The proliferation of BYOD, cloud, SaaS and consumer technologies in the workplace have made the application the disruptive technology that will drive business IT into the coming decades. At the same time, the application delivery chain is becoming more complex to support as applications become more networked, virtualization drives IT infrastructure convergence and abstraction and end users become more mobile. These survey findings highlight the impact of application performance and availability on business end users, and their experiences with and expectations of IT when problems arise. Chief among the findings is that while the application is now the heart of businesses of all sizes and its performance is the lifeblood of success, IT continues to struggle to ensure its performance and availability.
SolarWinds Application Performance End User Survey (Singapore)SolarWinds
The proliferation of BYOD, cloud, SaaS and consumer technologies in the workplace have made the application the disruptive technology that will drive business IT into the coming decades. At the same time, the application delivery chain is becoming more complex to support as applications become more networked, virtualization drives IT infrastructure convergence and abstraction and end users become more mobile. These survey findings highlight the impact of application performance and availability on business end users, and their experiences with and expectations of IT when problems arise. Chief among the findings is that while the application is now the heart of businesses of all sizes and its performance is the lifeblood of success, IT continues to struggle to ensure its performance and availability.
AFCEA Cybersecurity through Continuous Monitoring: SolarWinds Survey Results ...SolarWinds
WINNER: Overall Best In Show at 2014 AFCEA® Cyber Conference Solutions Trail
In a 2014 survey by SolarWinds and Market Connections, federal government and military IT professionals stated that their biggest cybersecurity threats are people both malicious external attackers and clueless insiders. So how do Federal IT Pros prevent activity that can put their agencies security at risk and address these living cybersecurity threats when human behavior is out of their
control? Implementing continuous monitoring solutions can help federal agencies safeguard against human error and quickly identify vulnerabilities, compliance issues and other threats by automatically collecting data and reporting on the performance, availability and security posture of an IT infrastructure. While continuous monitoring of the performance of networks, applications, servers, and
more will not stop hackers from attempting to infiltrate a network or stop careless employees from accidental blunders, it can provide a first line of defense and critical insight into how the IT infrastructure is impacted. In this session you will learn: " The top cybersecurity threats plaguing agencies today and their sources " The types of continuous monitoring tools and technologies that can be leveraged by both IT operations and information security simultaneously to quickly detect and mitigate threats " How to overcome common obstacles and frustrations agencies face when implementing continuous monitoring solutions and what benefits they see upon implementation.
SolarWinds Federal Cybersecurity Survey 2015SolarWinds
In December 2014, Market Connections, a leading government market research provider, in conjunction with SolarWinds conducted its second annual blind survey of 200 IT and IT security decision makers in the federal government, military and intelligence communities in an effort to uncover their most critical IT security challenges and to determine how to make potential security threats visible so IT can confront them. Respondents weighed in on top cybersecurity threat sources, obstacles to threat prevention, necessary tools for threat prevention, and their concerns, investment and policies regarding cybersecurity.
Visit http://www.solarwinds.com/federal to learn more.
Cybersecurity breaches in the government seem to be all over the news. The sheer number and wild variety of sources for these breaches led us to wonder what federal agencies are really dealing with. SolarWinds® partnered with leading government research provider Market Connections to survey 200 federal IT and IT security professionals to find out their top cybersecurity concerns and the obstacles they face when implementing IT security strategies.
The results of our survey include:
Detailed insight into the threats, challenges, and sources of cybersecurity breaches the government faces in its IT infrastructure
Top hindrances in the implementation of appropriate IT security tools
Strategies and courses of action being deployed by federal IT professionals to remediate cybersecurity threats
These results demonstrate that a broad and concerning range of cybersecurity threats plague government agencies. Federal IT pros must consider taking a more pragmatic and unified approach to addressing the availability, performance, and security of their infrastructures.
Visit http://www.solarwinds.com/federal to learn more.
The survey found that email management has become more complex for organizations due to factors like mobility, BYOD, and the volume of emails sent from smart devices. It is a costly challenge as well, with larger companies having 6 or more employees dedicated to email management. While monitoring emails takes up over half of IT employees' time, tools for managing emails lack innovation and companies use multiple tools to manage emails on-premise primarily, though interest in cloud-based email solutions is growing.
SolarWinds Application Performance End User Survey (UK)SolarWinds
The proliferation of BYOD, cloud, SaaS and consumer technologies in the workplace have made the application the disruptive technology that will drive business IT into the coming decades. At the same time, the application delivery chain is becoming more complex to support as applications become more networked, virtualization drives IT infrastructure convergence and abstraction and end users become more mobile. These survey findings highlight the impact of application performance and availability on business end users, and their experiences with and expectations of IT when problems arise. Chief among the findings is that while the application is now the heart of businesses of all sizes and its performance is the lifeblood of success, IT continues to struggle to ensure its performance and availability.
SolarWinds Application Performance End User Survey (North America)SolarWinds
The proliferation of BYOD, cloud, SaaS and consumer technologies in the workplace have made the application the disruptive technology that will drive business IT into the coming decades. At the same time, the application delivery chain is becoming more complex to support as applications become more networked, virtualization drives IT infrastructure convergence and abstraction and end users become more mobile. These survey findings highlight the impact of application performance and availability on business end users, and their experiences with and expectations of IT when problems arise. Chief among the findings is that while the application is now the heart of businesses of all sizes and its performance is the lifeblood of success, IT continues to struggle to ensure its performance and availability.
SolarWinds Application Performance End User Survey (Singapore)SolarWinds
The proliferation of BYOD, cloud, SaaS and consumer technologies in the workplace have made the application the disruptive technology that will drive business IT into the coming decades. At the same time, the application delivery chain is becoming more complex to support as applications become more networked, virtualization drives IT infrastructure convergence and abstraction and end users become more mobile. These survey findings highlight the impact of application performance and availability on business end users, and their experiences with and expectations of IT when problems arise. Chief among the findings is that while the application is now the heart of businesses of all sizes and its performance is the lifeblood of success, IT continues to struggle to ensure its performance and availability.
AFCEA Cybersecurity through Continuous Monitoring: SolarWinds Survey Results ...SolarWinds
WINNER: Overall Best In Show at 2014 AFCEA® Cyber Conference Solutions Trail
In a 2014 survey by SolarWinds and Market Connections, federal government and military IT professionals stated that their biggest cybersecurity threats are people both malicious external attackers and clueless insiders. So how do Federal IT Pros prevent activity that can put their agencies security at risk and address these living cybersecurity threats when human behavior is out of their
control? Implementing continuous monitoring solutions can help federal agencies safeguard against human error and quickly identify vulnerabilities, compliance issues and other threats by automatically collecting data and reporting on the performance, availability and security posture of an IT infrastructure. While continuous monitoring of the performance of networks, applications, servers, and
more will not stop hackers from attempting to infiltrate a network or stop careless employees from accidental blunders, it can provide a first line of defense and critical insight into how the IT infrastructure is impacted. In this session you will learn: " The top cybersecurity threats plaguing agencies today and their sources " The types of continuous monitoring tools and technologies that can be leveraged by both IT operations and information security simultaneously to quickly detect and mitigate threats " How to overcome common obstacles and frustrations agencies face when implementing continuous monitoring solutions and what benefits they see upon implementation.
SolarWinds Federal Cybersecurity Survey 2015SolarWinds
In December 2014, Market Connections, a leading government market research provider, in conjunction with SolarWinds conducted its second annual blind survey of 200 IT and IT security decision makers in the federal government, military and intelligence communities in an effort to uncover their most critical IT security challenges and to determine how to make potential security threats visible so IT can confront them. Respondents weighed in on top cybersecurity threat sources, obstacles to threat prevention, necessary tools for threat prevention, and their concerns, investment and policies regarding cybersecurity.
Visit http://www.solarwinds.com/federal to learn more.
Cybersecurity breaches in the government seem to be all over the news. The sheer number and wild variety of sources for these breaches led us to wonder what federal agencies are really dealing with. SolarWinds® partnered with leading government research provider Market Connections to survey 200 federal IT and IT security professionals to find out their top cybersecurity concerns and the obstacles they face when implementing IT security strategies.
The results of our survey include:
Detailed insight into the threats, challenges, and sources of cybersecurity breaches the government faces in its IT infrastructure
Top hindrances in the implementation of appropriate IT security tools
Strategies and courses of action being deployed by federal IT professionals to remediate cybersecurity threats
These results demonstrate that a broad and concerning range of cybersecurity threats plague government agencies. Federal IT pros must consider taking a more pragmatic and unified approach to addressing the availability, performance, and security of their infrastructures.
Visit http://www.solarwinds.com/federal to learn more.
The survey found that email management has become more complex for organizations due to factors like mobility, BYOD, and the volume of emails sent from smart devices. It is a costly challenge as well, with larger companies having 6 or more employees dedicated to email management. While monitoring emails takes up over half of IT employees' time, tools for managing emails lack innovation and companies use multiple tools to manage emails on-premise primarily, though interest in cloud-based email solutions is growing.
SolarWinds Application Performance End User Survey (UK)SolarWinds
The proliferation of BYOD, cloud, SaaS and consumer technologies in the workplace have made the application the disruptive technology that will drive business IT into the coming decades. At the same time, the application delivery chain is becoming more complex to support as applications become more networked, virtualization drives IT infrastructure convergence and abstraction and end users become more mobile. These survey findings highlight the impact of application performance and availability on business end users, and their experiences with and expectations of IT when problems arise. Chief among the findings is that while the application is now the heart of businesses of all sizes and its performance is the lifeblood of success, IT continues to struggle to ensure its performance and availability.
SolarWinds Application Performance End User Survey (North America)SolarWinds
The proliferation of BYOD, cloud, SaaS and consumer technologies in the workplace have made the application the disruptive technology that will drive business IT into the coming decades. At the same time, the application delivery chain is becoming more complex to support as applications become more networked, virtualization drives IT infrastructure convergence and abstraction and end users become more mobile. These survey findings highlight the impact of application performance and availability on business end users, and their experiences with and expectations of IT when problems arise. Chief among the findings is that while the application is now the heart of businesses of all sizes and its performance is the lifeblood of success, IT continues to struggle to ensure its performance and availability.
SolarWinds Application Performance End User Survey (Denmark)SolarWinds
- The document summarizes findings from a survey of 200 Danish end users about their use of applications at work and how application performance impacts their jobs.
- Email and office applications are used daily by over 90% and 58% respectively and are most critical for performing their jobs.
- For over 40%, application performance is critical to accomplishing their work, while for 55% its importance has increased over 5 years due to more time spent using apps and increased workload.
- Over 70% contacted IT up to 10 times in the past year regarding app issues, while 10% had no contact. 65% have experienced a critical app issue at some point.
Systems Administrators UK Survey ResultsSolarWinds
A survey of 400 UK-based systems administrators found that:
1) They enjoy solving problems and helping users the most about their jobs, but feel pressures of increased workload and responsibilities with too little pay and budget.
2) Most find their jobs at least somewhat enjoyable and appreciated by their employers, though less than 20% feel highly satisfied.
3) In their free time, many enjoy activities like surfing the web, video games, and outdoor activities to relax after long work weeks that often exceed 40 hours.
SolarWinds IT Trends Report 2015: Business at the Speed of IT (North America)SolarWinds
A look at the current state of significant new technology adoption, barriers to adoption and needs of IT pros tasked with delivering business impact in North America.
Automation of IT systems can save public sector organizations time and money while increasing productivity, according to a survey of 162 IT professionals. Network configuration management was found to be the most beneficial automation tool, saving over 58% of respondents' time. While 53% of respondents said automation had not changed their IT staff sizes, 67% saw increased productivity and over 84% believed automation saved time. However, integrating tools, budget constraints, and lack of training were cited as challenges to successful automation rollout. Compliance reporting requirements were also driving many organizations' decisions to adopt automation.
Over half of IT professionals feel infrastructure complexity has greatly affected their role in the last 3-5 years. Cloud computing is seen as the most disruptive emerging technology and the most important for investment. While most IT professionals are confident in providing strategic guidance, the majority only get occasional opportunities. To feel more empowered, around half need more training in their areas and a better understanding of the business.
- The document summarizes findings from a study on application performance and availability conducted between public and private sector employees. It finds that email and office applications are used daily by 94% of respondents and are most critical to their jobs. 70% of respondents have experienced an issue with a critical application at some point. While most (76%) are satisfied with the IT department's response time, 36% reported waiting at least one business day for some issues to be resolved.
IT Trends Report 2015: Business at the Speed of IT, Public Sector ResultsSolarWinds
IT Trends Report 2015: Business at the Speed of IT
A look at the current state of significant new technology adoption, barriers to adoption and needs of IT pros tasked with delivering organizational impact
(North America, Public Sector)
This survey of IT professionals at public sector agencies found that:
1) Nearly all respondents said increasing network complexity has affected their job responsibilities in the last 3-5 years.
2) Compute virtualization and cloud computing had the largest impacts and are seen as most important for remaining competitive.
3) Only about 30% of respondents are confident in providing guidance on strategic technology decisions due to complexity.
4) Most want more training to provide better guidance on emerging technologies.
Systems Administrators AUS Survey ResultsSolarWinds
A wide-ranging survey of Australia systems administrators that captures the rapidly evolving nature of the sysadmin role and their thoughts on life inside and outside of the workplace in October 2013.
Netadmin and Sysadmin Survey Results - UKSolarWinds
A wide-ranging survey of UK network and systems administrators that captures the rapidly evolving nature of these IT Pros’ roles and their thoughts on life inside and outside of the workplace
Netadmin and Sysadmin Survey Results - AUSSolarWinds
A wide-ranging survey of Australian network and systems administrators that captures the rapidly evolving nature of these IT Pros’ roles and their thoughts on life inside and outside of the workplace
IT Alert Management Survey Results - February 2013SolarWinds
SolarWinds recently conducted a survey on IT Alert Management with participation from over 150 IT professionals. We learned about the challenges faced in managing alerts. Here are the findings…
SolarWinds Federal Cybersecurity Survey 2016SolarWinds
The results of SolarWinds' third annual federal Cybersecurity Survey, which explores the biggest barriers to improving IT security, including exposure during consolidation and modernization processes, threats from foreign governments and careless or untrained insiders. The findings also highlight how the implementation of IT security management tools help mitigate threats, strengthening security strategies.
Nearly half of IT professionals surveyed indicated that additional training in their areas of responsibility would empower them to provide more strategic guidance to business decisions. Around a third felt they were already confident in this role, while another third wanted a better understanding of business operations. Infrastructure complexity was found to have greatly impacted most IT roles in the past 3-5 years. Data analytics and security were seen as the skills most important for the future.
Nearly 90% of IT professionals feel that increased infrastructure complexity has affected their role in the last 3-5 years. Cloud computing and mobility are seen as the most important technologies for investment, and information security is the IT role that needs to adapt the most. While most IT professionals feel confident providing strategic guidance, only a third are completely confident and the majority only get occasional opportunities to provide guidance. Additional training in their areas of responsibility and a better understanding of the business are most needed for IT professionals to feel more empowered.
Threat Detection as presented at the 2016 DGI Cyber security ConferenceSolarWinds
The document discusses cyber threats and IT security. It identifies the top sources of threats as careless insiders and foreign governments. It also outlines different types of threats like technical attacks, social engineering, and physical attacks. The document concludes that understanding threat profiles and deploying appropriate defenses is important, and that tools like patch management and SIEM can help organizations detect threats faster.
A look at IT decision making, budgeting, priorities and technology adoption among UK and Germany-based SMEs based on 500 interviews (250 in the UK and 250 in Germany) with IT decision makers from private sector SME organisations.
SolarWinds Application Performance End User Survey (Denmark)SolarWinds
- The document summarizes findings from a survey of 200 Danish end users about their use of applications at work and how application performance impacts their jobs.
- Email and office applications are used daily by over 90% and 58% respectively and are most critical for performing their jobs.
- For over 40%, application performance is critical to accomplishing their work, while for 55% its importance has increased over 5 years due to more time spent using apps and increased workload.
- Over 70% contacted IT up to 10 times in the past year regarding app issues, while 10% had no contact. 65% have experienced a critical app issue at some point.
Systems Administrators UK Survey ResultsSolarWinds
A survey of 400 UK-based systems administrators found that:
1) They enjoy solving problems and helping users the most about their jobs, but feel pressures of increased workload and responsibilities with too little pay and budget.
2) Most find their jobs at least somewhat enjoyable and appreciated by their employers, though less than 20% feel highly satisfied.
3) In their free time, many enjoy activities like surfing the web, video games, and outdoor activities to relax after long work weeks that often exceed 40 hours.
SolarWinds IT Trends Report 2015: Business at the Speed of IT (North America)SolarWinds
A look at the current state of significant new technology adoption, barriers to adoption and needs of IT pros tasked with delivering business impact in North America.
Automation of IT systems can save public sector organizations time and money while increasing productivity, according to a survey of 162 IT professionals. Network configuration management was found to be the most beneficial automation tool, saving over 58% of respondents' time. While 53% of respondents said automation had not changed their IT staff sizes, 67% saw increased productivity and over 84% believed automation saved time. However, integrating tools, budget constraints, and lack of training were cited as challenges to successful automation rollout. Compliance reporting requirements were also driving many organizations' decisions to adopt automation.
Over half of IT professionals feel infrastructure complexity has greatly affected their role in the last 3-5 years. Cloud computing is seen as the most disruptive emerging technology and the most important for investment. While most IT professionals are confident in providing strategic guidance, the majority only get occasional opportunities. To feel more empowered, around half need more training in their areas and a better understanding of the business.
- The document summarizes findings from a study on application performance and availability conducted between public and private sector employees. It finds that email and office applications are used daily by 94% of respondents and are most critical to their jobs. 70% of respondents have experienced an issue with a critical application at some point. While most (76%) are satisfied with the IT department's response time, 36% reported waiting at least one business day for some issues to be resolved.
IT Trends Report 2015: Business at the Speed of IT, Public Sector ResultsSolarWinds
IT Trends Report 2015: Business at the Speed of IT
A look at the current state of significant new technology adoption, barriers to adoption and needs of IT pros tasked with delivering organizational impact
(North America, Public Sector)
This survey of IT professionals at public sector agencies found that:
1) Nearly all respondents said increasing network complexity has affected their job responsibilities in the last 3-5 years.
2) Compute virtualization and cloud computing had the largest impacts and are seen as most important for remaining competitive.
3) Only about 30% of respondents are confident in providing guidance on strategic technology decisions due to complexity.
4) Most want more training to provide better guidance on emerging technologies.
Systems Administrators AUS Survey ResultsSolarWinds
A wide-ranging survey of Australia systems administrators that captures the rapidly evolving nature of the sysadmin role and their thoughts on life inside and outside of the workplace in October 2013.
Netadmin and Sysadmin Survey Results - UKSolarWinds
A wide-ranging survey of UK network and systems administrators that captures the rapidly evolving nature of these IT Pros’ roles and their thoughts on life inside and outside of the workplace
Netadmin and Sysadmin Survey Results - AUSSolarWinds
A wide-ranging survey of Australian network and systems administrators that captures the rapidly evolving nature of these IT Pros’ roles and their thoughts on life inside and outside of the workplace
IT Alert Management Survey Results - February 2013SolarWinds
SolarWinds recently conducted a survey on IT Alert Management with participation from over 150 IT professionals. We learned about the challenges faced in managing alerts. Here are the findings…
SolarWinds Federal Cybersecurity Survey 2016SolarWinds
The results of SolarWinds' third annual federal Cybersecurity Survey, which explores the biggest barriers to improving IT security, including exposure during consolidation and modernization processes, threats from foreign governments and careless or untrained insiders. The findings also highlight how the implementation of IT security management tools help mitigate threats, strengthening security strategies.
Nearly half of IT professionals surveyed indicated that additional training in their areas of responsibility would empower them to provide more strategic guidance to business decisions. Around a third felt they were already confident in this role, while another third wanted a better understanding of business operations. Infrastructure complexity was found to have greatly impacted most IT roles in the past 3-5 years. Data analytics and security were seen as the skills most important for the future.
Nearly 90% of IT professionals feel that increased infrastructure complexity has affected their role in the last 3-5 years. Cloud computing and mobility are seen as the most important technologies for investment, and information security is the IT role that needs to adapt the most. While most IT professionals feel confident providing strategic guidance, only a third are completely confident and the majority only get occasional opportunities to provide guidance. Additional training in their areas of responsibility and a better understanding of the business are most needed for IT professionals to feel more empowered.
Threat Detection as presented at the 2016 DGI Cyber security ConferenceSolarWinds
The document discusses cyber threats and IT security. It identifies the top sources of threats as careless insiders and foreign governments. It also outlines different types of threats like technical attacks, social engineering, and physical attacks. The document concludes that understanding threat profiles and deploying appropriate defenses is important, and that tools like patch management and SIEM can help organizations detect threats faster.
A look at IT decision making, budgeting, priorities and technology adoption among UK and Germany-based SMEs based on 500 interviews (250 in the UK and 250 in Germany) with IT decision makers from private sector SME organisations.
How-To: Linux Performance Monitoring & Management for your Multi-Vendor Network SolarWinds
Need more control over Linux performance monitoring and management? SolarWinds Server & Application Monitor delivers affordable, easy-to-use Linux performance monitoring and management for your multi-vendor network. Learn how.
The document discusses the results of a survey of 298 IT professionals in the US and Canada on emerging technologies and their impact on the role of IT. Key findings include:
- Over 90% of IT professionals said infrastructure complexity has affected their role in the last 3-5 years.
- Top emerging technologies impacting businesses were compute virtualization, mobility, and cloud computing. BYOD was seen as most disruptive.
- Cloud computing and mobility were seen as most important for investment to remain competitive in the future.
- Information security and cloud skills will be most in demand, while server management and virtualization skills are most likely to be automated.
- The IT role needing most adaptation is information security.
A wide-ranging survey of US systems administrators that captures the rapidly evolving nature of the sysadmin role and their thoughts on life inside and outside of the workplace in October 2013
Kiwi Syslog Server is a log management software that collects, displays, alerts, reacts to, and forwards syslog messages and SNMP traps from network devices such as routers, switches, firewalls, and Windows® servers, and Linux® and Unix® hosts.
Learn how Kiwi Syslog Server help help you simplify syslog management in your network
Kiwi CatTools is a network automation tool that helps manage device configurations on routers, switches, firewalls.
From a simple, easy-to-use console, you can simplify network configuration management, device config backup, config change alerting, config compare, reporting and more.
SolarWinds Application Performance End User Survey (Public Sector Results)SolarWinds
The proliferation of BYOD, cloud, SaaS and consumer technologies in the public sector workplace have made the application the disruptive technology that will drive business IT into the coming decades. At the same time, the application delivery chain is becoming more complex to support as applications become more networked, virtualization drives IT infrastructure convergence and abstraction and end users become more mobile. These survey findings highlight the impact of application performance and availability on business end users, and their experiences with and expectations of IT when problems arise. Chief among the findings is that while the application is now the heart of businesses of all sizes and its performance is the lifeblood of success, IT continues to struggle to ensure its performance and availability.
Survey: Application Use & Challenges in Government IT InfrastructuresSolarWinds
A look at which applications government IT Pros are using, where applications are stored, how application problems are identified, how application performance issues are addressed, and more.
Server & Application Monitor (SAM) - Benefits SurveySolarWinds
A survey of 579 IT professionals found that implementing the Server & Application Monitor product from SolarWinds improved several key metrics:
- 85% saw improved service availability, with 39% seeing 6% or more improvement.
- Response time to fulfill new monitoring requests dropped from over 30 minutes for 80% of respondents to under 30 minutes for 59%.
- Proactive issue response increased from 14% addressing over 50% of issues to 49%.
- Root cause identification time decreased from over 3 hours for 72% to under 3 hours for 69% and staffing needs reduced.
This presentation was delivered by Julie Craig, Research Director of Enterprise Management Associates (EMA) and Kalyan Ramanathan, VP, Product Marketing AppDynamics in a webinar. Julie reveals the results of a recently conducted EMA survey of 300+ IT professionals highlighting the real-world impact of Franken-monitoring.
On-demand webinar is available at: bit.ly/Franken-Monitoring
The Expanding Role and Importance of Application Delivery Controllers [Resear...Radware
When it Comes to ADCs, Perception is Not Reality.
The Enterprise Strategy Group and Radware recently conducted a collaborative research project about the current use and future strategies of application delivery controllers (ADCs).
Based on a survey of 243 IT professionals, the research reveals that the role of ADCs has expanded well beyond the historical perception of hardware-based load balancers.
What’s most interesting is that ADCs are becoming a critical component of a defense-in-depth security strategy as enterprises fine-tune security policy and enforcement to align with their sensitive business applications. Organizations are also deploying ADCs as virtual appliances at an increasing rate and taking advantage of ADC functionality from the network through the application layer.
There is a lesson to be learned here: enterprise organizations can get creative with ADC deployments for performance tuning, application-specific services, and critical system protection. Read this research http://www.radware.com/social/esg-adc-research/ to understand the benefits of applying ADCs in this fashion.
The document discusses the results of a study on the state of mobile development and performance testing in 2014. Some key findings from the study include:
- Mobile developers are releasing app updates more frequently but still rely heavily on manual testing which is time-consuming.
- Nearly 90% of developers see a connection between app performance and user reviews/ratings.
- Top challenges for developers are testing across numerous devices/platforms and keeping up with rapid release cycles.
- Most companies use a variety of free and paid testing tools and see room for improvement in their testing processes. There is strong interest in automation to improve efficiency.
With recent dramatic changes in our global workforce, economy, and environment, the need for digital business transformation is now proven to be critical.
These slides—based on the webinar from leading IT research firm EMA and Redwood Software—explain why you should prioritize digital transformation in your organization and support those efforts with workload automation.
Performance testing is important because non-performant applications do not provide benefits to organizations and users. If applications do not deliver benefits, their continued use is questionable. Performance is important from the end-user perspective, as users do not want to experience long load times or frustration. Some common reasons for bad application performance include lack of performance considerations in design, leaving performance testing until late, and underestimating user loads.
This survey was conducted from July 16-29, 2014 to understand organizations' awareness and usage of converged systems. It found that the majority of respondents indicated their organization is either planning a migration or has already migrated some applications to converged systems. The top challenges driving interest in convergence were leveraging the cloud more effectively, complex IT environments, and poor resource utilization. Perceived obstacles included cost uncertainty and lack of skills. Anticipated benefits included improved efficiency, flexibility, and integration cost savings.
- Today, around 50% of companies allow remote work but only 30% of employees work remotely. Remote work is most effective for general productivity and sales jobs, less so for collaboration and innovation.
- Benefits of remote work include improved work-life balance, reduced real estate needs, and ability to attract workers across locations. Challenges include device and connectivity support, security, training, and regulatory compliance.
- Supporting a mobile workforce requires changes to management approaches, increased communication, and prioritizing transparency and results. Collaboration applications must also be more user-friendly and process-specific.
IT Executive Survey: Strategies for Monitoring IT Infrastructure & ServicesCA Technologies
This slide deck summarizes results from a survey to uncover key challenges IT executives face in monitoring IT Infrastructure & services. 47% of the respondents use more than 5 IT monitoring tools to monitor their IT infrastructure, while scalability and the pain of jumping from one monitoring tool to the other were one of key challenges mentioned. Learn more about CA Nimsoft Monitor Snap at http://www.ca.com/snap
The survey found that agile adoption continues to grow, with 94% of organizations now practicing agile. Larger organizations and more distributed teams are embracing agile. The top benefits remain managing changing priorities, increased productivity, and project visibility. While Scrum remains dominant, scaling frameworks like SAFe are growing in popularity. Measurement of agile success focuses on delivery metrics like timelines and quality. Barriers to further adoption include organizational culture challenges and lack of agile experience.
SolarWinds IT Trends Report 2015: Business at the Speed of IT (Singapore)SolarWinds
A look at the current state of significant new technology adoption, barriers to adoption and needs of IT pros tasked with delivering business impact in Singapore.
In July and August of 2014, S3 Group undertook a study that sought the views of leading executives from companies including Accenture, BSkyB, Comcast, Ericsson, Liberty Global, Numericable, Virgin Media, and Time Warner Cable. This report provides a snapshot of Pay-TV Service Delivery, and gives an understanding of the current opinions of Development, QA and Operations experts on build and release processes.
S3 Group is a global leader at enhancing the performance and service readiness of video platforms across connected devices. In both development and production, S3 Group provides unique insights through service validation products and platform integration services for multiscreen deployments.
For further information please visit: http://www.s3group.com/tv-technology
This document summarizes the findings of a survey of 300 small business owners and executives about their use of collaboration apps. Key findings include:
- Four out of five businesses use video/audio conferencing, online productivity apps, and file sharing in addition to email. Adoption of internal portals and instant messaging is also common.
- Email, file sharing, online productivity apps, and video/audio conferencing are considered extremely or very important to business productivity by large majorities of users.
- Collaboration apps help small businesses communicate with coworkers both internally and across office locations, as well as with remote workers, vendors, and customers.
- While collaboration apps improve work processes, many respondents note draw
These slides - based on the webinar featuring Julie Craig, research director from leading IT analyst firm Enterprise Management Associates (EMA) - provide a top five list of hints and tips for you to consider when building your DevOps strategy.
SolarWinds IT Trends Report 2015: Business at the Speed of IT (United Kingdom)SolarWinds
A look at the current state of significant new technology adoption, barriers to adoption and needs of IT pros tasked with delivering business impact in the United Kingdom.
SolarWinds IT Trends Report 2015: Business at the Speed of IT (Germany)SolarWinds
A look at the current state of significant new technology adoption, barriers to adoption and needs of IT pros tasked with delivering business impact in Germany.
Application-Driven Network Performance Strategies, Pulse Report by Gatepoint ...CA Technologies
In early 2014, CA Technologies commissioned Gatepoint Research to conduct a survey on the topic of application-driven network performance strategies. More than 200 executives participated. The survey was focused on polling respondents from large enterprises who were responsible for network administration. 78% of respondents were from organizations that had annual revenues of greater than $1.5 billion and 90% of respondents were network engineers and managers.
Learn more about Application-driven Network Performance Management from CA Technologies at http://www.ca.com/anpm
Samepage Survey: Collaboration Apps Create New Challenges for SMBsSamepage
80% of small businesses use at least three collaboration apps. But are these apps creating new challenges for you organization? We partnered with ORC to find out - see our preliminary findings in this presentation, and an opportunity to get the full report.
Similar to SolarWinds Application Performance End User Survey (Australia) (20)
SolarWinds Government and Education Webinar: Greatest SolarWinds Features I N...SolarWinds
In this webinar, our presenter Vice President of Monalytic Scott Pross discussed how to implement features of the Orion Platform that can save you time and money and improve your understanding of when or where a problem occurs in your environment.
During this webinar, our presenter addressed the following questions:
What are the hidden features?
How do I add them to my monitoring environment (including best practices)?
In what scenarios should these features be implemented?
SolarWinds Government and Education Webinar: Gaps Exist in Your Monitoring In...SolarWinds
Gaps are the number one reason critical issues are missed, and network outages occur. Find out how to quickly identify and remove these gaps in your infrastructure monitoring and streamline mitigation.
Government Webinar: Alerting and Reporting in the Age of ObservabilitySolarWinds
Let your IT team take the Orion® Alerting Engine to the next level while providing in-depth business reports to management. Learn how to harness the metric ton of data from your SolarWinds database to power your IT and executive teams in the observability era.
Government and Education Webinar: Full Stack ObservabilitySolarWinds
A significant number of application performance issues can be traced back to the database tier. Learn how Server & Application Monitor plus SolarWinds database portfolio can provide the necessary observability to troubleshoot performance problems.
Government and Education Webinar: Public Sector Cybersecurity Survey - What I...SolarWinds
Join SolarWinds® CISO, Tim Brown, and Group Vice President, Brandon Shopp for a webinar to review and discuss our most recent Public Sector Cybersecurity Survey results, including significant differences across public sector market segments and how confident the respondents were in their teams’ ability to keep up with evolving threats.
Becoming Secure By Design: Questions You Should Ask Your Software VendorsSolarWinds
The next cyberattack is always around the corner, but you can use every minor incident to help you prepare for major ones. Designing your environment with security in mind at every step will help you better prepare, and you must make sure all those who contribute to your environment are equally secure, including your software partners.
Government and Education Webinar: Real-Time Mission, CIO, and Command DashboardsSolarWinds
Learn how to empower your leadership by connecting the dots for them between IT challenges and how they affect your mission and agency services, while providing the granular IT data engineers need to resolve issues.
Government and Education Webinar: Simplify Your Database Performance Manageme...SolarWinds
Kevin Kline, a noted database expert, gave a webinar on database performance management tools from SolarWinds. He discussed challenges database professionals face, an overview of SolarWinds solutions, and how to select the right tools. Tools like Database Performance Analyzer, Database Performance Monitor, and SQL Sentry were compared for features like monitoring multiple databases, troubleshooting performance issues, and optimizing queries. Kline took questions at the end on using the tools to solve common problems and demonstrate value.
Government and Education Webinar: SolarWinds Orion Platform: Audit and Stream...SolarWinds
During this interactive webinar, our presenter discussed how to leverage major Orion® Platform alert features and use lessons learned and best practices to provide actionable information for events around your organization.
Attendees learned about:
Using enhanced node status and dependencies
Defining thresholds or baselines
Categorizing and filtering with custom properties and groups
Leveraging advanced alerting features to improve alert detail and reduce noise
Ensuring persistent issues generate or escalate alerts and alarms
Integrating with chat, ticketing, APIs, and/or SMS and providing detailed poll data
Alert actions for network devices, servers, or services on failure
Government and Education Webinar: Leverage Automation to Improve IT OperationsSolarWinds
During this interactive webinar, our presenter discussed how automation can improve support levels and maximize your resources. He also reviewed how SolarWinds® IT operations management (ITOM) solutions can help with alerts, configuration management, capacity planning, and cyberthreat response and prevention.
Attendees learned about:
Alerts—leverage intelligent alerting to notify the appropriate staff members and use thresholds to trigger alerts
Configuration management—for networks, back up and standardize configs and automate repetitive tasks during upgrades; for systems, establish baselines and get notified of changes
Capacity planning—monitor system capacity and get notified when trends indicate shortages will occur; get virtualization recommendations based on data from your environment
Threat response—establish conditions for active responses to automatically make changes to deter active cyberthreats
Government and Education Webinar: Improving Application PerformanceSolarWinds
Learn about SolarWinds® systems management tools to monitor infrastructure and help improve application performance for your organization. SolarWinds systems management tools support on-premises, cloud-based, and hybrid applications.
Government and Education: IT Tools to Support Your Hybrid WorkforceSolarWinds
SolarWinds provides an overview of their IT operations management tools to support hybrid workforces. Their portfolio includes infrastructure and network monitoring, log management, and IT service management tools. They demonstrate their ipMonitor network monitoring tool, Kiwi CatTools for network configuration management, and Kiwi Syslog Server for log collection and management. The webinar aims to show how these tools can help improve visibility, support, and resolution for both on-site and remote users.
Government and Education Webinar: There's More Than One Way to Monitor SQL Da...SolarWinds
This webinar reviews the basics of database monitoring using SQL Server features, like extended events and agent monitoring to show you how to extend and amplify your database performance monitoring effectiveness with SolarWinds products.
SolarWinds Government and Education Webinar: Virtual Technology Briefing 08.0...SolarWinds
Attendees spent the day with SolarWinds learning how to get the most out of our network, systems, database, compliance and security products, and IT support tools. We discussed how we responded to the recent security incident, and how we’re moving forward with our Secure by Design approach. Our system engineers dove into the technical details, reviewed new products and features, and demonstrated configuration and integration points.
Presentation topics included technical updates on the following:
- Network management products and scaling the Orion® Platform
- Systems and database monitoring products
- Security and compliance products
- SolarWinds ITSM and support tools
Government and Education Webinar: Zero-Trust Panel Discussion SolarWinds
This document summarizes a SolarWinds webinar on zero-trust security for government and education organizations. The webinar covered an introduction to zero-trust principles, best practices and essential elements, the NIST zero-trust architecture, and how organizations can raise their defenses. It also included presentations by SolarWinds executives and an overview of the company and its security and IT management products.
Government and Education: Leveraging The SolarWinds Orion Assistance Program ...SolarWinds
The webinar provided an overview of the SolarWinds Orion Assistance Program (OAP) which offers upgrade and hotfix assistance at no cost to eligible SolarWinds customers affected by recent security incidents. It introduced Monalytic, a SolarWinds professional services partner, and covered best practices for securing the SolarWinds environment learned from the incidents. The webinar discussed OAP eligibility and services, recommended upgrading systems and changing passwords, and answered questions.
Government and Education Webinar: SQL Server—Advanced Performance Tuning SolarWinds
During this interactive webinar, attendees learned about:
Architecture and implementation of SolarWinds® Database Performance Analyzer (DPA) on-premises and in the cloud
What matters most when looking for SQL Server performance issue
Wait times
Blocking and deadlocking
VM metrics
Host resources
What you should be looking at if you’re running Azure SQL Database
Government and Education Webinar: Recovering IP Addresses on Your NetworkSolarWinds
In this webinar, we discussed how to recover IP addresses on your network, whether abandoned, static, or reserved.
During this interactive webinar, attendees learned about:
Gain a more complete view of your network and find abandoned IP addresses
Obtain accurate, current information about the IP addresses in use on your network
Easily change the address status from “Used” to “Available”
Receive alerts when DHCP address pools exceed utilization thresholds
Government and Education Webinar: Optimize Performance With Advanced Host Mon...SolarWinds
This webinar discussed advanced host monitoring solutions from SolarWinds. It began with an overview of SolarWinds and its various IT management products. It then covered challenges with monitoring hybrid systems, tracking resource usage, and monitoring applications. The presentation demonstrated SolarWinds' host monitoring products for areas like virtual machine monitoring, web application performance, server configurations, and database performance. Additional resources and a question and answer session concluded the webinar.
Government and Education Webinar: Conquering Remote Work IT Challenges SolarWinds
In this webinar, we discussed how SolarWinds® solutions can help you overcome remote work IT challenges.
During this interactive webinar, attendees learned about:
Improve network monitoring, configuration, and VPN management with SolarWinds Network Performance Monitor (NPM) and SolarWinds Network Configuration Manager (NCM)
Monitor the server and application performance of your collaboration systems with SolarWinds Server & Application Monitor (SAM)
Utilize configuration management to efficiently deploy upgrades and improve compliance with NCM
Support users and systems remotely with tools such as SolarWinds Dameware® Remote Support (DRS) and SolarWinds Dameware Remote Everywhere (DRE)
Improve IT request management, ticket tracking, and asset management with tools like SolarWinds Web Help Desk® and SolarWinds Service Desk
Automate provisioning and permissions management with SolarWinds Access Rights Manager™ (ARM)
Locate users and devices on your network with SolarWinds User Device Tracker (UDT)
Driving Business Innovation: Latest Generative AI Advancements & Success StorySafe Software
Are you ready to revolutionize how you handle data? Join us for a webinar where we’ll bring you up to speed with the latest advancements in Generative AI technology and discover how leveraging FME with tools from giants like Google Gemini, Amazon, and Microsoft OpenAI can supercharge your workflow efficiency.
During the hour, we’ll take you through:
Guest Speaker Segment with Hannah Barrington: Dive into the world of dynamic real estate marketing with Hannah, the Marketing Manager at Workspace Group. Hear firsthand how their team generates engaging descriptions for thousands of office units by integrating diverse data sources—from PDF floorplans to web pages—using FME transformers, like OpenAIVisionConnector and AnthropicVisionConnector. This use case will show you how GenAI can streamline content creation for marketing across the board.
Ollama Use Case: Learn how Scenario Specialist Dmitri Bagh has utilized Ollama within FME to input data, create custom models, and enhance security protocols. This segment will include demos to illustrate the full capabilities of FME in AI-driven processes.
Custom AI Models: Discover how to leverage FME to build personalized AI models using your data. Whether it’s populating a model with local data for added security or integrating public AI tools, find out how FME facilitates a versatile and secure approach to AI.
We’ll wrap up with a live Q&A session where you can engage with our experts on your specific use cases, and learn more about optimizing your data workflows with AI.
This webinar is ideal for professionals seeking to harness the power of AI within their data management systems while ensuring high levels of customization and security. Whether you're a novice or an expert, gain actionable insights and strategies to elevate your data processes. Join us to see how FME and AI can revolutionize how you work with data!
Full-RAG: A modern architecture for hyper-personalizationZilliz
Mike Del Balso, CEO & Co-Founder at Tecton, presents "Full RAG," a novel approach to AI recommendation systems, aiming to push beyond the limitations of traditional models through a deep integration of contextual insights and real-time data, leveraging the Retrieval-Augmented Generation architecture. This talk will outline Full RAG's potential to significantly enhance personalization, address engineering challenges such as data management and model training, and introduce data enrichment with reranking as a key solution. Attendees will gain crucial insights into the importance of hyperpersonalization in AI, the capabilities of Full RAG for advanced personalization, and strategies for managing complex data integrations for deploying cutting-edge AI solutions.
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdfMalak Abu Hammad
Discover how MongoDB Atlas and vector search technology can revolutionize your application's search capabilities. This comprehensive presentation covers:
* What is Vector Search?
* Importance and benefits of vector search
* Practical use cases across various industries
* Step-by-step implementation guide
* Live demos with code snippets
* Enhancing LLM capabilities with vector search
* Best practices and optimization strategies
Perfect for developers, AI enthusiasts, and tech leaders. Learn how to leverage MongoDB Atlas to deliver highly relevant, context-aware search results, transforming your data retrieval process. Stay ahead in tech innovation and maximize the potential of your applications.
#MongoDB #VectorSearch #AI #SemanticSearch #TechInnovation #DataScience #LLM #MachineLearning #SearchTechnology
Unlocking Productivity: Leveraging the Potential of Copilot in Microsoft 365, a presentation by Christoforos Vlachos, Senior Solutions Manager – Modern Workplace, Uni Systems
“An Outlook of the Ongoing and Future Relationship between Blockchain Technologies and Process-aware Information Systems.” Invited talk at the joint workshop on Blockchain for Information Systems (BC4IS) and Blockchain for Trusted Data Sharing (B4TDS), co-located with with the 36th International Conference on Advanced Information Systems Engineering (CAiSE), 3 June 2024, Limassol, Cyprus.
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?Speck&Tech
ABSTRACT: A prima vista, un mattoncino Lego e la backdoor XZ potrebbero avere in comune il fatto di essere entrambi blocchi di costruzione, o dipendenze di progetti creativi e software. La realtà è che un mattoncino Lego e il caso della backdoor XZ hanno molto di più di tutto ciò in comune.
Partecipate alla presentazione per immergervi in una storia di interoperabilità, standard e formati aperti, per poi discutere del ruolo importante che i contributori hanno in una comunità open source sostenibile.
BIO: Sostenitrice del software libero e dei formati standard e aperti. È stata un membro attivo dei progetti Fedora e openSUSE e ha co-fondato l'Associazione LibreItalia dove è stata coinvolta in diversi eventi, migrazioni e formazione relativi a LibreOffice. In precedenza ha lavorato a migrazioni e corsi di formazione su LibreOffice per diverse amministrazioni pubbliche e privati. Da gennaio 2020 lavora in SUSE come Software Release Engineer per Uyuni e SUSE Manager e quando non segue la sua passione per i computer e per Geeko coltiva la sua curiosità per l'astronomia (da cui deriva il suo nickname deneb_alpha).
UiPath Test Automation using UiPath Test Suite series, part 5DianaGray10
Welcome to UiPath Test Automation using UiPath Test Suite series part 5. In this session, we will cover CI/CD with devops.
Topics covered:
CI/CD with in UiPath
End-to-end overview of CI/CD pipeline with Azure devops
Speaker:
Lyndsey Byblow, Test Suite Sales Engineer @ UiPath, Inc.
In his public lecture, Christian Timmerer provides insights into the fascinating history of video streaming, starting from its humble beginnings before YouTube to the groundbreaking technologies that now dominate platforms like Netflix and ORF ON. Timmerer also presents provocative contributions of his own that have significantly influenced the industry. He concludes by looking at future challenges and invites the audience to join in a discussion.
Threats to mobile devices are more prevalent and increasing in scope and complexity. Users of mobile devices desire to take full advantage of the features
available on those devices, but many of the features provide convenience and capability but sacrifice security. This best practices guide outlines steps the users can take to better protect personal devices and information.
Removing Uninteresting Bytes in Software FuzzingAftab Hussain
Imagine a world where software fuzzing, the process of mutating bytes in test seeds to uncover hidden and erroneous program behaviors, becomes faster and more effective. A lot depends on the initial seeds, which can significantly dictate the trajectory of a fuzzing campaign, particularly in terms of how long it takes to uncover interesting behaviour in your code. We introduce DIAR, a technique designed to speedup fuzzing campaigns by pinpointing and eliminating those uninteresting bytes in the seeds. Picture this: instead of wasting valuable resources on meaningless mutations in large, bloated seeds, DIAR removes the unnecessary bytes, streamlining the entire process.
In this work, we equipped AFL, a popular fuzzer, with DIAR and examined two critical Linux libraries -- Libxml's xmllint, a tool for parsing xml documents, and Binutil's readelf, an essential debugging and security analysis command-line tool used to display detailed information about ELF (Executable and Linkable Format). Our preliminary results show that AFL+DIAR does not only discover new paths more quickly but also achieves higher coverage overall. This work thus showcases how starting with lean and optimized seeds can lead to faster, more comprehensive fuzzing campaigns -- and DIAR helps you find such seeds.
- These are slides of the talk given at IEEE International Conference on Software Testing Verification and Validation Workshop, ICSTW 2022.
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc
How does your privacy program stack up against your peers? What challenges are privacy teams tackling and prioritizing in 2024?
In the fifth annual Global Privacy Benchmarks Survey, we asked over 1,800 global privacy professionals and business executives to share their perspectives on the current state of privacy inside and outside of their organizations. This year’s report focused on emerging areas of importance for privacy and compliance professionals, including considerations and implications of Artificial Intelligence (AI) technologies, building brand trust, and different approaches for achieving higher privacy competence scores.
See how organizational priorities and strategic approaches to data security and privacy are evolving around the globe.
This webinar will review:
- The top 10 privacy insights from the fifth annual Global Privacy Benchmarks Survey
- The top challenges for privacy leaders, practitioners, and organizations in 2024
- Key themes to consider in developing and maintaining your privacy program
Climate Impact of Software Testing at Nordic Testing DaysKari Kakkonen
My slides at Nordic Testing Days 6.6.2024
Climate impact / sustainability of software testing discussed on the talk. ICT and testing must carry their part of global responsibility to help with the climat warming. We can minimize the carbon footprint but we can also have a carbon handprint, a positive impact on the climate. Quality characteristics can be added with sustainability, and then measured continuously. Test environments can be used less, and in smaller scale and on demand. Test techniques can be used in optimizing or minimizing number of tests. Test automation can be used to speed up testing.
HCL Notes and Domino License Cost Reduction in the World of DLAUpanagenda
Webinar Recording: https://www.panagenda.com/webinars/hcl-notes-and-domino-license-cost-reduction-in-the-world-of-dlau/
The introduction of DLAU and the CCB & CCX licensing model caused quite a stir in the HCL community. As a Notes and Domino customer, you may have faced challenges with unexpected user counts and license costs. You probably have questions on how this new licensing approach works and how to benefit from it. Most importantly, you likely have budget constraints and want to save money where possible. Don’t worry, we can help with all of this!
We’ll show you how to fix common misconfigurations that cause higher-than-expected user counts, and how to identify accounts which you can deactivate to save money. There are also frequent patterns that can cause unnecessary cost, like using a person document instead of a mail-in for shared mailboxes. We’ll provide examples and solutions for those as well. And naturally we’ll explain the new licensing model.
Join HCL Ambassador Marc Thomas in this webinar with a special guest appearance from Franz Walder. It will give you the tools and know-how to stay on top of what is going on with Domino licensing. You will be able lower your cost through an optimized configuration and keep it low going forward.
These topics will be covered
- Reducing license cost by finding and fixing misconfigurations and superfluous accounts
- How do CCB and CCX licenses really work?
- Understanding the DLAU tool and how to best utilize it
- Tips for common problem areas, like team mailboxes, functional/test users, etc
- Practical examples and best practices to implement right away
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...SOFTTECHHUB
The choice of an operating system plays a pivotal role in shaping our computing experience. For decades, Microsoft's Windows has dominated the market, offering a familiar and widely adopted platform for personal and professional use. However, as technological advancements continue to push the boundaries of innovation, alternative operating systems have emerged, challenging the status quo and offering users a fresh perspective on computing.
One such alternative that has garnered significant attention and acclaim is Nitrux Linux 3.5.0, a sleek, powerful, and user-friendly Linux distribution that promises to redefine the way we interact with our devices. With its focus on performance, security, and customization, Nitrux Linux presents a compelling case for those seeking to break free from the constraints of proprietary software and embrace the freedom and flexibility of open-source computing.
GraphSummit Singapore | The Art of the Possible with Graph - Q2 2024Neo4j
Neha Bajwa, Vice President of Product Marketing, Neo4j
Join us as we explore breakthrough innovations enabled by interconnected data and AI. Discover firsthand how organizations use relationships in data to uncover contextual insights and solve our most pressing challenges – from optimizing supply chains, detecting fraud, and improving customer experiences to accelerating drug discoveries.