2. STUDENT CENTER
DATE:- 6TH JESTHA 2078
3RD YEAR 2ND PART
1. INTRODUCTION
A STUDENT CENTER IS A TYPE OF BUILDING
FOUND ON UNIVERSITY AND SOME HIGH
SCHOOL CAMPUSES WHICH PROVIDE
SERVICES, PROGRAMS AND OFFERINGS
THAT SUPPORT THE DEVELOPMENT OF THE
WHOLE STUDENT AND THEIR SUCCESS AT
THE INSTITUTION.
PROGRAMS
ADMINISTRATIVE SERVICE & MAINTENANCE
1. OFFICE
2. LOCKER ROOM & REST ROOM
3. INFORMATION CENTER
4. JANITORIAL SPACE
5. BOOK STORE
6. NON UNION OFFICE
FOOD
1. FOOD COURT
2. STUDENT AREA
3. PARTY AREA
LIBRARY
THEATRE
SUNDECK
GAMES
1. INDOOR
2. OUTDOOR
QUITE AREA
1. MEETING ROOM
2. LOUNGE
3. GUEST ROOM
4. MUSIC ROOM
MISCELLANEOUS SPACE
1. BALL ROOM
2. SWIMMING POOL
3. DATE:- 6TH JESTHA 2078
3RD YEAR 2ND PART
2. SITE ANALYSIS
GENERAL INFORMATION
• NAME:- PURWANCHAL CAMPUS, DHARAN
(ERC)
• LEVEL:- BACHELOR/ MASTER
• LOCATION :- GANGALAL MARG, TINKUNE
DHARAN-8, SUNSARI DISTRICT
• AREA:-
• FOUNDED BY:- GOVERNMENT OF NEPAL
INFRASTRUCTURE
A. MAIN ENTRANCE
B. GIRLS HOSTEL
C .ADMINISTRATIVE BUILDING
D. STUDENT UNION BUILDING
E. LIBRARY
F. GENERAL CLASSROOM
G. BOYS HOSTEL
H. FOOTBALL GROUND
I. SPECIAL CLASSROOM
J. TEACHERS & STAFF RESIDENCE
K , L, M, N .LABORATORIES AND
WORKSHOPS OF DIFFERENT
DEPARTMENTS
O. CANTEEN
P. SEMINAR HALL
Q. GUARD ROOM
R. STATIONARY
S. BADMINTON COURT
T. BASKETBALL COURT
O P
Q
R
T
S
PROPOSED
SITE
INFLUENCE FACTOR
SELF REALIZATION
- CHAUTARI
- STAGE
- GAMES AREA
(BASKETBALL,
FOOTBALL)
- FOOD AREA
- SMALL PARK
HUMAN RELATIONSHIP
- OFFICE(FSU)
- POLITICAL PARTIES
- HEALTH FACILITY
- NON POLITICAL
PARTIES(PDC, ERCM
ETC)
CIVIC RESPONSIBILITY
- SEMINAR HALL
- FACULTY WISE
DEPARTMENT
DESIGN GUIDELINES
OPPORTUNITIES
WEAKNESS
4. DATE:- 6TH JESTHA 2078
3RD YEAR 2ND PART
3. PROGRAM FORMULATION/PROGRAM DEMANDED BY
SITE
ENTRANCE
- TOWARDS NORTH OF
SITE FACING ADMIN
AND LIBRARY-
PRIMARY ACCESS
ROAD
- SECONDARY
ENTRANCE FACING
S/E ROAD
PRIVACY AND
BUFFERING
TOWARDS GIRLS
HOSTEL
- NO WINDOWS
- USING VISUAL
DISTRACTION
ELEMENT
EXPANSIVITY OF
EXISTING SERVICES
- CHAUTARI-
SOCIOLIZING SPACE
- GROUPING
RELATABLE SPACES
WORKSHOP/ST
UDIO
- DEMANDED DUE
TO LESS
PROXIMITY OF
SITE TO EXISTING
DEPARTMENT
ADMINISTRATION
- SOME PROGRAMS
CAN BE ELIMINATTE
DUE TO PROXIMITY
TO ADMIN BLOCK
EX- TEACHER
LOUNGE, MEETTING
ROOM, SPACES FOR
TEACHERS & STAFFS
FOOD ZONE
- CAN BE USED AS
INTERMEDIATE
SPACE BETWEEN
INDOOR AND
OUTDOOR
SPACE CALCULATION
RELATION CHART
5. DATE:- 6TH JESTHA 2078
3RD YEAR 2ND PART
4. CONCEPT & DESIGN DEVELOPMENT
CONCEPTUAL ANALYSIS
ZONING OF SPACES-
STUDENT CENTER’S CORE
ACTIVITIES ARE PLACED
REAR/SOUTHERN SIDE OF
SITE IN ORDER TO CREATE
CLEAR AND OPEN
FRONTAGE – SUCH SPACES
CAN BE USED FOR
SOCIOLIZING SPACES
FOCAL POINTS – TAKING
REFERENCE POINTS THEY
ARE CENTRAL POINTS OF
CHAUTARI AND SITE
CREATING A REFERENCE
LINE THROUGH BOTH
CENTRAL POINTS AND
MARKED AS MAIN AXIS
PLACING BLOCKS ALONG MAIN
AXIS IE PARALLEL TO AXIS AND
FORMED DIAGONAL SHAPED
PLAN
ADDING PERGOLA AND
GARDEN TO DIAGONAL
PLAN TO ALINE WITH
EAST SIDE ROAD OF
PLAN
SKETCHES TO MAKE FINAL
FORM
LIBRARY
ADMIN
GYM HALL
BOARD
GAMES
BASKETBALL
COURT
THEATRE
WORKSHOP
OPEN COURT
GALLERY
CAFE
CREATING CENTRAL COURT A PLACE FOR SOCIOLIZING SPACE
CREATING CURVE INFRONT OF STUDENT CENTER TO ALINE
THE RADIAL SPREADING PATTERN OF TREE OF CHAUTARI
FINAL FORM
6. DATE:- 6TH JESTHA 2078
3RD YEAR 2ND PART
LARGE
SOCIALING(CHAUTARI)
SPACE IN FRONT OF
STUDENT ACTIVITY
CENTER LEADS US
CENTRAL PLAZA
UNDERNEATH THE
ART GALLERY BLOCK
GALLERY
NARROW STAIRS
FROM CENTER LEAD
US TO LARGE SUNKEN
GARDEN
(ELEMENT OF
SURPRISE)
SUNKEN GARDEN
NARROW
STAIRS
CREATING CURVE
STAIRS IN FRONT OF
CENTER TO ALINE
THE RADIAL
SPREADING
PATTERN OF
BRANCH OFTWO
BIG TREES
CURVE STAIRS
OPEN FRONT
SOCIOLOZING SPACE
PLACING TERRACE
AT DIFFERENT
LEVEL ACCORDING
TO NATURAL
SLOPE OF
GROUND
PLACING VIEWDECK
ON HIGHER
LEVELTHAN PLAY
AREA OF SPORT HALL
FOR VIEWING
TOURNAMENT’S
GAMES
DOUBLE STOREY
AUDITORIUM WITH
MAIN ENTRANCE
FROM CENTRAL
PLAZA AND EXIT TO
THE OUTSIDE OF
BUILDING FROM
OPEN LANDSCAPE
SOME DESIGN FEATURES
7. 5. MASTER PLAN
WITH GROUND
FLOOR PLAN
SCALE 1:300
N
DOWN
DOWN
DOWN
UP
DOWN
UP
UP
DOWN
DOWN
Y
Y’
X
X’
DATE:- 6TH JESTHA 2078
3RD YEAR 2ND PART
8. SCALE 1:300
FIRST FLOOR PLAN
ROOF PLAN
ORTHOGRAPHIC VIEW
UP
UP
UP
DOWN
UP
UP
DOWN
Y
Y’
X
X’
DATE:- 6TH JESTHA 2078
3RD YEAR 2ND PART
9. 6. SECTION & ELEVATION
SECTION YY’
SECTION XX’
WEST ELEVATION
NORTH ELEVATION SCALE 1:300
DATE:- 6TH JESTHA 2078
3RD YEAR 2ND PART