Scott Robert MacKay
Curriculum Vitae
30 Lake St Wyee Point NSW 2259
Mob: 0414 592 848 - Email: smroofing@bigpond.com
A highly competent Advanced Rigger/Scaffolder and Crane Operator with a
positive attitude and strong team ethic, reliable and widely experienced in
Working at Heights, Roof Plumbing and Franna & Forklift Operations. Familiar
with Steel Erection Safety Policies and Procedures.
PROFILE & OBJECTIVE
• Exceptional hands-on-skills with the ability to adapt to a range of vocations.
• Highly motivated, capable of operating independently or as part of a team.
• Ability to hit the ground running, pick up new skills quickly, adaptable to change and
motivated to succeed.
• Logical, with an eye for detail, safety and accuracy.
• Overall dependable, ambitious to progress and well suited to areas of responsibility.
Proven ability to perform complex duties in difficult working conditions in
confined spaces and at heights now investigating employment, where the
opportunity exists for security and progression utilising extensive Advanced
Rigging/Dogging/Scaffolding experience skills and attributes.
PROFESSIONAL ASSETS
• Extensive induction to Mining and Power Station sites.
• Ability to carry out Franna and Manitowoc Crane Operations, efficiently and in
compliance with operating procedures, safety policies and legislation.
• Excellent organisation and time management skills, able to juggle multiple
responsibilities and work in changing environments.
• Excellent communication skills and the ability to build working relationships on all
levels across cultural boundaries.
• Sound knowledge of and commitment to WHS Working at Heights.
• Strong supporter of WorkCover Equal Employment Opportunity Legislation.
• Respect & Comply with site work processes and procedures.
• Able to work efficiently without sacrificing quality or safety.
• Ability to pass a pre-employment medical including a drug & alcohol screen.
• Excellent problem solving skills.
• Builds excellent rapport with colleagues and other stakeholders.
Scott MacKay CV 2
CERTIFIED QUALIFICATIONS
Heavy Rigid Truck Licence - NSW 7302DJ Class HR/R
Roof Plumber Contractors licence – 133030C
HRW154108 - Perform High Risk Work –– C6, DG, SA, RI, RB, RA, LF, WP, SB, SI – EXP Jan 2019
Senior First Aid Certificate – HLTAID003-HLTAID004-EFA Response - EXP Dec 2016
RIIOHS204A RTO 22054 – Work Safely at Heights – WAM Training (Current)
Occupational Health & Safety Construction Induction – CGI00876163SEQ2
Elevated Work Platform Trained Operator 220218 - EWP Type SL
RIIOHS202A - Safe working in General Confined Spaces – Strategic Training Solutions
MDG25 – Safe Cutting & Welding in Coal Mines – MCR Training
Certificate No PRC6286 - Electrical Test & Tag 240 volt single & three phase plugs & sockets
INDUCTIONS
RTA Working on Foot – Sydney Harbour Bridge – XSTRATA Glencore Hunter Valley
Origin Energy – One Steel/Moly-Cop – Visy – Tomago Aluminium - PWCS
KEY CAREER PATH
2012 to Present
VARLEYS - RIG - TOSHIBA
Carry out routine maintenance and shutdowns on Paper Mills & Power stations. Varley’s
Power Services has held contracts with all the major power stations in New South Wales, and
today is the specialist contractor of choice for many of the power generation plants between
Tasmania and North Queensland
ADVANCED RIGGER
Key Responsibilities:
• Elevated Work Platform operation, Franna & Manitowoc Crane operation.
• VARLEYS Power Services - Advanced Rigging, high Risk working at heights.
• RIG INSTALLATION Hunter Valley Coal Mines professional services in fabrication,
installation, maintenance of mechanical plant and coal mills, structural steelwork.
• Rigger/Crane Driver for cranes up to 60 tonnes.
• Assemble, install, position and secure construction rigging, working platforms, pulleys and
winches used to undertake heavy lifting.
• TOSHIBA turbine maintenance, plan and prepare work on site
• Identify workplace hazards and the application of appropriate hazard control measures
• Conduct inspections of all rigging equipment/gear before and after use, repairing if
necessary
• Coordinate transport rigging equipment/gear to site
• Dismantle, remove and store rigging equipment/gear
Key Achievements
• Ability to determine the most effective manner in which to lift steel by examining it,
determining its size and weight and deciding on the right equipment.
Scott MacKay CV 3
RIGGER DOGMAN PLACEMENTS
2013 to present RIG Installations Hunter Valley Coal Mines - Rigger Crane Driver
2012 to 2013 VARLEYS Power Services – Rigger/Dogman
2011 to 2012 TRANSFIELD Supervisor, Vales Point Power Station - Rigger, Crane Driver
2008 to 2011 VARLEYS Power Services - Rigger
2006 to 2008 TRANSFIELD Power Services – Rigger
2001 to 2006 VARLEYS Power Services – Rigger
CAREER PATH
1996 to present
S.M.ROOFING (Small Business Owner Operator)
Key Skills:-Roof plumbing, roof carpentry, steel erection
1994 to 1996
BRETT SANDO CARPENTRY Trade Assistant
1990 to 1994
GARY DENSON PLUMBING & METAL ROOFING Trade Assistant
ADDITIONAL INFORMATION
Status: Australian Citizen – D.O.B. 22/08/1970
Education: 2001-Wyong Technical College Roof Plumbing & Carpentry
Skills: Flashings, Drainage, Steel Erection, Understanding Plans &
Specifications, Welding and Soldering
1996-1997-Hamilton Technical College (Butchery)
1986-North Lakes High School Year 10
Passport: No:-M5736110
Awards: 2013 Vales point Delta Electricity, completion of outage critical path
works inclusive of boiler, turbine and auxiliary plant valve overhauls
2011-Delta Electricity Safety excellence Award
Achievements: Barefoot water ski Australian & NSW Title Holder 1994 to 1998
1989-2004 Central Coast, Newcastle & England Rugby League 1st
Grade
Interests: Sailing, Fishing
Health: Excellent
IT Skills: Microsoft Word, PowerPoint, Excel, Internet and Outlook
Referees: Michael Pittock
Varley’s Power Services
Shutdown Supervisor
0417 421 491
Warren Davies
Eraring Power Station
Project Supervisor
0407 416 421
MacKay Scott Advanced Rigger Dogman

MacKay Scott Advanced Rigger Dogman

  • 1.
    Scott Robert MacKay CurriculumVitae 30 Lake St Wyee Point NSW 2259 Mob: 0414 592 848 - Email: smroofing@bigpond.com A highly competent Advanced Rigger/Scaffolder and Crane Operator with a positive attitude and strong team ethic, reliable and widely experienced in Working at Heights, Roof Plumbing and Franna & Forklift Operations. Familiar with Steel Erection Safety Policies and Procedures. PROFILE & OBJECTIVE • Exceptional hands-on-skills with the ability to adapt to a range of vocations. • Highly motivated, capable of operating independently or as part of a team. • Ability to hit the ground running, pick up new skills quickly, adaptable to change and motivated to succeed. • Logical, with an eye for detail, safety and accuracy. • Overall dependable, ambitious to progress and well suited to areas of responsibility. Proven ability to perform complex duties in difficult working conditions in confined spaces and at heights now investigating employment, where the opportunity exists for security and progression utilising extensive Advanced Rigging/Dogging/Scaffolding experience skills and attributes. PROFESSIONAL ASSETS • Extensive induction to Mining and Power Station sites. • Ability to carry out Franna and Manitowoc Crane Operations, efficiently and in compliance with operating procedures, safety policies and legislation. • Excellent organisation and time management skills, able to juggle multiple responsibilities and work in changing environments. • Excellent communication skills and the ability to build working relationships on all levels across cultural boundaries. • Sound knowledge of and commitment to WHS Working at Heights. • Strong supporter of WorkCover Equal Employment Opportunity Legislation. • Respect & Comply with site work processes and procedures. • Able to work efficiently without sacrificing quality or safety. • Ability to pass a pre-employment medical including a drug & alcohol screen. • Excellent problem solving skills. • Builds excellent rapport with colleagues and other stakeholders.
  • 2.
    Scott MacKay CV2 CERTIFIED QUALIFICATIONS Heavy Rigid Truck Licence - NSW 7302DJ Class HR/R Roof Plumber Contractors licence – 133030C HRW154108 - Perform High Risk Work –– C6, DG, SA, RI, RB, RA, LF, WP, SB, SI – EXP Jan 2019 Senior First Aid Certificate – HLTAID003-HLTAID004-EFA Response - EXP Dec 2016 RIIOHS204A RTO 22054 – Work Safely at Heights – WAM Training (Current) Occupational Health & Safety Construction Induction – CGI00876163SEQ2 Elevated Work Platform Trained Operator 220218 - EWP Type SL RIIOHS202A - Safe working in General Confined Spaces – Strategic Training Solutions MDG25 – Safe Cutting & Welding in Coal Mines – MCR Training Certificate No PRC6286 - Electrical Test & Tag 240 volt single & three phase plugs & sockets INDUCTIONS RTA Working on Foot – Sydney Harbour Bridge – XSTRATA Glencore Hunter Valley Origin Energy – One Steel/Moly-Cop – Visy – Tomago Aluminium - PWCS KEY CAREER PATH 2012 to Present VARLEYS - RIG - TOSHIBA Carry out routine maintenance and shutdowns on Paper Mills & Power stations. Varley’s Power Services has held contracts with all the major power stations in New South Wales, and today is the specialist contractor of choice for many of the power generation plants between Tasmania and North Queensland ADVANCED RIGGER Key Responsibilities: • Elevated Work Platform operation, Franna & Manitowoc Crane operation. • VARLEYS Power Services - Advanced Rigging, high Risk working at heights. • RIG INSTALLATION Hunter Valley Coal Mines professional services in fabrication, installation, maintenance of mechanical plant and coal mills, structural steelwork. • Rigger/Crane Driver for cranes up to 60 tonnes. • Assemble, install, position and secure construction rigging, working platforms, pulleys and winches used to undertake heavy lifting. • TOSHIBA turbine maintenance, plan and prepare work on site • Identify workplace hazards and the application of appropriate hazard control measures • Conduct inspections of all rigging equipment/gear before and after use, repairing if necessary • Coordinate transport rigging equipment/gear to site • Dismantle, remove and store rigging equipment/gear Key Achievements • Ability to determine the most effective manner in which to lift steel by examining it, determining its size and weight and deciding on the right equipment.
  • 3.
    Scott MacKay CV3 RIGGER DOGMAN PLACEMENTS 2013 to present RIG Installations Hunter Valley Coal Mines - Rigger Crane Driver 2012 to 2013 VARLEYS Power Services – Rigger/Dogman 2011 to 2012 TRANSFIELD Supervisor, Vales Point Power Station - Rigger, Crane Driver 2008 to 2011 VARLEYS Power Services - Rigger 2006 to 2008 TRANSFIELD Power Services – Rigger 2001 to 2006 VARLEYS Power Services – Rigger CAREER PATH 1996 to present S.M.ROOFING (Small Business Owner Operator) Key Skills:-Roof plumbing, roof carpentry, steel erection 1994 to 1996 BRETT SANDO CARPENTRY Trade Assistant 1990 to 1994 GARY DENSON PLUMBING & METAL ROOFING Trade Assistant ADDITIONAL INFORMATION Status: Australian Citizen – D.O.B. 22/08/1970 Education: 2001-Wyong Technical College Roof Plumbing & Carpentry Skills: Flashings, Drainage, Steel Erection, Understanding Plans & Specifications, Welding and Soldering 1996-1997-Hamilton Technical College (Butchery) 1986-North Lakes High School Year 10 Passport: No:-M5736110 Awards: 2013 Vales point Delta Electricity, completion of outage critical path works inclusive of boiler, turbine and auxiliary plant valve overhauls 2011-Delta Electricity Safety excellence Award Achievements: Barefoot water ski Australian & NSW Title Holder 1994 to 1998 1989-2004 Central Coast, Newcastle & England Rugby League 1st Grade Interests: Sailing, Fishing Health: Excellent IT Skills: Microsoft Word, PowerPoint, Excel, Internet and Outlook Referees: Michael Pittock Varley’s Power Services Shutdown Supervisor 0417 421 491 Warren Davies Eraring Power Station Project Supervisor 0407 416 421