Shrikant Dorle
Shubhashri Residential, Phase III, Near Fame Jai Ganesh Inox Theatre,
Building 1A/A, Flat No 304, Akurdi, Pune : 411035 MOB NO : +91 - 9049800335
Seeking Challenging Senior Level Assignment as…
Procurement Manager in Engineering & manufacturing Sector
Expertise in: Purchase Operations, Vendor Management/ Development, Material Management, Stores
Management, Quality Assurance.
Professional Synopsis
 A sincere and Competent professional with an experience of 10.0 years in material planning,
sourcing, procurement, logistics and inventory management in the Automobile and Aerospace
Industry.
 Expertise in formulating sourcing strategies, vendor identification and development, supply chain
management and analytical assessment for various grades of Material.
 A strategic planner with expertise in implementing cost saving measures to achieve reduction in terms
of raw material, procurement costs, and logistics cost.
 Extensive knowledge in updated technology, computer applications and its successful innovative
implementation.
 A good communicator with an ability to relate to people at any levels of business.
Key Deliverable s
Market Analysis & Planning
 Strategic planning for effective sourcing of components by interacting with manufacturing and Sales
Personnel.
 Documentation and study of market trends and competitor pricing to negotiate with vendors.
Sourcing/Procurement
 Identifying and developing vendors and negotiating commercial terms to achieve optimum price
levels and definite delivery schedules.
 Carrying out regular quality audits at suppliers end to ensure quality standards as per specifications.
Material Management
 Streamlining the system and procedures for effective inventory control for ensuring ready availability
of materials to meet the production targets.
 Maintaining optimum stock levels to decrease inventory holding costs.
Relationship Management
 Mentoring, managing and leading a team of professionals for smooth functioning of the organization.
 Interacting with distributors and end users to understand customer needs and areas of improvement.
Career Summary
Amphenol Interconnect India Pvt Ltd. (IMS Division)
Team Leader: Supply Chain Procurement, 12th
May 2012 to till date
A Worldwide Vision Connecting People with Technology
Amphenol is one of the largest manufacturers of interconnect products in the world. The Company
designs, manufactures and markets electrical, electronic and fiber optic connectors, coaxial and flat-
ribbon cable, and interconnect systems.
(A) Present Job Responsibilities
(B) Implement purchase plans to assure an orders to meet specified quality and delivery times and to minimize the
total cost of purchases.
(C) Establishes supplier base in conformance with respect to the project requirement.
(D) Handles requests for information, quotations, proposals, and bidding processes.
(E) Evaluates current and potential suppliers in co-ordination with Supplier Quality Teams.
(F) Negotiates with suppliers to meet quality, delivery, and cost objectives.
(G) Executes contract, negotiation and development with respect to project requirements.
(H) Evaluating supplier delivery performance on monthly basis and attempt to resolve delivery issues.
(I) Maintaining & following supplier safety stock performance in order to meet on timely delivery as per lean
guidelines.
(J) Reviewing maximum standard inventory once in quarter in order to have correct stock level of all the
top runner & slow runner components w.r.t. consumption level to meet delivery targets
(K) Optimizing inventory by doing ABC analysis time to time.
(L) Track &report key functional metrics to reduce expenses and improve effectiveness
(M) Access, manages and mitigate risks.
(N) Getting goods and services for the best price and value
(O) Building strong working relations both internally and with key suppliers.
(P) Contract management and negotiations
(Q) Dealing with international supplier.
(R) Collaborate with key persons to ensure the clarity of the specifications and expectations of the
company
(S) Import planning & execution in accordance with MRP twice in week & arranging consolidation
w.r.t. customer requirement
(T) collate figures and statistics, producing reports for management
(U) Has regular contact with Freight Forwarders, communicating cargo dispatch information.
(V) Providing strategic logistics advice internally to ensure the most cost effective modes of
transport are being used to meet delivery deadlines.
(W) Maintaining good relationship internally & externally in order to keep customer service level at
high and also to help developing partnership on behalf of the company.
(X) Maintain both administrative and accounting records on behalf of the company, which should be in
accordance with company policy as well as observing import/export laws.
Significant Contributions
 Successfully & independently completed the “Distribution network development project” across the
globe.
 It helped organization to manage customer RFQ’s through single window so quickly.
 Moreover, this activity made India entity to revert customer RFQ’s in optimum time frame.
Minda Industries Ltd. (Lighting Division)
Assistant Manager Purchase Imports, 17th
September 2010 to 21st
April 2012
Minda Industries Ltd. (Lighting Division) is one of group company of Minda empire having TS/16949 and
OHSAS certification. It is one of the bigger manufacturer of Automotive Lighting across the world having
precious customers base like Volkswagen India and Russia as well, TATA Motors. Mahindra & Mahindra,
Toyota, Maruti-Suziki, and Honda.
(Y) Present Job Responsibilities
 Importing and planning raw material, Coating chemicals, Automotive Lamps and Electronics parts
required to manufacture the Lamps.
 Monitoring Inventory Levels on daily basis and planning material based on production requirement.
 Chasing overseas supplier on daily basis to get the material within stipulated time period based on
the requirement.
 Developing new vendors by having vision of cost competitiveness with better quality and good
services.
 Negotiating with forwarding agent by having different quotations and approving through HOD, Since
most of shipment bringing on FOB and EXW Basis.
 Custom clearance of consignments with the coordination with CHA and monitoring daily status report
of import shipments to avoid demurrage at customs.
 Co-ordination with shipping company, CHA, Bank for releasing the consignments within stipulated
period.
 Ensuring insurance of all the shipment since all the shipments bringing on FOB and EXW basis.
 To prepare monthly MIS.
 To maintain all suppliers related documents as per ISO/TS 16949/2000 requirements.
 Purchasing, sourcing and negotiating for Non Productive Items (Maintenance and consumables) on daily
basis based on the plant requirement.
Finolex Cables Ltd.
Purchase Engineer Imports, November 2009 to 15th
September 2010.
Name of the organization: FINOLEX CABLES LTD., Pimpri, Pune-4110 18, India
Finolex is group of company having ISO 9001-2000 & ISO14001, Manufactures PVC/PE Cables, CFL bulbs,
PVC Sheet, Optic fiber cable, Switches, Cu rod etc.
(A)Present Job Responsibilities:
11 Development of new vendors.
Main objective is to develop new vendors for cost effectiveness with respect to quality ,
reliability and accessibility of the material all over the word.
11 Importing the raw material through out the world to 12 divisions located at Pimpri, Urse, Roorkee and
Goa.
 Collection and analysis of purchase requisitions on the basis of existing inventory and proposed
consumption.
 Getting offers from the various suppliers throughout the globe.
 Analysis of offers by price, delivery schedule, quality etc.
 Negotiation with overseas suppliers and their Indian representatives for price, delivery terms etc.
 Preparation of Purchase Orders, sending it to concerned authorities for release and issue it to
respective suppliers.
 Negotiation with freight forwarders in case of Shipments by Ex- Works, FOB etc for movement of
consignments as per schedule at optimum price.
 Sending applications to bank for establishing Letter of Credits.
 Arranging the payment of material by :
a) Advance payment by TT b) Bill of exchanges
b) Payment of LCs d) Cash Against Documents
 Custom clearance of consignments with the coordination with CHA under various government
schemes like under DUTY EXEMPTION,DEPB license etc.
 Guiding to CHA for selection of proper CUSTOMS TERIFS.
 Coordination with shipping company, CHA, Bank for releasing the consignments within stipulated
period.
TI Automotive Ltd., Vadodara
Sr. Purchase Engineer, March 2008 To October 2009
Company Profile
It is an ISO 9000:2000/TS: 16949 certified company engaged in manufacturing fuel systems and are the
major supplies to M&M (Nasik, Zahirabad), Toyota and General Motors. They also export their products to
other countries.
Responsibilities
 Handling the materials department, ensured uninterrupted supplies of raw/packing materials with no
stock outs.Managing all activities pertaining to procurement like developing vendors for purchasing the
bought out components required for regular automobiles, purchase items on subcontracting basis,
finalization of purchase orders, negotiating with suppliers.
 Evaluating vendors, quality of material supplied and payments.
 Maintaining ROL of the materials on day to day basis to maintain the inventory under control.
 Preparing documents related to material movement and co-ordinate paper work (e.g. PPAP
Documentation) with factory concerning sourcing & development work; preparation of Purchase order.
 Scheduling of material based on BOM provided and updating daily Purchase MIS.
 Identifying and developing new sources according to commodity of material. Dealing with the
development new component/localization of product.
Significant Contributions
 Devised systems for inventory control to ensure which resulted in reduction of inventory costs.
 Sourced various imported auto parts in the Indian market which resulted significant cost savings.
Kinetic engineering ltd., Pune
Purchase & Project engineer, June 2006 – Feb 2008
Company Profile
It is the first two-wheeler manufacturing company in India started in the year 1970. It is an ISO 9001 certified
company. Recently, they have with china for manufacturing Aquila motorcycle.
Responsibilities
 Developing the vendors for purchase of various auto components and negotiating commercial terms.
 Monitor and control the issues, maintain minimum stock through procurement and replenishment
generate stock statements.
Significant Contributions
 Developed & executed the undertaken projects within targeted period.
IT Skills
 Operating System: Win 9X, Win NT
 Application software’s: MS-Office, MS-Access, MS-Project
 CAD Tools: Pro-E Wildfire 2
 Knowledge of ERP System and SAP (MM) Module
Education
 B.E (Mechanical), College of Hi-tech engineering Pune, 2006
 Dip in Mechanical Engineering, College of Hi-tech engineering Pune, 2003
 Appeared for MBA Supply Chain Management through KSOU.
Project Title: Pick Place a Low Inertia Robot.
Paper presented: on Ocean Thermal Energy at College of Hi Tech Engg. Pune as a curriculum seminar.
Training
 Material management
 System documentation.
 One month Vocation In-plant Training at Kinetic engineering Ltd. at Ahmednagar
Personal Details
 Date of Birth: 21st
January 1984
 Languages Known: English, Hindi and Marathi
 Location Preference: Pune.
(SHRIKANT SANJEEVAN DORLE)
 Application software’s: MS-Office, MS-Access, MS-Project
 CAD Tools: Pro-E Wildfire 2
 Knowledge of ERP System and SAP (MM) Module
Education
 B.E (Mechanical), College of Hi-tech engineering Pune, 2006
 Dip in Mechanical Engineering, College of Hi-tech engineering Pune, 2003
 Appeared for MBA Supply Chain Management through KSOU.
Project Title: Pick Place a Low Inertia Robot.
Paper presented: on Ocean Thermal Energy at College of Hi Tech Engg. Pune as a curriculum seminar.
Training
 Material management
 System documentation.
 One month Vocation In-plant Training at Kinetic engineering Ltd. at Ahmednagar
Personal Details
 Date of Birth: 21st
January 1984
 Languages Known: English, Hindi and Marathi
 Location Preference: Pune.
(SHRIKANT SANJEEVAN DORLE)

Shrikant_Resume_updated

  • 1.
    Shrikant Dorle Shubhashri Residential,Phase III, Near Fame Jai Ganesh Inox Theatre, Building 1A/A, Flat No 304, Akurdi, Pune : 411035 MOB NO : +91 - 9049800335 Seeking Challenging Senior Level Assignment as… Procurement Manager in Engineering & manufacturing Sector Expertise in: Purchase Operations, Vendor Management/ Development, Material Management, Stores Management, Quality Assurance. Professional Synopsis  A sincere and Competent professional with an experience of 10.0 years in material planning, sourcing, procurement, logistics and inventory management in the Automobile and Aerospace Industry.  Expertise in formulating sourcing strategies, vendor identification and development, supply chain management and analytical assessment for various grades of Material.  A strategic planner with expertise in implementing cost saving measures to achieve reduction in terms of raw material, procurement costs, and logistics cost.  Extensive knowledge in updated technology, computer applications and its successful innovative implementation.  A good communicator with an ability to relate to people at any levels of business. Key Deliverable s Market Analysis & Planning  Strategic planning for effective sourcing of components by interacting with manufacturing and Sales Personnel.  Documentation and study of market trends and competitor pricing to negotiate with vendors. Sourcing/Procurement  Identifying and developing vendors and negotiating commercial terms to achieve optimum price levels and definite delivery schedules.  Carrying out regular quality audits at suppliers end to ensure quality standards as per specifications. Material Management  Streamlining the system and procedures for effective inventory control for ensuring ready availability of materials to meet the production targets.  Maintaining optimum stock levels to decrease inventory holding costs. Relationship Management  Mentoring, managing and leading a team of professionals for smooth functioning of the organization.  Interacting with distributors and end users to understand customer needs and areas of improvement. Career Summary Amphenol Interconnect India Pvt Ltd. (IMS Division) Team Leader: Supply Chain Procurement, 12th May 2012 to till date A Worldwide Vision Connecting People with Technology
  • 2.
    Amphenol is oneof the largest manufacturers of interconnect products in the world. The Company designs, manufactures and markets electrical, electronic and fiber optic connectors, coaxial and flat- ribbon cable, and interconnect systems. (A) Present Job Responsibilities (B) Implement purchase plans to assure an orders to meet specified quality and delivery times and to minimize the total cost of purchases. (C) Establishes supplier base in conformance with respect to the project requirement. (D) Handles requests for information, quotations, proposals, and bidding processes. (E) Evaluates current and potential suppliers in co-ordination with Supplier Quality Teams. (F) Negotiates with suppliers to meet quality, delivery, and cost objectives. (G) Executes contract, negotiation and development with respect to project requirements. (H) Evaluating supplier delivery performance on monthly basis and attempt to resolve delivery issues. (I) Maintaining & following supplier safety stock performance in order to meet on timely delivery as per lean guidelines. (J) Reviewing maximum standard inventory once in quarter in order to have correct stock level of all the top runner & slow runner components w.r.t. consumption level to meet delivery targets (K) Optimizing inventory by doing ABC analysis time to time. (L) Track &report key functional metrics to reduce expenses and improve effectiveness (M) Access, manages and mitigate risks. (N) Getting goods and services for the best price and value (O) Building strong working relations both internally and with key suppliers. (P) Contract management and negotiations (Q) Dealing with international supplier. (R) Collaborate with key persons to ensure the clarity of the specifications and expectations of the company (S) Import planning & execution in accordance with MRP twice in week & arranging consolidation w.r.t. customer requirement (T) collate figures and statistics, producing reports for management (U) Has regular contact with Freight Forwarders, communicating cargo dispatch information. (V) Providing strategic logistics advice internally to ensure the most cost effective modes of transport are being used to meet delivery deadlines. (W) Maintaining good relationship internally & externally in order to keep customer service level at high and also to help developing partnership on behalf of the company. (X) Maintain both administrative and accounting records on behalf of the company, which should be in accordance with company policy as well as observing import/export laws. Significant Contributions  Successfully & independently completed the “Distribution network development project” across the globe.  It helped organization to manage customer RFQ’s through single window so quickly.  Moreover, this activity made India entity to revert customer RFQ’s in optimum time frame. Minda Industries Ltd. (Lighting Division) Assistant Manager Purchase Imports, 17th September 2010 to 21st April 2012 Minda Industries Ltd. (Lighting Division) is one of group company of Minda empire having TS/16949 and OHSAS certification. It is one of the bigger manufacturer of Automotive Lighting across the world having
  • 3.
    precious customers baselike Volkswagen India and Russia as well, TATA Motors. Mahindra & Mahindra, Toyota, Maruti-Suziki, and Honda. (Y) Present Job Responsibilities  Importing and planning raw material, Coating chemicals, Automotive Lamps and Electronics parts required to manufacture the Lamps.  Monitoring Inventory Levels on daily basis and planning material based on production requirement.  Chasing overseas supplier on daily basis to get the material within stipulated time period based on the requirement.  Developing new vendors by having vision of cost competitiveness with better quality and good services.  Negotiating with forwarding agent by having different quotations and approving through HOD, Since most of shipment bringing on FOB and EXW Basis.  Custom clearance of consignments with the coordination with CHA and monitoring daily status report of import shipments to avoid demurrage at customs.  Co-ordination with shipping company, CHA, Bank for releasing the consignments within stipulated period.  Ensuring insurance of all the shipment since all the shipments bringing on FOB and EXW basis.  To prepare monthly MIS.  To maintain all suppliers related documents as per ISO/TS 16949/2000 requirements.  Purchasing, sourcing and negotiating for Non Productive Items (Maintenance and consumables) on daily basis based on the plant requirement. Finolex Cables Ltd. Purchase Engineer Imports, November 2009 to 15th September 2010. Name of the organization: FINOLEX CABLES LTD., Pimpri, Pune-4110 18, India Finolex is group of company having ISO 9001-2000 & ISO14001, Manufactures PVC/PE Cables, CFL bulbs, PVC Sheet, Optic fiber cable, Switches, Cu rod etc. (A)Present Job Responsibilities: 11 Development of new vendors. Main objective is to develop new vendors for cost effectiveness with respect to quality , reliability and accessibility of the material all over the word. 11 Importing the raw material through out the world to 12 divisions located at Pimpri, Urse, Roorkee and Goa.  Collection and analysis of purchase requisitions on the basis of existing inventory and proposed consumption.  Getting offers from the various suppliers throughout the globe.  Analysis of offers by price, delivery schedule, quality etc.  Negotiation with overseas suppliers and their Indian representatives for price, delivery terms etc.  Preparation of Purchase Orders, sending it to concerned authorities for release and issue it to respective suppliers.  Negotiation with freight forwarders in case of Shipments by Ex- Works, FOB etc for movement of consignments as per schedule at optimum price.
  • 4.
     Sending applicationsto bank for establishing Letter of Credits.  Arranging the payment of material by : a) Advance payment by TT b) Bill of exchanges b) Payment of LCs d) Cash Against Documents  Custom clearance of consignments with the coordination with CHA under various government schemes like under DUTY EXEMPTION,DEPB license etc.  Guiding to CHA for selection of proper CUSTOMS TERIFS.  Coordination with shipping company, CHA, Bank for releasing the consignments within stipulated period. TI Automotive Ltd., Vadodara Sr. Purchase Engineer, March 2008 To October 2009 Company Profile It is an ISO 9000:2000/TS: 16949 certified company engaged in manufacturing fuel systems and are the major supplies to M&M (Nasik, Zahirabad), Toyota and General Motors. They also export their products to other countries. Responsibilities  Handling the materials department, ensured uninterrupted supplies of raw/packing materials with no stock outs.Managing all activities pertaining to procurement like developing vendors for purchasing the bought out components required for regular automobiles, purchase items on subcontracting basis, finalization of purchase orders, negotiating with suppliers.  Evaluating vendors, quality of material supplied and payments.  Maintaining ROL of the materials on day to day basis to maintain the inventory under control.  Preparing documents related to material movement and co-ordinate paper work (e.g. PPAP Documentation) with factory concerning sourcing & development work; preparation of Purchase order.  Scheduling of material based on BOM provided and updating daily Purchase MIS.  Identifying and developing new sources according to commodity of material. Dealing with the development new component/localization of product. Significant Contributions  Devised systems for inventory control to ensure which resulted in reduction of inventory costs.  Sourced various imported auto parts in the Indian market which resulted significant cost savings. Kinetic engineering ltd., Pune Purchase & Project engineer, June 2006 – Feb 2008 Company Profile It is the first two-wheeler manufacturing company in India started in the year 1970. It is an ISO 9001 certified company. Recently, they have with china for manufacturing Aquila motorcycle. Responsibilities  Developing the vendors for purchase of various auto components and negotiating commercial terms.  Monitor and control the issues, maintain minimum stock through procurement and replenishment generate stock statements. Significant Contributions  Developed & executed the undertaken projects within targeted period. IT Skills  Operating System: Win 9X, Win NT
  • 5.
     Application software’s:MS-Office, MS-Access, MS-Project  CAD Tools: Pro-E Wildfire 2  Knowledge of ERP System and SAP (MM) Module Education  B.E (Mechanical), College of Hi-tech engineering Pune, 2006  Dip in Mechanical Engineering, College of Hi-tech engineering Pune, 2003  Appeared for MBA Supply Chain Management through KSOU. Project Title: Pick Place a Low Inertia Robot. Paper presented: on Ocean Thermal Energy at College of Hi Tech Engg. Pune as a curriculum seminar. Training  Material management  System documentation.  One month Vocation In-plant Training at Kinetic engineering Ltd. at Ahmednagar Personal Details  Date of Birth: 21st January 1984  Languages Known: English, Hindi and Marathi  Location Preference: Pune. (SHRIKANT SANJEEVAN DORLE)
  • 6.
     Application software’s:MS-Office, MS-Access, MS-Project  CAD Tools: Pro-E Wildfire 2  Knowledge of ERP System and SAP (MM) Module Education  B.E (Mechanical), College of Hi-tech engineering Pune, 2006  Dip in Mechanical Engineering, College of Hi-tech engineering Pune, 2003  Appeared for MBA Supply Chain Management through KSOU. Project Title: Pick Place a Low Inertia Robot. Paper presented: on Ocean Thermal Energy at College of Hi Tech Engg. Pune as a curriculum seminar. Training  Material management  System documentation.  One month Vocation In-plant Training at Kinetic engineering Ltd. at Ahmednagar Personal Details  Date of Birth: 21st January 1984  Languages Known: English, Hindi and Marathi  Location Preference: Pune. (SHRIKANT SANJEEVAN DORLE)