SlideShare a Scribd company logo
Bus System
•
•
•
•
•

Bus Routes
Initial Capital
Running Cost
Outreach
Ecological Impact
Breaking Down
Bus Transport Costs
• Operating and maintenance

- Fixed and Variable
• Capital
- Implementation
- Ongoing replacement/renewal
- Bringing system to state of good repair
Total Cost = Operating Cost +
Capital Cost
• Operating / Maintenance Cost are for items
consumed in less than one year
e.g., Labor , fuel , vehicle replacement parts

• Capital Costs are expenses for long term assets,
expressed as depreciation
e.g., buses , maintenance depots , stations
Initial Capital
•
•
•
•
•
•
•

Round Trip Distance = 5Km per trip
Number of Routes = 8
Number of trips = 8 (hourly)
Bus Capacity = 60
Total load =1200 per hr
Number of buses = 20
Cost of buses = 15 * 20 lacs = 3 Crs.
Estimated Running Cost
•
•
•
•

Bus Mileage = 4kmpl
Distance travelled = 5 * 8 * 20 = 800 km
Diesel Requirement = 200 ltrs per day
Fuel Cost = 200 * 60 = INR12,000 per day
Annual Maintenance Cost

•
•
•
•

For Non AC buses = INR 4 per km
Distance travelled = 5 * 8 * 365 = 14600
AMC = INR 58,400 per bus
Total AMC = INR 11,68,000
Labor Cost
• Driver + Helper = INR 20,000 per month
Total Variable Cost
• Annual Fuel Cost = INR 43,80,000
• AMC = INR 11,68,000
• Annual Labor Cost = INR 48,00,000
• Total = INR 1,03,48,000
Our Proposal
•
•
•
•
•

Campus Wide Cycle Sharing Program
8,000 green , blue , red , yellow cycles
Oppa KGP-style
Cycles spread all around campus
Foster inter-building collaboration
Advantages
• Allows people to depart from point "A" and
arrive at point "B" free from the worries of
ownership
• No Dependency for movement
• No Theft Concerns
• Relief for visitors in campus
• Green Campus
Cost Estimation of Cycle
• Total initial investment ~ INR 1.5 crs.

Working Capital
• Annual Maintenance Cost for cycles ~ INR 12
lacs
*Calculation based on large buses emitting 515g/km of CO2
Source : www.cseindia.org/userfiles/May_2009.pdf
Success Stories
•
•
•
•
•

Google Cycleplex
New York University
University of Wisconsin
University of Nebraska
Namma Cycle - IISc
Thank You
Imagine a cycle there, whenever u
need it
Abhishek Agarwal
Pulak Sarangi
Indian Institute of Technology, Kharagpur

More Related Content

Viewers also liked

Artistic textures
Artistic texturesArtistic textures
Pentaksiran
PentaksiranPentaksiran
PentaksiranWs Wi
 
New student orientation! (without videos)
New student orientation! (without videos)New student orientation! (without videos)
New student orientation! (without videos)
Mazi Mutafa
 

Viewers also liked (8)

Artistic textures
Artistic texturesArtistic textures
Artistic textures
 
Interpreting a painting
Interpreting a paintingInterpreting a painting
Interpreting a painting
 
Pentaksiran
PentaksiranPentaksiran
Pentaksiran
 
Quadrilaterals in works of art
Quadrilaterals in works of artQuadrilaterals in works of art
Quadrilaterals in works of art
 
Ejercicios 9 y 10 de baldor nuevo
Ejercicios 9 y 10 de baldor nuevo Ejercicios 9 y 10 de baldor nuevo
Ejercicios 9 y 10 de baldor nuevo
 
New student orientation! (without videos)
New student orientation! (without videos)New student orientation! (without videos)
New student orientation! (without videos)
 
Ejercicios 9 y 10 de baldor nuevo
Ejercicios 9 y 10 de baldor nuevo Ejercicios 9 y 10 de baldor nuevo
Ejercicios 9 y 10 de baldor nuevo
 
Compositions using a triangular net
Compositions using a triangular netCompositions using a triangular net
Compositions using a triangular net
 

Similar to Bike Sharing

Harvard Transportation Case Study: Developing a Regional Bike Sharing Program
Harvard Transportation Case Study: Developing a Regional Bike Sharing ProgramHarvard Transportation Case Study: Developing a Regional Bike Sharing Program
Harvard Transportation Case Study: Developing a Regional Bike Sharing ProgramHarvard Campus Services
 
APSRTC presentation
APSRTC presentationAPSRTC presentation
APSRTC presentation
Kunal Chaudhary
 
Ompresentationfinal 140318024702-phpapp02
Ompresentationfinal 140318024702-phpapp02Ompresentationfinal 140318024702-phpapp02
Ompresentationfinal 140318024702-phpapp02
varsha nihanth lade
 
Ompresentationfinal 140318024702-phpapp02
Ompresentationfinal 140318024702-phpapp02Ompresentationfinal 140318024702-phpapp02
Ompresentationfinal 140318024702-phpapp02
varsha nihanth lade
 
USPS - Optimizing Highway Transportation
USPS - Optimizing Highway TransportationUSPS - Optimizing Highway Transportation
USPS - Optimizing Highway Transportation
Harris Weinstein
 
Operations and Services Costing
Operations and Services Costing Operations and Services Costing
Operations and Services Costing
Shreyansh Kejriwal
 
Operating costing
Operating costingOperating costing
Operating costing
daminigyanchandani
 
Cycling Club Business Plan
Cycling Club Business PlanCycling Club Business Plan
Cycling Club Business Plan
19ashish87
 
Pedal-It presentation
Pedal-It presentationPedal-It presentation
Pedal-It presentation
Ryan Pal
 
BRTS Association of Indian and Asian Cities, and Ahmedabad BRTS
BRTS Association of Indian and Asian Cities, and Ahmedabad BRTSBRTS Association of Indian and Asian Cities, and Ahmedabad BRTS
BRTS Association of Indian and Asian Cities, and Ahmedabad BRTS
WRI Ross Center for Sustainable Cities
 
STEP Annual Conference 2018 - Gordon Manson, How SME’s can Flick the Switch o...
STEP Annual Conference 2018 - Gordon Manson, How SME’s can Flick the Switch o...STEP Annual Conference 2018 - Gordon Manson, How SME’s can Flick the Switch o...
STEP Annual Conference 2018 - Gordon Manson, How SME’s can Flick the Switch o...
STEP_scotland
 
Mobilising finance for clean public urban transport
Mobilising finance for clean public urban transportMobilising finance for clean public urban transport
Mobilising finance for clean public urban transport
OECD Environment
 
City Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IAS
City Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IASCity Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IAS
City Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IAS
WRI Ross Center for Sustainable Cities
 
ANDREW BIRD: Better Connected Live 2016
ANDREW BIRD: Better Connected Live 2016ANDREW BIRD: Better Connected Live 2016
ANDREW BIRD: Better Connected Live 2016
Boilerhouse Communications
 
ANDREW BIRD: Better Connected Live 2016
ANDREW BIRD: Better Connected Live 2016ANDREW BIRD: Better Connected Live 2016
ANDREW BIRD: Better Connected Live 2016
Boilerhouse Communications
 
Bus Karo: Bus Depot Design Guideline
Bus Karo: Bus Depot Design Guideline Bus Karo: Bus Depot Design Guideline
Bus Karo: Bus Depot Design Guideline
WRI India
 
Bus Karo: Bus Depot Design Guideline (Session VII)
Bus Karo: Bus Depot Design Guideline (Session VII)Bus Karo: Bus Depot Design Guideline (Session VII)
Bus Karo: Bus Depot Design Guideline (Session VII)
WRI Ross Center for Sustainable Cities
 
Ghana Priorities: Urban Transportation
Ghana Priorities: Urban TransportationGhana Priorities: Urban Transportation
Ghana Priorities: Urban Transportation
Copenhagen_Consensus
 
STEP on the Bus - Session 2.1 - Lothian Buses' Journey to Zero Emissions_Emma...
STEP on the Bus - Session 2.1 - Lothian Buses' Journey to Zero Emissions_Emma...STEP on the Bus - Session 2.1 - Lothian Buses' Journey to Zero Emissions_Emma...
STEP on the Bus - Session 2.1 - Lothian Buses' Journey to Zero Emissions_Emma...
STEP_scotland
 
Economic Benefits of Cycling Infrastructure
Economic Benefits of Cycling InfrastructureEconomic Benefits of Cycling Infrastructure
Economic Benefits of Cycling Infrastructure
JumpingJaq
 

Similar to Bike Sharing (20)

Harvard Transportation Case Study: Developing a Regional Bike Sharing Program
Harvard Transportation Case Study: Developing a Regional Bike Sharing ProgramHarvard Transportation Case Study: Developing a Regional Bike Sharing Program
Harvard Transportation Case Study: Developing a Regional Bike Sharing Program
 
APSRTC presentation
APSRTC presentationAPSRTC presentation
APSRTC presentation
 
Ompresentationfinal 140318024702-phpapp02
Ompresentationfinal 140318024702-phpapp02Ompresentationfinal 140318024702-phpapp02
Ompresentationfinal 140318024702-phpapp02
 
Ompresentationfinal 140318024702-phpapp02
Ompresentationfinal 140318024702-phpapp02Ompresentationfinal 140318024702-phpapp02
Ompresentationfinal 140318024702-phpapp02
 
USPS - Optimizing Highway Transportation
USPS - Optimizing Highway TransportationUSPS - Optimizing Highway Transportation
USPS - Optimizing Highway Transportation
 
Operations and Services Costing
Operations and Services Costing Operations and Services Costing
Operations and Services Costing
 
Operating costing
Operating costingOperating costing
Operating costing
 
Cycling Club Business Plan
Cycling Club Business PlanCycling Club Business Plan
Cycling Club Business Plan
 
Pedal-It presentation
Pedal-It presentationPedal-It presentation
Pedal-It presentation
 
BRTS Association of Indian and Asian Cities, and Ahmedabad BRTS
BRTS Association of Indian and Asian Cities, and Ahmedabad BRTSBRTS Association of Indian and Asian Cities, and Ahmedabad BRTS
BRTS Association of Indian and Asian Cities, and Ahmedabad BRTS
 
STEP Annual Conference 2018 - Gordon Manson, How SME’s can Flick the Switch o...
STEP Annual Conference 2018 - Gordon Manson, How SME’s can Flick the Switch o...STEP Annual Conference 2018 - Gordon Manson, How SME’s can Flick the Switch o...
STEP Annual Conference 2018 - Gordon Manson, How SME’s can Flick the Switch o...
 
Mobilising finance for clean public urban transport
Mobilising finance for clean public urban transportMobilising finance for clean public urban transport
Mobilising finance for clean public urban transport
 
City Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IAS
City Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IASCity Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IAS
City Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IAS
 
ANDREW BIRD: Better Connected Live 2016
ANDREW BIRD: Better Connected Live 2016ANDREW BIRD: Better Connected Live 2016
ANDREW BIRD: Better Connected Live 2016
 
ANDREW BIRD: Better Connected Live 2016
ANDREW BIRD: Better Connected Live 2016ANDREW BIRD: Better Connected Live 2016
ANDREW BIRD: Better Connected Live 2016
 
Bus Karo: Bus Depot Design Guideline
Bus Karo: Bus Depot Design Guideline Bus Karo: Bus Depot Design Guideline
Bus Karo: Bus Depot Design Guideline
 
Bus Karo: Bus Depot Design Guideline (Session VII)
Bus Karo: Bus Depot Design Guideline (Session VII)Bus Karo: Bus Depot Design Guideline (Session VII)
Bus Karo: Bus Depot Design Guideline (Session VII)
 
Ghana Priorities: Urban Transportation
Ghana Priorities: Urban TransportationGhana Priorities: Urban Transportation
Ghana Priorities: Urban Transportation
 
STEP on the Bus - Session 2.1 - Lothian Buses' Journey to Zero Emissions_Emma...
STEP on the Bus - Session 2.1 - Lothian Buses' Journey to Zero Emissions_Emma...STEP on the Bus - Session 2.1 - Lothian Buses' Journey to Zero Emissions_Emma...
STEP on the Bus - Session 2.1 - Lothian Buses' Journey to Zero Emissions_Emma...
 
Economic Benefits of Cycling Infrastructure
Economic Benefits of Cycling InfrastructureEconomic Benefits of Cycling Infrastructure
Economic Benefits of Cycling Infrastructure
 

Recently uploaded

Things to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your carThings to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your car
jennifermiller8137
 
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
European Service Center
 
Antique Plastic Traders Company Profile
Antique Plastic Traders Company ProfileAntique Plastic Traders Company Profile
Antique Plastic Traders Company Profile
Antique Plastic Traders
 
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtycccccccccccccccccccccccccccccccccccccccccccccccccccccccgtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
4thzenzstar
 
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
Autohaus Service and Sales
 
What Does the Active Steering Malfunction Warning Mean for Your BMW
What Does the Active Steering Malfunction Warning Mean for Your BMWWhat Does the Active Steering Malfunction Warning Mean for Your BMW
What Does the Active Steering Malfunction Warning Mean for Your BMW
Tanner Motors
 
Ec460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdfEc460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdf
Excavator
 
Tyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEATTyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEAT
kshamashah95
 
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Hyundai Motor Group
 
Why Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release CommandsWhy Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release Commands
Dart Auto
 
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs  Consulting SMEs.pptxEmpowering Limpopo Entrepreneurs  Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Precious Mvulane CA (SA),RA
 
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
Bertini's German Motors
 
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptxStatistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
coc7987515756
 
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
amvovau
 
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out HereWhy Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Masters European & Gapanese Auto Repair
 
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to TellWondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Vic Auto Collision & Repair
 
Ec330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdfEc330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdf
Excavator
 
What Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It WorkWhat Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It Work
Motor Cars International
 
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
psavhef
 

Recently uploaded (19)

Things to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your carThings to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your car
 
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
 
Antique Plastic Traders Company Profile
Antique Plastic Traders Company ProfileAntique Plastic Traders Company Profile
Antique Plastic Traders Company Profile
 
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtycccccccccccccccccccccccccccccccccccccccccccccccccccccccgtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
 
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
 
What Does the Active Steering Malfunction Warning Mean for Your BMW
What Does the Active Steering Malfunction Warning Mean for Your BMWWhat Does the Active Steering Malfunction Warning Mean for Your BMW
What Does the Active Steering Malfunction Warning Mean for Your BMW
 
Ec460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdfEc460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdf
 
Tyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEATTyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEAT
 
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
 
Why Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release CommandsWhy Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release Commands
 
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs  Consulting SMEs.pptxEmpowering Limpopo Entrepreneurs  Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
 
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
 
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptxStatistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
 
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
 
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out HereWhy Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
 
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to TellWondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
 
Ec330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdfEc330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdf
 
What Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It WorkWhat Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It Work
 
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
 

Bike Sharing

  • 1.
  • 2.
  • 3.
  • 4. Bus System • • • • • Bus Routes Initial Capital Running Cost Outreach Ecological Impact
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12. Breaking Down Bus Transport Costs • Operating and maintenance - Fixed and Variable • Capital - Implementation - Ongoing replacement/renewal - Bringing system to state of good repair
  • 13. Total Cost = Operating Cost + Capital Cost • Operating / Maintenance Cost are for items consumed in less than one year e.g., Labor , fuel , vehicle replacement parts • Capital Costs are expenses for long term assets, expressed as depreciation e.g., buses , maintenance depots , stations
  • 14. Initial Capital • • • • • • • Round Trip Distance = 5Km per trip Number of Routes = 8 Number of trips = 8 (hourly) Bus Capacity = 60 Total load =1200 per hr Number of buses = 20 Cost of buses = 15 * 20 lacs = 3 Crs.
  • 15. Estimated Running Cost • • • • Bus Mileage = 4kmpl Distance travelled = 5 * 8 * 20 = 800 km Diesel Requirement = 200 ltrs per day Fuel Cost = 200 * 60 = INR12,000 per day
  • 16. Annual Maintenance Cost • • • • For Non AC buses = INR 4 per km Distance travelled = 5 * 8 * 365 = 14600 AMC = INR 58,400 per bus Total AMC = INR 11,68,000
  • 17. Labor Cost • Driver + Helper = INR 20,000 per month
  • 18. Total Variable Cost • Annual Fuel Cost = INR 43,80,000 • AMC = INR 11,68,000 • Annual Labor Cost = INR 48,00,000 • Total = INR 1,03,48,000
  • 19.
  • 20. Our Proposal • • • • • Campus Wide Cycle Sharing Program 8,000 green , blue , red , yellow cycles Oppa KGP-style Cycles spread all around campus Foster inter-building collaboration
  • 21. Advantages • Allows people to depart from point "A" and arrive at point "B" free from the worries of ownership • No Dependency for movement • No Theft Concerns • Relief for visitors in campus • Green Campus
  • 22.
  • 23.
  • 24.
  • 25. Cost Estimation of Cycle • Total initial investment ~ INR 1.5 crs. Working Capital • Annual Maintenance Cost for cycles ~ INR 12 lacs
  • 26.
  • 27. *Calculation based on large buses emitting 515g/km of CO2 Source : www.cseindia.org/userfiles/May_2009.pdf
  • 28.
  • 29. Success Stories • • • • • Google Cycleplex New York University University of Wisconsin University of Nebraska Namma Cycle - IISc
  • 30. Thank You Imagine a cycle there, whenever u need it Abhishek Agarwal Pulak Sarangi Indian Institute of Technology, Kharagpur

Editor's Notes

  1. With kgp in eye & change in mind
  2. When we talk of change we could think of a galaxy of ways We chose the path to change the intra campus transportion Change cud be green or anti-green
  3. One of the proposed change was introduction of bus system
  4. Now we look deep into the system On breaking down the costs we see that the cost comprises of 2 components-
  5. Animated vertical list merging with pictures (Intermediate) To reproduce the SmartArt effects on this slide, do the following: On the Home tab, in the Slides group, click Layout, and then click Blank. On the Insert tab, in the Illustrations group, click SmartArt. In the Choose a SmartArt Graphic dialog box, in the left pane, click List. In the List pane, double-click Vertical Picture List (fifth row, first option from the left) to insert the graphic into the slide. To create a fourth shape in the graphic, select the third shape from the top, and then under SmartArt Tools, on the Design tab, in the Create Graphic group, click the arrow next to Add Shape, and then click Add Shape Before. Repeat this process to create a fifth shape. Select the graphic. Under SmartArt Tools, on the Format tab, click Size, and then do the following: In the Height box, enter 6.38”. In the Width box, enter 7.91”. Under SmartArt Tools, on the Format tab, in the Arrange group, click Align, and then do the following: Click Align to Slide. Click Align Middle. Click Align Center. Select the graphic, and then click one of the arrows on the left border. In the Type your text here dialog box, click each of the second-level bullets and then press DELETE until there are only three first-level bullets remaining (one for each shape). Enter text for each shape into the first-level bullets. On the slide, select the graphic. On the Home tab, in the Font group, select 14 from the Font Size list. Under SmartArt Tools, on the Design tab, in the SmartArt Styles group, click More, and then under Best Match for Document click Moderate Effect (fourth option from the left). On the Design tab (the regular Design tab, not that under the SmartArt Tools contextual tab), in the Themes group, click Colors, and then click Civic. (Note: If this action is taken in a PowerPoint presentation containing more than one slide, the theme colors will be applied to all of the slides.) Under SmartArt Tools, on the Design tab, in the SmartArt Styles group, click Change Colors, and then under Colorful click Colorful Range – Accent Colors 3 to 4 (third option from the left). Click each of the five picture placeholders in the graphic, and then in the Insert Picture dialog box, select a picture and click Insert. Press and hold CTRL, and then select all five of the pictures on the slide. Under SmartArt Tools, on the Format tab, in the Shapes group, click Change Shape, and then under Rectangles click Round Diagonal Corner Rectangle (ninth option from the left). Under SmartArt Tools, on the Format tab, in the Shape Styles group, click Shape Effects, point to Glow, and then do the following: Under Glow Variations, select 5 pt glow, Accent color 1, (first row, first option from the left). Point to More Glow Colors, and then under Theme Colors click White, Background 1 (first row, first option from the left). Press and hold CTRL, and then select all of the larger rounded rectangles. Under SmartArt Tools, on the Format tab, in the Shapes group, click Change Shape, and then under Rectangles click Round Diagonal Corner Rectangle (ninth option from the left). To reproduce the animation effects on this slide, do the following: On the Animations tab, in the Advanced Animations group, click Animation Pane. On the slide, select the graphic. On the Animations tab, in the Animation group, click the More arrow at the Effects Gallery, and under Entrance, click Fade. In the Timing group, in the Duration list, enter 01.00. In the Advanced Animations group, click Add Animation, and under Motion Paths, click Lines, then do the following: In the Animation group, click Effect Options and then click Right. In the Timing group, in the Start list, select With Previous. Also in the Timing group, in the Duration list, select 01.00. On the slide, right-click the right motion path and then click Reverse Path Direction. Press and hold CTRL, and then select the two animation effects in the Animation Pane. In the Animation group, click Effect Options and under Sequence, select One by One. Also in the Animation Pane, click the double arrows under each effect to expand the list of effects. Select the first animation effect (fade effect for the first rectangle). On the Animations tab, in the Timing group, in the Start list, select With Previous. Also in the Animation Pane, select the 11th animation effect (motion path for the first picture). On the slide, point to the starting point (green arrow) of the selected motion path until the cursor becomes a two-headed arrow. Press and hold SHIFT to constrain the path to a straight horizontal line, and then drag the starting point to the left of the endpoint (red arrow). Also in the Animation Pane, do the following: Drag the 11th effect until it is second in the list of effects. Drag the 12th effect (motion path for the first large rectangle) until it is fourth in the list of effects. Also in the Animation Pane, select the 13th animation effect (motion path for the second picture). On the slide, point to the starting point (green arrow) of the selected motion path until the cursor becomes a two-headed arrow. Press and hold SHIFT, and then drag the starting point to the left of the endpoint (red arrow), into the same position as the green arrow for the first picture motion path. Also in the Animation Pane, do the following: Drag the 13th animation effect until it is sixth in the list of effects. On the Animations tab, in the Timing group, in the Start list, select With Previous. Drag the 14th animation effect (motion path for the second large rectangle) until it is eighth in the list of effects. In the Animation Pane, select the 15th animation effect (motion path for the third picture). On the slide, point to the starting point (green arrow) of the selected motion path until the cursor becomes a two-headed arrow. Press and hold SHIFT, and then drag the starting point to the left of the endpoint (red arrow), into the same position as the starting point for the first picture motion path. Also in the Animation Pane, do the following: Drag the 15th animation effect until it is 10th in the list of effects. On the Animations tab, in the Timing group, in the Start list, select With Previous. Drag the 16th animation effect (motion path for the third large rectangle) until it is 12th in the list of effects. Select the 17th animation effect (motion path for the fourth picture). On the slide, point to the starting point (green arrow) of the selected motion path until the cursor becomes a two-headed arrow. Press and hold SHIFT, and then drag the starting point to the left of the endpoint (red arrow), into the same position as the starting point for the first picture motion path. Also in the Animation Pane, do the following: Drag the 17th animation effect until it is 14th in the list of effects. On the Animations tab, in the Timing group, in the Start list, select With Previous. Drag the 18th animation effect (motion path for the fourth large rectangle) until it is 16th in the list of effects. Select the 19th animation effect (motion path for the fifth picture). On the slide, point to the starting point (green arrow) of the selected motion path until the cursor becomes a two-headed arrow. Press and hold SHIFT, and then drag the starting point to the left of the endpoint (red arrow), into the same position as the starting point for the first picture motion path. Also in the Animation Pane, drag the 19th animation effect until it is 18th in the list of effects. On the Animations tab, in the Timing group, in the Start list, select With Previous. To reproduce the background effects on this slide, do the following: Right-click the slide background area, and then click Format Background. In the Format Background dialog box, click Fill in the left pane, select Gradient fill in the Fill pane, and then do the following: In the Type list, select Radial. Click the button next to Direction, and then click From Top Left Corner (fifth option from the left) in the drop-down list. Under Gradient stops, click Add gradient stop or Remove gradient stop until two stops appear on the slider, then customize the gradient stops as follows: Select the first stop on the slider, and then do the following: In the Position box, enter 0%. Click the button next to Color, and then under Theme Colors click White, Background 1 (first row, first option from the left). Select the last stop on the slider, and then do the following: In the Position box, enter 100%. Click the button next to Color, and then under Theme Colors click White, Background 1, Darker 25% (fourth row, first option from the left).