The document discusses the costs associated with operating a bus system and proposes implementing a campus-wide bicycle sharing program instead. It estimates the initial capital costs of a 20 bus fleet at 3 crores and annual operating costs of over 1 crore for fuel, maintenance, and labor. Alternatively, a bicycle sharing system of 8,000 cycles is proposed, which would cost around 1.5 crores initially for the cycles and 12 lakhs annually for maintenance. Benefits include reduced emissions, independence of movement around campus, and fostering collaboration between buildings. Successful programs at other universities are cited as examples.
Under JST RISTEX S3FIRE program, we are trying to implement Smart Access Vehicle (SAV) Service in Hakodate. The project adopts the method of service science loop - the repeated cycle of observation, design and implementation. In this paper we report the completion of its first cycle, and discuss how the cycle improved our initial design. We first conducted person trip research in Hakodate. We chose 20 candidates of various age and occupation, and recorded their everyday movements for four months. We then analyzed the result and made a person trip model. The model was then fed into our multi-agent simulator for Hakodate public transportation system. We conducted a small field test with five vehicles for one week. The most significant achievement is that we confirmed that our design of SAV system works. We succeeded in automatically dispatching five vehicles for eleven hours without any significant trouble or human supervision.
As a part of a contest in Shaastra 2014 at IIT Madras, a sustainable city - Shangri-La, was designed under four verticals: transportation, energy, water and waste management.
Horizon 2020 research opportunity - new generate rail services - Tony MercadoKTN
Presentation 6 of 8 from Horizon 2020 for Rail event held 8th Nov 2013.
The calls for research being made under the rail heading in the surface transport work programme for 2014 - New generation of rail vehicles (enhanced functionality, comfort, operational performance; reduced whole life cost of vehicles by improved reliability, reduced energy consumption and increased capacity)
Under JST RISTEX S3FIRE program, we are trying to implement Smart Access Vehicle (SAV) Service in Hakodate. The project adopts the method of service science loop - the repeated cycle of observation, design and implementation. In this paper we report the completion of its first cycle, and discuss how the cycle improved our initial design. We first conducted person trip research in Hakodate. We chose 20 candidates of various age and occupation, and recorded their everyday movements for four months. We then analyzed the result and made a person trip model. The model was then fed into our multi-agent simulator for Hakodate public transportation system. We conducted a small field test with five vehicles for one week. The most significant achievement is that we confirmed that our design of SAV system works. We succeeded in automatically dispatching five vehicles for eleven hours without any significant trouble or human supervision.
As a part of a contest in Shaastra 2014 at IIT Madras, a sustainable city - Shangri-La, was designed under four verticals: transportation, energy, water and waste management.
Horizon 2020 research opportunity - new generate rail services - Tony MercadoKTN
Presentation 6 of 8 from Horizon 2020 for Rail event held 8th Nov 2013.
The calls for research being made under the rail heading in the surface transport work programme for 2014 - New generation of rail vehicles (enhanced functionality, comfort, operational performance; reduced whole life cost of vehicles by improved reliability, reduced energy consumption and increased capacity)
This presentation covers Accounting of Services and Operations like - Cinema Hall, Canteen, Hospital, Transport, Costing etc.
an important part in MBA Financce
STEP Annual Conference 2018 - Gordon Manson, How SME’s can Flick the Switch o...STEP_scotland
STEP 2018 Conference. Gordon Manson. Support available to SMEs - Low Carbon Transport Fund, interest free loans for low carbon vehicles and free EV charging points.
This presentation covers Accounting of Services and Operations like - Cinema Hall, Canteen, Hospital, Transport, Costing etc.
an important part in MBA Financce
STEP Annual Conference 2018 - Gordon Manson, How SME’s can Flick the Switch o...STEP_scotland
STEP 2018 Conference. Gordon Manson. Support available to SMEs - Low Carbon Transport Fund, interest free loans for low carbon vehicles and free EV charging points.
Things to remember while upgrading the brakes of your carjennifermiller8137
Upgrading the brakes of your car? Keep these things in mind before doing so. Additionally, start using an OBD 2 GPS tracker so that you never miss a vehicle maintenance appointment. On top of this, a car GPS tracker will also let you master good driving habits that will let you increase the operational life of your car’s brakes.
"Trans Failsafe Prog" on your BMW X5 indicates potential transmission issues requiring immediate action. This safety feature activates in response to abnormalities like low fluid levels, leaks, faulty sensors, electrical or mechanical failures, and overheating.
𝘼𝙣𝙩𝙞𝙦𝙪𝙚 𝙋𝙡𝙖𝙨𝙩𝙞𝙘 𝙏𝙧𝙖𝙙𝙚𝙧𝙨 𝙞𝙨 𝙫𝙚𝙧𝙮 𝙛𝙖𝙢𝙤𝙪𝙨 𝙛𝙤𝙧 𝙢𝙖𝙣𝙪𝙛𝙖𝙘𝙩𝙪𝙧𝙞𝙣𝙜 𝙩𝙝𝙚𝙞𝙧 𝙥𝙧𝙤𝙙𝙪𝙘𝙩𝙨. 𝙒𝙚 𝙝𝙖𝙫𝙚 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙥𝙡𝙖𝙨𝙩𝙞𝙘 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙪𝙨𝙚𝙙 𝙞𝙣 𝙖𝙪𝙩𝙤𝙢𝙤𝙩𝙞𝙫𝙚 𝙖𝙣𝙙 𝙖𝙪𝙩𝙤 𝙥𝙖𝙧𝙩𝙨 𝙖𝙣𝙙 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙛𝙖𝙢𝙤𝙪𝙨 𝙘𝙤𝙢𝙥𝙖𝙣𝙞𝙚𝙨 𝙗𝙪𝙮 𝙩𝙝𝙚 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙛𝙧𝙤𝙢 𝙪𝙨.
Over the 10 years, we have gained a strong foothold in the market due to our range's high quality, competitive prices, and time-lined delivery schedules.
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...Autohaus Service and Sales
Learn what "PARKTRONIC Inoperative, See Owner's Manual" means for your Mercedes-Benz. This message indicates a malfunction in the parking assistance system, potentially due to sensor issues or electrical faults. Prompt attention is crucial to ensure safety and functionality. Follow steps outlined for diagnosis and repair in the owner's manual.
What Does the Active Steering Malfunction Warning Mean for Your BMWTanner Motors
Discover the reasons why your BMW’s Active Steering malfunction warning might come on. From electrical glitches to mechanical failures and software anomalies, addressing these promptly with professional inspection and maintenance ensures continued safety and performance on the road, maintaining the integrity of your driving experience.
Core technology of Hyundai Motor Group's EV platform 'E-GMP'Hyundai Motor Group
What’s the force behind Hyundai Motor Group's EV performance and quality?
Maximized driving performance and quick charging time through high-density battery pack and fast charging technology and applicable to various vehicle types!
Discover more about Hyundai Motor Group’s EV platform ‘E-GMP’!
Why Is Your BMW X3 Hood Not Responding To Release CommandsDart Auto
Experiencing difficulty opening your BMW X3's hood? This guide explores potential issues like mechanical obstruction, hood release mechanism failure, electrical problems, and emergency release malfunctions. Troubleshooting tips include basic checks, clearing obstructions, applying pressure, and using the emergency release.
Comprehensive program for Agricultural Finance, the Automotive Sector, and Empowerment . We will define the full scope and provide a detailed two-week plan for identifying strategic partners in each area within Limpopo, including target areas.:
1. Agricultural : Supporting Primary and Secondary Agriculture
• Scope: Provide support solutions to enhance agricultural productivity and sustainability.
• Target Areas: Polokwane, Tzaneen, Thohoyandou, Makhado, and Giyani.
2. Automotive Sector: Partnerships with Mechanics and Panel Beater Shops
• Scope: Develop collaborations with automotive service providers to improve service quality and business operations.
• Target Areas: Polokwane, Lephalale, Mokopane, Phalaborwa, and Bela-Bela.
3. Empowerment : Focusing on Women Empowerment
• Scope: Provide business support support and training to women-owned businesses, promoting economic inclusion.
• Target Areas: Polokwane, Thohoyandou, Musina, Burgersfort, and Louis Trichardt.
We will also prioritize Industrial Economic Zone areas and their priorities.
Sign up on https://profilesmes.online/welcome/
To be eligible:
1. You must have a registered business and operate in Limpopo
2. Generate revenue
3. Sectors : Agriculture ( primary and secondary) and Automative
Women and Youth are encouraged to apply even if you don't fall in those sectors.
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs AttentionBertini's German Motors
IBS monitors and manages your BMW’s battery performance. If it malfunctions, you will have to deal with an array of electrical issues in your vehicle. Recognize warning signs like dimming headlights, frequent battery replacements, and electrical malfunctions to address potential IBS issues promptly.
In this presentation, we have discussed a very important feature of BMW X5 cars… the Comfort Access. Things that can significantly limit its functionality. And things that you can try to restore the functionality of such a convenient feature of your vehicle.
Symptoms like intermittent starting and key recognition errors signal potential problems with your Mercedes’ EIS. Use diagnostic steps like error code checks and spare key tests. Professional diagnosis and solutions like EIS replacement ensure safe driving. Consult a qualified technician for accurate diagnosis and repair.
What Exactly Is The Common Rail Direct Injection System & How Does It WorkMotor Cars International
Learn about Common Rail Direct Injection (CRDi) - the revolutionary technology that has made diesel engines more efficient. Explore its workings, advantages like enhanced fuel efficiency and increased power output, along with drawbacks such as complexity and higher initial cost. Compare CRDi with traditional diesel engines and discover why it's the preferred choice for modern engines.
12. Breaking Down
Bus Transport Costs
• Operating and maintenance
- Fixed and Variable
• Capital
- Implementation
- Ongoing replacement/renewal
- Bringing system to state of good repair
13. Total Cost = Operating Cost +
Capital Cost
• Operating / Maintenance Cost are for items
consumed in less than one year
e.g., Labor , fuel , vehicle replacement parts
• Capital Costs are expenses for long term assets,
expressed as depreciation
e.g., buses , maintenance depots , stations
14. Initial Capital
•
•
•
•
•
•
•
Round Trip Distance = 5Km per trip
Number of Routes = 8
Number of trips = 8 (hourly)
Bus Capacity = 60
Total load =1200 per hr
Number of buses = 20
Cost of buses = 15 * 20 lacs = 3 Crs.
15. Estimated Running Cost
•
•
•
•
Bus Mileage = 4kmpl
Distance travelled = 5 * 8 * 20 = 800 km
Diesel Requirement = 200 ltrs per day
Fuel Cost = 200 * 60 = INR12,000 per day
16. Annual Maintenance Cost
•
•
•
•
For Non AC buses = INR 4 per km
Distance travelled = 5 * 8 * 365 = 14600
AMC = INR 58,400 per bus
Total AMC = INR 11,68,000
20. Our Proposal
•
•
•
•
•
Campus Wide Cycle Sharing Program
8,000 green , blue , red , yellow cycles
Oppa KGP-style
Cycles spread all around campus
Foster inter-building collaboration
21. Advantages
• Allows people to depart from point "A" and
arrive at point "B" free from the worries of
ownership
• No Dependency for movement
• No Theft Concerns
• Relief for visitors in campus
• Green Campus
22.
23.
24.
25. Cost Estimation of Cycle
• Total initial investment ~ INR 1.5 crs.
Working Capital
• Annual Maintenance Cost for cycles ~ INR 12
lacs
26.
27. *Calculation based on large buses emitting 515g/km of CO2
Source : www.cseindia.org/userfiles/May_2009.pdf
30. Thank You
Imagine a cycle there, whenever u
need it
Abhishek Agarwal
Pulak Sarangi
Indian Institute of Technology, Kharagpur
Editor's Notes
With kgp in eye & change in mind
When we talk of change we could think of a galaxy of ways
We chose the path to change the intra campus transportion
Change cud be green or anti-green
One of the proposed change was introduction of bus system
Now we look deep into the system
On breaking down the costs we see that the cost comprises of 2 components-
Animated vertical list merging with pictures
(Intermediate)
To reproduce the SmartArt effects on this slide, do the following:
On the Home tab, in the Slides group, click Layout, and then click Blank.
On the Insert tab, in the Illustrations group, click SmartArt. In the Choose a SmartArt Graphic dialog box, in the left pane, click List. In the List pane, double-click Vertical Picture List (fifth row, first option from the left) to insert the graphic into the slide.
To create a fourth shape in the graphic, select the third shape from the top, and then under SmartArt Tools, on the Design tab, in the Create Graphic group, click the arrow next to Add Shape, and then click Add Shape Before. Repeat this process to create a fifth shape.
Select the graphic. Under SmartArt Tools, on the Format tab, click Size, and then do the following:
In the Height box, enter 6.38”.
In the Width box, enter 7.91”.
Under SmartArt Tools, on the Format tab, in the Arrange group, click Align, and then do the following:
Click Align to Slide.
Click Align Middle.
Click Align Center.
Select the graphic, and then click one of the arrows on the left border. In the Type your text here dialog box, click each of the second-level bullets and then press DELETE until there are only three first-level bullets remaining (one for each shape). Enter text for each shape into the first-level bullets.
On the slide, select the graphic. On the Home tab, in the Font group, select 14 from the Font Size list.
Under SmartArt Tools, on the Design tab, in the SmartArt Styles group, click More, and then under Best Match for Document click Moderate Effect (fourth option from the left).
On the Design tab (the regular Design tab, not that under the SmartArt Tools contextual tab), in the Themes group, click Colors, and then click Civic. (Note: If this action is taken in a PowerPoint presentation containing more than one slide, the theme colors will be applied to all of the slides.)
Under SmartArt Tools, on the Design tab, in the SmartArt Styles group, click Change Colors, and then under Colorful click Colorful Range – Accent Colors 3 to 4 (third option from the left).
Click each of the five picture placeholders in the graphic, and then in the Insert Picture dialog box, select a picture and click Insert.
Press and hold CTRL, and then select all five of the pictures on the slide. Under SmartArt Tools, on the Format tab, in the Shapes group, click Change Shape, and then under Rectangles click Round Diagonal Corner Rectangle (ninth option from the left).
Under SmartArt Tools, on the Format tab, in the Shape Styles group, click Shape Effects, point to Glow, and then do the following:
Under Glow Variations, select 5 pt glow, Accent color 1, (first row, first option from the left).
Point to More Glow Colors, and then under Theme Colors click White, Background 1 (first row, first option from the left).
Press and hold CTRL, and then select all of the larger rounded rectangles. Under SmartArt Tools, on the Format tab, in the Shapes group, click Change Shape, and then under Rectangles click Round Diagonal Corner Rectangle (ninth option from the left).
To reproduce the animation effects on this slide, do the following:
On the Animations tab, in the Advanced Animations group, click Animation Pane.
On the slide, select the graphic. On the Animations tab, in the Animation group, click the More arrow at the Effects Gallery, and under Entrance, click Fade.
In the Timing group, in the Duration list, enter 01.00.
In the Advanced Animations group, click Add Animation, and under Motion Paths, click Lines, then do the following:
In the Animation group, click Effect Options and then click Right.
In the Timing group, in the Start list, select With Previous.
Also in the Timing group, in the Duration list, select 01.00.
On the slide, right-click the right motion path and then click Reverse Path Direction.
Press and hold CTRL, and then select the two animation effects in the Animation Pane. In the Animation group, click Effect Options and under Sequence, select One by One.
Also in the Animation Pane, click the double arrows under each effect to expand the list of effects. Select the first animation effect (fade effect for the first rectangle). On the Animations tab, in the Timing group, in the Start list, select With Previous.
Also in the Animation Pane, select the 11th animation effect (motion path for the first picture). On the slide, point to the starting point (green arrow) of the selected motion path until the cursor becomes a two-headed arrow. Press and hold SHIFT to constrain the path to a straight horizontal line, and then drag the starting point to the left of the endpoint (red arrow).
Also in the Animation Pane, do the following:
Drag the 11th effect until it is second in the list of effects.
Drag the 12th effect (motion path for the first large rectangle) until it is fourth in the list of effects.
Also in the Animation Pane, select the 13th animation effect (motion path for the second picture). On the slide, point to the starting point (green arrow) of the selected motion path until the cursor becomes a two-headed arrow. Press and hold SHIFT, and then drag the starting point to the left of the endpoint (red arrow), into the same position as the green arrow for the first picture motion path.
Also in the Animation Pane, do the following:
Drag the 13th animation effect until it is sixth in the list of effects. On the Animations tab, in the Timing group, in the Start list, select With Previous.
Drag the 14th animation effect (motion path for the second large rectangle) until it is eighth in the list of effects.
In the Animation Pane, select the 15th animation effect (motion path for the third picture). On the slide, point to the starting point (green arrow) of the selected motion path until the cursor becomes a two-headed arrow. Press and hold SHIFT, and then drag the starting point to the left of the endpoint (red arrow), into the same position as the starting point for the first picture motion path.
Also in the Animation Pane, do the following:
Drag the 15th animation effect until it is 10th in the list of effects. On the Animations tab, in the Timing group, in the Start list, select With Previous.
Drag the 16th animation effect (motion path for the third large rectangle) until it is 12th in the list of effects.
Select the 17th animation effect (motion path for the fourth picture). On the slide, point to the starting point (green arrow) of the selected motion path until the cursor becomes a two-headed arrow. Press and hold SHIFT, and then drag the starting point to the left of the endpoint (red arrow), into the same position as the starting point for the first picture motion path.
Also in the Animation Pane, do the following:
Drag the 17th animation effect until it is 14th in the list of effects. On the Animations tab, in the Timing group, in the Start list, select With Previous.
Drag the 18th animation effect (motion path for the fourth large rectangle) until it is 16th in the list of effects.
Select the 19th animation effect (motion path for the fifth picture). On the slide, point to the starting point (green arrow) of the selected motion path until the cursor becomes a two-headed arrow. Press and hold SHIFT, and then drag the starting point to the left of the endpoint (red arrow), into the same position as the starting point for the first picture motion path.
Also in the Animation Pane, drag the 19th animation effect until it is 18th in the list of effects. On the Animations tab, in the Timing group, in the Start list, select With Previous.
To reproduce the background effects on this slide, do the following:
Right-click the slide background area, and then click Format Background. In the Format Background dialog box, click Fill in the left pane, select Gradient fill in the Fill pane, and then do the following:
In the Type list, select Radial.
Click the button next to Direction, and then click From Top Left Corner (fifth option from the left) in the drop-down list.
Under Gradient stops, click Add gradient stop or Remove gradient stop until two stops appear on the slider, then customize the gradient stops as follows:
Select the first stop on the slider, and then do the following:
In the Position box, enter 0%.
Click the button next to Color, and then under Theme Colors click White, Background 1 (first row, first option from the left).
Select the last stop on the slider, and then do the following:
In the Position box, enter 100%.
Click the button next to Color, and then under Theme Colors click White, Background 1, Darker 25% (fourth row, first option from the left).