1/5
Talha Ali
P-24-G,W Block Madina Town Faisalabad, Punjab, Pakistan.
Date Of Birth: 04-04-1990
Marital Status: Single
PEC Registration #: TELECOM 4899
Cell Phone # +923126669259 +923447773601
Email : eng.talha@hotmail.com, its.talhas@gmail.com
OBJECTIVE
To find a suitable position in your reputable organization & want to excel as carrier oriented professional
with great zeal and enthusiasm by utilizing my skills keeping in view the reputation of the organization.
PROFESSIONAL SUMMARY
I have started my professional career in 2012, Worked in (O & M),(NPM 2G) Currently working in (NPM 3G
& 4G) b/m are details
COMPANY PROJECT VENDOR TENURE
RANOP Solutions Pvt
(Ltd)
Radio Network Optimization
3G/4G
ZTE 1st-July-2016 To Till Present
KomKonsult Pvt (Ltd)
Radio Network Optimization
3G/4G
ZTE 1st-Sep -2015 to 30-June-2016
KomKonsult Pvt (Ltd)
Radio Network Optimization
2G
ZTE 4th-Aug- 2013 to 31-Aug -2015
Mobiserve Pvt (Ltd) Operations and Maintenance Alcatel/Huawei 15-Nov-2012 to 31-July-2013
WORK EXPERIENCE
ZTE CMPAK OPTIMIZATION PROJECT 3G/4G CII REGION (1ST-SEP -2015 TO TILL PRESENT).
Activities:
 Analyze stats (CS CDR, PS Drop Rate, RRC Setup Success Ratio, CS RAB Setup Success Rate, PS
RAB Assignment Setup Rate, CS/PS RAB Congestion Ratio, HSPA/R99 Traffic Volume, CS/PS
IRAT Success Rate, Soft /Softer HO Success Rate).
 Routine preventive optimization measures such as RTWP analysis and rectification, Neighbor
Optimization (missing/more neighbors optimization), Pilot Pollution/Overshooting cells Analysis,
Alarms identification and reporting, Congested cells analysis, Frequency optimization, and coverage
improvement by redesigns and power modifications.
 Multi RAB Service and Dual Carrier implementation for HSDPA & HSPA+ Parameter tuning
and throughput Tests
 Analyze Problematic areas, Pilot Pollution, RAB Establishment, RRC Connection and Events
2/5
(Blocked calls, Dropped calls, Hard/Soft/IRAT failures, Cell Reselection failures, Location Updates,
Paging)
 Observing the particular cell parameters such as RSSI,RSCP,EC/N0,SQI MOS,SC, RSRP,
RSRQ,CINR ,PCI physical served throughput, CQI
 Providing support for VIP and customer complaints and tracking.
 Create Heat Maps for RTWP/Inference affected cells using mapinfo.
ZTE CMPAK OPTIMIZATION PROJECT 2G CII REGION (4TH-AUG- 2013 TO 31-AUG -2015).
Activities:
 Monitoring and Optimization of major KPIs; CDR, CSSR, SD Blocking and HOSR, DL/UL Qual to
meet monthly and SLA(Service Level Agreement) targets.
 Capacity planning and proposing expansions to remove blocking from the congested cells
KPI Analysis & Neighbor Analysis for the New Sites.
 Static & Dynamic PDCH addition and alignment of PDs in consideration to increase throughput of
worst cells.
 TCH Utilization study & provide recommendations for TCH Addition & TRX dilution for congested
& low Utilized cells respectively.
 Cells Auditing & Auditing Neighbor Relations Defined with Wrong LAC, BCCH, and BSIC.
 Tracking of hardware faults related to BSS/Transmission drops/Faulty TRXs/Zero traffic cells on
daily basis and intimating concerned departments for resolution
 Traffic study for SDCCH and TCH congestion, Balancing Traffic between multiband network
 Bench marking, Scanning, Cluster DT, Site Audit, Single City Site DT,BSC Cutover Activities, PS
Testing and analysis.
 Post processing the log files to draft the reports and to analyze the Events (Call drops, HO Failures,
Blocked Calls) with concerned Optimizer.
 Monitoring Log files analysis and Recommendation against all the highlighted issues including
Antenna Physical changes Soft parameter changes.
 Indoor Walk Test of Various Buildings.
 CQT and TRX testing of the sites with voice degradation issues
 Frequency, Neighbor and BSIC audit using MCOM and Mapinfo Piano Files.
 Observe the particular cell parameters such as Rx-level, Rx-Qual, C/I, SQI..
 Coordinate with BSS team to resolve issues Such as low power TRX, sector Swapping etc.
 Checking the handover performance between cells (Incoming / Outgoing HO)
 PRE and POST Drive Test the sites on which physical and soft parametric changes were
implemented.
 Analysis of different issues observed during Benchmarking and Drive Testing.
 Physical Audits of Sites and Optimizing their Antenna Azimuths and Tilts.
 Observing and troubleshooting issues like Sector Swap, Overshooting cells etc.
3/5
TRAINING:
DRIVE TESTING AT ZTE CMPAK OPTIMIZATION PROJECT AT FAISALABAD (STARTING DATE
1ST JUNE-2012 TO 14-NOV-2012)
Tasks:
 Bench marking
 Cluster DT
 Site Audit
 Single City Site DT
 GPRS/EDGE/SMS Drive Test
 Observe the particular cell parameters such as Rx-level, Rx-Qual, C/I, SQI.
 Physical audits of the sites to collect the physical data.
 Check the signal strength of a particular ZTE site and accordingly changing the tilts and orientation
of the GSM Antenna to improve the coverage area.
AS A CLUSTER ENGINEER IN O & M DEPARTMENT IN MOBISERVE PAKISTAN PVT(LTD).
(FROM 15-NOV-2012 TO 31-JULY-2013).
BSS ACTIVITIES:
 Installation & Configuration of ALCATEL Combiners and TREs.
 Maintenance and Calibration of BTS equipment at all cell sites e.g. RF transceivers, VSWR tests etc.
 Identifying and resolving the sector swapping issues in the BTS cell sites. Offline commissioning of
Alcatel BTS.
 To check the SUMA card at BTS either working properly or not.
 Configuring the combiner and TRE’s according to frequency and standard i.e. 900MHz; 1800MHz.
TRANSMISSION ACTIVITIES:
 Installation, configuration and troubleshooting of NEC & Alcatel microwave links for the better
performance of data transmissions.
 Troubleshooting of IDU & ODU.
 Resolving the issue regarding microwave dishes alignment and panning using different tests.
 Changing IDU in case existing got faulty.
 Changing the polarity of ODU to affect the Rx/Tx level for proper communication.
 Performing the interference test.
 Communication path verification from hop to hop in case of site down due to media issue.
 On field troubleshooting, in case of any BTS entity goes down due to Telco or non-Telco reasons.
4/5
PM Activities:
 Responsible for to check the all Team member working as per assigned duty
 Responsible for to check the New and Junk Material
 Responsible for to ensure last PM rejection snags should be clear on this PM visit
 Responsible for to cross check the AC, Genset, ATS, DP issues
 Responsible for to check the Battery Backup test, Rectifier setting,
 Responsible for to check the Alarm setting, reporting & Patching as per criteria
 Responsible for to mention the pending Issue including security domain, production domain, internal
domain(Material NA issue, Tool faulty/NA issue, Urgent Petty cash requirement issue)
 Responsible for to maintained the PM/Rectifier/rectifier Module/Battery bank data of his cluster
 Responsible for to check & clear the abnormal alarms on MW Link/BTS and Media related issues
CM Activities:
 Responsible for to check the Down RSL(Received Signal Level) report with realistic reason and their
action plan to rectified the issue
 Responsible for to check the alarm for verification of site outage(Due to power issue/Media
issue/BTS Issue) and move the team accordingly
 Responsible for to check the Media activity as well as understanding of connectivity.
ACADEMIC QUALIFICATIONS
DEGREE INSTITUTE/BOARD YEAR
BSc Telecom
Engineering
GC University Faisalabad 2012
F.sc
(Pre-Engineering)
F.B.I.S.E 2008
Matriculation F.B.I.S.E 2006
FINAL YEAR PROJECT
Path planning & hurdle detection for Blind person. This project uses a GPS module, to locate the path and
tell about the direction to reach at the destination, and Ultrasonic sensors to detect the hurdles in the path.
SEMESTER PROJECTS
 Mini projects in C++
 Calculator in Java using GUI programming
 DC motor Speed Controller
 FM transmitter
5/5
 A complete report on connecting the University using LAN
 P.B.X (Private Branch Exchange containing 1-8 telephones with 1 PTCL line)
PROFESSIONAL TECHNICAL SKILLS
 Programming Languages: C, C++, Java and Assembly.
 Softwares/Applications:MS Word, MS Excel, MS PowerPoint, TEMS investigation
8.0,8.3,10.05,15,16, MapInfo 8.5,10,11 Netnumen, Inspur. Adobe Photoshop, Inpage, Swish, Audio
video Mixing.
REFERENCE
Will be furnished upon request.

Talha Ali

  • 1.
    1/5 Talha Ali P-24-G,W BlockMadina Town Faisalabad, Punjab, Pakistan. Date Of Birth: 04-04-1990 Marital Status: Single PEC Registration #: TELECOM 4899 Cell Phone # +923126669259 +923447773601 Email : eng.talha@hotmail.com, its.talhas@gmail.com OBJECTIVE To find a suitable position in your reputable organization & want to excel as carrier oriented professional with great zeal and enthusiasm by utilizing my skills keeping in view the reputation of the organization. PROFESSIONAL SUMMARY I have started my professional career in 2012, Worked in (O & M),(NPM 2G) Currently working in (NPM 3G & 4G) b/m are details COMPANY PROJECT VENDOR TENURE RANOP Solutions Pvt (Ltd) Radio Network Optimization 3G/4G ZTE 1st-July-2016 To Till Present KomKonsult Pvt (Ltd) Radio Network Optimization 3G/4G ZTE 1st-Sep -2015 to 30-June-2016 KomKonsult Pvt (Ltd) Radio Network Optimization 2G ZTE 4th-Aug- 2013 to 31-Aug -2015 Mobiserve Pvt (Ltd) Operations and Maintenance Alcatel/Huawei 15-Nov-2012 to 31-July-2013 WORK EXPERIENCE ZTE CMPAK OPTIMIZATION PROJECT 3G/4G CII REGION (1ST-SEP -2015 TO TILL PRESENT). Activities:  Analyze stats (CS CDR, PS Drop Rate, RRC Setup Success Ratio, CS RAB Setup Success Rate, PS RAB Assignment Setup Rate, CS/PS RAB Congestion Ratio, HSPA/R99 Traffic Volume, CS/PS IRAT Success Rate, Soft /Softer HO Success Rate).  Routine preventive optimization measures such as RTWP analysis and rectification, Neighbor Optimization (missing/more neighbors optimization), Pilot Pollution/Overshooting cells Analysis, Alarms identification and reporting, Congested cells analysis, Frequency optimization, and coverage improvement by redesigns and power modifications.  Multi RAB Service and Dual Carrier implementation for HSDPA & HSPA+ Parameter tuning and throughput Tests  Analyze Problematic areas, Pilot Pollution, RAB Establishment, RRC Connection and Events
  • 2.
    2/5 (Blocked calls, Droppedcalls, Hard/Soft/IRAT failures, Cell Reselection failures, Location Updates, Paging)  Observing the particular cell parameters such as RSSI,RSCP,EC/N0,SQI MOS,SC, RSRP, RSRQ,CINR ,PCI physical served throughput, CQI  Providing support for VIP and customer complaints and tracking.  Create Heat Maps for RTWP/Inference affected cells using mapinfo. ZTE CMPAK OPTIMIZATION PROJECT 2G CII REGION (4TH-AUG- 2013 TO 31-AUG -2015). Activities:  Monitoring and Optimization of major KPIs; CDR, CSSR, SD Blocking and HOSR, DL/UL Qual to meet monthly and SLA(Service Level Agreement) targets.  Capacity planning and proposing expansions to remove blocking from the congested cells KPI Analysis & Neighbor Analysis for the New Sites.  Static & Dynamic PDCH addition and alignment of PDs in consideration to increase throughput of worst cells.  TCH Utilization study & provide recommendations for TCH Addition & TRX dilution for congested & low Utilized cells respectively.  Cells Auditing & Auditing Neighbor Relations Defined with Wrong LAC, BCCH, and BSIC.  Tracking of hardware faults related to BSS/Transmission drops/Faulty TRXs/Zero traffic cells on daily basis and intimating concerned departments for resolution  Traffic study for SDCCH and TCH congestion, Balancing Traffic between multiband network  Bench marking, Scanning, Cluster DT, Site Audit, Single City Site DT,BSC Cutover Activities, PS Testing and analysis.  Post processing the log files to draft the reports and to analyze the Events (Call drops, HO Failures, Blocked Calls) with concerned Optimizer.  Monitoring Log files analysis and Recommendation against all the highlighted issues including Antenna Physical changes Soft parameter changes.  Indoor Walk Test of Various Buildings.  CQT and TRX testing of the sites with voice degradation issues  Frequency, Neighbor and BSIC audit using MCOM and Mapinfo Piano Files.  Observe the particular cell parameters such as Rx-level, Rx-Qual, C/I, SQI..  Coordinate with BSS team to resolve issues Such as low power TRX, sector Swapping etc.  Checking the handover performance between cells (Incoming / Outgoing HO)  PRE and POST Drive Test the sites on which physical and soft parametric changes were implemented.  Analysis of different issues observed during Benchmarking and Drive Testing.  Physical Audits of Sites and Optimizing their Antenna Azimuths and Tilts.  Observing and troubleshooting issues like Sector Swap, Overshooting cells etc.
  • 3.
    3/5 TRAINING: DRIVE TESTING ATZTE CMPAK OPTIMIZATION PROJECT AT FAISALABAD (STARTING DATE 1ST JUNE-2012 TO 14-NOV-2012) Tasks:  Bench marking  Cluster DT  Site Audit  Single City Site DT  GPRS/EDGE/SMS Drive Test  Observe the particular cell parameters such as Rx-level, Rx-Qual, C/I, SQI.  Physical audits of the sites to collect the physical data.  Check the signal strength of a particular ZTE site and accordingly changing the tilts and orientation of the GSM Antenna to improve the coverage area. AS A CLUSTER ENGINEER IN O & M DEPARTMENT IN MOBISERVE PAKISTAN PVT(LTD). (FROM 15-NOV-2012 TO 31-JULY-2013). BSS ACTIVITIES:  Installation & Configuration of ALCATEL Combiners and TREs.  Maintenance and Calibration of BTS equipment at all cell sites e.g. RF transceivers, VSWR tests etc.  Identifying and resolving the sector swapping issues in the BTS cell sites. Offline commissioning of Alcatel BTS.  To check the SUMA card at BTS either working properly or not.  Configuring the combiner and TRE’s according to frequency and standard i.e. 900MHz; 1800MHz. TRANSMISSION ACTIVITIES:  Installation, configuration and troubleshooting of NEC & Alcatel microwave links for the better performance of data transmissions.  Troubleshooting of IDU & ODU.  Resolving the issue regarding microwave dishes alignment and panning using different tests.  Changing IDU in case existing got faulty.  Changing the polarity of ODU to affect the Rx/Tx level for proper communication.  Performing the interference test.  Communication path verification from hop to hop in case of site down due to media issue.  On field troubleshooting, in case of any BTS entity goes down due to Telco or non-Telco reasons.
  • 4.
    4/5 PM Activities:  Responsiblefor to check the all Team member working as per assigned duty  Responsible for to check the New and Junk Material  Responsible for to ensure last PM rejection snags should be clear on this PM visit  Responsible for to cross check the AC, Genset, ATS, DP issues  Responsible for to check the Battery Backup test, Rectifier setting,  Responsible for to check the Alarm setting, reporting & Patching as per criteria  Responsible for to mention the pending Issue including security domain, production domain, internal domain(Material NA issue, Tool faulty/NA issue, Urgent Petty cash requirement issue)  Responsible for to maintained the PM/Rectifier/rectifier Module/Battery bank data of his cluster  Responsible for to check & clear the abnormal alarms on MW Link/BTS and Media related issues CM Activities:  Responsible for to check the Down RSL(Received Signal Level) report with realistic reason and their action plan to rectified the issue  Responsible for to check the alarm for verification of site outage(Due to power issue/Media issue/BTS Issue) and move the team accordingly  Responsible for to check the Media activity as well as understanding of connectivity. ACADEMIC QUALIFICATIONS DEGREE INSTITUTE/BOARD YEAR BSc Telecom Engineering GC University Faisalabad 2012 F.sc (Pre-Engineering) F.B.I.S.E 2008 Matriculation F.B.I.S.E 2006 FINAL YEAR PROJECT Path planning & hurdle detection for Blind person. This project uses a GPS module, to locate the path and tell about the direction to reach at the destination, and Ultrasonic sensors to detect the hurdles in the path. SEMESTER PROJECTS  Mini projects in C++  Calculator in Java using GUI programming  DC motor Speed Controller  FM transmitter
  • 5.
    5/5  A completereport on connecting the University using LAN  P.B.X (Private Branch Exchange containing 1-8 telephones with 1 PTCL line) PROFESSIONAL TECHNICAL SKILLS  Programming Languages: C, C++, Java and Assembly.  Softwares/Applications:MS Word, MS Excel, MS PowerPoint, TEMS investigation 8.0,8.3,10.05,15,16, MapInfo 8.5,10,11 Netnumen, Inspur. Adobe Photoshop, Inpage, Swish, Audio video Mixing. REFERENCE Will be furnished upon request.