Smart dustbin
Presented by Dr K L Mokariya, H.O.D,
GECV
When any object
comes close to
the sensing
area, the lid will
open
automatically.
Smart Dustbin
Presented by Dr K L Mokariya, H.O.D,
GECV
When a dustbin gets full, a message will be sent to the municipal
corporation.GSM modem can use its RS 232 port to communicate and
develop embedded applications. Applications like SMS control, data
transfer, remote control and logging can be developed using GSM.
Smart Dustbin
Presented by Dr K L Mokariya, H.O.D,
GECV
Smart Dustbin
Presented by Dr K L Mokariya, H.O.D,
GECV
An updated methodology
Presented by Dr K L Mokariya, H.O.D,
GECV
An Updated methodology
IR sensors will continuously monitor the status of the bin. If the bin reaches
more than certain weight, the weight sensors will trigger the message to the
concerned authority.
when the bin is filled it will give the user the details of the empty bins which
are nearby with the help of LCD display, these dustbin will generate voice
messages with the help of playback IC and speaker.
In order to avoid the decaying smell produced inside the dustbin harm-less
chemical sprinkler is used the chemical used is Baking Soda, which will
prevent decaying smell spreading around the dustbin.
Implementation of Smart Garbage collection bin using internet, IR sensor, and
raspberry pi. The IR sensors will show us the various levels of garbage in the
dustbins and also the weight sensor gets activated to send its output ahead
when its threshold level is crossed.
smart garbage management system makes the garbage collection more
efficient and the use of solar panels in such systems may reduce the energy
consumption.
Presented by Dr K L Mokariya, H.O.D,
GECV
More updated methodology
• Optical flow sensor for accurate measurements. 16 referring measurement
points allows accurate evaluation of the waste volume and the review of 3D
graphs of waste placement within your containers
• Unlike ultrasonic sensing technology, optical sensors have no blind spots from
0-4 meters, allowing for accuracy in even the smallest containers.
Presented by Dr K L Mokariya, H.O.D,
GECV
https://www.wastehero.io/en/products/sens
Benefits to the Institute
Through such kind of technological advancements your
Institution can promote National level schemes like Swachh
Bharat Abhiyan, Digital India etc.
• This technique can also be implemented in your institute to
keep its campus clean and healthy.
• Customization of such kind of techniques in your campus can
motivate our students to think about the latest innovation in
technical domains.
• Students can start their own start ups in which they can make
such kind of commercial products .
Presented by Dr K L Mokariya, H.O.D,
GECV
Benefits to villages
Overflowing of dustbins can be stopped.
• The overflowing and cleaning of smart bins will be
continuously monitored and effectively managed thus
making clean and empty bins available to common people.
• Economically Effective technique if once implemented
successfully.
• It also intends at building a clean as well as green
surroundings.
Presented by Dr K L Mokariya, H.O.D,
GECV
Smart dustbin
Presented by Dr K L Mokariya, H.O.D,
GECV
Gantt Chart showing duration of the various tasks involved in proposed
project
Thank You
for
your Attention….

smart dustbin any interseted can learn for knowledge

  • 1.
    Smart dustbin Presented byDr K L Mokariya, H.O.D, GECV When any object comes close to the sensing area, the lid will open automatically.
  • 2.
    Smart Dustbin Presented byDr K L Mokariya, H.O.D, GECV When a dustbin gets full, a message will be sent to the municipal corporation.GSM modem can use its RS 232 port to communicate and develop embedded applications. Applications like SMS control, data transfer, remote control and logging can be developed using GSM.
  • 3.
    Smart Dustbin Presented byDr K L Mokariya, H.O.D, GECV
  • 4.
    Smart Dustbin Presented byDr K L Mokariya, H.O.D, GECV
  • 5.
    An updated methodology Presentedby Dr K L Mokariya, H.O.D, GECV
  • 6.
    An Updated methodology IRsensors will continuously monitor the status of the bin. If the bin reaches more than certain weight, the weight sensors will trigger the message to the concerned authority. when the bin is filled it will give the user the details of the empty bins which are nearby with the help of LCD display, these dustbin will generate voice messages with the help of playback IC and speaker. In order to avoid the decaying smell produced inside the dustbin harm-less chemical sprinkler is used the chemical used is Baking Soda, which will prevent decaying smell spreading around the dustbin. Implementation of Smart Garbage collection bin using internet, IR sensor, and raspberry pi. The IR sensors will show us the various levels of garbage in the dustbins and also the weight sensor gets activated to send its output ahead when its threshold level is crossed. smart garbage management system makes the garbage collection more efficient and the use of solar panels in such systems may reduce the energy consumption. Presented by Dr K L Mokariya, H.O.D, GECV
  • 7.
    More updated methodology •Optical flow sensor for accurate measurements. 16 referring measurement points allows accurate evaluation of the waste volume and the review of 3D graphs of waste placement within your containers • Unlike ultrasonic sensing technology, optical sensors have no blind spots from 0-4 meters, allowing for accuracy in even the smallest containers. Presented by Dr K L Mokariya, H.O.D, GECV https://www.wastehero.io/en/products/sens
  • 8.
    Benefits to theInstitute Through such kind of technological advancements your Institution can promote National level schemes like Swachh Bharat Abhiyan, Digital India etc. • This technique can also be implemented in your institute to keep its campus clean and healthy. • Customization of such kind of techniques in your campus can motivate our students to think about the latest innovation in technical domains. • Students can start their own start ups in which they can make such kind of commercial products . Presented by Dr K L Mokariya, H.O.D, GECV
  • 9.
    Benefits to villages Overflowingof dustbins can be stopped. • The overflowing and cleaning of smart bins will be continuously monitored and effectively managed thus making clean and empty bins available to common people. • Economically Effective technique if once implemented successfully. • It also intends at building a clean as well as green surroundings. Presented by Dr K L Mokariya, H.O.D, GECV
  • 10.
    Smart dustbin Presented byDr K L Mokariya, H.O.D, GECV Gantt Chart showing duration of the various tasks involved in proposed project
  • 11.