SlideShare a Scribd company logo
Platform Performance
    Demonstration
Purpose
Educate The Army On The Current State-of-the-Art
Of Medium Armored Vehicles
Communicate The Army’s Requirements To Industry
Provide A Forum For Eventual Industry Teaming
Allow The Army To Refine Its Requirements
Explore Current Vehicles For Adaptability To Our
Platform Requirements And Potential For Technology
Insertion
Platform Qualities Derived From O&O
C-130 Deployable; Air Dropable Desired,
But Not Required
Off/Near-Off-The-Shelf Characteristics
Increased Sustainability
Commonality in Platform
Tracked or Wheeled
High Reliability Rates
Embedded Diagnostics
Open Architecture for Enhancements
Digital Connectivity             High Tactical Mobility/Agility in
                                  Complex and Urban Terrain
                                  Swim Capable
                                  Survivable As a System-of-Systems,
                                  Underpinned By Complementary TTPs
                                  Owns the Night
                                  Scalable Armor
                                  300-500 Mile Cruising Range
                                  Plow/roller Capability
                                  Towing Capability
MAV Variants
Infantry Carrier Vehicle (ICV)                       C2
   • Pacing Item for All MAV Variants                     • C2 on the Move for Commanders
   • Carries 10 Soldiers With Individual Equipment        • ABCS Like Capabilities (FBCB2, Etc)

Mobile Gun System (MGS)                                    Striker
   • Direct Fire Support to Dismounted Infantry Assault         • Precise Locating
   • Defeats Fortified Positions and Troops in the Open         • RSTA, FIST

Anti-Tank                                                 Howitzer
    • Primary Tank Killer                                      • 155mm SP
    • Able to Defeat State of the Art Main Battle Tanks        • 30 km Range Rocket Assisted

   Reconnaissance                         Mortar
       • Optimize for Sensor Package           • 120mm is Design Driver; Accommodate 81mm
       • Weapons for Self Defense              • Arms Room Concept for 60mm

 TOCV                                                     Others
     • Supports ABCS Architecture                             • NBC Reconnaissance
     • Supports Rapid Displacement of C4ISR Nodes             • Engineer
                                                              • Wrecker
                                                              • Ambulance/Logistic
Concept Of Operation
                                           BRI
                        C-130                 GA
    PLAN/PREP        DEPLOYABLE                      DE
                                                          O&
                                                                OC
    PHASE I/II
                                                                       APA
                                                                             BIL
1 NOV – 17 DEC 99      PHASE III                                                   ITIE
    PLANNING        18 – 19 DEC 99                                                     S
   SAFETY/RISK        C130 LOAD        HIGH TACTICAL MOBILITY
  ASSESSMENT          HETT LOAD
       RSI            RAIL LOAD
                    AIR DROP EVAL            PHASE IVA                   DIRECT, RAPID FIRE GUN
  TECHNOLOGY
                                            9-10 JAN 00                  TO SUPPORT INFANTRY-
 INSERTION AND
                                     EXTENSIVE ROAD MARCHING                 CENTRIC FORCE
  ADAPTABILITY
                                         ADVANCED ON AND
                                     OFF-ROAD DRIVER’S COURSE                   PHASE IVB
                         CON                                                   11-14 JAN 00
                             TIN
                                U     OU S                                DAY/NIGHT LIVE FIRE IN
                                             OP E                        CLOSE TERRAIN AGAINST
                                                 RAT                     REINFORCED POSITIONS
                                                    I ON
                                                        S (+
                                                                  /- 10
                                                                       0 km
                                                                           /day
                                                                               )
                      SUSTAINABILITY & MANPRINT EVALUATED THROUGHOUT
Concept Of Operation

AGILITY IN COMPLEX AND                 BR
                                          IG   AD
    URBAN TERRAIN
                                                  E   O&
       PHASE IVC                                           OC
                                                                AP
    14 – 17 JAN 00                                                   AB
O&O DRIVEN TACTICAL             “OFF THE RAMP CAPABILITY”              ILIT
 SITUATION EXERCISE                 MINIMAL LOGISTICS                      I ES
  MOUT OPERATIONS                     REQUIREMENT
     IN MUCT SITE                     PHASE IVD
                                     15 – 18 JAN 00
                                      RECOVERY                       SWIM CAPABLE
                                     MAINTENANCE
                 MIS                    TOWING                          PHASE IVE
                     S   IO N      RANGE/FUEL USAGE                   18 – 19 JAN 00
                                AN
                                  DC                                 SWIM EXERCISE
                                    OM
                                      BA
                                        TT
                                                  ASK
                                                     S                               PHASE V
                                                                                  INFORMATION
         SUSTAINABILITY & MANPRINT EVALUATED THROUGHOUT
End State Products
FOR INDUSTRY
 A Written Report Of The Abilities Of Their Platforms To Meet The
  Required Capabilities In The Brigade O & O
   – Adaptability And Technology Insertion Potentials
   – Assessment Across Force Effectiveness Areas
FOR THE ARMY
 A Written Report on Industry’s Ability to Provide Off-The-Shelf
  Equipment That Meets The Required Capabilities In The O & O
  Concept
 Recommended Priority List of Required Technology Insertions
 Initial Insights Into Industry’s Capability To Produce Platforms at Rates
  and in Timeframes to Meet Fielding Requirements
 Refined MAV Operational Requirements Document (ORD) to HQDA
  by 26 January
35 MAV Variants Participating
                                    Infantry Vehicle
                                     ICV (IFV/APC)      16 vehicles


                                                       Mobile Gun System
        2 vehicles   C2 Vehicle                                               5 vehicles
                                                             (MGS)

                                        PPD                       Antitank    2 vehicles
                                     35 Vehicles
             Reconnaissance
6 vehicles
                (RECCE)                                   Other
                                                           Ambulance       1 vehicle
                      2 vehicles   Mortar                                  1 vehicle
                                                           Engineer


             Participants:
                                                Live Fire Exercise - 25
       Deployability - 12                      BDAR - 25
       Basic Drivers Crs - 25                  Tactical Exercise - 25
       Advanced Drivers Crs - 25               Swim - 4
PPD Participating Vehicles

General Dynamics
Land Systems (US)               DRAGOON

 – Dragoon 4 x 4 IFV
 – Dragoon 4 x 4 C2
 – Dragoon 4 x 4 APC
 – Pandur 6 x 6 IFV
   (25mm)
 – Pandur 6 x 6        PANDUR

   Ambulance
 – Pandur 6 x 6 IFV
   (30mm)
 – Pandur 6 x 6 APC
PPD Participating Vehicles
General Motors
Defense (Canada)
                                              LAV III IFV
–   LAV III IFV
–   LAV III IFV w/TOW
–   LAV III Turreted Mortar
–   LAV III Recce System
–   LAV III 105
                                                     FUCHS


Henschel (Germany)
– TPz 1 Fuchs (Fox) APC


MOWAG (Switzerland)           LAV III MOWAG

– LAV III MOWAG
PPD Participating Vehicles

Singapore
Technologies
Automotive, Ltd               BIONIX 40/50

(Singapore)
– Bionix 25 IFV
– Bionix 40/50 IFV
Giat Industries of    V.A.B

France (France)
– V.A.B APC
AM General (US)
– Cobra 4 x 4 Recce
                               COBRA
PPD Participating Vehicles

Cadillac Gage Textron            XM 1117
(US)
– XM 1117 4 x 4 Recce
– LAV 300 MK II IFV
– LAV 600 AGS
FNSS (Turkey)                              LAV 600


– Armored Infantry Fighting
  Vehicle
– Armored Engineering
  Squad Vehicle
– Armored Combat              AIFV
  Vehicle-New Generation
PPD Participating Vehicles
United Defense, LP
(US)
– Armored Gun System
  (w/Level I Protection)               AGS

– Armored Gun System
  (w/Level II Protection)
– Mobile Tactical Vehicle
  Light (MTVL) IFV (One
  Man Turret)
– MTVL IFV (Two Man
  Turret)
– MTVL APC
– XM1108 Universal          MTVL IFV
  Carrier
– M1068A3 C2
– M1064A3-120mm Mort
  (No Turret)
– M113A3 APC
The Way Ahead
CBD Announcement – 5 NOV 99
CG Letter to Industry – 15 NOV 99
Master Gunner/Road Test Examiner Train-the-Trainer at Industry
 – 29 NOV 99 to 3 DEC 99
Industry Day – 1 DEC 99
Platform Performance Demonstration – 9 DEC 99 to 20 JAN 00
Report Out – 31 JAN 00
ORD for Family of Medium Armored Vehicles - 26 JAN 00
RFP Out to Industry - 28 FEB 00
Acquisition Decision - Summer ‘00

More Related Content

Viewers also liked

Blogger tutorial
Blogger tutorialBlogger tutorial
Blogger tutorial
Margie C
 
1211510555 irfan adi rifangga tugas2_ku
1211510555 irfan adi rifangga tugas2_ku1211510555 irfan adi rifangga tugas2_ku
1211510555 irfan adi rifangga tugas2_ku
IrfanRifangga
 

Viewers also liked (20)

СЛУЖБА ПОМОЩИ БАС МАРФО-МАРИИНСКОГО МЕДИЦИНСКОГО ЦЕНТРА: СТРУКТУРА ОКАЗАНИЯ П...
СЛУЖБА ПОМОЩИ БАС МАРФО-МАРИИНСКОГО МЕДИЦИНСКОГО ЦЕНТРА: СТРУКТУРА ОКАЗАНИЯ П...СЛУЖБА ПОМОЩИ БАС МАРФО-МАРИИНСКОГО МЕДИЦИНСКОГО ЦЕНТРА: СТРУКТУРА ОКАЗАНИЯ П...
СЛУЖБА ПОМОЩИ БАС МАРФО-МАРИИНСКОГО МЕДИЦИНСКОГО ЦЕНТРА: СТРУКТУРА ОКАЗАНИЯ П...
 
Intel True Scale Fabric
Intel True Scale FabricIntel True Scale Fabric
Intel True Scale Fabric
 
Popgroups
PopgroupsPopgroups
Popgroups
 
Blogger tutorial
Blogger tutorialBlogger tutorial
Blogger tutorial
 
Dropbox
DropboxDropbox
Dropbox
 
1211510555 irfan adi rifangga tugas2_ku
1211510555 irfan adi rifangga tugas2_ku1211510555 irfan adi rifangga tugas2_ku
1211510555 irfan adi rifangga tugas2_ku
 
ITを活用した被災情報の収集と課題
ITを活用した被災情報の収集と課題ITを活用した被災情報の収集と課題
ITを活用した被災情報の収集と課題
 
Dots 2016 - Will Hudson, Founder and director at Its Nice That
Dots 2016 - Will Hudson, Founder and director at Its Nice ThatDots 2016 - Will Hudson, Founder and director at Its Nice That
Dots 2016 - Will Hudson, Founder and director at Its Nice That
 
Atti del convegno la capitale automobile moto
Atti del convegno   la capitale automobile motoAtti del convegno   la capitale automobile moto
Atti del convegno la capitale automobile moto
 
VYATTAによるマルチパスVPN接続手法
VYATTAによるマルチパスVPN接続手法VYATTAによるマルチパスVPN接続手法
VYATTAによるマルチパスVPN接続手法
 
Sustainability approach by design optimization for advanced layer manufacturing
Sustainability approach by design optimization for advanced layer manufacturingSustainability approach by design optimization for advanced layer manufacturing
Sustainability approach by design optimization for advanced layer manufacturing
 
Ape
ApeApe
Ape
 
Setting Artificial Neural Networks parameters
Setting Artificial Neural Networks parametersSetting Artificial Neural Networks parameters
Setting Artificial Neural Networks parameters
 
MQTTS mosquitto - cheat sheet -
MQTTS mosquitto - cheat sheet -MQTTS mosquitto - cheat sheet -
MQTTS mosquitto - cheat sheet -
 
GCC ARM nRF51 IoT SDK -cheat sheet-
GCC ARM nRF51 IoT SDK -cheat sheet-GCC ARM nRF51 IoT SDK -cheat sheet-
GCC ARM nRF51 IoT SDK -cheat sheet-
 
Tiny Server Clustering using Vyatta/VyOS (MEMO)
Tiny Server Clustering using Vyatta/VyOS (MEMO)Tiny Server Clustering using Vyatta/VyOS (MEMO)
Tiny Server Clustering using Vyatta/VyOS (MEMO)
 
1 5 Motor Control Theories
1 5 Motor Control Theories1 5 Motor Control Theories
1 5 Motor Control Theories
 
Coordination
CoordinationCoordination
Coordination
 
Vagrant
VagrantVagrant
Vagrant
 
Using the card infrastructure as rails for bitcoin adoption
Using the card infrastructure as rails for bitcoin adoptionUsing the card infrastructure as rails for bitcoin adoption
Using the card infrastructure as rails for bitcoin adoption
 

More from 1st_TSG_Airborne

More from 1st_TSG_Airborne (20)

AT-6C Texan II Observation/Attack Aircraft
AT-6C Texan II Observation/Attack Aircraft AT-6C Texan II Observation/Attack Aircraft
AT-6C Texan II Observation/Attack Aircraft
 
21st Century Battleships: THE FUTURE
21st Century Battleships: THE FUTURE21st Century Battleships: THE FUTURE
21st Century Battleships: THE FUTURE
 
New SKEDCO Products
New SKEDCO ProductsNew SKEDCO Products
New SKEDCO Products
 
Light Infantry Resupply Transformation v3.0
Light Infantry Resupply Transformation v3.0Light Infantry Resupply Transformation v3.0
Light Infantry Resupply Transformation v3.0
 
Sheeple-Minded Strykerites
Sheeple-Minded StrykeritesSheeple-Minded Strykerites
Sheeple-Minded Strykerites
 
Zhukovsky Air Show: Smart Russians
Zhukovsky Air Show: Smart Russians Zhukovsky Air Show: Smart Russians
Zhukovsky Air Show: Smart Russians
 
Why U.S. Soldiers are Killed in Iraq v1.0
Why U.S. Soldiers are Killed in Iraq v1.0Why U.S. Soldiers are Killed in Iraq v1.0
Why U.S. Soldiers are Killed in Iraq v1.0
 
Wheeled Mine Strike: Afghanistan (U.S. Copied This)
Wheeled Mine Strike: Afghanistan (U.S. Copied This)Wheeled Mine Strike: Afghanistan (U.S. Copied This)
Wheeled Mine Strike: Afghanistan (U.S. Copied This)
 
USAF DragonEye 1
USAF DragonEye 1USAF DragonEye 1
USAF DragonEye 1
 
Uninspired Sealift vs Cargo 747s vs LCAC Sealift
Uninspired Sealift vs Cargo 747s vs LCAC SealiftUninspired Sealift vs Cargo 747s vs LCAC Sealift
Uninspired Sealift vs Cargo 747s vs LCAC Sealift
 
Tsvposter with M113A4 AmphiGavins or Super Gavins
Tsvposter with M113A4 AmphiGavins or Super GavinsTsvposter with M113A4 AmphiGavins or Super Gavins
Tsvposter with M113A4 AmphiGavins or Super Gavins
 
Tank-Box-Plane v2.0
Tank-Box-Plane v2.0Tank-Box-Plane v2.0
Tank-Box-Plane v2.0
 
T72 Medium Tank Destroyed by Top-Attack Missile
T72 Medium Tank Destroyed by Top-Attack MissileT72 Medium Tank Destroyed by Top-Attack Missile
T72 Medium Tank Destroyed by Top-Attack Missile
 
SpeedHawk v3.0
SpeedHawk v3.0SpeedHawk v3.0
SpeedHawk v3.0
 
SpeedHawk 1-Page Hand-Out Slide v2.0
SpeedHawk 1-Page Hand-Out Slide v2.0SpeedHawk 1-Page Hand-Out Slide v2.0
SpeedHawk 1-Page Hand-Out Slide v2.0
 
SpeedHook v1.0
SpeedHook v1.0SpeedHook v1.0
SpeedHook v1.0
 
S.O.B. Defined
S.O.B. DefinedS.O.B. Defined
S.O.B. Defined
 
Sealift 05: Comparison to Cargo 747s
Sealift 05: Comparison to Cargo 747sSealift 05: Comparison to Cargo 747s
Sealift 05: Comparison to Cargo 747s
 
Sealift 04: Cargo 747s Better than BS HSS
Sealift 04: Cargo 747s Better than BS HSSSealift 04: Cargo 747s Better than BS HSS
Sealift 04: Cargo 747s Better than BS HSS
 
SeaBasing 21 v3.0
SeaBasing 21 v3.0SeaBasing 21 v3.0
SeaBasing 21 v3.0
 

Recently uploaded

Recently uploaded (20)

PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)
 
ODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User GroupODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User Group
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
 
Demystifying gRPC in .Net by John Staveley
Demystifying gRPC in .Net by John StaveleyDemystifying gRPC in .Net by John Staveley
Demystifying gRPC in .Net by John Staveley
 
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
 
Unpacking Value Delivery - Agile Oxford Meetup - May 2024.pptx
Unpacking Value Delivery - Agile Oxford Meetup - May 2024.pptxUnpacking Value Delivery - Agile Oxford Meetup - May 2024.pptx
Unpacking Value Delivery - Agile Oxford Meetup - May 2024.pptx
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
 
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
 
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
 
НАДІЯ ФЕДЮШКО БАЦ «Професійне зростання QA спеціаліста»
НАДІЯ ФЕДЮШКО БАЦ  «Професійне зростання QA спеціаліста»НАДІЯ ФЕДЮШКО БАЦ  «Професійне зростання QA спеціаліста»
НАДІЯ ФЕДЮШКО БАЦ «Професійне зростання QA спеціаліста»
 
UiPath Test Automation using UiPath Test Suite series, part 1
UiPath Test Automation using UiPath Test Suite series, part 1UiPath Test Automation using UiPath Test Suite series, part 1
UiPath Test Automation using UiPath Test Suite series, part 1
 
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
 

Stryker Lies: IAV Platform Performance Demonstration Deception

  • 1. Platform Performance Demonstration
  • 2. Purpose Educate The Army On The Current State-of-the-Art Of Medium Armored Vehicles Communicate The Army’s Requirements To Industry Provide A Forum For Eventual Industry Teaming Allow The Army To Refine Its Requirements Explore Current Vehicles For Adaptability To Our Platform Requirements And Potential For Technology Insertion
  • 3. Platform Qualities Derived From O&O C-130 Deployable; Air Dropable Desired, But Not Required Off/Near-Off-The-Shelf Characteristics Increased Sustainability Commonality in Platform Tracked or Wheeled High Reliability Rates Embedded Diagnostics Open Architecture for Enhancements Digital Connectivity High Tactical Mobility/Agility in Complex and Urban Terrain Swim Capable Survivable As a System-of-Systems, Underpinned By Complementary TTPs Owns the Night Scalable Armor 300-500 Mile Cruising Range Plow/roller Capability Towing Capability
  • 4. MAV Variants Infantry Carrier Vehicle (ICV) C2 • Pacing Item for All MAV Variants • C2 on the Move for Commanders • Carries 10 Soldiers With Individual Equipment • ABCS Like Capabilities (FBCB2, Etc) Mobile Gun System (MGS) Striker • Direct Fire Support to Dismounted Infantry Assault • Precise Locating • Defeats Fortified Positions and Troops in the Open • RSTA, FIST Anti-Tank Howitzer • Primary Tank Killer • 155mm SP • Able to Defeat State of the Art Main Battle Tanks • 30 km Range Rocket Assisted Reconnaissance Mortar • Optimize for Sensor Package • 120mm is Design Driver; Accommodate 81mm • Weapons for Self Defense • Arms Room Concept for 60mm TOCV Others • Supports ABCS Architecture • NBC Reconnaissance • Supports Rapid Displacement of C4ISR Nodes • Engineer • Wrecker • Ambulance/Logistic
  • 5. Concept Of Operation BRI C-130 GA PLAN/PREP DEPLOYABLE DE O& OC PHASE I/II APA BIL 1 NOV – 17 DEC 99 PHASE III ITIE PLANNING 18 – 19 DEC 99 S SAFETY/RISK C130 LOAD HIGH TACTICAL MOBILITY ASSESSMENT HETT LOAD RSI RAIL LOAD AIR DROP EVAL PHASE IVA DIRECT, RAPID FIRE GUN TECHNOLOGY 9-10 JAN 00 TO SUPPORT INFANTRY- INSERTION AND EXTENSIVE ROAD MARCHING CENTRIC FORCE ADAPTABILITY ADVANCED ON AND OFF-ROAD DRIVER’S COURSE PHASE IVB CON 11-14 JAN 00 TIN U OU S DAY/NIGHT LIVE FIRE IN OP E CLOSE TERRAIN AGAINST RAT REINFORCED POSITIONS I ON S (+ /- 10 0 km /day ) SUSTAINABILITY & MANPRINT EVALUATED THROUGHOUT
  • 6. Concept Of Operation AGILITY IN COMPLEX AND BR IG AD URBAN TERRAIN E O& PHASE IVC OC AP 14 – 17 JAN 00 AB O&O DRIVEN TACTICAL “OFF THE RAMP CAPABILITY” ILIT SITUATION EXERCISE MINIMAL LOGISTICS I ES MOUT OPERATIONS REQUIREMENT IN MUCT SITE PHASE IVD 15 – 18 JAN 00 RECOVERY SWIM CAPABLE MAINTENANCE MIS TOWING PHASE IVE S IO N RANGE/FUEL USAGE 18 – 19 JAN 00 AN DC SWIM EXERCISE OM BA TT ASK S PHASE V INFORMATION SUSTAINABILITY & MANPRINT EVALUATED THROUGHOUT
  • 7. End State Products FOR INDUSTRY  A Written Report Of The Abilities Of Their Platforms To Meet The Required Capabilities In The Brigade O & O – Adaptability And Technology Insertion Potentials – Assessment Across Force Effectiveness Areas FOR THE ARMY  A Written Report on Industry’s Ability to Provide Off-The-Shelf Equipment That Meets The Required Capabilities In The O & O Concept  Recommended Priority List of Required Technology Insertions  Initial Insights Into Industry’s Capability To Produce Platforms at Rates and in Timeframes to Meet Fielding Requirements  Refined MAV Operational Requirements Document (ORD) to HQDA by 26 January
  • 8. 35 MAV Variants Participating Infantry Vehicle ICV (IFV/APC) 16 vehicles Mobile Gun System 2 vehicles C2 Vehicle 5 vehicles (MGS) PPD Antitank 2 vehicles 35 Vehicles Reconnaissance 6 vehicles (RECCE) Other Ambulance 1 vehicle 2 vehicles Mortar 1 vehicle Engineer Participants:  Live Fire Exercise - 25  Deployability - 12  BDAR - 25  Basic Drivers Crs - 25  Tactical Exercise - 25  Advanced Drivers Crs - 25  Swim - 4
  • 9. PPD Participating Vehicles General Dynamics Land Systems (US) DRAGOON – Dragoon 4 x 4 IFV – Dragoon 4 x 4 C2 – Dragoon 4 x 4 APC – Pandur 6 x 6 IFV (25mm) – Pandur 6 x 6 PANDUR Ambulance – Pandur 6 x 6 IFV (30mm) – Pandur 6 x 6 APC
  • 10. PPD Participating Vehicles General Motors Defense (Canada) LAV III IFV – LAV III IFV – LAV III IFV w/TOW – LAV III Turreted Mortar – LAV III Recce System – LAV III 105 FUCHS Henschel (Germany) – TPz 1 Fuchs (Fox) APC MOWAG (Switzerland) LAV III MOWAG – LAV III MOWAG
  • 11. PPD Participating Vehicles Singapore Technologies Automotive, Ltd BIONIX 40/50 (Singapore) – Bionix 25 IFV – Bionix 40/50 IFV Giat Industries of V.A.B France (France) – V.A.B APC AM General (US) – Cobra 4 x 4 Recce COBRA
  • 12. PPD Participating Vehicles Cadillac Gage Textron XM 1117 (US) – XM 1117 4 x 4 Recce – LAV 300 MK II IFV – LAV 600 AGS FNSS (Turkey) LAV 600 – Armored Infantry Fighting Vehicle – Armored Engineering Squad Vehicle – Armored Combat AIFV Vehicle-New Generation
  • 13. PPD Participating Vehicles United Defense, LP (US) – Armored Gun System (w/Level I Protection) AGS – Armored Gun System (w/Level II Protection) – Mobile Tactical Vehicle Light (MTVL) IFV (One Man Turret) – MTVL IFV (Two Man Turret) – MTVL APC – XM1108 Universal MTVL IFV Carrier – M1068A3 C2 – M1064A3-120mm Mort (No Turret) – M113A3 APC
  • 14. The Way Ahead CBD Announcement – 5 NOV 99 CG Letter to Industry – 15 NOV 99 Master Gunner/Road Test Examiner Train-the-Trainer at Industry – 29 NOV 99 to 3 DEC 99 Industry Day – 1 DEC 99 Platform Performance Demonstration – 9 DEC 99 to 20 JAN 00 Report Out – 31 JAN 00 ORD for Family of Medium Armored Vehicles - 26 JAN 00 RFP Out to Industry - 28 FEB 00 Acquisition Decision - Summer ‘00