SlideShare a Scribd company logo
1 of 3
we-do-IT (India) Pvt Ltd
9th Floor, Block – I,
My Home Hub, Madhapur
Hyderabad – 500 081.
tel +91 40 615123460 Page 1 of 3
Srihari Nishangi
QUALIFICATIONS & AFFILIATIONS
 B. Tech (Mechanical Engineering)
ACHIEVEMENTS
 Trained in AutoCAD
 Trained in ANSYS
 Maintain the 100% Efficiency and Quality for the project “Rural Maintenance
(US)” in “Tech Mahindra”.
 Performance Achievement from “Nokia” for the
Nav_Coverage_RM_US_Update Project”.
 Achieved “Pat on the Back” (POB) 3 times for the year 2010 & 2011
 Achieved Associate Consistency Excel (ACE) Certificate for the last 4 years
SKILLS SUMMARY
Roles Jr. GIS Associate, Snr. GIS Associate, SME- GIS, GIS Engineer,
Production Executive, QA, Data Engineer
Domain Knowledge Telecom, Electrical, Gas, Naming and Addressing
Tools AutoCAD, Citrix, Google Earth, Atlas Bison, ARC GIS, Small World,
Geo Editor
General Knowledge C, JAVA
PROFILE
I have joined WE-DO-IT in March 2015 and having 4.6 years of experience GIS
domain in Tech Mahindra and worked for Navigations process and I played an
important role in Quality control, and SME.
CAREER SUMMARY
[2015-Current] [GIS Engineer] – [We-Do-IT]
[2010-2014] [SME-GIS] – [Tech Mahindra]
CAREER DETAILS
Data Engineer – we-do-IT (India)Pvt Ltd. 2016 – Current
BC Hydro Project-USA
Project Title: Electrical Network Assets Adjustment (Adjust IT 4.3.1)
Role: Adjust IT Operator
we-do-IT (India) Pvt Ltd
9th Floor, Block – I,
My Home Hub, Madhapur
Hyderabad – 500 081.
tel +91 40 615123460 Page 2 of 3
Responsible for:
 Shift Vector Placement
 Adjustment of Network Assets
 Improving network accuracy
 Manual QA processing
 Analysing complex situations with the view of producing quality results.
Engineer-GIS, we-do-IT (India) Pvt Ltd
Cablevision Asset Conflation Project – Phase 1, Phase 2, & phase 3 USA
Project Title: Telecom Network Assets Adjustment (Small world PNI
4.3.1)
Roles: Adjust.IT Operator
Responsible for:
Shift Model Processing:
 Shift Vector Placement
 Shift Model QA
Adjustment Job Processing:
 Initiate and Monitor the Adjustment Processing
 Inspect the adjustment of Network Assets
 Manually update the Network with Freehand Tool
 Improving Network Accuracy
 Improving Spatial Accuracy
SME-GIS – Tech Mahindra 2010 – 2014
Worked for GIS Conversion Projects
Projects:
France Naming Repo Project: In this project based on the Arc-GIS software
we need to place the
Addressing points using the Arc CatLog.
Rural Maintenance Project: In this project we are updating the naming, addressing
and repositioning
the geometry.
Midas Project: Based on the mid covers points we are updating the naming and
addressing.
2D-Project: In this project we are capturing the buildings.
Land base & Electrical Network mapping for North West Energy (NWE)
we-do-IT (India) Pvt Ltd
9th Floor, Block – I,
My Home Hub, Madhapur
Hyderabad – 500 081.
tel +91 40 615123460 Page 3 of 3
Columbia Gas (CG) projects on Arc-GIS.
Roles and Responsibilities:
 Responsible for checking source inputs from clients.
 Responsible for delivering weekly hours ~700hrs to the clients.
 I lead a team of 25 production team members.
 Assigning the wok allocations to the production through MIS (Management
Information Systems) tool.
 I used to clarify the doubts of production team.
 I raised the doubt logs through JIRA tool to the clients.
 Responsible for raising the US (United States) county level documentation
and preparing PowerPoint presentation to the clients.
 Explaining source issues of US county levels to the entire production team.
 Responsible for taking daily status of production team members.
 Responsible for quality checks & quality assurance and maintaining 100%
efficient.
 Responsible for taking feedbacks and weekly update form client sides.
 Delivering the US counties within given time to the clients with 100%
quality checks.
 I was handling RM US project from last three years and getting source
inputs from client through mail communication, Chat process and also
whatever problem occurs in project requirement we need to raise doubt log
through client and get problems rectified.
 We have the client meeting every week to discuss hours and also source
inputs, doubts, etc.
 After discussion with client we need to send the minutes of meeting (MOM)
through mail Communication.
 We also developed various tools for our project to identifying the easy way
of errors in our Project. At last we maintained our project 100% efficiency
and 100% quality and got appreciation from client with good results from
last quarters.
 I worked with Here maps and Nokia client for the project names
“Nav_Coverage_RM_US_Update Project and maintained 100% quality

More Related Content

What's hot

What's hot (20)

ShihabResume
ShihabResumeShihabResume
ShihabResume
 
Killedar Resume
Killedar ResumeKilledar Resume
Killedar Resume
 
Resume.....
Resume.....Resume.....
Resume.....
 
Punit_Kumar( Graduated with B.tech with 1.6 years experience in RF engg
Punit_Kumar( Graduated with B.tech with 1.6 years experience in RF enggPunit_Kumar( Graduated with B.tech with 1.6 years experience in RF engg
Punit_Kumar( Graduated with B.tech with 1.6 years experience in RF engg
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Arun(MEP QAQC)
Arun(MEP QAQC)Arun(MEP QAQC)
Arun(MEP QAQC)
 
Sarowar zahan _cv
Sarowar zahan  _cvSarowar zahan  _cv
Sarowar zahan _cv
 
RESUME 30-07-2015
RESUME 30-07-2015RESUME 30-07-2015
RESUME 30-07-2015
 
Atanu Ghosh Resume -DC - Copy
Atanu Ghosh Resume -DC - CopyAtanu Ghosh Resume -DC - Copy
Atanu Ghosh Resume -DC - Copy
 
Company Introduction- Vostok 2015-16
Company Introduction- Vostok 2015-16Company Introduction- Vostok 2015-16
Company Introduction- Vostok 2015-16
 
kanchan Resume
kanchan Resumekanchan Resume
kanchan Resume
 
Sajini-Resume
Sajini-ResumeSajini-Resume
Sajini-Resume
 
rahul kumar Document.
rahul kumar Document.rahul kumar Document.
rahul kumar Document.
 
Cv site civil engineer
Cv site civil engineerCv site civil engineer
Cv site civil engineer
 
khinmaraye resume (1)
khinmaraye resume (1)khinmaraye resume (1)
khinmaraye resume (1)
 
Vipin mv civil engineer cv and coverletter
Vipin mv civil engineer cv and coverletterVipin mv civil engineer cv and coverletter
Vipin mv civil engineer cv and coverletter
 
veeraiyan resume
veeraiyan resumeveeraiyan resume
veeraiyan resume
 
Suman-Bakshi
Suman-BakshiSuman-Bakshi
Suman-Bakshi
 
Resume_HVAC Engineer
Resume_HVAC EngineerResume_HVAC Engineer
Resume_HVAC Engineer
 
CV_SANJAY SOHIL
CV_SANJAY SOHILCV_SANJAY SOHIL
CV_SANJAY SOHIL
 

Similar to Srihari Nishangi_CV

Similar to Srihari Nishangi_CV (20)

Updated resume
Updated resumeUpdated resume
Updated resume
 
Sanjeev Thakur_April'16
Sanjeev Thakur_April'16Sanjeev Thakur_April'16
Sanjeev Thakur_April'16
 
Amal U S(Asp.Net Web Developer)
Amal U S(Asp.Net Web Developer)Amal U S(Asp.Net Web Developer)
Amal U S(Asp.Net Web Developer)
 
Resume_ganesh
Resume_ganeshResume_ganesh
Resume_ganesh
 
Satish Singh
Satish SinghSatish Singh
Satish Singh
 
CV_RadhikaSharma
CV_RadhikaSharmaCV_RadhikaSharma
CV_RadhikaSharma
 
Shankhadeep_Bhattacharya_Cognizant_Resume
Shankhadeep_Bhattacharya_Cognizant_ResumeShankhadeep_Bhattacharya_Cognizant_Resume
Shankhadeep_Bhattacharya_Cognizant_Resume
 
Wireline-Engineering-Solutions-for-a-High-Speed-Network-Provider.pdf
Wireline-Engineering-Solutions-for-a-High-Speed-Network-Provider.pdfWireline-Engineering-Solutions-for-a-High-Speed-Network-Provider.pdf
Wireline-Engineering-Solutions-for-a-High-Speed-Network-Provider.pdf
 
AWADH BHUSHAN PANDEY_RESUME
AWADH BHUSHAN PANDEY_RESUMEAWADH BHUSHAN PANDEY_RESUME
AWADH BHUSHAN PANDEY_RESUME
 
Resume-Vimukth1
Resume-Vimukth1Resume-Vimukth1
Resume-Vimukth1
 
PRR-RESUME-Project_New
PRR-RESUME-Project_NewPRR-RESUME-Project_New
PRR-RESUME-Project_New
 
PRR-RESUME-Project_New
PRR-RESUME-Project_NewPRR-RESUME-Project_New
PRR-RESUME-Project_New
 
anil cv
anil cvanil cv
anil cv
 
DIBYA CV
DIBYA  CVDIBYA  CV
DIBYA CV
 
ganesh
ganeshganesh
ganesh
 
Veera - Infosys - DotNet Devoloper
Veera - Infosys - DotNet DevoloperVeera - Infosys - DotNet Devoloper
Veera - Infosys - DotNet Devoloper
 
Resume_Shyamalendu
Resume_ShyamalenduResume_Shyamalendu
Resume_Shyamalendu
 
Resume __Sanjay Gulati
Resume __Sanjay GulatiResume __Sanjay Gulati
Resume __Sanjay Gulati
 
Garima_Vishnoi
Garima_VishnoiGarima_Vishnoi
Garima_Vishnoi
 
IT ENGINEER
IT ENGINEERIT ENGINEER
IT ENGINEER
 

Srihari Nishangi_CV

  • 1. we-do-IT (India) Pvt Ltd 9th Floor, Block – I, My Home Hub, Madhapur Hyderabad – 500 081. tel +91 40 615123460 Page 1 of 3 Srihari Nishangi QUALIFICATIONS & AFFILIATIONS  B. Tech (Mechanical Engineering) ACHIEVEMENTS  Trained in AutoCAD  Trained in ANSYS  Maintain the 100% Efficiency and Quality for the project “Rural Maintenance (US)” in “Tech Mahindra”.  Performance Achievement from “Nokia” for the Nav_Coverage_RM_US_Update Project”.  Achieved “Pat on the Back” (POB) 3 times for the year 2010 & 2011  Achieved Associate Consistency Excel (ACE) Certificate for the last 4 years SKILLS SUMMARY Roles Jr. GIS Associate, Snr. GIS Associate, SME- GIS, GIS Engineer, Production Executive, QA, Data Engineer Domain Knowledge Telecom, Electrical, Gas, Naming and Addressing Tools AutoCAD, Citrix, Google Earth, Atlas Bison, ARC GIS, Small World, Geo Editor General Knowledge C, JAVA PROFILE I have joined WE-DO-IT in March 2015 and having 4.6 years of experience GIS domain in Tech Mahindra and worked for Navigations process and I played an important role in Quality control, and SME. CAREER SUMMARY [2015-Current] [GIS Engineer] – [We-Do-IT] [2010-2014] [SME-GIS] – [Tech Mahindra] CAREER DETAILS Data Engineer – we-do-IT (India)Pvt Ltd. 2016 – Current BC Hydro Project-USA Project Title: Electrical Network Assets Adjustment (Adjust IT 4.3.1) Role: Adjust IT Operator
  • 2. we-do-IT (India) Pvt Ltd 9th Floor, Block – I, My Home Hub, Madhapur Hyderabad – 500 081. tel +91 40 615123460 Page 2 of 3 Responsible for:  Shift Vector Placement  Adjustment of Network Assets  Improving network accuracy  Manual QA processing  Analysing complex situations with the view of producing quality results. Engineer-GIS, we-do-IT (India) Pvt Ltd Cablevision Asset Conflation Project – Phase 1, Phase 2, & phase 3 USA Project Title: Telecom Network Assets Adjustment (Small world PNI 4.3.1) Roles: Adjust.IT Operator Responsible for: Shift Model Processing:  Shift Vector Placement  Shift Model QA Adjustment Job Processing:  Initiate and Monitor the Adjustment Processing  Inspect the adjustment of Network Assets  Manually update the Network with Freehand Tool  Improving Network Accuracy  Improving Spatial Accuracy SME-GIS – Tech Mahindra 2010 – 2014 Worked for GIS Conversion Projects Projects: France Naming Repo Project: In this project based on the Arc-GIS software we need to place the Addressing points using the Arc CatLog. Rural Maintenance Project: In this project we are updating the naming, addressing and repositioning the geometry. Midas Project: Based on the mid covers points we are updating the naming and addressing. 2D-Project: In this project we are capturing the buildings. Land base & Electrical Network mapping for North West Energy (NWE)
  • 3. we-do-IT (India) Pvt Ltd 9th Floor, Block – I, My Home Hub, Madhapur Hyderabad – 500 081. tel +91 40 615123460 Page 3 of 3 Columbia Gas (CG) projects on Arc-GIS. Roles and Responsibilities:  Responsible for checking source inputs from clients.  Responsible for delivering weekly hours ~700hrs to the clients.  I lead a team of 25 production team members.  Assigning the wok allocations to the production through MIS (Management Information Systems) tool.  I used to clarify the doubts of production team.  I raised the doubt logs through JIRA tool to the clients.  Responsible for raising the US (United States) county level documentation and preparing PowerPoint presentation to the clients.  Explaining source issues of US county levels to the entire production team.  Responsible for taking daily status of production team members.  Responsible for quality checks & quality assurance and maintaining 100% efficient.  Responsible for taking feedbacks and weekly update form client sides.  Delivering the US counties within given time to the clients with 100% quality checks.  I was handling RM US project from last three years and getting source inputs from client through mail communication, Chat process and also whatever problem occurs in project requirement we need to raise doubt log through client and get problems rectified.  We have the client meeting every week to discuss hours and also source inputs, doubts, etc.  After discussion with client we need to send the minutes of meeting (MOM) through mail Communication.  We also developed various tools for our project to identifying the easy way of errors in our Project. At last we maintained our project 100% efficiency and 100% quality and got appreciation from client with good results from last quarters.  I worked with Here maps and Nokia client for the project names “Nav_Coverage_RM_US_Update Project and maintained 100% quality