVA CANAL COLOR NATURAL 2.48
C07-06-68 DECOCURVA CUMBRERA COLOR NATURAL 2.48
35. ENERO 2009
TEJA MALLORQUINA.-
C07-02-00 TEJA PEQUEÑA 45-19 NATURAL.......................................................... 0.450
TEJA PEQUEÑA 45-19 PAJA ............................................................. 0.450
TEJA PEQUEÑA 45-19 ROJO....................................................................... 0.457
TEJA PEQUEÑA 45-19 ROJO TIERRA....................................................... 0.471
TEJA PEQUEÑA 45-19 ENVEJECIDA CLASICA.................................... 0.522
(NATURAL Y COLOR NEGRO)
TEJA PEQUEÑA 45-19 ENVEJECIDA LLEVANT..................................... 0.660
(COLOR PAJA Y NEGRO)
C07-02-01 TEJA GRANDE 50-22 NATURAL.......................................................... 0.566
TEJA GRANDE 50-22 PAJA ............................................................. 0.566
TEJA GRANDE 50-22 ROJO....................................................................... 0.580
TEJA GRANDE 50-22 ROJO TIERRA......................................................... 0.602
TEJA GRANDE 50-22 ENVEJECIDA CLASICA.................................... 0.638
(NATURAL Y COLOR NEGRO)
TEJA GRANDE 50-22 ENVEJECIDA LLEVANT..................................... 0.819
(COLOR PAJA Y NEGRO)
TEJA VENTILACION NATURAL.................................................................... 14.5
TEJA VENTILACION COLOR Y ENVEJECIDAS........................................ 15.95
36. LISTA DE PRECIOS TERMOARCILLA.- NOVIEMBRE 2007
OBRA OBRA
CODIGO TERMOARCILLA PLATAFORMA CAMION
C07-10-00 14-19-30
C07-10-01 14-19-30 MEDIOS
C07-10-02 14-19-30 ESQUINAS
C07-10-03 14-19-30 ZUNCHOS
C07-11-00 19-19-30
C07-11-01 19-19-30 MEDIOS
C07-11-02 19-19-30 ESQUINAS
C07-11-03 19-19-30 ZUNCHOS
C07-12-00 24-19-30
C07-12-01 24-19-30 MEDIOS
C07-12-02 24-19-30 ESQUINAS
C07-12-03 24-19-30 ZUNCHOS
C07-13-00 29-19-30
C07-13-01 29-19-30 MEDIOS
C07-13-02 29-19-30 ESQUINAS
C07-13-03 29-19-30 ZUNCHOS
37. SEPTIEMBRE'2009
LADRILLO PENINSULA.-
C07-00-67 4-20-33 ………………………………..
0,262,-€/UD
C07-00-69 7-20-33 ………………………………..
0,315,-€/UD
C07-00-55 9-20-33 ………………………………..
0,393.-€/UD
C07-00-47 11-20-33 ………………………………..
0,551,-€/UD
C07-00-51 15-20-33 ………………………………..
0,714,-€/UD
C07-00-70 PANAL 9-12-25 3 AGUJ
…………… 0,245,-€/UD
NOTA.-
PRECIOS PUESTOS EN OBRA SOBRE PLATAFORMA O EN N/ALMACEN PALETS COMPLETOS
PRECIOS VALIDOS HASTA FIN DE OBRA
ESTOS PRECIOS SON NETOS
38. ENERO 2009
LADRILLO MALLORQUIN.- PRECIO PRECIO
FABRICA OBRA
UD UD
LADRILLO H-24 (CARGA) 24-19-24................... 0,875,- 0,935,-
LADRILLO H-20 (CARGA) 14-19-24.................. 0,720,- 0,760,-
LADRILLO H-16 (CERRAMIENTO) 14-19-24.. 0,465,- 0,505,-
LADRILLO H-12 12-19-24................................... 0,465,- 0,495,-
TOCHANA H-8 10-14-24................................... 0,375,- 0,390,-
LADRILLO DOBLE CASTELLANO H-6 8-12-24 0,195,- 0,210,-
LADRILLO DOBLE TABIQUE 6,5-14-24............. CONSULTAR OFERTA
LADRILLO TABIQUERO H4 4-13-24.................. 0,245,- 0,255,-
LADRILLO H-16 (CARGA) 14-19-33.................. 0,850,- 0,910,-
SUPER H-8 10-19-33.......................................... 0,700,- 0,735,-
SUPER H-8 10-19-49.......................................... 1,195,- 1,240,-
SUPER H-6 8-19-33............................................. 0,495,- 0,525,-
SUPER H-6 7,9-19-49............................................. 0,935,- 0,975,-
SUPER 6,5 6,7-19-33........................................... 0,395,- 0,420,-
SUPER 6,5 6,7-19-49........................................... 0,875,- 0,910,-
SUPER 5 4,9-19-33................................................ 0,335,- 0,350,-
SUPER 5 4,9-19-49.................................................. 0,800,- 0,825,-
PLAQUETA DE FORRO 3,6-28-33...................... 0,625,- 0,650,-
PLAQUETA DE FORRO 3,6-28-49...................... 0,990,- 1,025,-
40. ENERO 2008
REFRACTARIOS
EUROS
C07-07-00 LADRILLO REFRACTARIO 2,5-10-20 0.432 UD
C07-07-01 LADRILLO REFRACTARIO 5-10-20 0.632 UD
C07-07-06 PLAQUETAS REFRACTARIAS 2,5-5-20 0.324 UD
41. ENERO 2006
TARIFA DE PRECIOS NORMATRIS.-
C07-15-00 NORMATRIS R-10 24-19-10 PESO 3 KGS...................... 1.23 UD
C07-15-01 NORMATRIS C-19 24-19-19 PESO 7,6 KGS................... 1.81 UD
C07-15-02 NORMATRIS C-24 24-19-24 PESO 10 KGS................... 2.10 UD
C07-15-03 NORMATRIS P-29 24-19-29 PESO 12,6 KGS................ 2.40 UD
C07-15-04 NORMATRIS P-34 24-19-34 PESO 15 KGS.................... 2.72 UD
C07-15-05 NORMATRIS P-39 24-19-39 PESO 17 KGS.................... 2.98 UD
C07-15-07 NORMATRIS C-22................................................................. 1.81 UD
FEBRERO 2006
ACUSPER.-
C07-50-00 ACUSPER 24 - 14 - 10.................................. 0.51 UD
42. FEBRERO 2006
TERMICON y BARDO
CODIGO DESCRIPCION EUROS
TERMICON
C07-20-30 TN 80-26-12 4.72 UD
C07-20-31 TN 100-26-12 6.51 UD
TERMICON DECORACION.-
C07-20-32 100-26-12 ACABADO MADERA Nª 9.13 UD
C07-20-33 100-26-12 LISO 7.63 UD
C07-20-34 100-26-12 ROJO ESTRIADO 7.39 UD
BARDO CASAO
C07-20-50 BN BARDO 50-25-4 0.80 UD
C07-20-51 BN BARDO 80-25-4 1.18 UD
C07-20-52 BN BARDO 100-25-4 1.41 UD
ACUSTISTAC
C07-30-01 ACUSTISTAC 32-50-16 4.37 UD
43. ENERO 2009
TADOBE
PRECIO ALMACEN PALMA
CODIGO DESCRIPCION EUROS
C07-20-60 TADOBE 51,5-50-4 1.81 UD
C07-20-61 TADOBE 51,5-50-5 1.91 UD
C07-20-62 TADOBE 51,5-50-6 2.12 UD
C07-20-63 TADOBE 51,5-50-7 2.43 UD
C07-20-64 TADOBE 51,5-50-10 2.86 UD
C07-20-65 TADOBE TERMICO 50-52-9 4.51 UD
C07-20-66 TADOBE TERMICO 50-52-10 5.07 UD
ENERO 2009
C07-00-85 CERAYESO 96-36-6 4.35 UD
CERAYESO 6 1 CARA 4.51 UD
C07-00-86 CERAYESO 96-36-8 5.04 UD
C07-00-87 CERAYESO 96-36-10 5.86 UD
CERAYESO 45-33,3-12 5.21 UD
C07-00-88 TERMICO 96-36-8 6.01 UD
TERMICO 96-36-10 6.21 UD
PLAQUETA 3-45-33 2.58 UD
PLAQUETA TERMICA 45-33,3-3 3.36 UD
OCTUBRE 2005
BOVEDILLA MALLORQUINA CURVADA
C07-01-51 BOVEDILLA 60-23-9 2.07 UD
C07-01-52 BOVEDILLA 70-23-13 2.48 UD
44. ABRIL 2009
PRODUCTOS COMPLEMENTARIOS.- LADRYESO Y TADOBE
TADOBE - LADRYESO.- EUROS
C07-00-90 YESO CONTROLADO LENTO S/20 KG 3.58 SC
C07-00-98 YESO PROYECTAR ALIGERADO G S/25 KG 5.96 SC
C07-00-92 YESAYOLA (ESCAYOLA) S/25 KGS 4.61 SC
C07-00-91 YESACOL 1 (PEGAMENTO) S/25 KGS 7.67 SC
C07-00-97 YESACOL (PEGAMENTO) ROJO S/25 KG 5.77 SC
C07-00-94 YESAFINO S/25 KGS..................................... 7.43 SC
C07-00-95 SISAL (ROLLO 8/10 KG)............................... 31.85 RLL
C07-00-96 YESACOL 2 (PEGAM.PREPARADO)............. 7.00 SC
Mortero de Agarre.- Mezcla al 50 % de yeso y pegamento. Consumo 4 kgs/m2
Sisal.- Consumo 100 grs/m2
Mecafino.- Consumo 1 kgs/m2
ABRIL 2009
GUARDAVIVOS.-
C07-03-00 GUARDAVIVOS L-2,50........................................ 0,61,-UD
C07-03-01 GUARDAVIVOS L-2,80....................................... 0,68,-UD
46. ADOQUINES CERAMICOS.- "MALPESA" NOVIEMBRE/2009
ADOQUINES ESTÁNDAR.- PRECIO PLATAFORMA COMPLETA EN OBRA
ADOQUIN EXTRUIDO CARAS 20X10
TEXTURA RASPADA 200-100-50 mm
C07-60-30 K. ROJO ………………………………………………………..0.667 €/UD
K. MARRON………………………………………………………..0.726 €/UD
K.FLASEADO ROJO-MARRON ………………………… 0.704 €/UD
K.FLASEADO NEGRO-MARRON …………………………. 0.717 €/UD
K.PALO DE ROSA ………………………………………….. 0.890 €/UD
K. BLANCO ………………………………………….. 1.038 €/UD
K. GRIS ………………………………………….. 0.995 €/UD
K. MAESTRANZA ………………………………………….. 1.074 €/UD
K. ROBLE ………………………………………….. 0.957 €/UD
K. TERRACOTA …………………………………………… 0.898 €/UD
ADOQ.EXTRU. CARAS 24-12
TEXTURA LISA 240-120-60 mm
K. ROJO ………………………………………………………..1.259 €/UD
K. MARRON………………………………………………………..1.373 €/UD
K.FLASEADO ROJO-MARRON ………………………… 1.331 €/UD
K.FLASEADO NEGRO-MARRON …………………………. 1.355 €/UD
K.PALO DE ROSA ………………………………………….. 1.686 €/UD
K. BLANCO ………………………………………….. 1.973 €/UD
K. GRIS ………………………………………….. 1.890 €/UD
K. MAESTRANZA ………………………………………….. 2.040 €/UD
K. ROBLE ………………………………………….. 1.816 €/UD
K. TERRACOTA ………………………………………….. 1.702 €/UD
ADOQUIN PRENSADO 230-114-40 mm
K. ROBLE ………………………………………….. 1.65 €/UD
K. TERRACOTA ………………………………………….. 1.53 €/UD
ADOQUIN EXTRUIDO CARAS 20-10
TEXTURA RASPADA 200-100-60mm
K. ROJO ………………………………………………………..0.827 €/UD
K. MARRON………………………………………………………..0.901 €/UD
K.FLASEADO ROJO-MARRON ………………………… 0.874 €/UD
K.FLASEADO NEGRO-MARRON …………………………. 0.890 €/UD
K.PALO DE ROSA ………………………………………….. 1.107 €/UD
K. BLANCO ………………………………………….. 1.294 €/UD
K. GRIS ………………………………………….. 1.240 €/UD
K. MAESTRANZA ………………………………………….. 1.339 €/UD
K. ROBLE ………………………………………….. 1.192 €/UD
K. TERRACOTA ………………………………………….. 1.117 €/UD
ADOQUIN PRENSADO 200-100-40 mm
TEXTURA LISA
K. ROBLE ……………………………………………………€/UD
1.419
K. TERRACOTA ………………………………………….. 1.330 €/UD
47. ADOQUINES CERAMICOS.- "MALPESA"
NOVIEMBRE/2009
ADOQUINES ESTÁNDAR.- PRECIO PARA PALETS SUELTOS
ADOQUIN EXTRUIDO CARAS 20X10
TEXTURA RASPADA 200-100-50 mm
C07-60-30 K. ROJO ………………………………………………………..0.962 €/UD
K. MARRON………………………………………………………..1.021 €/UD
K.FLASEADO ROJO-MARRON ………………………… 0.998 €/UD
K.FLASEADO NEGRO-MARRON …………………………. 1.011 €/UD
K.PALO DE ROSA ………………………………………….. 1.184 €/UD
K. BLANCO ………………………………………….. 1.333 €/UD
K. GRIS ………………………………………….. 1.290 €/UD
K. MAESTRANZA ………………………………………….. 1.368 €/UD
K. ROBLE ………………………………………….. 1.251 €/UD
K. TERRACOTA …………………………………………… 1.192 €/UD
ADOQ.EXTRU. CARAS 24-12
TEXTURA LISA 240-120-60 mm
K. ROJO ………………………………………………………..1.746 €/UD
K. MARRON………………………………………………………..1.859 €/UD
K.FLASEADO ROJO-MARRON ………………………… 1.818 €/UD
K.FLASEADO NEGRO-MARRON …………………………. 1.842 €/UD
K.PALO DE ROSA ………………………………………….. 2.173 €/UD
K. BLANCO ………………………………………….. 2.459 €/UD
K. GRIS ………………………………………….. 2.376 €/UD
K. MAESTRANZA ………………………………………….. 2.526 €/UD
K. ROBLE ………………………………………….. 2.302 €/UD
K. TERRACOTA ………………………………………….. 2.189 €/UD
ADOQUIN PRENSADO 230-114-40 mm
K. ROBLE ………………………………………….. 2.019 €/UD
K. TERRACOTA ………………………………………….. 1.904 €/UD
ADOQUIN EXTRUIDO CARAS 20-10
TEXTURA RASPADA 200-100-60mm
K. ROJO ………………………………………………………..1.181 €/UD
K. MARRON………………………………………………………..1.254 €/UD
K.FLASEADO ROJO-MARRON ………………………… 1.227 €/UD
K.FLASEADO NEGRO-MARRON …………………………. 1.243 €/UD
K.PALO DE ROSA ………………………………………….. 1.461 €/UD
K. BLANCO ………………………………………….. 1.648 €/UD
K. GRIS ………………………………………….. 1.594 €/UD
K. MAESTRANZA ………………………………………….. 1.693 €/UD
K. ROBLE ………………………………………….. 1.546 €/UD
K. TERRACOTA ………………………………………….. 1.470 €/UD
ADOQUIN PRENSADO 200-100-40 mm
TEXTURA LISA
K. ROBLE ……………………………………………………€/UD
1.515
K. TERRACOTA ………………………………………….. 1.426 €/UD
48. MATERIAL DE AGARRE.- ABRIL 2010
C07-70-00 * SACO YESO CONTROLADO 20 KGS………………………… 2,56,-€/SC ***************
C07-70-01 SACO YESO RAPIDO 18 KGS………………………………….. 2,22,-€/SC
C07-70-02 * SACO YESO PROMILL RAPIDO -Proyección 20 KGS…….. 3,13,-€/SC ***************
C07-70-03 SACO YESO PROMILL PERLITA RAPIDO
Proyección con perlita RF-240 17 KGS…………………………. 2,95,-€/SC
C07-70-04 * SACO YESO PROMILL MILLENIUM
Proyección con perlita (alto rendimiento) 25 KGS…………….. 4,76,-€/SC ***************
C07-70-05 SACO YESO PROYECCION ALIGERADO CON
PERLITA 17 KGS………………………………………………….. 2,64,-€/SC
C07-70-06 SACO DE PERLIPLASTER-P Mortero escayola con perlita
Proyección RF 240 15 KGS………………………………………. 4,17,-€/SC
C07-70-07 SACO PERLIPASTER-M Mortero de escayola con perlita
manual 15 KGS…………………………………………………….. 4,09,-€/SC
C07-70-08 SACO YESO FINO MIX 25 KGS…………………………………. 6,17,-€/SC ***************
C07-70-09 SACO SUPERCOLL - Cola especial escayola 16 KGS……….. 5,43,-€/SC
C07-70-10 SACO ESCAYOLA MILLAN 18 KGS……………………………. 2,96,-€/SC
C07-70-11 * SACO SUPERCOLL TABIQUE Adhesivo gran formato
20 KGS……………………………………………………………….. 4,22,-€/SC ***************
C07-70-12 SACO MASILLA ESTANDAR 15 KGS………………………….. 8,00,-€/SC
C07-70-13 SACO MASILLA RENOVACION. Cubrir gotelé 15 KGS……… 9,89,-€/SC
C07-70-14 SACO PROMILL IGNIFUGO Mortero Protección contra el
fuego - Metal 20 KGS……………………………………………… 9,25,-€/SC
Los máteriales en los que aparece ************** los tenemos en existencia
49. ENCOFRADOS CILINDRICOS.- JUNIO 2009
CODIGO DIAMETRO P.V.P P.V.P.
C08-02-00 200 43.40 57.87
250 51.74 68.99
300 70.61 94.15
350 82.32 109.76
400 119.71 159.62
450 151.82 202.43
500 167.27 223.04
550 183.96 245.28
600 200.90 267.86
650 347.42 463.22
700 446.67 595.56
750 435.5 580.66
800 461.76 615.68
900 504.34 672.45
1000 579.35 772.46
PRECIOS EN NUESTRO ALMACEN
RECARGO POR LARGO ESPECIAL
10% HASTA 6000 MM LONGITUD
15% DESDE 6000 MM LONGITUD
LONGITUD MAXIMA 12000 MM