18   I N F OWO R L D . C O M 	   03.13.06
Successful service-oriented architectures begin
with process modeling and real collaboration
between IT architects and business stakeholders

A    s SOA goes mainstream in the
     enterprise, its success may hinge
on a crucial meeting of the minds —
                                         really works and what it needs, often
                                         in isolation and with limited ability to
                                         act on their process insights.
a mashup of talent that can uncap a        Before enterprises deploy SOA on a
font of creative potential.              large scale, experts say, getting these
  On one side of the mashup are archi-   teams together in a disciplined plan-
tects and developers, who up to now      ning exercise can unlock the business
have perhaps been designing point        value that process modelers knew was
Web-services deployments or legacy       there all along.
systems wrappers. On the other side        “I think the business process model-
are business process modelers, who’ve    ers were waiting for SOA to show up,”
been mapping out how your business       says Sean Rhody, a chief architect at

BY Dav iD M a rg u l i us | ph oto g r a ph Y BY M a r k j o h a n n

                                           I N F OWO R L D . C O M 	   03.13.06     19
From Processes to Services
                                                 SOA is a better way to do application integration, but a small SOA
                                                 vision centered on integration misses the point of designing for greater business flex-
     the CSC Consulting Group. “Without          ibility. The word “service” in SOA refers to business services, which capture business
     being able to define services, they         capabilities in digital form, making them available for reconfiguration and reconnec-
     were always talking at a level that         tion to meet a constantly changing landscape of business needs.
     didn’t connect to the actual imple-            To align services with business capabilities, IT must design SOA-based business ser-
     mentation at all.”                          vices within the context of the business processes they serve. The real power of SOA
       Before SOA, says Sandy Carter, IBM’s      comes in putting analysis of technology as well as business in a tight feedback loop
     vice president of SOA and WebSphere         that aims to improve the efficiency, effectiveness, and flexibility of business process
     strategy, “you could do all this won-       operations.
     derful mapping of processes, but the           IT shops must demonstrate that they have the business savvy to participate in
     underlying technology didn’t exist          business-level discussions. Beyond “talking business language” IT must “think business
     to support any major changes in the         thoughts” in order to gain the credibility and respect needed to partner with the busi-
     process. Now IT has the technology          ness, and design digital business services that best capture the capabilities needed for
     to offer services on a business activity    the future of the business.
     basis, whereas before it was on a tech-     — Randy Heffner, Forrester Research
     nical subtask. Process is becoming
     that common vocabulary that exists
     between the business and IT.”
       And the payoff, says Forrester                                      Physical World Processes
     Research Vice President Randy Heff-
     ner, comes when the two groups work                                        Product            Reserve                   Schedule
                                                   Sample process
     together to find business processes that                                   inquiry            inventory                 production
     share common services and prioritize
     the development of those services.                                                           Create
       “It’s capturing business capability as                                                     customer
                                                                                                  order
     reusable digital services, in a way that
     can be connected to any business pro-                                                                                      Create
                                                                                Schedule                                        supplier
     cess,” Heffner explains.
                                                                                shipment                                        order
       Across a range of enterprises, IT is
     laying the groundwork for SOA de-
     ployments that will have a transfor-
     mative effect on IT, rolling out services
     that various applications can share
     and establishing governance rule for                                          Digital Services
     service design and interconnect. Yet
     woe to those who ignore business pro-
     cess planning and proceed directly to                                                 Service delivery network
     architectural design.                                             Product Reserve Schedule Create Schedule Create
       “If you don’t factor in your business                           inquiry inventory production supplier production customer
     process, you really don’t have an SOA,”                                                        order               order
     says Tim Vibbert, senior systems engi-
     neer at Lockheed Martin.
                                                                                                             Services can initiate
     Lessons From the Front                        Digital processes                                         digital processes
     What does it take to model processes
     successfully in an SOA context? Info-
                                                                                                                                            NaNcy suess




     World interviewed consultants, ana-
     lysts, and enterprise architects and got

20      I N F OWO R L D . C O M 	   03.13.06
How to Model Processes in an SOA World
                                    Consultants, IT managers, and vendors offer a range of advice for creating
                                    the process underpinnings of a successful SOA

     an earful from those on a    Choose the right process for initial SOA deployment based on the potential to     Another key is to
                                   add business value
     the front lines, among                                                                                       completely         ignore
     them Wachovia vice aIgnore organizational constraints when evaluating processes                              organizational con-
     president Rohn Griggs. a on modeling current processes as-is before redesigning them to get a
                                   Insist                                                                         straints when mapping
        “We’re just now            valid baseline                                                                 a business process,
     scratching the sur- a a long-term commitment to process modeling and an organizational
                                   Make                                                                           says Griggs. “We look
     face around SOA,” says        structure for IT/business dialogue                                             at how do we make it
     Griggs, who oversees a with a workshop and get the right stakeholders in a room to jump-start
                                   Start
                                                                                                                  end-to- end the most
     workflow, imaging, and        the discussion                                                                 efficient,       stream-
     integration technology                                                                                       lined possible even
     in the company’s busi- a top down and bottom up, simultaneously mapping out business process
                                   Work                                                                           if it crosses business
                                   goals and potential service capabilities
     ness process modeling                                                                                        boundaries.”
     “center of excellence,” a be too rigid with methodology; it’s the business/IT dialogue that
                                   Don’t                                                                             Griggs recommends
     a group that provides         matters most                                                                   working with outside
     enterprise-wide ground a     Remember that processes extend outside your organization to vendors,           consultants who can
     rules and guidance.           customers, and partners                                                        help benchmark you
        Griggs explains that a intractable disagreements and put them in the parking lot; solve the easy
                                   Take                                                                           against other organi-
     although the company          problems first                                                                 zations, but not giving
     started from the bot-                                                                                        them too much control.
     tom up, exposing legacy                                                                                      “Don’t try to do it alone,”
     apps as Web services, it’s now trying to interview subject-matter experts on he says. “You still need to run it as an in-
     orchestrate those services around busi- their perspective,” Griggs says. Then ternal project. Just use the consultant’s
     ness processes such as loan origination. his team gets down to work, developing expertise as staff augmentation.”
        “My team is trying to stand up process maps that can be played back
     some shared infrastructure with SOA to the business in a two-day validation The Great Methodology Debate
     capability,” Griggs says. “We’re good at session — including re-engineering Although process modeling has been
     business process modeling, and we’re proposals, for example, to eliminate around for years, the combo of process
     good at exposing legacy applications costs or reduce cycle time.                              modeling and SOA is still new enough
     as Web services. Now its time to say,             Be prepared for resistance from the that analysts and consultants have
     ‘Let’s bring the two together.’”               line of business when you try to map strong and often differing opinions
        To do so, Griggs is leveraging his business processes as they actually are, about best practices.
     center of excellence, which sits within Griggs warns. “You wouldn’t believe                     IBM, which worked with Wachovia
     corporate IT and now also oversees the amount of pushback we get. They’ll on its pre-SOA deployment process
     integration. The group includes prod- say, ‘We don’t need you to model, just mapping, emphasizes a rigorous meth-
     uct specialists (developers familiar do it like we tell you. I know how I do odology called component business
     with modeling), process engineers things today; I know my process is bro- modeling for synching up processes
     (who interview business users for pro- ken.’” Griggs advises IT to refuse this with services, starting with proactively
     cess-centric modeling), and a consulting type of engagement.                                  selecting the processes that will help
     organization that markets the technol-            “That’s a big lesson learned for us. differentiate businesses.
     ogy to the bank’s lines of business. The Validation of the as-is is imperative,”                “Today, people are selecting the proj-
     bank also has a roundtable steering Griggs says. “It’s an eye-opening experi- ect they dive into based on their his-
     committee for SOA and process mod- ence when the business sees a process- tory,” IBM’s Carter says. “If I’m an ERP
     eling, made up of architects from each centric view of their work. They’ll say, shop, I’ll start from an ERP perspective
     line-of-business organization.                 ‘Geez, I never thought of our process and move out. If I’m a datacentric shop,
        “The way we typically start a proj- that way. Why do we staple that in the I’ll start from my data view and move
     ect is with a daylong kickoff meeting, upper left hand corner? That’s the way out. Only 20 percent are re-architect-
     including breakout sessions where we we’ve always done it.’”                                  ing from SOA; the other 80 percent

22      I N F OWO R L D . C O M 	   03.13.06
“it’s an eye-opening experience when the business
 sees a process-centric view of their work.”
                                                                                                          — Rohn Griggs, Wachovia


 are starting with their heritage.” What      a business transformation. You need             points … success is characterized by
 enterprises should be doing, Carter          alignment of business and IT, and a             the dynamics of the process.”
 argues, is looking at their processes        set decision-making process. And you
 across the board, and identifying the        need rules for compliance — everyone            Meeting in the Middle
 highest impact opportunities — such          will use this particular service.”              Execution is key to a successful process/
 as improving customer satisfac-                    Just don’t expect any magic formu-        services mashup, according to analysts
 tion, enabling better collabora-                    las that can be applied across the       — from methods for resolving conflicts,
 tion, or more quickly getting                           board, Forrester’s Heffner says.     to grounding your assumptions in spe-
 new products to market.                                    “It’s less important to figure    cifics, to leaving room for the business-
 “If you try to start with                                      out which process mod-        use cases and SOA to evolve over time.
 ESB [enterprise ser-                                               eling method you’re          One frequent challenge that pro-
 vice bus], we’ll                                                       using, and more       cess-design teams face is getting past a
 push you to                                                               important to       small number of intractable disagree-
 look at your                                                                ensure that      ments, often while trying to consoli-
 process,”                                                                   you’re getting   date redundant legacy systems that
 Carter says.                                                               a rich dialogue   enable similar processes, CSC’s Rho-
 “The process you                                                        between the busi-    dy says. “A lot of the conflicts are turf
 select to start with                                                ness and IT,” he says.   battles, people with competing agen-
 SOA on is crucial.”                                                “Success now is char-     das,” he notes, citing billing and cus-
    As an example of how                                     acterized by personality,”       tomer information as two frequent
 small process shortcomings                               Heffner argues — the involve-       battlegrounds. “There may be anoth-
 can have huge business impacts,                      ment of self-starters who com-          er organization in the same company
 she cites a Columbian coffee com-                 bine business and IT savvy, create         that wants to do the same thing, with
 pany that had 17 different ways to           opportunities by making connections,            their own technology.”
 label a single coffee bean. “Because         build relationships around a process               The answer is what Rhody calls “the
 they had different ways to qualify it        area, and just make things happen.              parking lot”: Put the 20 percent con-
 around the world, they couldn’t tell if          “Forget about best practices,” Heffner      flict on hold while you get agreement
 they were in or out of stock — it was        says. “Take bits from here and there ... just   on the rest.
 there, but just designated a different       enough process modeling, just enough               “When people see we’ve got 80 per-
 way. It seemed like a simple little thing,   technology. This is not the kind of thing       cent agreement and are making signif-
 but it was costing the company a lot         we’ve had in the industry long enough for       icant progress, they now have to start
 of money.”                                   it to be programmatized in a way that leads     to resolve things,” Rhody explains.
    In IBM’s component business mod-          to good outcomes.”                              “Getting that forward momentum
 eling framework, consultants typically           Focus too rigidly on either pure            gives the sponsors the collateral they
 pull together diverse business stake-        process modeling or services archi-             need to push forward.”
 holders for a rigorous, full-blown map-      tecture, Heffner warns, and you could              Rhody also suggests making sure to
 ping exercise. A session with a retail       end up in a methodology boneyard.               ground your planning phase in reality
 industry client, for example, might          “Three years ago, somebody drew                 and specifics, including a shared tax-
 include representatives from IT, busi-       some maps, and they’re not really               onomy. “Most issues are about tech-
 ness administration (HR, corporate           part of any solution delivery process           nology, interoperability, and business
 strategy, financial planning, and com-       [today]. At this point, you should be           choice,” he explains. In a recent
 pliance), distribution and warehous-         establishing opportunities, design-             engagement where a client was try-
 ing ( for logistics expertise), product      ing your business as you’re design-             ing to work out the process for getting
 merchandising, and marketing.                ing your services, understanding                a single view of a customer’s financial
    “This is all about governance,” Carter    how your business will function in              holdings, for example, “it was pretty
 says. “At the very highest level of busi-    the digital world,” he says. “You don’t         clear to everybody what the process
 ness, most companies are doing it as         want to freeze either of these design           was for querying the systems. What

                                                                                                I N F OWO R L D . C O M 	   03.13.06      23
DoD Puts SOA Into Action
                                               when it comes to modeling complex business processes, the folks at the
                                               U.S. Transportation Command (U.S. Transcom) have a lot of experience. As the
                                               central defense agency responsible for worldwide air, land, and sea transportation for
     was less clear was whose definition of    the U.S. armed services, U.S. Transcom has been developing internal process architec-
     holdings should be used, and how do       tures for more than a decade.
     you get the consensus on that.”              That experience came in handy recently when, as part of a government-wide push
       Services must be grounded in the        toward SOA, it stepped up its efforts to develop services that can be leveraged across
     real world, Rhody adds. “If every time    multiple processes, both internally and by its many military partners and commercial
     your process is going to do a lookup      vendors.
     by account number, and your services         “We had a jumpstart on understanding the value of doing architecture work,” says
     don’t have an account number, they        a U.S. Transcom representative who asked not to be identified. “We have a full blown
     use a social security number, you’ve      architecture here — all the processes, including information exchange requirements
     got to know that. Starting from the       between systems. We looked at what was being driven down from the highest levels
     business process downward to ser-         on SOA by the DISA [Defense Information Systems Agency] and NII [Networks and
     vices doesn’t work — you need to          Information Integration] guys — and asked how can we start to instantiate those
     come bottom up and top down and           kinds of services against our operational processes to make them more effective.”
     meet in the middle.”                        Having spent a year evaluating actual processes, such as manifesting (for thou-
       Lockheed Martin’s Vibbert, who          sands of ships, aircraft, and railcars) or distributing ammunition, the command has
     developed a services-oriented mod-        now started building standardized services and transaction sets that will enable a
     eling methodology for his company,        more efficient flow of information and matériel throughout its far-flung network,
     includes tolerance for uncertainty as     according to the representative.
     a best practice. Vibbert’s methodol-        “We worked the business issues with the functional guys as we built the architec-
     ogy centers on breaking down goals,       ture,” the representative says. “We … essentially said to the community, We really
     business cases, and use cases, while      need to understand these business processes better.” Some of the key issues involved
     simultaneously starting to define         the many relationships the command has with external agencies, such as how to
     potential services, their SLAs, and a     manage handoffs of both information and cargo, explains Dennis Nadler, CTO of
     data model. The next step is defining     Merlin Technical Solutions, a consulting firm that supported the project.
     core or common services that can be         “One of the main thrusts is around sharing of information,” Nadler says. “In the
     re-used across use cases.                 past, when people wanted to interface with US Transcom’s GTN [Global Transporta-
       “The tricky part is when you start                                    tion Network], they had to go through a giant develop-
     defining the use cases, you can only                                       ment effort. Whereas now they can go to a registry and
     identify x number of them,” Vib-                                             discover the Web service, for example, that provides
     bert notes. “But there’s always that                                           passenger manifests for an airplane.”
     n-plus-1 that you might not think                                                   Key insights from the work done so far, accord-
     of. The nature of an SOA is ad hoc.                                               ing to the US Transcom representative, include
     Someone can re-orchestrate the ser-                                                the importance of doing up-front business
     vices in an unpredicted way and get                                                    process mapping down to a detailed level, via
     value as well.”                                                                             the architectural workshops with subject
       Because much of the execution-                                                              matter experts.
     related learning on business process                                                               “We’re one of the few government
     mapping and SOA is cumulative,                                                                   agencies that is using this type of
     experts recommend a continuous                                                                   architecture to drive the SOA envi-
     commitment to careful, collaborative                                                              ronment,” the representative adds.
     planning efforts. “Organizations are                                                               And as with many SOA initiatives,
     building this in as part of an ongoing                                                             the ultimate payoff will be a whole
     strategy to understand their business                                                               new level of agility. “We need to
     and data architecture,” says Jan Pop-                                                                be able to say, ‘I need to be able
     kin, chief strategist for architecture                                                                to readjust the planning of a
     software firm Telelogic. “As projects                                                                  shipment; I need it to go here
     come along, they plug into that.” i                                                                     and not there.’” — D.M.


24      I N F OWO R L D . C O M 	   03.13.06
APPLICATION FOR FREE SUBSCRIPTION
                   GET TECHNOLOGY RIGHT
Apply online at: http://subscribe.infoworld.com                                                                                                                          PRIORITY CODE: WW5PDF

I wish to receive a free subscription to InfoWorld.
                                                                                 K     Yes           K No             4.  Are you involved in buying, specifying, recommending
                                                                                                                      or approving the following IT products / services?
SIGNATURE                                                                               DATE                          (PLEASE CHECK ALL THAT APPLY):



A.         MAILING ADDRESS
Publisher reserves the right to limit the number of complimentary subscriptions.
                                                                                                                      Software / Products / Technologies
                                                                                                                      K 01. Customer Relationship Management
                                                                                                                      K 02. Enterprise Resource Planning
                                                                                                                                                                          K
                                                                                                                                                                          K
                                                                                                                                                                          K
                                                                                                                                                                               18.
                                                                                                                                                                               19.
                                                                                                                                                                               20.
                                                                                                                                                                                     Web / Video Conferencing
                                                                                                                                                                                     Storage
                                                                                                                                                                                     Disaster Recovery
Free subscriptions available in the U.S. (including APO and FPO) and Canada                                           K 03. Business Process Management /                 K    21.   Security
                                                                                                                             Outsourcing                                  K    22.   Anti-Virus / Content Filtering
NAME                                                                                                                  K 04. Business Intelligence / Data Mining /         K    23.   Firewall
                                                                                                                             Data Warehousing                             K    24.   VPN
TITLE
                                                                                                                      K 05. Portals                                       K    25.   Identity Management
COMPANY NAME                                                                                                          K 06. Financials / Payroll / Billing                K    26.   Authentication / Authorization
                                                                                                                      K 07. Performance / Application Management          K    27.   Intrusion Detection  Prevention
DIVISION / DEPT. / MAIL STOP                                                                                          K 08. .NET                                          K    28.   Encryption
MAILING ADDRESS
                                                                                                                      K 09. Other Software                                K    29.   Other IT Products / Technologies
                                                                                                                      K 10. Networking
CITY / STATE / ZIP / POSTAL CODE                                                                                      K 11. Web Services                                  Hardware / Peripherals
                                                                                                                                                                          K 30. Servers
Is the above address a home address?                                                 K 1. Yes        K 0. No          K 12. Content Delivery Networks
                                                                                                                                                                          K 31. Notebooks / Laptops
                                                                                                                      K 13. Network and Systems Management
                                                                                                                                                                          K 32. PDAs / Handhelds / Pocket PC /
                                                                                                                      K 14. VoIP (Voice Over IP)
E-MAIL ADDRESS
                                                                                                                      K 15. Telecommunications                                  Wireless
                                                                                                                      K 16. Wireless                                      K 33. Printers
BUSINESS PHONE (INCLUDING AREA CODE)                                         BUSINESS FAX NO. (INCLUDING AREA CODE)
                                                                                                                      K 17. Remote Access                                 K 34. Other Hardware / Peripherals


1. Over the course of one year, do you buy, specify,
recommend, or approve the purchase of the following
products or services worth:
Please include amounts for all locations of your organization. Consultants: please include what you recommend for
                                                                                                                      5. What is your organization’s primary business
your clients as well as what you buy for your own business.
                                                                                                                      activity at this location? (PLEASE CHECK ONE ONLY):
01. $100 million or more               06.   $5,000,000 to $9,999,999          11.   $100,000 to $399,999             General Business Industries                       Technology Providers
02. $50,000,000 to $99,999,999         07.   $2,500,000 to $4,999,999          12.   $50,000 to $99,999               K 01. Defense Contractor / Aerospace              K 12. Service Provider (MSP, BSP, ISP,
03. $30,000,000 to $49,999,999         08.   $1,000,000 to $2,499,999          13.   Less than $49,999                K 02. Retail / Wholesale / Distribution                  ASP, etc.)
04. $20,000,000 to $29,999,999         09.   $600,000 to $999,999              14.   None                                    (non-computer)                             K 13. Computer / Network Consultant
05. $10,000,000 to $19,999,999         10.   $400,000 to $599,999                                                     K 03. Pharmaceutical / Medical / Dental /         K 14. Systems / Network Integrator, VAR / VAD
                                                                                                                             Healthcare                                 K 15. Technology Manufacturer (hardware,
Product category                                                                               Write code in box      K 04. Financial Services / Banking                       software, peripherals, etc.)
Large systems                                                                                                         K 05. Insurance / Real Estate / Legal             K 16. Technology - Related Retailer /
Client computers                                                                                                      K 06. Transportation / Utilities                         Wholesaler / Distributor
                                                                                                                      K 07. Media (print / electronic)
Networking / Telecom (including servers)                                                                              K 08. Communication Carriers (telecomm,           Government / Education
                                                                                                                                                                        K 17. Government: federal (including military)
Wireless                                                                                                                     data comm., TV / cable)                    K 18. Government: state or local
                                                                                                                      K 09. Construction / Architecture / Engineering
Internet / Intranet / Extranet                                                                                                                                          K 19. Education
                                                                                                                      K 10. Manufacturing  Process Industries
                                                                                                                                                                              K 98. Other
Security                                                                                                                     (non-computer)
                                                                                                                      K 11. Research / Development                                    (specify)____________________________
Storage
Peripheral equipment
Software
Service / Support / Outsourcing                                                                                       6.   How many people are employed at this organization,
                                                                                                                      including all of its branches, divisions and subsidiaries?
                                                                                                                      (PLEASE CHECK ONE ONLY):

2. What is your primary job title?                                     (PLEASE CHECK ONE ONLY)                        K   1.   20,000 or more                            K    5.   500 - 999
IT / Technology Management                                   K 10. IT Staff                                           K   2.   10,000 - 19,999                           K    6.   100 - 499
K 01. CTO, CIO, CSO, Vice President                          K 11. Other IT Professional                              K   3.   5,000 - 9,999                             K    7.   50 - 99
K 02. Director                                               Corporate / Business Management                          K   4.   1,000 - 4,999                             K    8.   Less than 49
K 03. Manager / Supervisor                                   K 12. CEO, COO, President, Owner,
K 04. Network Manager / Director                                   Vice President
K 05. Engineer                                               K 13. CFO, Controller, Treasurer
K 06. Systems Analyst / Programmer /                         K 14. Director
        Architect
K 07. Other IT Management
                                                             K 15. Manager / Supervisor
                                                             K 16. Other Business Management Title
                                                                                                                      7.   Which of the following operating systems are in use
IT / Technology Professional
                                                                                                                      or planned for use at this location?
K 08. Consultant / Integrator                                          K 98. Other Title                              (PLEASE CHECK ALL THAT APPLY):
K 09. Developer                                                            (specify)____________________________      K 01. Windows XP                                   K 04. Linux / Unix / Solaris
                                                                                                                      K 02. Other Windows                                K 05. Other
                                                                                                                      K 03. Mac                                                (please specify) ___________________
3. Please indicate your job function(s)?                                             (PLEASE CHECK ALL THAT APPLY):
IT / Technology Functions                                    Corporate / Business Functions
K 01. Executive
K 02. Department Management - IT
                                                             K 09. Executive
                                                             K 10. Department Management - Business                   B. CONTACT PREFERENCES
K 03. Networks / Systems Management                          K 11. Financial / Accounting Management                  You may receive a renewal reminder via e-mail. May we send other information about InfoWorld
K 04. Applications Development                               K 12. Research / Development Management                  products, services, or research via e-mail?                K 1. Yes K 0. No
K 05. Management of Enterprise Applications                  K 13. Sales / Marketing Management
        (CRM, ERP, SCM, etc.)                                K 14. Other Business Functions                           We occasionally send our subscribers email messages with news about technology solutions and
K 06. Research / Development Management
                                                                                                                      special offers from qualified third parties. Would you like to receive these messages?
K 07. Consultant / Integrator                                          K 98. Other Functions
                                                                                                                                                                                       K 1. Yes
K 08. Other IT Functions                                                   (specify)____________________________

SOA Planning Sizing Up Your Business Processes

  • 1.
    18 I N F OWO R L D . C O M 03.13.06
  • 2.
    Successful service-oriented architecturesbegin with process modeling and real collaboration between IT architects and business stakeholders A s SOA goes mainstream in the enterprise, its success may hinge on a crucial meeting of the minds — really works and what it needs, often in isolation and with limited ability to act on their process insights. a mashup of talent that can uncap a Before enterprises deploy SOA on a font of creative potential. large scale, experts say, getting these On one side of the mashup are archi- teams together in a disciplined plan- tects and developers, who up to now ning exercise can unlock the business have perhaps been designing point value that process modelers knew was Web-services deployments or legacy there all along. systems wrappers. On the other side “I think the business process model- are business process modelers, who’ve ers were waiting for SOA to show up,” been mapping out how your business says Sean Rhody, a chief architect at BY Dav iD M a rg u l i us | ph oto g r a ph Y BY M a r k j o h a n n I N F OWO R L D . C O M 03.13.06 19
  • 3.
    From Processes toServices SOA is a better way to do application integration, but a small SOA vision centered on integration misses the point of designing for greater business flex- the CSC Consulting Group. “Without ibility. The word “service” in SOA refers to business services, which capture business being able to define services, they capabilities in digital form, making them available for reconfiguration and reconnec- were always talking at a level that tion to meet a constantly changing landscape of business needs. didn’t connect to the actual imple- To align services with business capabilities, IT must design SOA-based business ser- mentation at all.” vices within the context of the business processes they serve. The real power of SOA Before SOA, says Sandy Carter, IBM’s comes in putting analysis of technology as well as business in a tight feedback loop vice president of SOA and WebSphere that aims to improve the efficiency, effectiveness, and flexibility of business process strategy, “you could do all this won- operations. derful mapping of processes, but the IT shops must demonstrate that they have the business savvy to participate in underlying technology didn’t exist business-level discussions. Beyond “talking business language” IT must “think business to support any major changes in the thoughts” in order to gain the credibility and respect needed to partner with the busi- process. Now IT has the technology ness, and design digital business services that best capture the capabilities needed for to offer services on a business activity the future of the business. basis, whereas before it was on a tech- — Randy Heffner, Forrester Research nical subtask. Process is becoming that common vocabulary that exists between the business and IT.” And the payoff, says Forrester Physical World Processes Research Vice President Randy Heff- ner, comes when the two groups work Product Reserve Schedule Sample process together to find business processes that inquiry inventory production share common services and prioritize the development of those services. Create “It’s capturing business capability as customer order reusable digital services, in a way that can be connected to any business pro- Create Schedule supplier cess,” Heffner explains. shipment order Across a range of enterprises, IT is laying the groundwork for SOA de- ployments that will have a transfor- mative effect on IT, rolling out services that various applications can share and establishing governance rule for Digital Services service design and interconnect. Yet woe to those who ignore business pro- cess planning and proceed directly to Service delivery network architectural design. Product Reserve Schedule Create Schedule Create “If you don’t factor in your business inquiry inventory production supplier production customer process, you really don’t have an SOA,” order order says Tim Vibbert, senior systems engi- neer at Lockheed Martin. Services can initiate Lessons From the Front Digital processes digital processes What does it take to model processes successfully in an SOA context? Info- NaNcy suess World interviewed consultants, ana- lysts, and enterprise architects and got 20 I N F OWO R L D . C O M 03.13.06
  • 4.
    How to ModelProcesses in an SOA World Consultants, IT managers, and vendors offer a range of advice for creating the process underpinnings of a successful SOA an earful from those on a Choose the right process for initial SOA deployment based on the potential to Another key is to add business value the front lines, among completely ignore them Wachovia vice aIgnore organizational constraints when evaluating processes organizational con- president Rohn Griggs. a on modeling current processes as-is before redesigning them to get a Insist straints when mapping “We’re just now valid baseline a business process, scratching the sur- a a long-term commitment to process modeling and an organizational Make says Griggs. “We look face around SOA,” says structure for IT/business dialogue at how do we make it Griggs, who oversees a with a workshop and get the right stakeholders in a room to jump-start Start end-to- end the most workflow, imaging, and the discussion efficient, stream- integration technology lined possible even in the company’s busi- a top down and bottom up, simultaneously mapping out business process Work if it crosses business goals and potential service capabilities ness process modeling boundaries.” “center of excellence,” a be too rigid with methodology; it’s the business/IT dialogue that Don’t Griggs recommends a group that provides matters most working with outside enterprise-wide ground a Remember that processes extend outside your organization to vendors, consultants who can rules and guidance. customers, and partners help benchmark you Griggs explains that a intractable disagreements and put them in the parking lot; solve the easy Take against other organi- although the company problems first zations, but not giving started from the bot- them too much control. tom up, exposing legacy “Don’t try to do it alone,” apps as Web services, it’s now trying to interview subject-matter experts on he says. “You still need to run it as an in- orchestrate those services around busi- their perspective,” Griggs says. Then ternal project. Just use the consultant’s ness processes such as loan origination. his team gets down to work, developing expertise as staff augmentation.” “My team is trying to stand up process maps that can be played back some shared infrastructure with SOA to the business in a two-day validation The Great Methodology Debate capability,” Griggs says. “We’re good at session — including re-engineering Although process modeling has been business process modeling, and we’re proposals, for example, to eliminate around for years, the combo of process good at exposing legacy applications costs or reduce cycle time. modeling and SOA is still new enough as Web services. Now its time to say, Be prepared for resistance from the that analysts and consultants have ‘Let’s bring the two together.’” line of business when you try to map strong and often differing opinions To do so, Griggs is leveraging his business processes as they actually are, about best practices. center of excellence, which sits within Griggs warns. “You wouldn’t believe IBM, which worked with Wachovia corporate IT and now also oversees the amount of pushback we get. They’ll on its pre-SOA deployment process integration. The group includes prod- say, ‘We don’t need you to model, just mapping, emphasizes a rigorous meth- uct specialists (developers familiar do it like we tell you. I know how I do odology called component business with modeling), process engineers things today; I know my process is bro- modeling for synching up processes (who interview business users for pro- ken.’” Griggs advises IT to refuse this with services, starting with proactively cess-centric modeling), and a consulting type of engagement. selecting the processes that will help organization that markets the technol- “That’s a big lesson learned for us. differentiate businesses. ogy to the bank’s lines of business. The Validation of the as-is is imperative,” “Today, people are selecting the proj- bank also has a roundtable steering Griggs says. “It’s an eye-opening experi- ect they dive into based on their his- committee for SOA and process mod- ence when the business sees a process- tory,” IBM’s Carter says. “If I’m an ERP eling, made up of architects from each centric view of their work. They’ll say, shop, I’ll start from an ERP perspective line-of-business organization. ‘Geez, I never thought of our process and move out. If I’m a datacentric shop, “The way we typically start a proj- that way. Why do we staple that in the I’ll start from my data view and move ect is with a daylong kickoff meeting, upper left hand corner? That’s the way out. Only 20 percent are re-architect- including breakout sessions where we we’ve always done it.’” ing from SOA; the other 80 percent 22 I N F OWO R L D . C O M 03.13.06
  • 5.
    “it’s an eye-openingexperience when the business sees a process-centric view of their work.” — Rohn Griggs, Wachovia are starting with their heritage.” What a business transformation. You need points … success is characterized by enterprises should be doing, Carter alignment of business and IT, and a the dynamics of the process.” argues, is looking at their processes set decision-making process. And you across the board, and identifying the need rules for compliance — everyone Meeting in the Middle highest impact opportunities — such will use this particular service.” Execution is key to a successful process/ as improving customer satisfac- Just don’t expect any magic formu- services mashup, according to analysts tion, enabling better collabora- las that can be applied across the — from methods for resolving conflicts, tion, or more quickly getting board, Forrester’s Heffner says. to grounding your assumptions in spe- new products to market. “It’s less important to figure cifics, to leaving room for the business- “If you try to start with out which process mod- use cases and SOA to evolve over time. ESB [enterprise ser- eling method you’re One frequent challenge that pro- vice bus], we’ll using, and more cess-design teams face is getting past a push you to important to small number of intractable disagree- look at your ensure that ments, often while trying to consoli- process,” you’re getting date redundant legacy systems that Carter says. a rich dialogue enable similar processes, CSC’s Rho- “The process you between the busi- dy says. “A lot of the conflicts are turf select to start with ness and IT,” he says. battles, people with competing agen- SOA on is crucial.” “Success now is char- das,” he notes, citing billing and cus- As an example of how acterized by personality,” tomer information as two frequent small process shortcomings Heffner argues — the involve- battlegrounds. “There may be anoth- can have huge business impacts, ment of self-starters who com- er organization in the same company she cites a Columbian coffee com- bine business and IT savvy, create that wants to do the same thing, with pany that had 17 different ways to opportunities by making connections, their own technology.” label a single coffee bean. “Because build relationships around a process The answer is what Rhody calls “the they had different ways to qualify it area, and just make things happen. parking lot”: Put the 20 percent con- around the world, they couldn’t tell if “Forget about best practices,” Heffner flict on hold while you get agreement they were in or out of stock — it was says. “Take bits from here and there ... just on the rest. there, but just designated a different enough process modeling, just enough “When people see we’ve got 80 per- way. It seemed like a simple little thing, technology. This is not the kind of thing cent agreement and are making signif- but it was costing the company a lot we’ve had in the industry long enough for icant progress, they now have to start of money.” it to be programmatized in a way that leads to resolve things,” Rhody explains. In IBM’s component business mod- to good outcomes.” “Getting that forward momentum eling framework, consultants typically Focus too rigidly on either pure gives the sponsors the collateral they pull together diverse business stake- process modeling or services archi- need to push forward.” holders for a rigorous, full-blown map- tecture, Heffner warns, and you could Rhody also suggests making sure to ping exercise. A session with a retail end up in a methodology boneyard. ground your planning phase in reality industry client, for example, might “Three years ago, somebody drew and specifics, including a shared tax- include representatives from IT, busi- some maps, and they’re not really onomy. “Most issues are about tech- ness administration (HR, corporate part of any solution delivery process nology, interoperability, and business strategy, financial planning, and com- [today]. At this point, you should be choice,” he explains. In a recent pliance), distribution and warehous- establishing opportunities, design- engagement where a client was try- ing ( for logistics expertise), product ing your business as you’re design- ing to work out the process for getting merchandising, and marketing. ing your services, understanding a single view of a customer’s financial “This is all about governance,” Carter how your business will function in holdings, for example, “it was pretty says. “At the very highest level of busi- the digital world,” he says. “You don’t clear to everybody what the process ness, most companies are doing it as want to freeze either of these design was for querying the systems. What I N F OWO R L D . C O M 03.13.06 23
  • 6.
    DoD Puts SOAInto Action when it comes to modeling complex business processes, the folks at the U.S. Transportation Command (U.S. Transcom) have a lot of experience. As the central defense agency responsible for worldwide air, land, and sea transportation for was less clear was whose definition of the U.S. armed services, U.S. Transcom has been developing internal process architec- holdings should be used, and how do tures for more than a decade. you get the consensus on that.” That experience came in handy recently when, as part of a government-wide push Services must be grounded in the toward SOA, it stepped up its efforts to develop services that can be leveraged across real world, Rhody adds. “If every time multiple processes, both internally and by its many military partners and commercial your process is going to do a lookup vendors. by account number, and your services “We had a jumpstart on understanding the value of doing architecture work,” says don’t have an account number, they a U.S. Transcom representative who asked not to be identified. “We have a full blown use a social security number, you’ve architecture here — all the processes, including information exchange requirements got to know that. Starting from the between systems. We looked at what was being driven down from the highest levels business process downward to ser- on SOA by the DISA [Defense Information Systems Agency] and NII [Networks and vices doesn’t work — you need to Information Integration] guys — and asked how can we start to instantiate those come bottom up and top down and kinds of services against our operational processes to make them more effective.” meet in the middle.” Having spent a year evaluating actual processes, such as manifesting (for thou- Lockheed Martin’s Vibbert, who sands of ships, aircraft, and railcars) or distributing ammunition, the command has developed a services-oriented mod- now started building standardized services and transaction sets that will enable a eling methodology for his company, more efficient flow of information and matériel throughout its far-flung network, includes tolerance for uncertainty as according to the representative. a best practice. Vibbert’s methodol- “We worked the business issues with the functional guys as we built the architec- ogy centers on breaking down goals, ture,” the representative says. “We … essentially said to the community, We really business cases, and use cases, while need to understand these business processes better.” Some of the key issues involved simultaneously starting to define the many relationships the command has with external agencies, such as how to potential services, their SLAs, and a manage handoffs of both information and cargo, explains Dennis Nadler, CTO of data model. The next step is defining Merlin Technical Solutions, a consulting firm that supported the project. core or common services that can be “One of the main thrusts is around sharing of information,” Nadler says. “In the re-used across use cases. past, when people wanted to interface with US Transcom’s GTN [Global Transporta- “The tricky part is when you start tion Network], they had to go through a giant develop- defining the use cases, you can only ment effort. Whereas now they can go to a registry and identify x number of them,” Vib- discover the Web service, for example, that provides bert notes. “But there’s always that passenger manifests for an airplane.” n-plus-1 that you might not think Key insights from the work done so far, accord- of. The nature of an SOA is ad hoc. ing to the US Transcom representative, include Someone can re-orchestrate the ser- the importance of doing up-front business vices in an unpredicted way and get process mapping down to a detailed level, via value as well.” the architectural workshops with subject Because much of the execution- matter experts. related learning on business process “We’re one of the few government mapping and SOA is cumulative, agencies that is using this type of experts recommend a continuous architecture to drive the SOA envi- commitment to careful, collaborative ronment,” the representative adds. planning efforts. “Organizations are And as with many SOA initiatives, building this in as part of an ongoing the ultimate payoff will be a whole strategy to understand their business new level of agility. “We need to and data architecture,” says Jan Pop- be able to say, ‘I need to be able kin, chief strategist for architecture to readjust the planning of a software firm Telelogic. “As projects shipment; I need it to go here come along, they plug into that.” i and not there.’” — D.M. 24 I N F OWO R L D . C O M 03.13.06
  • 7.
    APPLICATION FOR FREESUBSCRIPTION GET TECHNOLOGY RIGHT Apply online at: http://subscribe.infoworld.com PRIORITY CODE: WW5PDF I wish to receive a free subscription to InfoWorld. K Yes K No 4. Are you involved in buying, specifying, recommending or approving the following IT products / services? SIGNATURE DATE (PLEASE CHECK ALL THAT APPLY): A. MAILING ADDRESS Publisher reserves the right to limit the number of complimentary subscriptions. Software / Products / Technologies K 01. Customer Relationship Management K 02. Enterprise Resource Planning K K K 18. 19. 20. Web / Video Conferencing Storage Disaster Recovery Free subscriptions available in the U.S. (including APO and FPO) and Canada K 03. Business Process Management / K 21. Security Outsourcing K 22. Anti-Virus / Content Filtering NAME K 04. Business Intelligence / Data Mining / K 23. Firewall Data Warehousing K 24. VPN TITLE K 05. Portals K 25. Identity Management COMPANY NAME K 06. Financials / Payroll / Billing K 26. Authentication / Authorization K 07. Performance / Application Management K 27. Intrusion Detection Prevention DIVISION / DEPT. / MAIL STOP K 08. .NET K 28. Encryption MAILING ADDRESS K 09. Other Software K 29. Other IT Products / Technologies K 10. Networking CITY / STATE / ZIP / POSTAL CODE K 11. Web Services Hardware / Peripherals K 30. Servers Is the above address a home address? K 1. Yes K 0. No K 12. Content Delivery Networks K 31. Notebooks / Laptops K 13. Network and Systems Management K 32. PDAs / Handhelds / Pocket PC / K 14. VoIP (Voice Over IP) E-MAIL ADDRESS K 15. Telecommunications Wireless K 16. Wireless K 33. Printers BUSINESS PHONE (INCLUDING AREA CODE) BUSINESS FAX NO. (INCLUDING AREA CODE) K 17. Remote Access K 34. Other Hardware / Peripherals 1. Over the course of one year, do you buy, specify, recommend, or approve the purchase of the following products or services worth: Please include amounts for all locations of your organization. Consultants: please include what you recommend for 5. What is your organization’s primary business your clients as well as what you buy for your own business. activity at this location? (PLEASE CHECK ONE ONLY): 01. $100 million or more 06. $5,000,000 to $9,999,999 11. $100,000 to $399,999 General Business Industries Technology Providers 02. $50,000,000 to $99,999,999 07. $2,500,000 to $4,999,999 12. $50,000 to $99,999 K 01. Defense Contractor / Aerospace K 12. Service Provider (MSP, BSP, ISP, 03. $30,000,000 to $49,999,999 08. $1,000,000 to $2,499,999 13. Less than $49,999 K 02. Retail / Wholesale / Distribution ASP, etc.) 04. $20,000,000 to $29,999,999 09. $600,000 to $999,999 14. None (non-computer) K 13. Computer / Network Consultant 05. $10,000,000 to $19,999,999 10. $400,000 to $599,999 K 03. Pharmaceutical / Medical / Dental / K 14. Systems / Network Integrator, VAR / VAD Healthcare K 15. Technology Manufacturer (hardware, Product category Write code in box K 04. Financial Services / Banking software, peripherals, etc.) Large systems K 05. Insurance / Real Estate / Legal K 16. Technology - Related Retailer / Client computers K 06. Transportation / Utilities Wholesaler / Distributor K 07. Media (print / electronic) Networking / Telecom (including servers) K 08. Communication Carriers (telecomm, Government / Education K 17. Government: federal (including military) Wireless data comm., TV / cable) K 18. Government: state or local K 09. Construction / Architecture / Engineering Internet / Intranet / Extranet K 19. Education K 10. Manufacturing Process Industries K 98. Other Security (non-computer) K 11. Research / Development (specify)____________________________ Storage Peripheral equipment Software Service / Support / Outsourcing 6. How many people are employed at this organization, including all of its branches, divisions and subsidiaries? (PLEASE CHECK ONE ONLY): 2. What is your primary job title? (PLEASE CHECK ONE ONLY) K 1. 20,000 or more K 5. 500 - 999 IT / Technology Management K 10. IT Staff K 2. 10,000 - 19,999 K 6. 100 - 499 K 01. CTO, CIO, CSO, Vice President K 11. Other IT Professional K 3. 5,000 - 9,999 K 7. 50 - 99 K 02. Director Corporate / Business Management K 4. 1,000 - 4,999 K 8. Less than 49 K 03. Manager / Supervisor K 12. CEO, COO, President, Owner, K 04. Network Manager / Director Vice President K 05. Engineer K 13. CFO, Controller, Treasurer K 06. Systems Analyst / Programmer / K 14. Director Architect K 07. Other IT Management K 15. Manager / Supervisor K 16. Other Business Management Title 7. Which of the following operating systems are in use IT / Technology Professional or planned for use at this location? K 08. Consultant / Integrator K 98. Other Title (PLEASE CHECK ALL THAT APPLY): K 09. Developer (specify)____________________________ K 01. Windows XP K 04. Linux / Unix / Solaris K 02. Other Windows K 05. Other K 03. Mac (please specify) ___________________ 3. Please indicate your job function(s)? (PLEASE CHECK ALL THAT APPLY): IT / Technology Functions Corporate / Business Functions K 01. Executive K 02. Department Management - IT K 09. Executive K 10. Department Management - Business B. CONTACT PREFERENCES K 03. Networks / Systems Management K 11. Financial / Accounting Management You may receive a renewal reminder via e-mail. May we send other information about InfoWorld K 04. Applications Development K 12. Research / Development Management products, services, or research via e-mail? K 1. Yes K 0. No K 05. Management of Enterprise Applications K 13. Sales / Marketing Management (CRM, ERP, SCM, etc.) K 14. Other Business Functions We occasionally send our subscribers email messages with news about technology solutions and K 06. Research / Development Management special offers from qualified third parties. Would you like to receive these messages? K 07. Consultant / Integrator K 98. Other Functions K 1. Yes K 08. Other IT Functions (specify)____________________________