1. we-do-IT (India) Pvt Ltd
9th Floor, Block – I,
My Home Hub, Madhapur
Hyderabad – 500 081.
tel +91 40 615123460 Page 1 of 3
Srihari Nishangi
QUALIFICATIONS & AFFILIATIONS
B. Tech (Mechanical Engineering)
ACHIEVEMENTS
Trained in AutoCAD
Trained in ANSYS
Maintain the 100% Efficiency and Quality for the project “Rural Maintenance
(US)” in “Tech Mahindra”.
Performance Achievement from “Nokia” for the
Nav_Coverage_RM_US_Update Project”.
Achieved “Pat on the Back” (POB) 3 times for the year 2010 & 2011
Achieved Associate Consistency Excel (ACE) Certificate for the last 4 years
SKILLS SUMMARY
Roles Jr. GIS Associate, Snr. GIS Associate, SME- GIS, GIS Engineer,
Production Executive, QA, Data Engineer
Domain Knowledge Telecom, Electrical, Gas, Naming and Addressing
Tools AutoCAD, Citrix, Google Earth, Atlas Bison, ARC GIS, Small World,
Geo Editor
General Knowledge C, JAVA
PROFILE
I have joined WE-DO-IT in March 2015 and having 4.6 years of experience GIS
domain in Tech Mahindra and worked for Navigations process and I played an
important role in Quality control, and SME.
CAREER SUMMARY
[2015-Current] [GIS Engineer] – [We-Do-IT]
[2010-2014] [SME-GIS] – [Tech Mahindra]
CAREER DETAILS
Data Engineer – we-do-IT (India)Pvt Ltd. 2016 – Current
BC Hydro Project-USA
Project Title: Electrical Network Assets Adjustment (Adjust IT 4.3.1)
Role: Adjust IT Operator
2. we-do-IT (India) Pvt Ltd
9th Floor, Block – I,
My Home Hub, Madhapur
Hyderabad – 500 081.
tel +91 40 615123460 Page 2 of 3
Responsible for:
Shift Vector Placement
Adjustment of Network Assets
Improving network accuracy
Manual QA processing
Analysing complex situations with the view of producing quality results.
Engineer-GIS, we-do-IT (India) Pvt Ltd
Cablevision Asset Conflation Project – Phase 1, Phase 2, & phase 3 USA
Project Title: Telecom Network Assets Adjustment (Small world PNI
4.3.1)
Roles: Adjust.IT Operator
Responsible for:
Shift Model Processing:
Shift Vector Placement
Shift Model QA
Adjustment Job Processing:
Initiate and Monitor the Adjustment Processing
Inspect the adjustment of Network Assets
Manually update the Network with Freehand Tool
Improving Network Accuracy
Improving Spatial Accuracy
SME-GIS – Tech Mahindra 2010 – 2014
Worked for GIS Conversion Projects
Projects:
France Naming Repo Project: In this project based on the Arc-GIS software
we need to place the
Addressing points using the Arc CatLog.
Rural Maintenance Project: In this project we are updating the naming, addressing
and repositioning
the geometry.
Midas Project: Based on the mid covers points we are updating the naming and
addressing.
2D-Project: In this project we are capturing the buildings.
Land base & Electrical Network mapping for North West Energy (NWE)
3. we-do-IT (India) Pvt Ltd
9th Floor, Block – I,
My Home Hub, Madhapur
Hyderabad – 500 081.
tel +91 40 615123460 Page 3 of 3
Columbia Gas (CG) projects on Arc-GIS.
Roles and Responsibilities:
Responsible for checking source inputs from clients.
Responsible for delivering weekly hours ~700hrs to the clients.
I lead a team of 25 production team members.
Assigning the wok allocations to the production through MIS (Management
Information Systems) tool.
I used to clarify the doubts of production team.
I raised the doubt logs through JIRA tool to the clients.
Responsible for raising the US (United States) county level documentation
and preparing PowerPoint presentation to the clients.
Explaining source issues of US county levels to the entire production team.
Responsible for taking daily status of production team members.
Responsible for quality checks & quality assurance and maintaining 100%
efficient.
Responsible for taking feedbacks and weekly update form client sides.
Delivering the US counties within given time to the clients with 100%
quality checks.
I was handling RM US project from last three years and getting source
inputs from client through mail communication, Chat process and also
whatever problem occurs in project requirement we need to raise doubt log
through client and get problems rectified.
We have the client meeting every week to discuss hours and also source
inputs, doubts, etc.
After discussion with client we need to send the minutes of meeting (MOM)
through mail Communication.
We also developed various tools for our project to identifying the easy way
of errors in our Project. At last we maintained our project 100% efficiency
and 100% quality and got appreciation from client with good results from
last quarters.
I worked with Here maps and Nokia client for the project names
“Nav_Coverage_RM_US_Update Project and maintained 100% quality