SlideShare a Scribd company logo
Solar Energy&Urban Planning
                                 Renewables Energies
                                 Civil Engineering
                                 Thermal Engineering
                                 Environment Engineering
                                 Construction
                                 Structural Engineering
                                 Process Engineering
                                 Food Factories Engineering Design
                                 Hydraulic Engineering
                                 Plants Engineering


Manuel Cabello de Alba
ka2veyo@yahoo.com

Integrated Bachelor´s and Master´s Degree:
MEng Rural Civil Engineering&Food Factories Engineering

·Master´s in Renewable Energy
·Master´s in Environmental Impact Assessment
·Master´s in Ecoaudits and Environment Management
·Master´s in Health and Safety Risks
SINGULAR PROJECTS IN GIBRALTAR (UK)
Buena Vista

                             Mid Harbour
                                           Waterport
                                           Terraces




Tunnel


                   Airport
537 DWELLINGS. NEW RESIDENTIAL DEVELOPMENT. WATERPORT
      TERRACES. GIBRALTAR (UK). BUILDING CONTRACT.
                            Budget: $83M
          Position: Construction Manager/Technical Manager
 The scheme comprises of 537 apartments in 10 blocks, varying
 in height from 4 to 9 storey’s.Car parking for 550 cars, roads,
 infrastructure services, podiums and landscaped areas are also
 to be provided for the use of the residents, along with the
 supporting ancillary accommodation in the form of meter rooms,
 waste collection areas, generators, substations, transformers,
 etc.
537 DWELLINGS. NEW RESIDENTIAL DEVELOPMENT. WATERPORT
      TERRACES. GIBRALTAR (UK). BUILDING CONTRACT.
                            Budget: $83M
          Position: Construction Manager/Technical Manager
492 DWELLINGS. NEW RENTAL HOUSES. MID HARBOUR.
      GIBRALTAR (UK). DESING&BUILDING CONTRACT.
                      Budget: $100M
                 Position: Design Manager

The scheme comprises of 492 apartments in 6 blocks, varying in
height from 6 to 8 storey’s.Car parking for 500 cars, roads,
infrastructure services, electrical distribution center, podiums
and landscaped areas are also to be provided for the use of the
residents, along with the supporting ancillary accommodation in
the form of meter rooms, waste collection areas, generators,
substations, transformers, etc
GIBRALTAR AIRPORT TUNNEL AND FRONTIER ACCESS
                 ROAD. 2011-2012
                   Budget: $80M
            Position: Technical Manager
The contract include the construction of a tunnel below sea level for
traffic and another for pedestrians under the airport runway, and a road
between the frontier and Eastern Beach. The aim of the investment is
to address the problem of traffic decongestion at the airport when
aircraft land or take off.
The contract includes design and construction of the following: (1) a
dual carriage way (four lanes) from the commercial gate at the frontier
to the junction of Eastern Beach Road and Devil’s Tower Road (via
Eastern Beach). (2) A tunnel under the eastern end of the runway
consisting of four traffic lanes and a separate tunnel for pedestrians
and a cycle path including dewatering and treatment water plant. There
will also be a tunnel control centre. (3) An aviation fuel storage tanks
farm buried underground on the north side of the runway. (4) An
offshore structure (around 100 metres off the eastern end of the
runway) to provide aircraft approach lighting required by modern
aviation practices and procedures.
GIBRALTAR AIRPORT. 2011
BUENA VISTA. GIBRALTAR 2012
  Position: Technical Manager
Singular Projects Gibraltar
Singular Projects Gibraltar
Singular Projects Gibraltar
Singular Projects Gibraltar
Singular Projects Gibraltar
Singular Projects Gibraltar
Singular Projects Gibraltar
Singular Projects Gibraltar
Singular Projects Gibraltar
Singular Projects Gibraltar
Singular Projects Gibraltar
Singular Projects Gibraltar

More Related Content

Similar to Singular Projects Gibraltar

CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)amr mahrous
 
jerry-pinder-resume
jerry-pinder-resumejerry-pinder-resume
jerry-pinder-resumeJerry Pinder
 
RHDHV Buildings Architecture 2008-18
RHDHV Buildings Architecture 2008-18RHDHV Buildings Architecture 2008-18
RHDHV Buildings Architecture 2008-18
Mauritz Kruger
 
MEC - COMPANY PROFILE
MEC - COMPANY PROFILEMEC - COMPANY PROFILE
MEC - COMPANY PROFILECarlos Camino
 
Scandinavian Rail Development 2013 - Eskil Sellgren
Scandinavian Rail Development 2013 - Eskil SellgrenScandinavian Rail Development 2013 - Eskil Sellgren
Scandinavian Rail Development 2013 - Eskil SellgrenRussell Publishing
 
Sustainable design & bim technology
Sustainable design & bim technologySustainable design & bim technology
Sustainable design & bim technology
Omar Selim
 
Sustainable design & bim technology
Sustainable design & bim technologySustainable design & bim technology
Sustainable design & bim technology
Omar Selim
 
DSD-INT 2017 New features in iMOD for the dissemination of geological models ...
DSD-INT 2017 New features in iMOD for the dissemination of geological models ...DSD-INT 2017 New features in iMOD for the dissemination of geological models ...
DSD-INT 2017 New features in iMOD for the dissemination of geological models ...
Deltares
 
L&t
L&tL&t
A Slum Redevelopment Project
A Slum Redevelopment ProjectA Slum Redevelopment Project
Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy
 

Similar to Singular Projects Gibraltar (20)

Singular Projects Gibraltar
Singular Projects GibraltarSingular Projects Gibraltar
Singular Projects Gibraltar
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
 
KWKCV16
KWKCV16KWKCV16
KWKCV16
 
Oct. -2015-CV
Oct. -2015-CVOct. -2015-CV
Oct. -2015-CV
 
Breviary Photographic Projects
Breviary Photographic ProjectsBreviary Photographic Projects
Breviary Photographic Projects
 
jerry-pinder-resume
jerry-pinder-resumejerry-pinder-resume
jerry-pinder-resume
 
David's CV, 2017
David's CV, 2017David's CV, 2017
David's CV, 2017
 
RHDHV Buildings Architecture 2008-18
RHDHV Buildings Architecture 2008-18RHDHV Buildings Architecture 2008-18
RHDHV Buildings Architecture 2008-18
 
MEC - COMPANY PROFILE
MEC - COMPANY PROFILEMEC - COMPANY PROFILE
MEC - COMPANY PROFILE
 
Scandinavian Rail Development 2013 - Eskil Sellgren
Scandinavian Rail Development 2013 - Eskil SellgrenScandinavian Rail Development 2013 - Eskil Sellgren
Scandinavian Rail Development 2013 - Eskil Sellgren
 
CV-VA- March2016
CV-VA- March2016CV-VA- March2016
CV-VA- March2016
 
Sustainable design & bim technology
Sustainable design & bim technologySustainable design & bim technology
Sustainable design & bim technology
 
Sustainable design & bim technology
Sustainable design & bim technologySustainable design & bim technology
Sustainable design & bim technology
 
DSD-INT 2017 New features in iMOD for the dissemination of geological models ...
DSD-INT 2017 New features in iMOD for the dissemination of geological models ...DSD-INT 2017 New features in iMOD for the dissemination of geological models ...
DSD-INT 2017 New features in iMOD for the dissemination of geological models ...
 
L&t
L&tL&t
L&t
 
A Slum Redevelopment Project
A Slum Redevelopment ProjectA Slum Redevelopment Project
A Slum Redevelopment Project
 
Mohamed Morshed
Mohamed MorshedMohamed Morshed
Mohamed Morshed
 
Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15
 
John_Buckley_CV_Dec 2016
John_Buckley_CV_Dec 2016John_Buckley_CV_Dec 2016
John_Buckley_CV_Dec 2016
 
Jonathan Hemming CV
Jonathan Hemming CVJonathan Hemming CV
Jonathan Hemming CV
 

Recently uploaded

FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Product School
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
91mobiles
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
Safe Software
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Jeffrey Haguewood
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
OnBoard
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
Guy Korland
 
JMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and GrafanaJMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and Grafana
RTTS
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
Kari Kakkonen
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
Sri Ambati
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
BookNet Canada
 
Search and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical FuturesSearch and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical Futures
Bhaskar Mitra
 
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
Product School
 
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Inflectra
 
ODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User GroupODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User Group
CatarinaPereira64715
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
Cheryl Hung
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
Frank van Harmelen
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
Thijs Feryn
 

Recently uploaded (20)

FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
 
JMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and GrafanaJMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and Grafana
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
 
Search and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical FuturesSearch and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical Futures
 
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
 
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
 
ODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User GroupODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User Group
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
 

Singular Projects Gibraltar

  • 1. Solar Energy&Urban Planning Renewables Energies Civil Engineering Thermal Engineering Environment Engineering Construction Structural Engineering Process Engineering Food Factories Engineering Design Hydraulic Engineering Plants Engineering Manuel Cabello de Alba ka2veyo@yahoo.com Integrated Bachelor´s and Master´s Degree: MEng Rural Civil Engineering&Food Factories Engineering ·Master´s in Renewable Energy ·Master´s in Environmental Impact Assessment ·Master´s in Ecoaudits and Environment Management ·Master´s in Health and Safety Risks
  • 2. SINGULAR PROJECTS IN GIBRALTAR (UK)
  • 3. Buena Vista Mid Harbour Waterport Terraces Tunnel Airport
  • 4. 537 DWELLINGS. NEW RESIDENTIAL DEVELOPMENT. WATERPORT TERRACES. GIBRALTAR (UK). BUILDING CONTRACT. Budget: $83M Position: Construction Manager/Technical Manager The scheme comprises of 537 apartments in 10 blocks, varying in height from 4 to 9 storey’s.Car parking for 550 cars, roads, infrastructure services, podiums and landscaped areas are also to be provided for the use of the residents, along with the supporting ancillary accommodation in the form of meter rooms, waste collection areas, generators, substations, transformers, etc.
  • 5. 537 DWELLINGS. NEW RESIDENTIAL DEVELOPMENT. WATERPORT TERRACES. GIBRALTAR (UK). BUILDING CONTRACT. Budget: $83M Position: Construction Manager/Technical Manager
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23. 492 DWELLINGS. NEW RENTAL HOUSES. MID HARBOUR. GIBRALTAR (UK). DESING&BUILDING CONTRACT. Budget: $100M Position: Design Manager The scheme comprises of 492 apartments in 6 blocks, varying in height from 6 to 8 storey’s.Car parking for 500 cars, roads, infrastructure services, electrical distribution center, podiums and landscaped areas are also to be provided for the use of the residents, along with the supporting ancillary accommodation in the form of meter rooms, waste collection areas, generators, substations, transformers, etc
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43.
  • 44.
  • 45. GIBRALTAR AIRPORT TUNNEL AND FRONTIER ACCESS ROAD. 2011-2012 Budget: $80M Position: Technical Manager The contract include the construction of a tunnel below sea level for traffic and another for pedestrians under the airport runway, and a road between the frontier and Eastern Beach. The aim of the investment is to address the problem of traffic decongestion at the airport when aircraft land or take off. The contract includes design and construction of the following: (1) a dual carriage way (four lanes) from the commercial gate at the frontier to the junction of Eastern Beach Road and Devil’s Tower Road (via Eastern Beach). (2) A tunnel under the eastern end of the runway consisting of four traffic lanes and a separate tunnel for pedestrians and a cycle path including dewatering and treatment water plant. There will also be a tunnel control centre. (3) An aviation fuel storage tanks farm buried underground on the north side of the runway. (4) An offshore structure (around 100 metres off the eastern end of the runway) to provide aircraft approach lighting required by modern aviation practices and procedures.
  • 46.
  • 47.
  • 48.
  • 49.
  • 50.
  • 51.
  • 53.
  • 54.
  • 55.
  • 56.
  • 57.
  • 58.
  • 59.
  • 60.
  • 61. BUENA VISTA. GIBRALTAR 2012 Position: Technical Manager