TANK FARM TECHNOLOGY
WITH
TOTAL INTEGRATED AUTOMATION
The operation of the infrastructure is controlled by a Supervisory Control and Data Acquisition (SCADA) system
with two component: a Pipeline Control (transportation) Subsystem (PCS) and a Tank Farm (storage) Subsystem
(TFS). This presents the configuration, features, performance and future of the tank farm SCADA subsystem
(TFS). The software generally in use is based on the Real Time Application Platform (RTAP), a generic SCADA
package developed by Agilent Technology. Besides oil and gas transportation and storage, the platform is currently
in use for many application types including petrochemical plants, GPS, gas plants, oil field control. Over several
years, it has been designed and implemented layer upon layer of communication and configuration tools, data
structures and calculation engines, as well as an original Graphical User’s Interface (GUI) to make TFS an effective,
highly customized, open and easy to use control tool.
The System
1. Hardware and infrastructure: TFS currently run on HP’s J class workstations with 256/512 MB RAM and 2
PA-8200 processors. At each site the local equipment is interconnected within a Local Area Network
(LAN) running on twisted pair cable at speeds of 10Mbps to 100Mbps.
2. Operating System and Programming Language: TFS workstations use Hewlett-Packard’s UNIX operating
system.
3. Configuration: Each TFS operates on a primary computer, a back up computer with an X-terminal to add
more viewing capabilities and one or two printers.
4. Data Structure: It is built around the concept of point type/class, a collection of attributes containing
values, algorithms, status and alarm reporting features and security. A point class models: An
analogy/digital/string/pulse input output and user defined calculations.
5. The environment: The environment defines the collection of related process and associated resources that
are managed by a scheduler to perform all TFS functions.
When is AUTOMATION the logical choice?
 When distances and Topological condition are challenging.
 When the installation or replacement of the field wiring is a safety concern.
 When we want to reduce cost and complexity.
 When existing tank instrumentation needs modernizing.

More Related Content

What's hot

Near rt ric tc
Near rt ric tcNear rt ric tc
Near rt ric tc
NickHuang49
 
Near rt ric tc
Near rt ric tcNear rt ric tc
Near rt ric tc
NickHuang49
 
Near rt ric tc
Near rt ric tcNear rt ric tc
Near rt ric tc
NickHuang49
 
Near rt ric tc
Near rt ric tcNear rt ric tc
Near rt ric tc
NickHuang49
 
Mainframe - OPC
Mainframe -  OPCMainframe -  OPC
Mainframe - OPC
Srinimf-Slides
 
Network Simulators Comparison Research Help
Network Simulators Comparison Research HelpNetwork Simulators Comparison Research Help
Network Simulators Comparison Research Help
Matlab Simulation
 
1230---assembly-integration-verification-of-systems-of-systems
1230---assembly-integration-verification-of-systems-of-systems1230---assembly-integration-verification-of-systems-of-systems
1230---assembly-integration-verification-of-systems-of-systems
Rubén Colomina Citoler
 
CArcMOOC 01.01 - Automated information processing
CArcMOOC 01.01 - Automated information processingCArcMOOC 01.01 - Automated information processing
CArcMOOC 01.01 - Automated information processing
Alessandro Bogliolo
 
5 Things to Know about the Railway Data Center menRDC
5 Things to Know about the Railway Data Center menRDC5 Things to Know about the Railway Data Center menRDC
5 Things to Know about the Railway Data Center menRDC
MEN Mikro Elektronik GmbH
 
Use of GIS technology to improve QOS in computer networks
Use of GIS technology to improve QOS in computer networksUse of GIS technology to improve QOS in computer networks
Use of GIS technology to improve QOS in computer networks
APNIC
 
20210506 meeting2
20210506 meeting220210506 meeting2
20210506 meeting2
NickHuang49
 
Psim brochure press
Psim brochure pressPsim brochure press
Psim brochure press
Elizabeth Gannett
 
Rf planning for lte using atoll v1
Rf planning for lte using atoll v1Rf planning for lte using atoll v1
Rf planning for lte using atoll v1
Muhammad Rizki
 
Overview spectra reconn
Overview   spectra reconnOverview   spectra reconn
Overview spectra reconn
Bruce Ackman
 

What's hot (14)

Near rt ric tc
Near rt ric tcNear rt ric tc
Near rt ric tc
 
Near rt ric tc
Near rt ric tcNear rt ric tc
Near rt ric tc
 
Near rt ric tc
Near rt ric tcNear rt ric tc
Near rt ric tc
 
Near rt ric tc
Near rt ric tcNear rt ric tc
Near rt ric tc
 
Mainframe - OPC
Mainframe -  OPCMainframe -  OPC
Mainframe - OPC
 
Network Simulators Comparison Research Help
Network Simulators Comparison Research HelpNetwork Simulators Comparison Research Help
Network Simulators Comparison Research Help
 
1230---assembly-integration-verification-of-systems-of-systems
1230---assembly-integration-verification-of-systems-of-systems1230---assembly-integration-verification-of-systems-of-systems
1230---assembly-integration-verification-of-systems-of-systems
 
CArcMOOC 01.01 - Automated information processing
CArcMOOC 01.01 - Automated information processingCArcMOOC 01.01 - Automated information processing
CArcMOOC 01.01 - Automated information processing
 
5 Things to Know about the Railway Data Center menRDC
5 Things to Know about the Railway Data Center menRDC5 Things to Know about the Railway Data Center menRDC
5 Things to Know about the Railway Data Center menRDC
 
Use of GIS technology to improve QOS in computer networks
Use of GIS technology to improve QOS in computer networksUse of GIS technology to improve QOS in computer networks
Use of GIS technology to improve QOS in computer networks
 
20210506 meeting2
20210506 meeting220210506 meeting2
20210506 meeting2
 
Psim brochure press
Psim brochure pressPsim brochure press
Psim brochure press
 
Rf planning for lte using atoll v1
Rf planning for lte using atoll v1Rf planning for lte using atoll v1
Rf planning for lte using atoll v1
 
Overview spectra reconn
Overview   spectra reconnOverview   spectra reconn
Overview spectra reconn
 

Similar to Tank farm technology

Tail f Systems Whitepaper - Top Ten Management Issues for ATCA
Tail f Systems Whitepaper - Top Ten Management Issues for ATCATail f Systems Whitepaper - Top Ten Management Issues for ATCA
Tail f Systems Whitepaper - Top Ten Management Issues for ATCA
Tail-f Systems
 
NMS Projects and POCs completed and ongoing for OSS NAM v 1.5 Linkedin
NMS Projects and POCs completed and ongoing for OSS NAM v 1.5 LinkedinNMS Projects and POCs completed and ongoing for OSS NAM v 1.5 Linkedin
NMS Projects and POCs completed and ongoing for OSS NAM v 1.5 Linkedin
Javier Guillermo, MBA, MSc, PMP
 
Programmable Automation Controller with modular expansion
Programmable Automation Controller with modular expansionProgrammable Automation Controller with modular expansion
Programmable Automation Controller with modular expansion
Hile Controls of Alabama, Inc.
 
ATS @SCADA+
ATS @SCADA+ATS @SCADA+
ATS @SCADA+
Hoang Le Van
 
Design and Implementing Novel Independent Real-Time Software Programmable DAQ...
Design and Implementing Novel Independent Real-Time Software Programmable DAQ...Design and Implementing Novel Independent Real-Time Software Programmable DAQ...
Design and Implementing Novel Independent Real-Time Software Programmable DAQ...
Editor IJCATR
 
IPlant_LEC
IPlant_LECIPlant_LEC
IPlant_LEC
Mohamed Balah
 
Air Quality Data Acquisition and Management Systems
Air Quality Data Acquisition and Management SystemsAir Quality Data Acquisition and Management Systems
Air Quality Data Acquisition and Management Systems
Agilaire LLC
 
Dsa00170624
Dsa00170624Dsa00170624
SICAM PAS Software (6MD90)
SICAM PAS Software (6MD90)SICAM PAS Software (6MD90)
SICAM PAS Software (6MD90)
ashwini reliserv
 
Programmable Automation Controller T2750
Programmable Automation Controller T2750Programmable Automation Controller T2750
Programmable Automation Controller T2750
Hile Controls of Alabama, Inc.
 
p850-ries
p850-riesp850-ries
p850-ries
Bernhard Ries
 
RUGGEDCOM ELAN software
RUGGEDCOM ELAN softwareRUGGEDCOM ELAN software
RUGGEDCOM ELAN software
ashwini reliserv
 
Juniper Networks Router Architecture
Juniper Networks Router ArchitectureJuniper Networks Router Architecture
Juniper Networks Router Architecture
lawuah
 
A NETWORK-BASED DAC OPTIMIZATION PROTOTYPE SOFTWARE 2 (1).pdf
A NETWORK-BASED DAC OPTIMIZATION PROTOTYPE SOFTWARE 2 (1).pdfA NETWORK-BASED DAC OPTIMIZATION PROTOTYPE SOFTWARE 2 (1).pdf
A NETWORK-BASED DAC OPTIMIZATION PROTOTYPE SOFTWARE 2 (1).pdf
SaiReddy794166
 
Brochure of Yokogawa's Fast/Tools Supervisory Systems
Brochure of Yokogawa's Fast/Tools Supervisory SystemsBrochure of Yokogawa's Fast/Tools Supervisory Systems
Brochure of Yokogawa's Fast/Tools Supervisory Systems
Yokogawa
 
IRJET-Design of ARM Based Data Acquisition and Control System for Engine Asse...
IRJET-Design of ARM Based Data Acquisition and Control System for Engine Asse...IRJET-Design of ARM Based Data Acquisition and Control System for Engine Asse...
IRJET-Design of ARM Based Data Acquisition and Control System for Engine Asse...
IRJET Journal
 
Distributed control system
Distributed control systemDistributed control system
Distributed control system
Tilahun Shibru
 
HMI Replacement_GE MARK V, ABB Procontrol 13, MHI MIDAS 8000, SIEMEN TXP
HMI Replacement_GE MARK V, ABB Procontrol 13, MHI MIDAS 8000, SIEMEN TXP HMI Replacement_GE MARK V, ABB Procontrol 13, MHI MIDAS 8000, SIEMEN TXP
HMI Replacement_GE MARK V, ABB Procontrol 13, MHI MIDAS 8000, SIEMEN TXP
Hyemin Hwang
 
Stop Wasting Energy on M2M
Stop Wasting Energy on M2MStop Wasting Energy on M2M
Stop Wasting Energy on M2M
Eurotech
 
GDPS and System Complex
GDPS and System ComplexGDPS and System Complex
GDPS and System Complex
Najmi Mansoor Ahmed
 

Similar to Tank farm technology (20)

Tail f Systems Whitepaper - Top Ten Management Issues for ATCA
Tail f Systems Whitepaper - Top Ten Management Issues for ATCATail f Systems Whitepaper - Top Ten Management Issues for ATCA
Tail f Systems Whitepaper - Top Ten Management Issues for ATCA
 
NMS Projects and POCs completed and ongoing for OSS NAM v 1.5 Linkedin
NMS Projects and POCs completed and ongoing for OSS NAM v 1.5 LinkedinNMS Projects and POCs completed and ongoing for OSS NAM v 1.5 Linkedin
NMS Projects and POCs completed and ongoing for OSS NAM v 1.5 Linkedin
 
Programmable Automation Controller with modular expansion
Programmable Automation Controller with modular expansionProgrammable Automation Controller with modular expansion
Programmable Automation Controller with modular expansion
 
ATS @SCADA+
ATS @SCADA+ATS @SCADA+
ATS @SCADA+
 
Design and Implementing Novel Independent Real-Time Software Programmable DAQ...
Design and Implementing Novel Independent Real-Time Software Programmable DAQ...Design and Implementing Novel Independent Real-Time Software Programmable DAQ...
Design and Implementing Novel Independent Real-Time Software Programmable DAQ...
 
IPlant_LEC
IPlant_LECIPlant_LEC
IPlant_LEC
 
Air Quality Data Acquisition and Management Systems
Air Quality Data Acquisition and Management SystemsAir Quality Data Acquisition and Management Systems
Air Quality Data Acquisition and Management Systems
 
Dsa00170624
Dsa00170624Dsa00170624
Dsa00170624
 
SICAM PAS Software (6MD90)
SICAM PAS Software (6MD90)SICAM PAS Software (6MD90)
SICAM PAS Software (6MD90)
 
Programmable Automation Controller T2750
Programmable Automation Controller T2750Programmable Automation Controller T2750
Programmable Automation Controller T2750
 
p850-ries
p850-riesp850-ries
p850-ries
 
RUGGEDCOM ELAN software
RUGGEDCOM ELAN softwareRUGGEDCOM ELAN software
RUGGEDCOM ELAN software
 
Juniper Networks Router Architecture
Juniper Networks Router ArchitectureJuniper Networks Router Architecture
Juniper Networks Router Architecture
 
A NETWORK-BASED DAC OPTIMIZATION PROTOTYPE SOFTWARE 2 (1).pdf
A NETWORK-BASED DAC OPTIMIZATION PROTOTYPE SOFTWARE 2 (1).pdfA NETWORK-BASED DAC OPTIMIZATION PROTOTYPE SOFTWARE 2 (1).pdf
A NETWORK-BASED DAC OPTIMIZATION PROTOTYPE SOFTWARE 2 (1).pdf
 
Brochure of Yokogawa's Fast/Tools Supervisory Systems
Brochure of Yokogawa's Fast/Tools Supervisory SystemsBrochure of Yokogawa's Fast/Tools Supervisory Systems
Brochure of Yokogawa's Fast/Tools Supervisory Systems
 
IRJET-Design of ARM Based Data Acquisition and Control System for Engine Asse...
IRJET-Design of ARM Based Data Acquisition and Control System for Engine Asse...IRJET-Design of ARM Based Data Acquisition and Control System for Engine Asse...
IRJET-Design of ARM Based Data Acquisition and Control System for Engine Asse...
 
Distributed control system
Distributed control systemDistributed control system
Distributed control system
 
HMI Replacement_GE MARK V, ABB Procontrol 13, MHI MIDAS 8000, SIEMEN TXP
HMI Replacement_GE MARK V, ABB Procontrol 13, MHI MIDAS 8000, SIEMEN TXP HMI Replacement_GE MARK V, ABB Procontrol 13, MHI MIDAS 8000, SIEMEN TXP
HMI Replacement_GE MARK V, ABB Procontrol 13, MHI MIDAS 8000, SIEMEN TXP
 
Stop Wasting Energy on M2M
Stop Wasting Energy on M2MStop Wasting Energy on M2M
Stop Wasting Energy on M2M
 
GDPS and System Complex
GDPS and System ComplexGDPS and System Complex
GDPS and System Complex
 

Recently uploaded

12 steps to transform your organization into the agile org you deserve
12 steps to transform your organization into the agile org you deserve12 steps to transform your organization into the agile org you deserve
12 steps to transform your organization into the agile org you deserve
Pierre E. NEIS
 
一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理
8p28uk6g
 
Employment Practices Regulation and Multinational Corporations
Employment PracticesRegulation and Multinational CorporationsEmployment PracticesRegulation and Multinational Corporations
Employment Practices Regulation and Multinational Corporations
RoopaTemkar
 
Resource-mobilization-guide-for-community-based-organizations1.pdf
Resource-mobilization-guide-for-community-based-organizations1.pdfResource-mobilization-guide-for-community-based-organizations1.pdf
Resource-mobilization-guide-for-community-based-organizations1.pdf
FeteneA
 
Conflict resololution,role of hr in resolution
Conflict resololution,role of hr in resolutionConflict resololution,role of hr in resolution
Conflict resololution,role of hr in resolution
Dr. Christine Ngari ,Ph.D (HRM)
 
Ganpati Kumar Choudhary Indian Ethos PPT.pptx
Ganpati Kumar Choudhary Indian Ethos PPT.pptxGanpati Kumar Choudhary Indian Ethos PPT.pptx
Ganpati Kumar Choudhary Indian Ethos PPT.pptx
GanpatiKumarChoudhar
 
Team Building and TUCKMANS MODEL Explained
Team Building and TUCKMANS MODEL ExplainedTeam Building and TUCKMANS MODEL Explained
Team Building and TUCKMANS MODEL Explained
iampriyanshujaiswal
 
Myrna Story of Leadership and Management
Myrna Story of Leadership and ManagementMyrna Story of Leadership and Management
Myrna Story of Leadership and Management
Waleed Kamal
 
Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...
Ram V Chary
 
Chart--Time Management.pdf How to time is spent
Chart--Time Management.pdf How to time is spentChart--Time Management.pdf How to time is spent
Chart--Time Management.pdf How to time is spent
spandane
 
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Dr. Nazrul Islam
 
Comparing Stability and Sustainability in Agile Systems
Comparing Stability and Sustainability in Agile SystemsComparing Stability and Sustainability in Agile Systems
Comparing Stability and Sustainability in Agile Systems
Rob Healy
 
Stuart Wilson the teams I have led - 2024
Stuart Wilson the teams I have led - 2024Stuart Wilson the teams I have led - 2024
Stuart Wilson the teams I have led - 2024
stuwilson.co.uk
 
Enriching engagement with ethical review processes
Enriching engagement with ethical review processesEnriching engagement with ethical review processes
Enriching engagement with ethical review processes
strikingabalance
 
innovation in nursing practice, education and management.pptx
innovation in nursing practice, education and management.pptxinnovation in nursing practice, education and management.pptx
innovation in nursing practice, education and management.pptx
TulsiDhidhi1
 
Strategy for E-Types - Strategy Formulation.pptx
Strategy for E-Types - Strategy Formulation.pptxStrategy for E-Types - Strategy Formulation.pptx
Strategy for E-Types - Strategy Formulation.pptx
KarthikRaghu8
 
All the Small Things - XP2024 Bolzano/Bozen
All the Small Things - XP2024 Bolzano/BozenAll the Small Things - XP2024 Bolzano/Bozen
All the Small Things - XP2024 Bolzano/Bozen
Alberto Brandolini
 
20240608 QFM019 Engineering Leadership Reading List May 2024
20240608 QFM019 Engineering Leadership Reading List May 202420240608 QFM019 Engineering Leadership Reading List May 2024
20240608 QFM019 Engineering Leadership Reading List May 2024
Matthew Sinclair
 
The Management Guide: From Projects to Portfolio
The Management Guide: From Projects to PortfolioThe Management Guide: From Projects to Portfolio
The Management Guide: From Projects to Portfolio
Ahmed AbdelMoneim
 
Public Speaking Tips to Help You Be A Strong Leader.pdf
Public Speaking Tips to Help You Be A Strong Leader.pdfPublic Speaking Tips to Help You Be A Strong Leader.pdf
Public Speaking Tips to Help You Be A Strong Leader.pdf
Pinta Partners
 

Recently uploaded (20)

12 steps to transform your organization into the agile org you deserve
12 steps to transform your organization into the agile org you deserve12 steps to transform your organization into the agile org you deserve
12 steps to transform your organization into the agile org you deserve
 
一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理
 
Employment Practices Regulation and Multinational Corporations
Employment PracticesRegulation and Multinational CorporationsEmployment PracticesRegulation and Multinational Corporations
Employment Practices Regulation and Multinational Corporations
 
Resource-mobilization-guide-for-community-based-organizations1.pdf
Resource-mobilization-guide-for-community-based-organizations1.pdfResource-mobilization-guide-for-community-based-organizations1.pdf
Resource-mobilization-guide-for-community-based-organizations1.pdf
 
Conflict resololution,role of hr in resolution
Conflict resololution,role of hr in resolutionConflict resololution,role of hr in resolution
Conflict resololution,role of hr in resolution
 
Ganpati Kumar Choudhary Indian Ethos PPT.pptx
Ganpati Kumar Choudhary Indian Ethos PPT.pptxGanpati Kumar Choudhary Indian Ethos PPT.pptx
Ganpati Kumar Choudhary Indian Ethos PPT.pptx
 
Team Building and TUCKMANS MODEL Explained
Team Building and TUCKMANS MODEL ExplainedTeam Building and TUCKMANS MODEL Explained
Team Building and TUCKMANS MODEL Explained
 
Myrna Story of Leadership and Management
Myrna Story of Leadership and ManagementMyrna Story of Leadership and Management
Myrna Story of Leadership and Management
 
Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...
 
Chart--Time Management.pdf How to time is spent
Chart--Time Management.pdf How to time is spentChart--Time Management.pdf How to time is spent
Chart--Time Management.pdf How to time is spent
 
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
 
Comparing Stability and Sustainability in Agile Systems
Comparing Stability and Sustainability in Agile SystemsComparing Stability and Sustainability in Agile Systems
Comparing Stability and Sustainability in Agile Systems
 
Stuart Wilson the teams I have led - 2024
Stuart Wilson the teams I have led - 2024Stuart Wilson the teams I have led - 2024
Stuart Wilson the teams I have led - 2024
 
Enriching engagement with ethical review processes
Enriching engagement with ethical review processesEnriching engagement with ethical review processes
Enriching engagement with ethical review processes
 
innovation in nursing practice, education and management.pptx
innovation in nursing practice, education and management.pptxinnovation in nursing practice, education and management.pptx
innovation in nursing practice, education and management.pptx
 
Strategy for E-Types - Strategy Formulation.pptx
Strategy for E-Types - Strategy Formulation.pptxStrategy for E-Types - Strategy Formulation.pptx
Strategy for E-Types - Strategy Formulation.pptx
 
All the Small Things - XP2024 Bolzano/Bozen
All the Small Things - XP2024 Bolzano/BozenAll the Small Things - XP2024 Bolzano/Bozen
All the Small Things - XP2024 Bolzano/Bozen
 
20240608 QFM019 Engineering Leadership Reading List May 2024
20240608 QFM019 Engineering Leadership Reading List May 202420240608 QFM019 Engineering Leadership Reading List May 2024
20240608 QFM019 Engineering Leadership Reading List May 2024
 
The Management Guide: From Projects to Portfolio
The Management Guide: From Projects to PortfolioThe Management Guide: From Projects to Portfolio
The Management Guide: From Projects to Portfolio
 
Public Speaking Tips to Help You Be A Strong Leader.pdf
Public Speaking Tips to Help You Be A Strong Leader.pdfPublic Speaking Tips to Help You Be A Strong Leader.pdf
Public Speaking Tips to Help You Be A Strong Leader.pdf
 

Tank farm technology

  • 1. TANK FARM TECHNOLOGY WITH TOTAL INTEGRATED AUTOMATION The operation of the infrastructure is controlled by a Supervisory Control and Data Acquisition (SCADA) system with two component: a Pipeline Control (transportation) Subsystem (PCS) and a Tank Farm (storage) Subsystem (TFS). This presents the configuration, features, performance and future of the tank farm SCADA subsystem (TFS). The software generally in use is based on the Real Time Application Platform (RTAP), a generic SCADA package developed by Agilent Technology. Besides oil and gas transportation and storage, the platform is currently in use for many application types including petrochemical plants, GPS, gas plants, oil field control. Over several years, it has been designed and implemented layer upon layer of communication and configuration tools, data structures and calculation engines, as well as an original Graphical User’s Interface (GUI) to make TFS an effective, highly customized, open and easy to use control tool. The System 1. Hardware and infrastructure: TFS currently run on HP’s J class workstations with 256/512 MB RAM and 2 PA-8200 processors. At each site the local equipment is interconnected within a Local Area Network (LAN) running on twisted pair cable at speeds of 10Mbps to 100Mbps. 2. Operating System and Programming Language: TFS workstations use Hewlett-Packard’s UNIX operating system. 3. Configuration: Each TFS operates on a primary computer, a back up computer with an X-terminal to add more viewing capabilities and one or two printers. 4. Data Structure: It is built around the concept of point type/class, a collection of attributes containing values, algorithms, status and alarm reporting features and security. A point class models: An analogy/digital/string/pulse input output and user defined calculations. 5. The environment: The environment defines the collection of related process and associated resources that are managed by a scheduler to perform all TFS functions. When is AUTOMATION the logical choice?  When distances and Topological condition are challenging.  When the installation or replacement of the field wiring is a safety concern.  When we want to reduce cost and complexity.  When existing tank instrumentation needs modernizing.