This document is a summer training report submitted by Sujeet Chaudhary describing their 6-week industrial training at the Northern Eastern Railway Carriage and Wagon workshop in Gorakhpur, India. The report focuses on the painting process for LHB coaches, including surface preparation such as cleaning, grinding, and application of a body filler; application of a two-component epoxy zinc phosphate primer; multi-coat painting with putty and finishing; and inspection methods such as using a gloss meter and salt spray testing. The training provided hands-on experience of best practices for achieving a high quality exterior paint job on railway coaches.