SlideShare a Scribd company logo
3/1
Abdel-Rhman Muhammad Zaky
10th of Ramadan, Sharkia, Egypt
Tel: 01002178950
E-mail: eng.amz8@gmail.com
 Personal Data:
- Date of birth 05/12/1984
- Place of birth Cairo
- Military status not required
- Marital status Married
 Education:
- Degree B.Sc. In Electrical Engineering the Higher Technological Institute
Class 2006
- Grade Good with GPA 2.87
- Project Home Automation through SMS Grade Excellent
 Career objectives:
-Seeking position in international firm to utilize my experience in designing, developing, testing
and evaluating integrated systems for managing industrial production and increase firm’s
output.
 Work Experience:
- Dec 2012 - Till now Maintenance Section Head (Electrical & Packaging)
at Farm Frites.
- Aug 2008 – Dec 2012 Electrical engineer at Farm Frites Egypt.
- Jan 2008 - Aug 2008 Electrical Engineer at Enviro-Tech Co.
- Dec 2006 - Jan 2008 Researcher & Electric Lab. Engineer at the Higher
Technological Institute.
** My Job description:
• Creating the yearly preventive maintenance plan, and issue the monthly maintenance plan by
coordination with production planning department .
• Plan and execute the annual maintenance plane.
• Preparing the yearly budget of departmental expenses, and engineering Capital, and
monthly reviewing both according to the approved budget.
• following up the daily tasks.
• Work in maintain the abnormal and complicated problem
• Development our technicians with their need trainee and courses.
• Down Time analysis .
• Cost analysis monitoring & control monthly for machines.
• Preparing plan and list for the required spare parts ( foreign and local ) for all machines every
year and execute the plan according to the approved budget .
 Check and insure records and updating of maintenance works in the log books for all
machines, as higher authorization level in this task above foreman and maintenance
coordinator according to quality requirement.
• Choice the contractors and outsourcing workshops .
• Assessment & evaluate our management team through the specified KPI’s
• Improvement and development our machinery system.
 Following up, and GRA ( Good Receiving Acceptance ) approval, of local and foreign
purchase requisitions of spare parts .
 Prepare, Supervise and participate of executing the Installation of new equipment as
well as the Qualification (IQ) & Operation Qualifications (OQ) for all machines in
FAT( Factory Acceptance Test ) and SAT ( Site Acceptance Test)
3/2
 Constructions & Installation Electric System Experience
Good knowledge in plant projects as production lines, maintenance low
voltage panels, transformers and medium tension panels.
- Works on installation of variable cables, cable trays, earth network,
control panels and machines connection.
- Works on wide variety of instrumentations and sensors.
- Strong organizational skills to coordinate team activities and ensure work are
appropriately prioritized, and achieve time plan.
- Starting up and commissioning.
 Project Experience
- Feb 2008 Commissioning & start up HILLER centrifugal m/c as Enviro-tech engineer at
Farm Frites.
- Sep 2008 Electrical installation of increasing medium tension power low voltage
- panels, new transformers and all power cables at Farm Frites.
- Oct 2008 Electrical installation of Flakes line at Farm Frites.
- Dec 2010 Electrical installation of one boiler 22 bar 7.5 tons at FFE.
- Nov 2011 Electrical installation for freezing tunnel.
- Feb 2012 Design and implementation HVAC sys. For FFE plant.
- June 2012 Installation Optical sorting machine.
- Jan 2013 Design and implementation Refrigerator coils control
- Jan 2014 Installation a new Packaging line (Starting from preparing the P& ID ,
choosing the suitable equipment companies till installing the new line
which including:( Shakers KEY & KIREMKO, Weighing machine
ISHIDA, Packing machine INNO-Tech, Check weigher, Rejection system,
Sealing m/c, Printing m/c) with their accessories like photocells, proximity
sensors, encoders, load cells, cables, sub electric controlpanels....etc)
 Maintenance Experience
- Maintain operation and control panels for production lines & Utilities.
- Maintain instruments, sensors and programming its digital meters.
- Analyzes drive motors, PLC, touch screen problems.
- Keep running well low voltage, medium voltage and transforms.
- Understand production equipment and its effect upon product quality.
- Electric maintenance for boilers, air compressor, refrigeration
equipment, pumps and waste water treatment.
- Maintain packing equipment like weighing M/C, bagging M/C and metal
detectors.
 Programming skills
- Analyze & edit in PLC ladder diagram for HITACHI & DELTA PLCs.
- Design control circuits with Zelio & Delta PLC.
- Drawing Delta screens & linked in with PLC
- Drawing control circuits with Cady designer.
- Drawing & reading AutoCAD projects.
3/3
 Training Course
- Aug 2006 LV, MV and Transformers at ABB
- Nov 2008 TPM & 5S system Course at ACCT
- Jan 2009 Business English course level 9 at ATA
- May 2009 Automatic control at SAIF
- Aug 2009 PLC and touch screen programming (DELTA)
- Feb 2010 Analytical and problems solving Techniques
- Oct 2010 Essential Management Skills
- Jan 2011 Communication skills
- June 2014 Advanced management skills (Leadership,
influence, Project management & Teamwork)
- Nov 2014 Potato School processing
- Jan 2015 Food Safety concept
- June 2015 SQMS audit training (Standard Quality for Mcdonald’s System)
- Sep 2015 PMP (Project Management Professional)
36 hours training course
 Special skills
- Strive for continued excellence.
- Strong communication skills.
- I am a self-starter.
- Eager to learn new things.
 Hobbies/ Interests etc:
- To work with the team professionals.
- To keep learning more and more information of Automation and electrical
- PC Hardware maintenance, combinations and follow up new wireless product.

More Related Content

What's hot

ELECTRICAL DESIGN & ESTIMATION ENGINEER
ELECTRICAL DESIGN & ESTIMATION ENGINEERELECTRICAL DESIGN & ESTIMATION ENGINEER
ELECTRICAL DESIGN & ESTIMATION ENGINEERGopi s
 
1.mep engineer latest
1.mep engineer latest1.mep engineer latest
1.mep engineer latest
Arun Das
 
Project engineer(cv)
Project engineer(cv)Project engineer(cv)
Project engineer(cv)
Ammar naseem
 
RESUME
RESUMERESUME
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
Dylan Barron
 
New resume Ivan 2015
New resume Ivan 2015New resume Ivan 2015
New resume Ivan 2015Yvon Gagnon
 
sherif Gharib Dec 2016 CV ver 1P
sherif Gharib Dec 2016 CV  ver 1Psherif Gharib Dec 2016 CV  ver 1P
sherif Gharib Dec 2016 CV ver 1PSherif Gharib, MBA
 

What's hot (20)

m.rizk cv 1
m.rizk cv 1m.rizk cv 1
m.rizk cv 1
 
Mr Khater Updated CV
Mr  Khater Updated CVMr  Khater Updated CV
Mr Khater Updated CV
 
Ramin resume
Ramin resumeRamin resume
Ramin resume
 
Ethan Resume
Ethan ResumeEthan Resume
Ethan Resume
 
MAHDI CV
MAHDI CVMAHDI CV
MAHDI CV
 
ELECTRICAL DESIGN & ESTIMATION ENGINEER
ELECTRICAL DESIGN & ESTIMATION ENGINEERELECTRICAL DESIGN & ESTIMATION ENGINEER
ELECTRICAL DESIGN & ESTIMATION ENGINEER
 
1.mep engineer latest
1.mep engineer latest1.mep engineer latest
1.mep engineer latest
 
CV Charbel Alam
CV Charbel AlamCV Charbel Alam
CV Charbel Alam
 
Jamil_cv new
Jamil_cv newJamil_cv new
Jamil_cv new
 
Adil_Abdulla CV
Adil_Abdulla CVAdil_Abdulla CV
Adil_Abdulla CV
 
Ogbonnaya Okoro CV
Ogbonnaya Okoro  CVOgbonnaya Okoro  CV
Ogbonnaya Okoro CV
 
Resume
ResumeResume
Resume
 
Project engineer(cv)
Project engineer(cv)Project engineer(cv)
Project engineer(cv)
 
Shafeeque CV (1)
Shafeeque CV (1)Shafeeque CV (1)
Shafeeque CV (1)
 
RESUME
RESUMERESUME
RESUME
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 
New resume Ivan 2015
New resume Ivan 2015New resume Ivan 2015
New resume Ivan 2015
 
Facility Engineer
Facility EngineerFacility Engineer
Facility Engineer
 
bassim
bassimbassim
bassim
 
sherif Gharib Dec 2016 CV ver 1P
sherif Gharib Dec 2016 CV  ver 1Psherif Gharib Dec 2016 CV  ver 1P
sherif Gharib Dec 2016 CV ver 1P
 

Similar to Abdelrhman CV

Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resumebarun dutta
 
Islam's CV.pdf
Islam's CV.pdfIslam's CV.pdf
Islam's CV.pdf
IslamAzkoul1
 
New - Shetteppa Najjarad BE with 5 Year Exp
New - Shetteppa Najjarad BE with 5 Year ExpNew - Shetteppa Najjarad BE with 5 Year Exp
New - Shetteppa Najjarad BE with 5 Year ExpShetteppa Najjarad
 
Mohammed Suliman CV Intensive Version 1
Mohammed Suliman CV Intensive Version 1Mohammed Suliman CV Intensive Version 1
Mohammed Suliman CV Intensive Version 1Mohd Suliman
 
012416 andrei k_resume_php
012416 andrei k_resume_php012416 andrei k_resume_php
012416 andrei k_resume_php
Andrei Karunungan
 
Utility TTIPL RESUME 1 -new Address Copy
Utility TTIPL RESUME 1 -new Address  CopyUtility TTIPL RESUME 1 -new Address  Copy
Utility TTIPL RESUME 1 -new Address Copyumesh gowda
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
Khalid Eltahir
 
Resume- updated junaid 8
Resume- updated junaid 8Resume- updated junaid 8
Resume- updated junaid 8junaid bashir
 

Similar to Abdelrhman CV (20)

CV Dewaharbabu
CV DewaharbabuCV Dewaharbabu
CV Dewaharbabu
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Ahmed El_Nashar
Ahmed El_NasharAhmed El_Nashar
Ahmed El_Nashar
 
Ahmed El_Nashar
Ahmed El_NasharAhmed El_Nashar
Ahmed El_Nashar
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
 
Ahmed El_Nashar
Ahmed El_NasharAhmed El_Nashar
Ahmed El_Nashar
 
Islam's CV.pdf
Islam's CV.pdfIslam's CV.pdf
Islam's CV.pdf
 
New - Shetteppa Najjarad BE with 5 Year Exp
New - Shetteppa Najjarad BE with 5 Year ExpNew - Shetteppa Najjarad BE with 5 Year Exp
New - Shetteppa Najjarad BE with 5 Year Exp
 
Mohammed Suliman CV Intensive Version 1
Mohammed Suliman CV Intensive Version 1Mohammed Suliman CV Intensive Version 1
Mohammed Suliman CV Intensive Version 1
 
012416 andrei k_resume_php
012416 andrei k_resume_php012416 andrei k_resume_php
012416 andrei k_resume_php
 
Mohammed Islam's Resume-05-20-15
Mohammed Islam's Resume-05-20-15Mohammed Islam's Resume-05-20-15
Mohammed Islam's Resume-05-20-15
 
Muthu Raman SAP
Muthu Raman SAPMuthu Raman SAP
Muthu Raman SAP
 
CV
CVCV
CV
 
Utility TTIPL RESUME 1 -new Address Copy
Utility TTIPL RESUME 1 -new Address  CopyUtility TTIPL RESUME 1 -new Address  Copy
Utility TTIPL RESUME 1 -new Address Copy
 
F.M.Camus (CV 2016)
F.M.Camus (CV 2016)F.M.Camus (CV 2016)
F.M.Camus (CV 2016)
 
Ahmed_C.V
Ahmed_C.VAhmed_C.V
Ahmed_C.V
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
 
Resume- updated junaid 8
Resume- updated junaid 8Resume- updated junaid 8
Resume- updated junaid 8
 
randy san andres resume
randy san andres resumerandy san andres resume
randy san andres resume
 
ajay cv new (3)
ajay cv new (3)ajay cv new (3)
ajay cv new (3)
 

Abdelrhman CV

  • 1. 3/1 Abdel-Rhman Muhammad Zaky 10th of Ramadan, Sharkia, Egypt Tel: 01002178950 E-mail: eng.amz8@gmail.com  Personal Data: - Date of birth 05/12/1984 - Place of birth Cairo - Military status not required - Marital status Married  Education: - Degree B.Sc. In Electrical Engineering the Higher Technological Institute Class 2006 - Grade Good with GPA 2.87 - Project Home Automation through SMS Grade Excellent  Career objectives: -Seeking position in international firm to utilize my experience in designing, developing, testing and evaluating integrated systems for managing industrial production and increase firm’s output.  Work Experience: - Dec 2012 - Till now Maintenance Section Head (Electrical & Packaging) at Farm Frites. - Aug 2008 – Dec 2012 Electrical engineer at Farm Frites Egypt. - Jan 2008 - Aug 2008 Electrical Engineer at Enviro-Tech Co. - Dec 2006 - Jan 2008 Researcher & Electric Lab. Engineer at the Higher Technological Institute. ** My Job description: • Creating the yearly preventive maintenance plan, and issue the monthly maintenance plan by coordination with production planning department . • Plan and execute the annual maintenance plane. • Preparing the yearly budget of departmental expenses, and engineering Capital, and monthly reviewing both according to the approved budget. • following up the daily tasks. • Work in maintain the abnormal and complicated problem • Development our technicians with their need trainee and courses. • Down Time analysis . • Cost analysis monitoring & control monthly for machines. • Preparing plan and list for the required spare parts ( foreign and local ) for all machines every year and execute the plan according to the approved budget .  Check and insure records and updating of maintenance works in the log books for all machines, as higher authorization level in this task above foreman and maintenance coordinator according to quality requirement. • Choice the contractors and outsourcing workshops . • Assessment & evaluate our management team through the specified KPI’s • Improvement and development our machinery system.  Following up, and GRA ( Good Receiving Acceptance ) approval, of local and foreign purchase requisitions of spare parts .  Prepare, Supervise and participate of executing the Installation of new equipment as well as the Qualification (IQ) & Operation Qualifications (OQ) for all machines in FAT( Factory Acceptance Test ) and SAT ( Site Acceptance Test)
  • 2. 3/2  Constructions & Installation Electric System Experience Good knowledge in plant projects as production lines, maintenance low voltage panels, transformers and medium tension panels. - Works on installation of variable cables, cable trays, earth network, control panels and machines connection. - Works on wide variety of instrumentations and sensors. - Strong organizational skills to coordinate team activities and ensure work are appropriately prioritized, and achieve time plan. - Starting up and commissioning.  Project Experience - Feb 2008 Commissioning & start up HILLER centrifugal m/c as Enviro-tech engineer at Farm Frites. - Sep 2008 Electrical installation of increasing medium tension power low voltage - panels, new transformers and all power cables at Farm Frites. - Oct 2008 Electrical installation of Flakes line at Farm Frites. - Dec 2010 Electrical installation of one boiler 22 bar 7.5 tons at FFE. - Nov 2011 Electrical installation for freezing tunnel. - Feb 2012 Design and implementation HVAC sys. For FFE plant. - June 2012 Installation Optical sorting machine. - Jan 2013 Design and implementation Refrigerator coils control - Jan 2014 Installation a new Packaging line (Starting from preparing the P& ID , choosing the suitable equipment companies till installing the new line which including:( Shakers KEY & KIREMKO, Weighing machine ISHIDA, Packing machine INNO-Tech, Check weigher, Rejection system, Sealing m/c, Printing m/c) with their accessories like photocells, proximity sensors, encoders, load cells, cables, sub electric controlpanels....etc)  Maintenance Experience - Maintain operation and control panels for production lines & Utilities. - Maintain instruments, sensors and programming its digital meters. - Analyzes drive motors, PLC, touch screen problems. - Keep running well low voltage, medium voltage and transforms. - Understand production equipment and its effect upon product quality. - Electric maintenance for boilers, air compressor, refrigeration equipment, pumps and waste water treatment. - Maintain packing equipment like weighing M/C, bagging M/C and metal detectors.  Programming skills - Analyze & edit in PLC ladder diagram for HITACHI & DELTA PLCs. - Design control circuits with Zelio & Delta PLC. - Drawing Delta screens & linked in with PLC - Drawing control circuits with Cady designer. - Drawing & reading AutoCAD projects.
  • 3. 3/3  Training Course - Aug 2006 LV, MV and Transformers at ABB - Nov 2008 TPM & 5S system Course at ACCT - Jan 2009 Business English course level 9 at ATA - May 2009 Automatic control at SAIF - Aug 2009 PLC and touch screen programming (DELTA) - Feb 2010 Analytical and problems solving Techniques - Oct 2010 Essential Management Skills - Jan 2011 Communication skills - June 2014 Advanced management skills (Leadership, influence, Project management & Teamwork) - Nov 2014 Potato School processing - Jan 2015 Food Safety concept - June 2015 SQMS audit training (Standard Quality for Mcdonald’s System) - Sep 2015 PMP (Project Management Professional) 36 hours training course  Special skills - Strive for continued excellence. - Strong communication skills. - I am a self-starter. - Eager to learn new things.  Hobbies/ Interests etc: - To work with the team professionals. - To keep learning more and more information of Automation and electrical - PC Hardware maintenance, combinations and follow up new wireless product.