SOON FOONG TECHNOLOGY SDN BHD (745473-A)
NO.12 & 14, JALAN UTAMA 2/22,
TAMAN PERINDUSTRIAN PUCHONG UTAMA,
47100 PUCHONG, SELANGOR DARUL EHSAN, MALAYSIA
TEL: 603-8051 2235 FAX: 603-8061 4982
E-MAIL: soonfoong_technology@yahoo.com
GST NO: 001559404544
(745473-A)
SoonFoongTechnologySdn. Bhd. wasestablished inthe yearof1994.
It isa Malaysiancompanythatdealswith local companyand international company which isin
Singapore, and so forth. It wasestablished due tothe reasonofhighdemand inthe marketand the
possibilityof expandingthebusinessto theworld.
SoonFoongTechnologySdn. Bhd. isa dynamic and resourceful companywitha reputationfor
impeccablequalityand reliability. We will continue toreachforgreater heightsbyfocusing onthe
provisionofhigh technicaland professional standardsofservicetoniche marketswith emphasis on
building strong, trusting and long standing associationswith satisfiedcustomer. Wedo ensureour
customer to have total satisfactionthrough superiorcraftsmanship, excellence inour customerservice
and the higheststandardsofquality, priceand availability, whichourcustomers canrelyon.
The highest standardsofexpertengineering and the individual attentiongivento eachorder
ensurea productoffinestquality and efficiencyinoperation. Our engineers fullyunderstandand
appreciate theneedto be thorough, complete andtechnically accurateinthe office, and tobepractical,
realistic and timelyindealing with the challengesofconstructionprojects. Tobestassure the qualityof
works, ourownprojectmanager willthoroughlymonitor the progress of worksand thedelivery
progressofour products. We are precision-built tomeetourcustomer’sspecificationand made totheir
requirements. We dohold our basic corporate philosophies whendealing with ourcustomer, which is
high standards of quality, strict adherence to time schedulesandtotalcustomersatisfaction.
Specialization:
 Mild Steel &StainlessSteelWork
 Machining &Mechanical Jobs
 ConveyerSystem&AutomationSystem, define problem,
 Selectsolution, design conceptualization, designdrawings,
 Manufacture, installation, commissioning.
 Interior piping (Utilitypiping:waterpump, chillwater pump, condenser pipe, steam piping,
gas piping standard steelpipe all piping work)
 Repair&Installation valve
 Steel Structure, FactoryPlatform
 General HardwareTrading
OUR PURPOSE
To provide excellent product and services thatgives Maximumsatisfactiontoour customer
To becomea dynamic, enduring companywith the most recognized and respectedtrademark,
renowned fordelivering service, uncompromising standards, qualityand valuetoemployees,
customersand thecommunity.
Besides, our experienced teamof engineer and technicianswill assistyou to achieve cost-effective
operationandhigherprofitabilitybydelivering anuncompromising standard ofexpertiseand
professional service.
 Providing a great working environment and treating everyone withrespectand dignity
 Applying the higheststandardsofexcellenceinproductionand after salesservices.
 Developing enthusiasticallysatisfied customersallofthe time.
 Recognizing thatprofitabilityisessentialtoourfuture success.
In order to runanengineering and tradingcompanysuccessfully, there area fewaspectsthat
need totake into consideration.
OUR MISSION
OUR GUIDING PRINCIPLES
 Accurate planning
 Good organizing
 Properleading
 Controlling
Accurateplanning
Firstly, anaccurate planningis veryimportant becauseit is wherethe starting point is. Byhaving
an accurate planning, itenablesustoachieve high productivityat a lower cost. Besides, italsohelpsto
runthe productioneffectivelyand efficiently.
Goodorganizing
Here iswheretaskisassignto engineers and technicians based ontheir specialization. This is to
avoidanydefective and uncertaintytooccur. Through goodorganizing, it helps the productionto run
smoothlyand it istime saving.
Proper leading
Though motivating anddirecting employees, it helps to ensureproper installation. Thus, it
loweredtheriskofhavingdefectswhile running the production
Controlling
In order to ensure smoothimplementation, everyactivityis being monitored. All productsare
carefullyexamined before delivering it to the customers. We do makesure that ourtasksare
accomplished as planned inordertomeet deadlines. We alsoprovidesafter salesservices to achieve
customerssatisfaction.
We areconfidentthatcohesivebusinessstrategywillresultin
Increasinglylevel of Marketplace leverage, lowered costand
Increased profitabilityforcustomers.
We havecompletedthefollowing MainProjects.
1. Customer : EncordSdn Bhd,
Mercoid Control (M) Sdn
Bhd, Mikuni Sdn.Bhd.
IvatechSdn Bhd.
Duration : 1994 –2007
Total Value : RM 500,000.00
Scope ofWork : Repairvalves, actuator, strainerfabrication,
Modification andthedimension
Oftheflanges.
2. Customer : Bachy Soletanchy (M)Sdn Bhd
Duration : 1994 –1997
Total Value : RM 3,535,549.65
Scope ofWorks : Drilling MachineBoom, Lifting Folks,
Clampshell, Hydraulic Jack, Tremie Brake,
Lifting Head,CWSJoint Holder,Concrete
Mould,ToolsCabinet,Waterpump, Track
Roller, MissionPump, MixerPump, Double
Mixer,TremiePipe,Leaderc/w Hydraulic
Cylinder,HoistCrane,Canopy, SpacerMould,
Hammer,Chisel, Clampshell Grab,Pipe rack,
TapperHooper,CWSJoint Head, Anchor
Housing, I-beam Bridge,Platform,Channel
CementGrouting Platform,Bentonite Tank,
Angle rack,Heavy-Duty,Pivot Roller, Soil
Spiral Wheel, Watertank,SHS Platform,M.S.
Channel Lifting Spreader,GroutingPacker,
Clampshell 600 c/w Grab, Cyclo,Russian
PuppetSilo, DoubleConcrete cementMixer,
Digester,Spotlight Tower,Clampshell,1000
c/wGrab,Spare Missionpump,Concrete
Mould (BSW),Diesel Tank,Clampshell
KL-800 c/wGrab, CWS600,Double Steel
Cage,Chamffer, Tool Box,Electric Box c/w
Plywood Trailer.
3. Customer : Tomoe
Duration : 1995 –1996
Total Value : RM 2,300,000.00
Scope Of Works : Fabricate for KLIA,fasteners of Roof
Light,Welding, Joining Bracket,Roll
Bending,Structure, andEraction, By
Keel Trust.
4. Customer : Permatang Pau(Penang)
Duration : 1994 –1995
Total Value : RM 1,135,000.00
Scope Of Work : BendRolling,StandardSteel Tank,Erection,
SuckingPiping,AndPacking Machine.
5. Customer : Netsteel Engineering (Singapore)
Duration : 1996 –1997
Total Value : RM6,540,000.00
Scope ofWork : Fabricate, InstallationTank, Cement PlantSupply
Conveyer, Erection, andCommisioning.
6. Customer : L & M Agencies SdnBhd
Duration : 1994 –1996
Total Value : RM 361,300.00
Scope Of Work : CounterMixerPaddle,JackingColumn,
ShearKey Pocket,AngleBracket, ShearKey
Deck Hanger,CastSteel MixerPaddle,Shear
Key Beam, CastSteel Clamp, Cast Steel
ClampGuide.
7. Customer : SinaranUnikSdnBhd
Duration : 1995 –1997
Total Value : RM 125,700.00
Scope Of Work : Cyclo,Spare Missionpump, Frame,4” Spare
MissionPump, TremieBrake, Chamffer,
Hooper,TremiePipe.
8. Customer : GeoprimaSdn Bhd
Duration : 1997– 2000
Total Value : RM 1,123,416.85
Scope Of Work : Clampshell 800 c/wGrab,WSI-600,SiloTank,
MissionPump, Chamffer,BentoniteTank,
Spare Missionpump, Concretecement
Mixer,Anchor Recess, Clampshell 1000 c/w
Grab, TapperHooper,800 Grab, Steel Rope
Single Roller, Square Chisel,Clampshell
600 c/w Grab,1200 Grab,BentoniteMixer,
Lifting Head,BottomToe.
9. Customer : I-PFoundationLtd.(Singapore)
Duration : 1998– 1999
Total value : RM 1,662,009.60
Scope Of Work : WSI-600, WSI-800,Silo,Clampshell 1000
10. Customer : Intrafor(France)
Duration : 1998
Total Value : RM 683,236.30
Scope Of Work : WSI-800,Silo
11. Customer : I-PThaiLtd(Thailand)
Duration : 1998
Total Value : RM 362,936.00
Scope Of Work : WSI-600, Silo.
12. Customer : I-PFoundationLtd.(Hong Kong)
Duration : 1999
Total Value : RM 1,269,548.60
Scope Of Work : WSI-1000,Silo
13. Customer : TurfChemicalsSdn Bhd
Duration : 1999 –2000
Total Value : RM 327,382.40
Scope Of Work : Awning, TapperHooperMixer,Sliding Gate,
Roofing, Platform, Roller Mixer, AutoGate,
Horizontal Tank.
14 Maincontractor :Harris Pye MarineLtd.
Duration : 1994 -1996
Total Value : RM 2,500.000.00
ScopeofWork :Marine Boiler Repairing, Tankershiprepair,
Fabrication and Installationpiping work.
Job Location :Keppel Shipyard.
Workdone under : SoonFoong Technology Sdn Bhd
15 Maincontractor : Harris Pye MarineLtd.
Duration : 1996 1998
Total Value : RM 3,500.000.00
ScopeOf Work :Marine Boiler Repairing, Tanker shiprepair,
Fabrication and Installationpiping work.
Job Location :Sembawang ShipYard
Workdone Under : Soon FoongTechnology SdnBhd
16 Maincontractor : Harris Pye MarineLtd.
Duration : 1999-2001
Total Value : RM 2,500.000.00
ScopeOf Work :Marine Boiler Repairing, Tanker shiprepair,
Fabrication and Installationpiping work.
Job Location :Jurong Shipyard
Workdone Under : Soon FoongTechnology SdnBhd
17 Maincontractor : Harris PyeMarine Ltd.
Duration : 2001 - 2003
Total Value : RM 2,500.000.00
ScopeOf Work :Marine Boiler Repairing, Tanker shiprepair,
Fabrication and Installationpiping work.
Job Location : SingaporeShipyard
Workdone Under :Soon FoongTechnology SdnBhd
18 Maincontractor :SetiaDamai Sdn.Bhd
Duration : 2007 -2007
Total Value : RM 2,500.000.00
ScopeOf Work :FabricationErectionofupper gate, lower gate
and emergency gate whicheach gateapprox
weight30 tons.
Job Location :SMARTTUNNEL (Kuala Lumpur)
Workdone Under :Soon FoongTechnology SdnBhd

Sft company profile

  • 1.
    SOON FOONG TECHNOLOGYSDN BHD (745473-A) NO.12 & 14, JALAN UTAMA 2/22, TAMAN PERINDUSTRIAN PUCHONG UTAMA, 47100 PUCHONG, SELANGOR DARUL EHSAN, MALAYSIA TEL: 603-8051 2235 FAX: 603-8061 4982 E-MAIL: soonfoong_technology@yahoo.com GST NO: 001559404544
  • 2.
    (745473-A) SoonFoongTechnologySdn. Bhd. wasestablishedinthe yearof1994. It isa Malaysiancompanythatdealswith local companyand international company which isin Singapore, and so forth. It wasestablished due tothe reasonofhighdemand inthe marketand the possibilityof expandingthebusinessto theworld. SoonFoongTechnologySdn. Bhd. isa dynamic and resourceful companywitha reputationfor impeccablequalityand reliability. We will continue toreachforgreater heightsbyfocusing onthe provisionofhigh technicaland professional standardsofservicetoniche marketswith emphasis on building strong, trusting and long standing associationswith satisfiedcustomer. Wedo ensureour customer to have total satisfactionthrough superiorcraftsmanship, excellence inour customerservice and the higheststandardsofquality, priceand availability, whichourcustomers canrelyon.
  • 3.
    The highest standardsofexpertengineeringand the individual attentiongivento eachorder ensurea productoffinestquality and efficiencyinoperation. Our engineers fullyunderstandand appreciate theneedto be thorough, complete andtechnically accurateinthe office, and tobepractical, realistic and timelyindealing with the challengesofconstructionprojects. Tobestassure the qualityof works, ourownprojectmanager willthoroughlymonitor the progress of worksand thedelivery progressofour products. We are precision-built tomeetourcustomer’sspecificationand made totheir requirements. We dohold our basic corporate philosophies whendealing with ourcustomer, which is high standards of quality, strict adherence to time schedulesandtotalcustomersatisfaction. Specialization:  Mild Steel &StainlessSteelWork  Machining &Mechanical Jobs  ConveyerSystem&AutomationSystem, define problem,  Selectsolution, design conceptualization, designdrawings,  Manufacture, installation, commissioning.  Interior piping (Utilitypiping:waterpump, chillwater pump, condenser pipe, steam piping, gas piping standard steelpipe all piping work)  Repair&Installation valve  Steel Structure, FactoryPlatform  General HardwareTrading OUR PURPOSE
  • 4.
    To provide excellentproduct and services thatgives Maximumsatisfactiontoour customer To becomea dynamic, enduring companywith the most recognized and respectedtrademark, renowned fordelivering service, uncompromising standards, qualityand valuetoemployees, customersand thecommunity. Besides, our experienced teamof engineer and technicianswill assistyou to achieve cost-effective operationandhigherprofitabilitybydelivering anuncompromising standard ofexpertiseand professional service.  Providing a great working environment and treating everyone withrespectand dignity  Applying the higheststandardsofexcellenceinproductionand after salesservices.  Developing enthusiasticallysatisfied customersallofthe time.  Recognizing thatprofitabilityisessentialtoourfuture success. In order to runanengineering and tradingcompanysuccessfully, there area fewaspectsthat need totake into consideration. OUR MISSION OUR GUIDING PRINCIPLES
  • 5.
     Accurate planning Good organizing  Properleading  Controlling Accurateplanning Firstly, anaccurate planningis veryimportant becauseit is wherethe starting point is. Byhaving an accurate planning, itenablesustoachieve high productivityat a lower cost. Besides, italsohelpsto runthe productioneffectivelyand efficiently. Goodorganizing Here iswheretaskisassignto engineers and technicians based ontheir specialization. This is to avoidanydefective and uncertaintytooccur. Through goodorganizing, it helps the productionto run smoothlyand it istime saving. Proper leading
  • 6.
    Though motivating anddirectingemployees, it helps to ensureproper installation. Thus, it loweredtheriskofhavingdefectswhile running the production Controlling In order to ensure smoothimplementation, everyactivityis being monitored. All productsare carefullyexamined before delivering it to the customers. We do makesure that ourtasksare accomplished as planned inordertomeet deadlines. We alsoprovidesafter salesservices to achieve customerssatisfaction. We areconfidentthatcohesivebusinessstrategywillresultin Increasinglylevel of Marketplace leverage, lowered costand Increased profitabilityforcustomers.
  • 7.
    We havecompletedthefollowing MainProjects. 1.Customer : EncordSdn Bhd, Mercoid Control (M) Sdn Bhd, Mikuni Sdn.Bhd. IvatechSdn Bhd. Duration : 1994 –2007 Total Value : RM 500,000.00 Scope ofWork : Repairvalves, actuator, strainerfabrication, Modification andthedimension Oftheflanges. 2. Customer : Bachy Soletanchy (M)Sdn Bhd Duration : 1994 –1997 Total Value : RM 3,535,549.65 Scope ofWorks : Drilling MachineBoom, Lifting Folks, Clampshell, Hydraulic Jack, Tremie Brake, Lifting Head,CWSJoint Holder,Concrete
  • 8.
    Mould,ToolsCabinet,Waterpump, Track Roller, MissionPump,MixerPump, Double Mixer,TremiePipe,Leaderc/w Hydraulic Cylinder,HoistCrane,Canopy, SpacerMould, Hammer,Chisel, Clampshell Grab,Pipe rack, TapperHooper,CWSJoint Head, Anchor Housing, I-beam Bridge,Platform,Channel CementGrouting Platform,Bentonite Tank, Angle rack,Heavy-Duty,Pivot Roller, Soil Spiral Wheel, Watertank,SHS Platform,M.S. Channel Lifting Spreader,GroutingPacker, Clampshell 600 c/w Grab, Cyclo,Russian PuppetSilo, DoubleConcrete cementMixer, Digester,Spotlight Tower,Clampshell,1000 c/wGrab,Spare Missionpump,Concrete Mould (BSW),Diesel Tank,Clampshell KL-800 c/wGrab, CWS600,Double Steel Cage,Chamffer, Tool Box,Electric Box c/w Plywood Trailer. 3. Customer : Tomoe Duration : 1995 –1996 Total Value : RM 2,300,000.00
  • 9.
    Scope Of Works: Fabricate for KLIA,fasteners of Roof Light,Welding, Joining Bracket,Roll Bending,Structure, andEraction, By Keel Trust. 4. Customer : Permatang Pau(Penang) Duration : 1994 –1995 Total Value : RM 1,135,000.00 Scope Of Work : BendRolling,StandardSteel Tank,Erection, SuckingPiping,AndPacking Machine. 5. Customer : Netsteel Engineering (Singapore) Duration : 1996 –1997 Total Value : RM6,540,000.00 Scope ofWork : Fabricate, InstallationTank, Cement PlantSupply Conveyer, Erection, andCommisioning. 6. Customer : L & M Agencies SdnBhd Duration : 1994 –1996 Total Value : RM 361,300.00 Scope Of Work : CounterMixerPaddle,JackingColumn, ShearKey Pocket,AngleBracket, ShearKey Deck Hanger,CastSteel MixerPaddle,Shear
  • 10.
    Key Beam, CastSteelClamp, Cast Steel ClampGuide. 7. Customer : SinaranUnikSdnBhd Duration : 1995 –1997 Total Value : RM 125,700.00 Scope Of Work : Cyclo,Spare Missionpump, Frame,4” Spare MissionPump, TremieBrake, Chamffer, Hooper,TremiePipe. 8. Customer : GeoprimaSdn Bhd Duration : 1997– 2000 Total Value : RM 1,123,416.85 Scope Of Work : Clampshell 800 c/wGrab,WSI-600,SiloTank, MissionPump, Chamffer,BentoniteTank, Spare Missionpump, Concretecement Mixer,Anchor Recess, Clampshell 1000 c/w Grab, TapperHooper,800 Grab, Steel Rope Single Roller, Square Chisel,Clampshell 600 c/w Grab,1200 Grab,BentoniteMixer, Lifting Head,BottomToe. 9. Customer : I-PFoundationLtd.(Singapore)
  • 11.
    Duration : 1998–1999 Total value : RM 1,662,009.60 Scope Of Work : WSI-600, WSI-800,Silo,Clampshell 1000 10. Customer : Intrafor(France) Duration : 1998 Total Value : RM 683,236.30 Scope Of Work : WSI-800,Silo 11. Customer : I-PThaiLtd(Thailand) Duration : 1998 Total Value : RM 362,936.00 Scope Of Work : WSI-600, Silo. 12. Customer : I-PFoundationLtd.(Hong Kong) Duration : 1999 Total Value : RM 1,269,548.60 Scope Of Work : WSI-1000,Silo
  • 12.
    13. Customer :TurfChemicalsSdn Bhd Duration : 1999 –2000 Total Value : RM 327,382.40 Scope Of Work : Awning, TapperHooperMixer,Sliding Gate, Roofing, Platform, Roller Mixer, AutoGate, Horizontal Tank. 14 Maincontractor :Harris Pye MarineLtd. Duration : 1994 -1996 Total Value : RM 2,500.000.00 ScopeofWork :Marine Boiler Repairing, Tankershiprepair, Fabrication and Installationpiping work. Job Location :Keppel Shipyard. Workdone under : SoonFoong Technology Sdn Bhd 15 Maincontractor : Harris Pye MarineLtd. Duration : 1996 1998 Total Value : RM 3,500.000.00
  • 13.
    ScopeOf Work :MarineBoiler Repairing, Tanker shiprepair, Fabrication and Installationpiping work. Job Location :Sembawang ShipYard Workdone Under : Soon FoongTechnology SdnBhd 16 Maincontractor : Harris Pye MarineLtd. Duration : 1999-2001 Total Value : RM 2,500.000.00 ScopeOf Work :Marine Boiler Repairing, Tanker shiprepair, Fabrication and Installationpiping work. Job Location :Jurong Shipyard Workdone Under : Soon FoongTechnology SdnBhd 17 Maincontractor : Harris PyeMarine Ltd. Duration : 2001 - 2003 Total Value : RM 2,500.000.00 ScopeOf Work :Marine Boiler Repairing, Tanker shiprepair, Fabrication and Installationpiping work. Job Location : SingaporeShipyard
  • 14.
    Workdone Under :SoonFoongTechnology SdnBhd 18 Maincontractor :SetiaDamai Sdn.Bhd Duration : 2007 -2007 Total Value : RM 2,500.000.00 ScopeOf Work :FabricationErectionofupper gate, lower gate and emergency gate whicheach gateapprox weight30 tons. Job Location :SMARTTUNNEL (Kuala Lumpur) Workdone Under :Soon FoongTechnology SdnBhd