The document is a site inspection report for fiberglass reinforced plastic spools for a flue gas desulfurization system at a thermal power plant. It verifies that the large diameter spools and smaller spools are as per the drawings. It notes that extra bonding material inside the spools is correct according to specifications and that shortages of spools and bolts will be resupplied. Repairing the inside bonding material is not recommended as it could cause cracks, and any extra material will be removed during initial testing when water flows through.