The document outlines the shooting schedule for a film project over two days. Day 1 takes place on December 22nd in Sulham woods, with shots planned from 4pm to 5:45pm. Possible restrictions include daylight, weather, actor/crew availability, equipment availability, location occupancy, and transportation. Day 2 is on December 23rd at the school changing rooms, with shots from 1:35pm to 2:45pm. Possible restrictions are daylight entering a ceiling window, weather, actor/crew availability, equipment availability, and location occupancy. Rescheduling dates if needed are December 28th, 29th or January 3rd.