THE POWER OF
SOCIAL MEDIA
   HOW SOCIAL MEDIA CAN HELP
        GROW YOUR BUSINESS




             © Nexzenpro 2012
SOCIAL MEDIA MARKETING IN INDIA
(Findings of the India Social Media Report Edition 2, released by Blogworks
and NMIncite (a Nielsen/McKinsey company) at the India Social Summit 2010,
held in December in New Delhi)

                •    40% of organisations in India spend more than 10% of
                     their marketing and communication budget on digital
  40%                media
                 •   Within this, 11% are heavy spenders with more than
                     30% of digital budgets going to social media

  90%            •   90% of brands and organisations in India have already
                     engaged in social media initiatives


 Nature of brand/organisation's social media engagement programme


                                                                              Spending on Social Media marketing
                                                                              is increasing unlike other forms of online
                                                                              marketing activities. It is estimated that
                                                                              about 11% of total online advertising was
                                                                              done on social networking sites in year
                                                                              2009-10 and is expected to grow to 17% in
                                                                              year 2010-11


                                                           © Nexzenpro 2012
REACH OF SOCIAL MEDIA IN INDIA
Profile of Indian Social Media Users


                                                                                                     Social Media
                                                                                                     reach 60% of
                                                                                                        online
                                                                                                      audience in
                                                                                                         India

                                                           The age group 25-35
A survey by the US-based                                   increases its usage of
                            37% of heavy social
Nielsen Company found                                      social networks around 3
                            media users in India fall in
that 70% of social media                                   p.m., which suggests that
                            the age group of 21-30
users in India accessed a                                  working professionals
                            years (alootechie.com,                                       Most Popular Social Media Sites in India –
social networking site                                     mostly begin to ease out
                            September 2010)                                              •  Facebook – 22.1 million users
every day.                                                 at the workplace around
                                                           that time (ViziSense)         •  Orkut – 18.5 million users
                                                                                         •  Twitter – 8 million users
                                                                                         •  Ibibo – 3.45 million users

                                                                                         Source :ViziSense, July 2010

•   According to Telecom Regulatory Authority of India data, there are 83 million Internet users in India in 2010 and more
    than 56% of them are on broadband
•   Social networks enjoyed 22.49% of Total Page Views of the Indian audience, whereas websites in all categories managed to
    get only 3.86% of the total page views (Daily News & Analysis, 29 Nov 2010)


                                                      © Nexzenpro 2012
USE SOCIAL MEDIA …….
    To Build Awareness
    • If you are launching a new product/service in the
      market, create brand awareness
    • If you are re-positioning, create strong word-of-
      mouth marketing
    • Drive viewers to campaign websites and official
      website

    To Engage Customers
    • Engage with people and create brand awareness
    • Re-engage with customers, build loyalty and               As a Recruitment        As a Direct Sales
      differentiate the brand from competitors                  Agent                   Vehicle
    • Develop a brand character at the heart of advertising
      campaign and allow the character to exchange ideas        Identify brand          An excellent
      and thoughts with the consumers                           influencers and         opportunity to target
                                                                promote your brand      valued customers with
                                                                through them            specific deals and
    As a Customer Service Provider                              Expand business         special offers; targeting
    • Respond to all queries received from customers            network and seek        different customers
                                                                opportunities           with different deals
    • Launch a campaign to offer support and advice to
      consumers                                                 Recruit online social   Create an interactive
    • Distribute educational and informational content to       leaders and create a    platform to express
      stand out in the crowd                                    campaign                your business goals,
                                                                                        values and offerings




                                             © Nexzenpro 2012
Our Tool - SIMPLIFY360
Simplify360 is a web based social media
engagement and analytics platform that
offers a ONE STOP SOLUTION to the social
media needs of a business and lets you
engage with your customers and interpret
your social presence
                      Nexzenpro with its state of art tool –
                      Simplify 360, provides an easy to use platform for
                      tracking and listening to what people are talking
                      about your brand in social communities.
                                 With Simplify360 you can not only LISTEN to what your
                                 customers are talking about your brand but also ENGAGE
                                 with them!


                                                   Simplify360 lets you ANALYSE the social media
                                                   presence of your brand by giving you actionable
                                                   insights



                                           © Nexzenpro 2012
Our Social Media Tool
Brand Management: General Brand Health
TRACK REAL TIME CONVERSATIONS                        Simplify360 tracking conversation in Twitter for “McDonald”




TRACK keywords and LISTEN to brand mentions to understand how your brand is being talked
about online and act on those insights. You can filter the conversation based on location, time
zone, date, sentiment type, etc.

Once you understand how your product is perceived, you can take informed decisions to
market it better

                                         © Nexzenpro 2012
•   Get negative feedback about your brand too.

Our Social Media Tool
Brand Management: General Brand Health
DEMOGRAPHIC
                                                               Find out EXACT DETAILS about your consumers, audience or target market.




                                  Demographic for Head &
                                                               You know which demographic does your consumer belong to and what he




                                    Shoulder tweeters
                                                               likes about your product
                                                                                                              BRAND INFLUENCER




                                                                                 McDonald in Facebook
                                                                                 Brand Influencers for
SENTIMENTS
                                                Overall sentiment for the
                                                   brand McDonald




                                                                                                         KNOW who are your brand influencer. ENGAGE with
                                                                                                         them as they are a STRONG MEDIUM of word of
                                                                                                         mouth for your brand

                                                                                                         Get up, close and personal with them if you want to
                                                                                                         maximize your social media outreach
Too much negative sentiment might let you want dig
deeper to get the true picture. It’s always better to act than never and try to find out what can be done about it

                                                                            © Nexzenpro 2012
Our Social Media Tool
Brand Management: Competitor Analysis
Use Simplify360 to –
• LISTEN to your competitor’s mention to get an edge
• KNOW what your competitors are up to
• COMPARE how much your brand is doing better or worst than your
   competitors
• IDENTIFY what people are talking about your competitors

Once you understand how your brand is doing viz-a-viz your competitor,
you can take informed decisions to market it better

                                                     • Leverage the power of social media to formulate strategies on how
                                                       to TACKLE competition with your biggest competitors
                                                     • Compare the patronage demographics of your brand versus your
                                                       competitor and get meaningful INSIGHTS




Simplify360 chart showing the comparison between the popularity of Dove and Pantene


                                                         © Nexzenpro 2012
Our Social Media Tool
Brand Management: Industry Trend
•    TRACK specific keywords to understand how much your
     brand is mentioned in the industry
•    FIND relevant people and information on industry trend
•    KNOW what things are being talked about the industry
•    IDENTIFY the top blogs and sites where people usually talk
     about your industry
•    UNDERSTAND the latest industry trend and get
     meaningful insights from people talking online             Brand Influencer in Facebook




    Simplify360 tracking conversation about the credit card industry


                                                        © Nexzenpro 2012
Our Social Media Tool
Brand Management: Industry Trend
•   TRACK reasons why people
    talk negative about certain
    industry and take actions
    accordingly

    Snapshot from Simplify360
    showing negative messages
    about the fast-food

                                  •   TRACK which countries or
                                      regions are talking most
                                      about the industry
                                  •   TRACK which age groups
                                      and gender are talking
                                      most about the industry

                                  •   Once you understand the
                                      industry trend, you can
                                      take informed decisions
                                      to market your product
                                      better


                                             © Nexzenpro 2012
Our Social Media Tool
Page Management: Engagement
With Engagement Dashboard, you can
COMMUNICATE directly with your consumers and
let them know that you care

You can SEND message, follow, re-tweet, mention,
shout or assign and engage with your customers

                  CREATE

                  Polls                  With Simplify360, you can CREATE Social Media
                                         Campaigns with real time click tracing system. Not
                  URL Tracking           only do you get to define the goal for your campaign
                                         but see the progress in terms of visibility and reach
                                         of the campaign created
                  Email Campaign and

                  RSS Feeds with
                  Simplify360


                                       © Nexzenpro 2012
Our Social Media Tool
Page Management: Channel Analytics
• Get INSIGHTS into your social media channel like when do
  you get maximum visibility, what time of the day do
  people tend to click on your links, who are the people
  interested in your campaign and what’s their
  demographic can help you plan your campaigns better

• Find the interest area of your followers
• COMPARE your channel with your competitors




                                             © Nexzenpro 2012
Our Social Media Tool
Page Management: Channel Analytics




   HDFC Bank tweets both engagement and                            Canara Bank tweets only notification with its
   notification with its followers in Twitter                      followers in Twitter


   Canara Bank might want to engage with its customers and focus not only on notification




                                                © Nexzenpro 2012
Our Social Media Tool
            Simplified Reports      Simplified Consultation        In House Training
                                                                                 • Simplify360 training is
                                                                                   designed to make our users
• We will provide weekly and                                                       understand various aspects
  monthly updates of how                                                           of Simplify360 and how they
  your brand is doing, how                                                         can use it to better their
  you are faring against                                                           online presence. The
  competitors and industry                                                         training is tailor made for
  trends                          • Set up or extend an in house                   individuals, agencies and
                                    team for listening and                         business
• We understand that every          managing online
  business runs differently and     conversations                                • Based on your needs, we
  there could be a need for a                                                      design a program that would
  little more than what you       • Provide a platform for                         benefit you/ your
  just see. With our                managing online presence                       organization. The training
  customized reports, you can       without the overhead of an                     doesn't stop with one
  get to know even finer            in house solution                              program, we provide you
  details on how these online                                                      on-going training support
  conversations are affecting     • Suggestive measures on                         and resources
  your brand                        how to improve your brand
                                    performance




                                               © Nexzenpro 2012
Our Social Media Tool
 Brand Monitoring

• Creating Reports on the campaign Weekly/Monthly
  basics
• Comparing the progress and optimizing the campaign

                                                                            Reports & Updates
• Tracking the traffic of the website and
  comparing with the activities in the Social
  Media Space
                                                                          Monitoring
• After laying out the action plan
  according to the social plan chosen,
  work will start on executing the plan
  with continuous update to clients on
  the progress with the work                                 Implementation
• Client’s need would be thoroughly
  studied and understood
• Goals and expectations from the
  client will be laid down and            Understanding Client’s Needs
  accordingly will be used to plan
  the social media campaign




                                                       © Nexzenpro 2012
Our Social Media Tool
Page Management

                   Engagement
                   Top Fan App                                     Brand Monitoring & Sentiment Analysis
                   Facebook Campaigns:
                    Cartoons, Polls, Info-Graphics
                   Facebook Apps                                   Social Analytics Dashboard
                   Channel Analytics
                                                                    Schedule Messages and RSS Feed

                   Engagement                                      Personalized URL Tracking
                   Twitter Campaigns: Cartoons,
                    Polls, Info-Graphics, etc.                      Download Data and Reports
                   RSS Feed Posting
                   Channel Analytics: Weekly
                    Progress Report
                                                                    Creating Polls and Sharing

                                                                    Email Campaigns
                    Video Creation
                    Video Marketing                                Team Collaboration and Work Assignment
                    Channel Analytics: Weekly
                     Progress Report                                Email and Notification




                                                 © Nexzenpro 2012
Start Using Nexzenpro Today

                                                 Or Send a Mail to –

                                                 samir@nexzenpro.com

                                                 Or call at –
                                                 +91- 9810170858

                                                 Samir Anand
                                                 Sr. Manager – Ad Sales

                              © Nexzenpro 2012

Social Media Using Simplify360

  • 1.
    THE POWER OF SOCIALMEDIA HOW SOCIAL MEDIA CAN HELP GROW YOUR BUSINESS © Nexzenpro 2012
  • 2.
    SOCIAL MEDIA MARKETINGIN INDIA (Findings of the India Social Media Report Edition 2, released by Blogworks and NMIncite (a Nielsen/McKinsey company) at the India Social Summit 2010, held in December in New Delhi) • 40% of organisations in India spend more than 10% of their marketing and communication budget on digital 40% media • Within this, 11% are heavy spenders with more than 30% of digital budgets going to social media 90% • 90% of brands and organisations in India have already engaged in social media initiatives Nature of brand/organisation's social media engagement programme Spending on Social Media marketing is increasing unlike other forms of online marketing activities. It is estimated that about 11% of total online advertising was done on social networking sites in year 2009-10 and is expected to grow to 17% in year 2010-11 © Nexzenpro 2012
  • 3.
    REACH OF SOCIALMEDIA IN INDIA Profile of Indian Social Media Users Social Media reach 60% of online audience in India The age group 25-35 A survey by the US-based increases its usage of 37% of heavy social Nielsen Company found social networks around 3 media users in India fall in that 70% of social media p.m., which suggests that the age group of 21-30 users in India accessed a working professionals years (alootechie.com, Most Popular Social Media Sites in India – social networking site mostly begin to ease out September 2010) • Facebook – 22.1 million users every day. at the workplace around that time (ViziSense) • Orkut – 18.5 million users • Twitter – 8 million users • Ibibo – 3.45 million users Source :ViziSense, July 2010 • According to Telecom Regulatory Authority of India data, there are 83 million Internet users in India in 2010 and more than 56% of them are on broadband • Social networks enjoyed 22.49% of Total Page Views of the Indian audience, whereas websites in all categories managed to get only 3.86% of the total page views (Daily News & Analysis, 29 Nov 2010) © Nexzenpro 2012
  • 4.
    USE SOCIAL MEDIA……. To Build Awareness • If you are launching a new product/service in the market, create brand awareness • If you are re-positioning, create strong word-of- mouth marketing • Drive viewers to campaign websites and official website To Engage Customers • Engage with people and create brand awareness • Re-engage with customers, build loyalty and As a Recruitment As a Direct Sales differentiate the brand from competitors Agent Vehicle • Develop a brand character at the heart of advertising campaign and allow the character to exchange ideas Identify brand An excellent and thoughts with the consumers influencers and opportunity to target promote your brand valued customers with through them specific deals and As a Customer Service Provider Expand business special offers; targeting • Respond to all queries received from customers network and seek different customers opportunities with different deals • Launch a campaign to offer support and advice to consumers Recruit online social Create an interactive • Distribute educational and informational content to leaders and create a platform to express stand out in the crowd campaign your business goals, values and offerings © Nexzenpro 2012
  • 5.
    Our Tool -SIMPLIFY360 Simplify360 is a web based social media engagement and analytics platform that offers a ONE STOP SOLUTION to the social media needs of a business and lets you engage with your customers and interpret your social presence Nexzenpro with its state of art tool – Simplify 360, provides an easy to use platform for tracking and listening to what people are talking about your brand in social communities. With Simplify360 you can not only LISTEN to what your customers are talking about your brand but also ENGAGE with them! Simplify360 lets you ANALYSE the social media presence of your brand by giving you actionable insights © Nexzenpro 2012
  • 6.
    Our Social MediaTool Brand Management: General Brand Health TRACK REAL TIME CONVERSATIONS Simplify360 tracking conversation in Twitter for “McDonald” TRACK keywords and LISTEN to brand mentions to understand how your brand is being talked about online and act on those insights. You can filter the conversation based on location, time zone, date, sentiment type, etc. Once you understand how your product is perceived, you can take informed decisions to market it better © Nexzenpro 2012
  • 7.
    Get negative feedback about your brand too. Our Social Media Tool Brand Management: General Brand Health DEMOGRAPHIC Find out EXACT DETAILS about your consumers, audience or target market. Demographic for Head & You know which demographic does your consumer belong to and what he Shoulder tweeters likes about your product BRAND INFLUENCER McDonald in Facebook Brand Influencers for SENTIMENTS Overall sentiment for the brand McDonald KNOW who are your brand influencer. ENGAGE with them as they are a STRONG MEDIUM of word of mouth for your brand Get up, close and personal with them if you want to maximize your social media outreach Too much negative sentiment might let you want dig deeper to get the true picture. It’s always better to act than never and try to find out what can be done about it © Nexzenpro 2012
  • 8.
    Our Social MediaTool Brand Management: Competitor Analysis Use Simplify360 to – • LISTEN to your competitor’s mention to get an edge • KNOW what your competitors are up to • COMPARE how much your brand is doing better or worst than your competitors • IDENTIFY what people are talking about your competitors Once you understand how your brand is doing viz-a-viz your competitor, you can take informed decisions to market it better • Leverage the power of social media to formulate strategies on how to TACKLE competition with your biggest competitors • Compare the patronage demographics of your brand versus your competitor and get meaningful INSIGHTS Simplify360 chart showing the comparison between the popularity of Dove and Pantene © Nexzenpro 2012
  • 9.
    Our Social MediaTool Brand Management: Industry Trend • TRACK specific keywords to understand how much your brand is mentioned in the industry • FIND relevant people and information on industry trend • KNOW what things are being talked about the industry • IDENTIFY the top blogs and sites where people usually talk about your industry • UNDERSTAND the latest industry trend and get meaningful insights from people talking online Brand Influencer in Facebook Simplify360 tracking conversation about the credit card industry © Nexzenpro 2012
  • 10.
    Our Social MediaTool Brand Management: Industry Trend • TRACK reasons why people talk negative about certain industry and take actions accordingly Snapshot from Simplify360 showing negative messages about the fast-food • TRACK which countries or regions are talking most about the industry • TRACK which age groups and gender are talking most about the industry • Once you understand the industry trend, you can take informed decisions to market your product better © Nexzenpro 2012
  • 11.
    Our Social MediaTool Page Management: Engagement With Engagement Dashboard, you can COMMUNICATE directly with your consumers and let them know that you care You can SEND message, follow, re-tweet, mention, shout or assign and engage with your customers CREATE Polls With Simplify360, you can CREATE Social Media Campaigns with real time click tracing system. Not URL Tracking only do you get to define the goal for your campaign but see the progress in terms of visibility and reach of the campaign created Email Campaign and RSS Feeds with Simplify360 © Nexzenpro 2012
  • 12.
    Our Social MediaTool Page Management: Channel Analytics • Get INSIGHTS into your social media channel like when do you get maximum visibility, what time of the day do people tend to click on your links, who are the people interested in your campaign and what’s their demographic can help you plan your campaigns better • Find the interest area of your followers • COMPARE your channel with your competitors © Nexzenpro 2012
  • 13.
    Our Social MediaTool Page Management: Channel Analytics HDFC Bank tweets both engagement and Canara Bank tweets only notification with its notification with its followers in Twitter followers in Twitter Canara Bank might want to engage with its customers and focus not only on notification © Nexzenpro 2012
  • 14.
    Our Social MediaTool Simplified Reports Simplified Consultation In House Training • Simplify360 training is designed to make our users • We will provide weekly and understand various aspects monthly updates of how of Simplify360 and how they your brand is doing, how can use it to better their you are faring against online presence. The competitors and industry training is tailor made for trends • Set up or extend an in house individuals, agencies and team for listening and business • We understand that every managing online business runs differently and conversations • Based on your needs, we there could be a need for a design a program that would little more than what you • Provide a platform for benefit you/ your just see. With our managing online presence organization. The training customized reports, you can without the overhead of an doesn't stop with one get to know even finer in house solution program, we provide you details on how these online on-going training support conversations are affecting • Suggestive measures on and resources your brand how to improve your brand performance © Nexzenpro 2012
  • 15.
    Our Social MediaTool Brand Monitoring • Creating Reports on the campaign Weekly/Monthly basics • Comparing the progress and optimizing the campaign Reports & Updates • Tracking the traffic of the website and comparing with the activities in the Social Media Space Monitoring • After laying out the action plan according to the social plan chosen, work will start on executing the plan with continuous update to clients on the progress with the work Implementation • Client’s need would be thoroughly studied and understood • Goals and expectations from the client will be laid down and Understanding Client’s Needs accordingly will be used to plan the social media campaign © Nexzenpro 2012
  • 16.
    Our Social MediaTool Page Management  Engagement  Top Fan App Brand Monitoring & Sentiment Analysis  Facebook Campaigns: Cartoons, Polls, Info-Graphics  Facebook Apps Social Analytics Dashboard  Channel Analytics Schedule Messages and RSS Feed  Engagement Personalized URL Tracking  Twitter Campaigns: Cartoons, Polls, Info-Graphics, etc. Download Data and Reports  RSS Feed Posting  Channel Analytics: Weekly Progress Report Creating Polls and Sharing Email Campaigns  Video Creation  Video Marketing Team Collaboration and Work Assignment  Channel Analytics: Weekly Progress Report Email and Notification © Nexzenpro 2012
  • 17.
    Start Using NexzenproToday Or Send a Mail to – samir@nexzenpro.com Or call at – +91- 9810170858 Samir Anand Sr. Manager – Ad Sales © Nexzenpro 2012