Siemens Metering Limited – PCB / Assembly Data Release
Siemens Doc release.doc Page 1 of 1 10/11/09
ITERATIVE LOOP
Iterative, Concurrent design process
THE PCB INFORMATION PACKAGE
*file name: BC8811AB
PCA Assembly 4 622 8811 0
PCA Drawing D4 622 8811 0
PCB Mech. Drg. in gerber D4 425 6905 0
Schematic in gerber S4 425 6905 1
Gerber Data G4 425 6905 2
Netlist N4 425 6905 3
Placement P4 425 6905 4
Changes to
Prototype
BOM & PCB
driven by F181
4th
Shift BOM
‘Extract’ into
Excel
New
component
OTI’s
ECO’s for
released BOM
PCB & Comps.
RFFI raised for
CAD files &
BOM Preliminary Excel BOM’s & CAD released to CEM
Prototype 4th
shift BOM
Release of updated
OTI database
Engineering Data: document release
drawings / data, generate ECO
Email Package to Procurement, with ECO.
Procurement send package to CEM.
The Build Sheet effectively replaces the
Advice Note.
CIM-Bridge
Placement machine
programming
Pre-release data
Emailed direct,
Procurement &
NPI are informed.
ATE Supplier
For in-circuit
test
Test Engineering
At Oldham or
Telford
NPI ENGINEER
Procurement of
new components
to SML BOM
PCB
supplier
Solder Paste
Screen
supplier
*File Name definition: BC8811AB
BC Build Control Sheet
8811 Assy. Number, i.e. the four sequential digits of: 4 622 8811 0.
AB Build Control File revision number. This is incremented every
time data is either added to the file, or modified. The BC Sheet is
then updated and the file sent to Procurement; CEM; Test Eng.
NPI etc.

More Related Content

Similar to Siemens Doc release

Arnold Labares Early Career Notable Projects [downloadable]
Arnold Labares Early Career Notable Projects [downloadable]Arnold Labares Early Career Notable Projects [downloadable]
Arnold Labares Early Career Notable Projects [downloadable]Arnold Labares
 
Introduction to VLSI
Introduction to VLSI Introduction to VLSI
Introduction to VLSI illpa
 
ODSA PoC Physical Design Elements
ODSA PoC Physical Design ElementsODSA PoC Physical Design Elements
ODSA PoC Physical Design Elementsjennimenni
 
ODSA - PoC Physical Design Elements
ODSA - PoC Physical Design ElementsODSA - PoC Physical Design Elements
ODSA - PoC Physical Design ElementsODSA Workgroup
 
Dell supply chain integration
Dell supply chain integrationDell supply chain integration
Dell supply chain integrationDeepak25
 
Cell Broadband EngineTM: and Cell/B.E. based blade technology
Cell Broadband EngineTM: and Cell/B.E. based blade technologyCell Broadband EngineTM: and Cell/B.E. based blade technology
Cell Broadband EngineTM: and Cell/B.E. based blade technologySlide_N
 
09.50 Ernst Vrolijks
09.50 Ernst Vrolijks09.50 Ernst Vrolijks
09.50 Ernst VrolijksThemadagen
 
Additive manufacturing metal
Additive manufacturing metalAdditive manufacturing metal
Additive manufacturing metalHARI ADAVALLI
 
Ethernet summit 2011_toe
Ethernet summit 2011_toeEthernet summit 2011_toe
Ethernet summit 2011_toeintilop
 
Road Mapping 3b
Road Mapping  3bRoad Mapping  3b
Road Mapping 3babstrused1
 
Building information modeling
Building information modelingBuilding information modeling
Building information modelingmichaeljmack
 
Comtrade file manipulationver1
Comtrade file manipulationver1Comtrade file manipulationver1
Comtrade file manipulationver1Jay Gosalia
 
Eplan - Esrral Selvam
Eplan - Esrral SelvamEplan - Esrral Selvam
Eplan - Esrral SelvamEsrral Selvam
 
DATA CENTER MANAGEMENT - Business as usual tasks and Processes
DATA CENTER MANAGEMENT - Business as usual tasks and ProcessesDATA CENTER MANAGEMENT - Business as usual tasks and Processes
DATA CENTER MANAGEMENT - Business as usual tasks and Processesclashngpinoy
 

Similar to Siemens Doc release (20)

Arnold Labares Early Career Notable Projects [downloadable]
Arnold Labares Early Career Notable Projects [downloadable]Arnold Labares Early Career Notable Projects [downloadable]
Arnold Labares Early Career Notable Projects [downloadable]
 
Introduction to VLSI
Introduction to VLSI Introduction to VLSI
Introduction to VLSI
 
ODSA PoC Physical Design Elements
ODSA PoC Physical Design ElementsODSA PoC Physical Design Elements
ODSA PoC Physical Design Elements
 
ODSA - PoC Physical Design Elements
ODSA - PoC Physical Design ElementsODSA - PoC Physical Design Elements
ODSA - PoC Physical Design Elements
 
GRA16-8
GRA16-8GRA16-8
GRA16-8
 
Dell supply chain integration
Dell supply chain integrationDell supply chain integration
Dell supply chain integration
 
2015-12-1 IMechE Lightweighting_v2
2015-12-1 IMechE Lightweighting_v22015-12-1 IMechE Lightweighting_v2
2015-12-1 IMechE Lightweighting_v2
 
SEBING_EN
SEBING_ENSEBING_EN
SEBING_EN
 
Cell Broadband EngineTM: and Cell/B.E. based blade technology
Cell Broadband EngineTM: and Cell/B.E. based blade technologyCell Broadband EngineTM: and Cell/B.E. based blade technology
Cell Broadband EngineTM: and Cell/B.E. based blade technology
 
09.50 Ernst Vrolijks
09.50 Ernst Vrolijks09.50 Ernst Vrolijks
09.50 Ernst Vrolijks
 
Additive manufacturing metal
Additive manufacturing metalAdditive manufacturing metal
Additive manufacturing metal
 
PLC Training Intro
PLC Training IntroPLC Training Intro
PLC Training Intro
 
Ethernet summit 2011_toe
Ethernet summit 2011_toeEthernet summit 2011_toe
Ethernet summit 2011_toe
 
Road Mapping 3b
Road Mapping  3bRoad Mapping  3b
Road Mapping 3b
 
Building information modeling
Building information modelingBuilding information modeling
Building information modeling
 
Neurons On Wheels - Work Organisation
Neurons On Wheels - Work OrganisationNeurons On Wheels - Work Organisation
Neurons On Wheels - Work Organisation
 
Comtrade file manipulationver1
Comtrade file manipulationver1Comtrade file manipulationver1
Comtrade file manipulationver1
 
Eplan - Esrral Selvam
Eplan - Esrral SelvamEplan - Esrral Selvam
Eplan - Esrral Selvam
 
Ken Naumann925
Ken Naumann925Ken Naumann925
Ken Naumann925
 
DATA CENTER MANAGEMENT - Business as usual tasks and Processes
DATA CENTER MANAGEMENT - Business as usual tasks and ProcessesDATA CENTER MANAGEMENT - Business as usual tasks and Processes
DATA CENTER MANAGEMENT - Business as usual tasks and Processes
 

More from Paul Rouse

Cutaway Drawing-A4
Cutaway Drawing-A4Cutaway Drawing-A4
Cutaway Drawing-A4Paul Rouse
 
Measle Effect Rev 2
Measle Effect Rev 2Measle Effect Rev 2
Measle Effect Rev 2Paul Rouse
 
L&G EI_Release Proc
L&G EI_Release ProcL&G EI_Release Proc
L&G EI_Release ProcPaul Rouse
 
Hardware Process Improvement
Hardware Process ImprovementHardware Process Improvement
Hardware Process ImprovementPaul Rouse
 
PDS-Development Roadmap
PDS-Development RoadmapPDS-Development Roadmap
PDS-Development RoadmapPaul Rouse
 
PDS Company Manual Rev_d 190404a
PDS Company Manual Rev_d 190404aPDS Company Manual Rev_d 190404a
PDS Company Manual Rev_d 190404aPaul Rouse
 
OBA EOL PRE RUN In JUNE06a
OBA EOL PRE RUN In JUNE06aOBA EOL PRE RUN In JUNE06a
OBA EOL PRE RUN In JUNE06aPaul Rouse
 
Temp Proc - Operations Reporting
Temp Proc - Operations ReportingTemp Proc - Operations Reporting
Temp Proc - Operations ReportingPaul Rouse
 
Temp Proc - GSX Ecalation Rev B
Temp Proc - GSX Ecalation Rev BTemp Proc - GSX Ecalation Rev B
Temp Proc - GSX Ecalation Rev BPaul Rouse
 
WI-134-1A Mitutoyo
WI-134-1A MitutoyoWI-134-1A Mitutoyo
WI-134-1A MitutoyoPaul Rouse
 
UGUIDE-007-1D Sharepoint User Guide
UGUIDE-007-1D Sharepoint User GuideUGUIDE-007-1D Sharepoint User Guide
UGUIDE-007-1D Sharepoint User GuidePaul Rouse
 
Jerusalem 2015 journal rev d
Jerusalem 2015 journal rev dJerusalem 2015 journal rev d
Jerusalem 2015 journal rev dPaul Rouse
 
B Section 16 AutoCAD Paperspace
B Section 16 AutoCAD PaperspaceB Section 16 AutoCAD Paperspace
B Section 16 AutoCAD PaperspacePaul Rouse
 

More from Paul Rouse (13)

Cutaway Drawing-A4
Cutaway Drawing-A4Cutaway Drawing-A4
Cutaway Drawing-A4
 
Measle Effect Rev 2
Measle Effect Rev 2Measle Effect Rev 2
Measle Effect Rev 2
 
L&G EI_Release Proc
L&G EI_Release ProcL&G EI_Release Proc
L&G EI_Release Proc
 
Hardware Process Improvement
Hardware Process ImprovementHardware Process Improvement
Hardware Process Improvement
 
PDS-Development Roadmap
PDS-Development RoadmapPDS-Development Roadmap
PDS-Development Roadmap
 
PDS Company Manual Rev_d 190404a
PDS Company Manual Rev_d 190404aPDS Company Manual Rev_d 190404a
PDS Company Manual Rev_d 190404a
 
OBA EOL PRE RUN In JUNE06a
OBA EOL PRE RUN In JUNE06aOBA EOL PRE RUN In JUNE06a
OBA EOL PRE RUN In JUNE06a
 
Temp Proc - Operations Reporting
Temp Proc - Operations ReportingTemp Proc - Operations Reporting
Temp Proc - Operations Reporting
 
Temp Proc - GSX Ecalation Rev B
Temp Proc - GSX Ecalation Rev BTemp Proc - GSX Ecalation Rev B
Temp Proc - GSX Ecalation Rev B
 
WI-134-1A Mitutoyo
WI-134-1A MitutoyoWI-134-1A Mitutoyo
WI-134-1A Mitutoyo
 
UGUIDE-007-1D Sharepoint User Guide
UGUIDE-007-1D Sharepoint User GuideUGUIDE-007-1D Sharepoint User Guide
UGUIDE-007-1D Sharepoint User Guide
 
Jerusalem 2015 journal rev d
Jerusalem 2015 journal rev dJerusalem 2015 journal rev d
Jerusalem 2015 journal rev d
 
B Section 16 AutoCAD Paperspace
B Section 16 AutoCAD PaperspaceB Section 16 AutoCAD Paperspace
B Section 16 AutoCAD Paperspace
 

Siemens Doc release

  • 1. Siemens Metering Limited – PCB / Assembly Data Release Siemens Doc release.doc Page 1 of 1 10/11/09 ITERATIVE LOOP Iterative, Concurrent design process THE PCB INFORMATION PACKAGE *file name: BC8811AB PCA Assembly 4 622 8811 0 PCA Drawing D4 622 8811 0 PCB Mech. Drg. in gerber D4 425 6905 0 Schematic in gerber S4 425 6905 1 Gerber Data G4 425 6905 2 Netlist N4 425 6905 3 Placement P4 425 6905 4 Changes to Prototype BOM & PCB driven by F181 4th Shift BOM ‘Extract’ into Excel New component OTI’s ECO’s for released BOM PCB & Comps. RFFI raised for CAD files & BOM Preliminary Excel BOM’s & CAD released to CEM Prototype 4th shift BOM Release of updated OTI database Engineering Data: document release drawings / data, generate ECO Email Package to Procurement, with ECO. Procurement send package to CEM. The Build Sheet effectively replaces the Advice Note. CIM-Bridge Placement machine programming Pre-release data Emailed direct, Procurement & NPI are informed. ATE Supplier For in-circuit test Test Engineering At Oldham or Telford NPI ENGINEER Procurement of new components to SML BOM PCB supplier Solder Paste Screen supplier *File Name definition: BC8811AB BC Build Control Sheet 8811 Assy. Number, i.e. the four sequential digits of: 4 622 8811 0. AB Build Control File revision number. This is incremented every time data is either added to the file, or modified. The BC Sheet is then updated and the file sent to Procurement; CEM; Test Eng. NPI etc.