Setting New Activities in
Primavera 8.2 – Duration Type
and Percent Complete
New Activity Defaults
After creating a new project and before adding
activities it is important to set the defaults such
as the Activity ID Numbers and Calendars.
By setting them correctly before adding activities you
will save a significant amount of time because you will
not have to change a number of attributes against all
activities at a later date.
These defaults are set in the Defaults tab of the Project
Details form:
Duration Type
None of the Duration Type options affects how the
schedule calculates until one or more resources is
assigned to an Activity. The following options are
available:
 Fixed Units
 Fixed Duration & Units/Time
 Fixed Units/Time
 Fixed Duration & Units
If you do not plan to add resources to Activities, then
you do not need to assign a Duration Type and it may
be left as the default.
This topic will be covered in detail in the Assigning
Roles and Resources Expenses chapter.
Percent Complete Type
The Percent Complete type should be understood if it
is intended to be used to update (status or progress)
the schedule. This option may be set for each activity
individually in Primavera and the default for new
activities is set in the Percent Complete Type drop
down box.
Primavera has many Activity Percent Complete fields
that may be displayed in columns and we will discuss
four of them now:
Activity % Complete, which may be linked to one
only of the three following % Complete fields and is
always linked to the % Complete displayed on
the Gantt Chart bars:
 Physical % Complete, which is independent of
activity resources and durations,
 Duration % Complete, which is linked to activity
durations, and
 Units % Complete, which is linked to resource
units.
There are three percent complete options; each new
activity is assigned the project default Percent
Complete Type and then this may be edited for each
activity as required.
Therefore, for example, when the option of Physical %
Complete is selected for an activity then the Activity
% Complete and the Physical % Complete are
linked and a change to one will change the other and
this value would be displayed on the Gantt Chart.
Eastwood Harris Supplies Project Management
Training Manuals, Project Management Training
Presentations and Consulting on Primavera
P6 and Microsoft Project 2010 across Australia.

More Related Content

More from danieljohn810

More from danieljohn810 (20)

Destination Wedding Etiquette
Destination Wedding EtiquetteDestination Wedding Etiquette
Destination Wedding Etiquette
 
Diploma of Project Management – How to Set Up Project Activity Sequences
Diploma of Project Management – How to Set Up Project Activity SequencesDiploma of Project Management – How to Set Up Project Activity Sequences
Diploma of Project Management – How to Set Up Project Activity Sequences
 
Australian Workplace Health and Safety Resources
Australian Workplace Health and Safety ResourcesAustralian Workplace Health and Safety Resources
Australian Workplace Health and Safety Resources
 
Cert IV OHS - WHS Responsibilities and Legislative Requirements
Cert IV OHS - WHS Responsibilities and Legislative RequirementsCert IV OHS - WHS Responsibilities and Legislative Requirements
Cert IV OHS - WHS Responsibilities and Legislative Requirements
 
Certificate IV Project Management - Activity Duration Estimating (Inputs)
Certificate IV Project Management - Activity Duration Estimating (Inputs)Certificate IV Project Management - Activity Duration Estimating (Inputs)
Certificate IV Project Management - Activity Duration Estimating (Inputs)
 
Certificate IV OHS - Glossary of Common OHS Terms
Certificate IV OHS - Glossary of Common OHS TermsCertificate IV OHS - Glossary of Common OHS Terms
Certificate IV OHS - Glossary of Common OHS Terms
 
Writing Meeting Agendas - Business Writing Skills Training Courses
Writing Meeting Agendas - Business Writing Skills Training CoursesWriting Meeting Agendas - Business Writing Skills Training Courses
Writing Meeting Agendas - Business Writing Skills Training Courses
 
Diploma of Project Management - Activity Resource Estimating (Outputs)
Diploma of Project Management - Activity Resource Estimating (Outputs)Diploma of Project Management - Activity Resource Estimating (Outputs)
Diploma of Project Management - Activity Resource Estimating (Outputs)
 
Cert IV Project Management - Activity Duration Estimating (Tools and Techniques)
Cert IV Project Management - Activity Duration Estimating (Tools and Techniques)Cert IV Project Management - Activity Duration Estimating (Tools and Techniques)
Cert IV Project Management - Activity Duration Estimating (Tools and Techniques)
 
Schedule Development - Diploma in Project Management
Schedule Development - Diploma in Project Management Schedule Development - Diploma in Project Management
Schedule Development - Diploma in Project Management
 
Occupational Health and Safety Training -The Role of Managers in WHS
Occupational Health and Safety Training -The Role of Managers in WHSOccupational Health and Safety Training -The Role of Managers in WHS
Occupational Health and Safety Training -The Role of Managers in WHS
 
Executive Assistant Training - Advanced PA Training
Executive Assistant Training - Advanced PA TrainingExecutive Assistant Training - Advanced PA Training
Executive Assistant Training - Advanced PA Training
 
Occupational Health and Safety Training - WHS Needs and Priorities (Legal Req...
Occupational Health and Safety Training - WHS Needs and Priorities (Legal Req...Occupational Health and Safety Training - WHS Needs and Priorities (Legal Req...
Occupational Health and Safety Training - WHS Needs and Priorities (Legal Req...
 
Occupational Health and Safety Training - WHS Needs and Priorities
Occupational Health and Safety Training - WHS Needs and PrioritiesOccupational Health and Safety Training - WHS Needs and Priorities
Occupational Health and Safety Training - WHS Needs and Priorities
 
Office 365 Excel Essentials Training Course.pdf
Office 365 Excel Essentials Training Course.pdfOffice 365 Excel Essentials Training Course.pdf
Office 365 Excel Essentials Training Course.pdf
 
Glossary of OHS Terms - Diploma in Occupational Health and Safety
Glossary of OHS Terms - Diploma in Occupational Health and SafetyGlossary of OHS Terms - Diploma in Occupational Health and Safety
Glossary of OHS Terms - Diploma in Occupational Health and Safety
 
How to Measure the Relevance and Accuracy of OHS Information
How to Measure the Relevance and Accuracy of OHS InformationHow to Measure the Relevance and Accuracy of OHS Information
How to Measure the Relevance and Accuracy of OHS Information
 
Diploma Human Resources
Diploma Human ResourcesDiploma Human Resources
Diploma Human Resources
 
Diploma of Management - Three Basic Types of Human Communication
Diploma of Management - Three Basic Types of Human CommunicationDiploma of Management - Three Basic Types of Human Communication
Diploma of Management - Three Basic Types of Human Communication
 
Management Diploma Online - Seven Categories of Motivation
Management Diploma Online - Seven Categories of MotivationManagement Diploma Online - Seven Categories of Motivation
Management Diploma Online - Seven Categories of Motivation
 

Recently uploaded

NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
Khaled Al Awadi
 
Creating an Income Statement with Forecasts: A Simple Guide and Free Excel Te...
Creating an Income Statement with Forecasts: A Simple Guide and Free Excel Te...Creating an Income Statement with Forecasts: A Simple Guide and Free Excel Te...
Creating an Income Statement with Forecasts: A Simple Guide and Free Excel Te...
Aurelien Domont, MBA
 
Powerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metricsPowerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metrics
CaitlinCummins3
 
Presentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledPresentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelled
CaitlinCummins3
 
What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...
srcw2322l101
 
Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312
LR1709MUSIC
 
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
drm1699
 

Recently uploaded (20)

NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
 
Creating an Income Statement with Forecasts: A Simple Guide and Free Excel Te...
Creating an Income Statement with Forecasts: A Simple Guide and Free Excel Te...Creating an Income Statement with Forecasts: A Simple Guide and Free Excel Te...
Creating an Income Statement with Forecasts: A Simple Guide and Free Excel Te...
 
How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...
How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...
How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...
 
Should Law Firms Outsource their Bookkeeping
Should Law Firms Outsource their BookkeepingShould Law Firms Outsource their Bookkeeping
Should Law Firms Outsource their Bookkeeping
 
Powerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metricsPowerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metrics
 
1Q24_EN hyundai capital 1q performance
1Q24_EN   hyundai capital 1q performance1Q24_EN   hyundai capital 1q performance
1Q24_EN hyundai capital 1q performance
 
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
 
Moradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in PenacovaMoradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in Penacova
 
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deckPitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
 
First Time Home Buyer's Guide - KM Realty Group LLC
First Time Home Buyer's Guide - KM Realty Group LLCFirst Time Home Buyer's Guide - KM Realty Group LLC
First Time Home Buyer's Guide - KM Realty Group LLC
 
How to refresh to be fit for the future world
How to refresh to be fit for the future worldHow to refresh to be fit for the future world
How to refresh to be fit for the future world
 
HAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future ProspectsHAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future Prospects
 
Toyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & TransformationsToyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & Transformations
 
Presentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledPresentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelled
 
What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...
 
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdfProgress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
 
MichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdfMichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdf
 
Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312
 
Global Internal Audit Standards 2024.pdf
Global Internal Audit Standards 2024.pdfGlobal Internal Audit Standards 2024.pdf
Global Internal Audit Standards 2024.pdf
 
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
 

Setting New Activities in Primavera 8.2 – Duration Type and Percent Complete

  • 1. Setting New Activities in Primavera 8.2 – Duration Type and Percent Complete
  • 2. New Activity Defaults After creating a new project and before adding activities it is important to set the defaults such as the Activity ID Numbers and Calendars. By setting them correctly before adding activities you will save a significant amount of time because you will not have to change a number of attributes against all activities at a later date.
  • 3. These defaults are set in the Defaults tab of the Project Details form:
  • 4. Duration Type None of the Duration Type options affects how the schedule calculates until one or more resources is assigned to an Activity. The following options are available:  Fixed Units  Fixed Duration & Units/Time  Fixed Units/Time  Fixed Duration & Units
  • 5. If you do not plan to add resources to Activities, then you do not need to assign a Duration Type and it may be left as the default. This topic will be covered in detail in the Assigning Roles and Resources Expenses chapter.
  • 6. Percent Complete Type The Percent Complete type should be understood if it is intended to be used to update (status or progress) the schedule. This option may be set for each activity individually in Primavera and the default for new activities is set in the Percent Complete Type drop down box. Primavera has many Activity Percent Complete fields that may be displayed in columns and we will discuss four of them now:
  • 7. Activity % Complete, which may be linked to one only of the three following % Complete fields and is always linked to the % Complete displayed on the Gantt Chart bars:  Physical % Complete, which is independent of activity resources and durations,  Duration % Complete, which is linked to activity durations, and  Units % Complete, which is linked to resource units.
  • 8. There are three percent complete options; each new activity is assigned the project default Percent Complete Type and then this may be edited for each activity as required.
  • 9. Therefore, for example, when the option of Physical % Complete is selected for an activity then the Activity % Complete and the Physical % Complete are linked and a change to one will change the other and this value would be displayed on the Gantt Chart.
  • 10. Eastwood Harris Supplies Project Management Training Manuals, Project Management Training Presentations and Consulting on Primavera P6 and Microsoft Project 2010 across Australia.