This document discusses the installation of Strongwell's SAFRAILTM fiberglass handrail system at the Stonecutter's Island Sewage Treatment Works in Hong Kong in 1996. Over 7,000 meters of the corrosion and UV resistant handrail were installed around flocculation and sedimentation tanks at the plant, which operates in an extremely corrosive environment. Square handrails were used and fabricated to meet fiberglass handrail specifications, and were easily installed with epoxy adhesive at connections between horizontal and vertical rail sections within the plant's internal areas.