1. Southeast Atlanta Green Infrastructure Initiative
Phase I
Design and Construction Data
City of Atlanta Department of Watershed Management
72 Marietta Street
Atlanta, GA 30303
BGR Joint Venture
April 17, 2013
Prepared By Adam Carducci
Reviewed By Joe Crooms, P.E.
RohadFox Construction Services
2. Add Intersection paver treatment at Dodd and Central intersection.
Increase width of paver strip to 10' (minimum) for driving lanes.
Have sidewalk repair work done as noted in pictures, including areas where
major cracking, scouring and tree root intrusion occur.
Have clogged catch basins and inlets cleaned out.
Confirm structural integrity of catch basin structures proposed to be tapped
into.
Have point repair on catch basin lids and panel covers performed.
As proposed in the 4/15/2013 meeting, a good placement of paver
neighborhood marker would be at Fulton and Windsor Street for the
Mechanicsville neighborhood.
Action Items needed
3. 1. Dodd at Central
2. Pulliam St.
3. Pulliam St.
4. Richardson ( Between Central and Pulliam)
5. Richardson ( Between Central and Pulliam)
6. Richardson ( Between Central and Pulliam)
7. Windsor St
8. Pulliam St.
9. Windsor St.
10.Central St.
11.Windsor St
12. Windsor St
4. Better served by an
intersection treatment, rather
than pavers as shown on the
map.
16. Contact Information
Adam Carducci
Field Engineer
ROHADFOX - RCCSC
171 17th Street NW, Suite 1625
Atlanta, GA 30363
[P] 404.880.9888
[M] 404.849.4009
[F] 404.880.9911
a.carducci@rccsc.net
www.rccsc.net
Joe Crooms, P. E.
Project Manager
ROHADFOX - RCCSC
Program Management, Construction
Management
171 17th Street NW, Suite 1625
Atlanta, GA 30363
[P] 404.880.9888
[M] 404.771.9007
[F] 404.880.9911
joe.crooms@rccsc.net
www.rccsc.net