80’
Outline
• Problem Statement
• Background
• Modeling
• Utilities
• Hydrology and Hydraulics
2
• Life Cycle Cost Assessment
• Alternatives
• Future - Continuing Work
• Conclusion
Problem Statement
• Deterioration
• Load reduction
• Emergency retrofit
• Consideration of different alternatives
• Recommend efficient long term solution
3
Background - Location
4
Project Location
Drexel University
Project Location
Project Location
Background - Structural Description
• Single span, 80 feet long
• Two lanes of traffic
• 44 foot wide roadway
• 82° abut. skew to road
• North-south orientation
• Reinforced concrete deck
• 8 weathering steel girders
5
Background - Future and Community Impact
• Desire of increasing public transit and
commercial revitalization
• Goal to alleviate traffic congestion
• Current heavy use of bus/train
• Upkeep of retail and industrial parks an
issue
• Growing trend of single to multi-family
home conversions
6
Project Location
Project Location
Community Impact - Potential Detour Route
• Total distance of
approximately 2.36 miles
• Emergency Response
Located on either side of
the structure
• Verree Road (SR 1001) bridge
also allows for mounted
police patrol
7
Project Location
Background-Inspections and Current Condition
• Last City inspection: June 18th,
2014
• Team site visit: Nov. 18, 2015
• Deck: cracking on parapets,
spalling, and potholes on deck
• North expansion joint in poor
condition
8
Superstructure Inspection
• Eight W33x130 girders with cross
braces
• Section loss evident on girders
• Rusting of cross braces & bearings
9
Substructure Inspection
• Both abutments have 3-4” settlement
10
• South abutment - minor cracking, delamination of bridge seats
• North abutment - cracked pedestals, pooling water behind bridge
seats
Modeling - AutoCAD
• Developed a model to import into SAP2000
• Combination of shell elements (bridge deck), frame elements
(beams), and rigid links
• Only superstructure
11
Modeling - SAP2000
• Current condition
• Application of loads and load cases
• Results:
• L/800 deflection
• Stress
12
Utilities
• PWD - 20” Main
• PGW - 8” Main
• 10” sewer and 42” storm sewer run under
creek - encased in concrete
13
Hydraulics and Hydrology
14
• Downstream of structure
looking downstream
Peak Flow Rates
15
Hydrologic Analysis
16
Hydraulic Analysis
• Normal Clearance 12’-3”
• 100-yr Clearance 12’-8”
• 500-yr Clearance 15’-4 ½”
• Lift Low Chord 6”
17
HY-8 Output Table
18
19
Life Cycle Cost Assessment
• Maintenance Records
• Present Net Worth
20
Pine Road over Pennypack Creek
Wyoming Avenue over Frankford Creek
Do Nothing Alternative
• Structure in a state of deterioration
• Average weight of garbage truck is
32 tons
• Impact on community and
environment
21
Repair Alternative
• Deterioration of structure due to drainage
design flaws
• Replace beam ends, deck, and bearings
• Very expensive to install temporary supports
22
Rehabilitation Alternative
• Fix abutment for settlement issues
• Fix drainage issues
• Hydraulic considerations
23
Replacement Alternative
• Need to lift bridge above 100 year storm
• Completed Scupper Design Calculations
• Fix drainage design issues by adding
expansion joint
• Abutment to Approach Slab
• Fix settlement issues
• Propose Prestressed Concrete Beams
24
Structural Design - Material Considerations
25
Current: Weathering Steel Proposed: Prestressed Concrete
• Performs better under wet
conditions
• Low maintenance
• Less expensive than
weathering steel
• Forms patina
• Poor performance under wet
conditions
• Not recommended in areas
wetter greater than 60% of the
time
8 - Beam Configuration
• 80’ long
• 8” Deck
• 36” Top Flange
26
6 - Beam Configuration
• 80’ long
• 8” Deck
• 48” Top Flange
27
28
Schedule to Date
29
Expected Future Schedule
Design Budget
30
Future - Continuing Work
• Completion of Superstructure design
• Geotechnical Analysis
• Abutment Design
• Transportation Design
• Modeling
• Life Cycle Cost Assessment
31
Conclusion
• Bridge is necessary for community
• Recommend replacement alternative
• Modeling
• Accounted for hydrologic impacts
• Structural design calculations
• Looked into life cycle cost assessment
32
Questions?
33

More Related Content

What's hot

Downsview Water Service Improvement Study Boards
Downsview Water Service Improvement Study BoardsDownsview Water Service Improvement Study Boards
Downsview Water Service Improvement Study Boards
Toronto Public Consultation Unit
 
CPAC Meeting 10-25-04
CPAC Meeting 10-25-04CPAC Meeting 10-25-04
CPAC Meeting 10-25-04
HartTWI
 
Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing
Toronto Public Consultation Unit
 
Rehabilitation of Three Equalization Basins and Ancillary Facilities
Rehabilitation of Three Equalization Basins and Ancillary Facilities Rehabilitation of Three Equalization Basins and Ancillary Facilities
Rehabilitation of Three Equalization Basins and Ancillary Facilities
Fairfax County
 
LTCP meeting 11-18-04
LTCP meeting 11-18-04LTCP meeting 11-18-04
LTCP meeting 11-18-04
HartTWI
 
C5 Council Workshop Presentation 7-27-11
C5 Council Workshop Presentation 7-27-11C5 Council Workshop Presentation 7-27-11
C5 Council Workshop Presentation 7-27-11
publicinvolvement
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
Association for Project Management
 
Presentation-Orange-County-Great-Park-Storm-Water-Reuse-Pond-System-June-2014
Presentation-Orange-County-Great-Park-Storm-Water-Reuse-Pond-System-June-2014Presentation-Orange-County-Great-Park-Storm-Water-Reuse-Pond-System-June-2014
Presentation-Orange-County-Great-Park-Storm-Water-Reuse-Pond-System-June-2014
Joseph Merzlak
 
Best Practices in Sustainable Pavement Management
Best Practices in Sustainable Pavement ManagementBest Practices in Sustainable Pavement Management
Best Practices in Sustainable Pavement Management
Cartegraph
 
TTG Luncheon 4.6.2016 - OC Streetcar
TTG Luncheon 4.6.2016 - OC StreetcarTTG Luncheon 4.6.2016 - OC Streetcar
TTG Luncheon 4.6.2016 - OC Streetcar
American Society of Civil Engineers, Orange County Branch
 
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 ImplementationDulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Fairfax County
 
Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...
Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...
Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...
Youn Sim, Ph.D., P.E.
 
Lid Stormwater Approach: Overcoming Barriers to Implementation
Lid Stormwater Approach: Overcoming Barriers to ImplementationLid Stormwater Approach: Overcoming Barriers to Implementation
Lid Stormwater Approach: Overcoming Barriers to Implementation
abroadsword
 
Fairfax County Tertiary Filtration System Rehabilitation July 2020
Fairfax County Tertiary Filtration System Rehabilitation July 2020Fairfax County Tertiary Filtration System Rehabilitation July 2020
Fairfax County Tertiary Filtration System Rehabilitation July 2020
Fairfax County
 
Fy 19 PPT Public Works and Utilities
Fy 19 PPT Public Works and UtilitiesFy 19 PPT Public Works and Utilities
Fy 19 PPT Public Works and Utilities
ahcitycouncil
 
Compressors presentation on Types, Classification and governing Equations
Compressors presentation on Types, Classification and governing EquationsCompressors presentation on Types, Classification and governing Equations
Compressors presentation on Types, Classification and governing Equations
Hassan ElBanhawi
 
City Council April 3, 2012 Hickory Aquifer Project Update
City Council April 3, 2012 Hickory Aquifer Project UpdateCity Council April 3, 2012 Hickory Aquifer Project Update
City Council April 3, 2012 Hickory Aquifer Project Update
City of San Angelo Texas
 
Island Water Treatment Plant Capacity Increase Study
Island Water Treatment Plant Capacity Increase StudyIsland Water Treatment Plant Capacity Increase Study
Island Water Treatment Plant Capacity Increase Study
Toronto Public Consultation Unit
 
Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014
Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014
Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014
San Diego County Water Authority
 
Updated combined transportation_facility_report.pdf 2
Updated combined transportation_facility_report.pdf 2Updated combined transportation_facility_report.pdf 2
Updated combined transportation_facility_report.pdf 2
Kenneth Hogge Sr
 

What's hot (20)

Downsview Water Service Improvement Study Boards
Downsview Water Service Improvement Study BoardsDownsview Water Service Improvement Study Boards
Downsview Water Service Improvement Study Boards
 
CPAC Meeting 10-25-04
CPAC Meeting 10-25-04CPAC Meeting 10-25-04
CPAC Meeting 10-25-04
 
Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing
 
Rehabilitation of Three Equalization Basins and Ancillary Facilities
Rehabilitation of Three Equalization Basins and Ancillary Facilities Rehabilitation of Three Equalization Basins and Ancillary Facilities
Rehabilitation of Three Equalization Basins and Ancillary Facilities
 
LTCP meeting 11-18-04
LTCP meeting 11-18-04LTCP meeting 11-18-04
LTCP meeting 11-18-04
 
C5 Council Workshop Presentation 7-27-11
C5 Council Workshop Presentation 7-27-11C5 Council Workshop Presentation 7-27-11
C5 Council Workshop Presentation 7-27-11
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
 
Presentation-Orange-County-Great-Park-Storm-Water-Reuse-Pond-System-June-2014
Presentation-Orange-County-Great-Park-Storm-Water-Reuse-Pond-System-June-2014Presentation-Orange-County-Great-Park-Storm-Water-Reuse-Pond-System-June-2014
Presentation-Orange-County-Great-Park-Storm-Water-Reuse-Pond-System-June-2014
 
Best Practices in Sustainable Pavement Management
Best Practices in Sustainable Pavement ManagementBest Practices in Sustainable Pavement Management
Best Practices in Sustainable Pavement Management
 
TTG Luncheon 4.6.2016 - OC Streetcar
TTG Luncheon 4.6.2016 - OC StreetcarTTG Luncheon 4.6.2016 - OC Streetcar
TTG Luncheon 4.6.2016 - OC Streetcar
 
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 ImplementationDulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
 
Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...
Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...
Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...
 
Lid Stormwater Approach: Overcoming Barriers to Implementation
Lid Stormwater Approach: Overcoming Barriers to ImplementationLid Stormwater Approach: Overcoming Barriers to Implementation
Lid Stormwater Approach: Overcoming Barriers to Implementation
 
Fairfax County Tertiary Filtration System Rehabilitation July 2020
Fairfax County Tertiary Filtration System Rehabilitation July 2020Fairfax County Tertiary Filtration System Rehabilitation July 2020
Fairfax County Tertiary Filtration System Rehabilitation July 2020
 
Fy 19 PPT Public Works and Utilities
Fy 19 PPT Public Works and UtilitiesFy 19 PPT Public Works and Utilities
Fy 19 PPT Public Works and Utilities
 
Compressors presentation on Types, Classification and governing Equations
Compressors presentation on Types, Classification and governing EquationsCompressors presentation on Types, Classification and governing Equations
Compressors presentation on Types, Classification and governing Equations
 
City Council April 3, 2012 Hickory Aquifer Project Update
City Council April 3, 2012 Hickory Aquifer Project UpdateCity Council April 3, 2012 Hickory Aquifer Project Update
City Council April 3, 2012 Hickory Aquifer Project Update
 
Island Water Treatment Plant Capacity Increase Study
Island Water Treatment Plant Capacity Increase StudyIsland Water Treatment Plant Capacity Increase Study
Island Water Treatment Plant Capacity Increase Study
 
Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014
Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014
Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014
 
Updated combined transportation_facility_report.pdf 2
Updated combined transportation_facility_report.pdf 2Updated combined transportation_facility_report.pdf 2
Updated combined transportation_facility_report.pdf 2
 

Similar to Senior Design Presentation - Winter Term

Senior Design Presntation - Spring Term
Senior Design Presntation - Spring TermSenior Design Presntation - Spring Term
Senior Design Presntation - Spring Term
Steven E. Kreeley, EIT
 
Senior Design Presentation - Fall Term
Senior Design Presentation - Fall TermSenior Design Presentation - Fall Term
Senior Design Presentation - Fall Term
Steven E. Kreeley, EIT
 
Washinton State University/Manchester Fuel Depot Senior Project
Washinton State University/Manchester Fuel Depot Senior ProjectWashinton State University/Manchester Fuel Depot Senior Project
Washinton State University/Manchester Fuel Depot Senior Project
WSUME_2013_A-TEAM
 
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Fairfax County
 
01-Preliminary Studies.pptx
01-Preliminary Studies.pptx01-Preliminary Studies.pptx
01-Preliminary Studies.pptx
DikiSuryaIrawan
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Toronto Public Consultation Unit
 
Wp mp-update-camp pendleton.-april_25_2013
Wp   mp-update-camp pendleton.-april_25_2013Wp   mp-update-camp pendleton.-april_25_2013
Wp mp-update-camp pendleton.-april_25_2013
San Diego County Water Authority
 
Sharing Experiences of Flood Modelling Using MIKE 21
Sharing Experiences of Flood Modelling Using MIKE 21Sharing Experiences of Flood Modelling Using MIKE 21
Sharing Experiences of Flood Modelling Using MIKE 21
Stephen Flood
 
Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...
 Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali... Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...
Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...
Fairfax County
 
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
Fairfax County
 
K.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 projectK.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 project
ascemiami-dade
 
2013 NEFCO ERTAC TANKS
2013 NEFCO ERTAC TANKS2013 NEFCO ERTAC TANKS
2013 NEFCO ERTAC TANKS
Timothy Antos
 
Lawrence Park PIC 3 slides
Lawrence Park PIC 3 slidesLawrence Park PIC 3 slides
Lawrence Park PIC 3 slides
Toronto Public Consultation Unit
 
Lakevale Estates Collection Improvements Community Meeting
Lakevale Estates Collection Improvements Community MeetingLakevale Estates Collection Improvements Community Meeting
Lakevale Estates Collection Improvements Community Meeting
Fairfax County
 
Canal City - Poster-
Canal City - Poster-Canal City - Poster-
Canal City - Poster-
Leila Mouhsine
 
Investigation for bridge construction
Investigation for bridge constructionInvestigation for bridge construction
Investigation for bridge construction
Madujith Sagara
 
Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015
Northeast Ohio Regional Sewer District
 
Natural Gas an Inside Propective 2-19-14
Natural Gas an Inside Propective 2-19-14Natural Gas an Inside Propective 2-19-14
Natural Gas an Inside Propective 2-19-14
James M. Bright, P.E.
 
Water transportation to drilling sites
Water transportation to drilling sitesWater transportation to drilling sites
Water transportation to drilling sites
Martin Preene
 
Powering sydneys future workshop
Powering sydneys future workshopPowering sydneys future workshop
Powering sydneys future workshop
TransGrid AU
 

Similar to Senior Design Presentation - Winter Term (20)

Senior Design Presntation - Spring Term
Senior Design Presntation - Spring TermSenior Design Presntation - Spring Term
Senior Design Presntation - Spring Term
 
Senior Design Presentation - Fall Term
Senior Design Presentation - Fall TermSenior Design Presentation - Fall Term
Senior Design Presentation - Fall Term
 
Washinton State University/Manchester Fuel Depot Senior Project
Washinton State University/Manchester Fuel Depot Senior ProjectWashinton State University/Manchester Fuel Depot Senior Project
Washinton State University/Manchester Fuel Depot Senior Project
 
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
 
01-Preliminary Studies.pptx
01-Preliminary Studies.pptx01-Preliminary Studies.pptx
01-Preliminary Studies.pptx
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
 
Wp mp-update-camp pendleton.-april_25_2013
Wp   mp-update-camp pendleton.-april_25_2013Wp   mp-update-camp pendleton.-april_25_2013
Wp mp-update-camp pendleton.-april_25_2013
 
Sharing Experiences of Flood Modelling Using MIKE 21
Sharing Experiences of Flood Modelling Using MIKE 21Sharing Experiences of Flood Modelling Using MIKE 21
Sharing Experiences of Flood Modelling Using MIKE 21
 
Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...
 Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali... Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...
Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...
 
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
 
K.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 projectK.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 project
 
2013 NEFCO ERTAC TANKS
2013 NEFCO ERTAC TANKS2013 NEFCO ERTAC TANKS
2013 NEFCO ERTAC TANKS
 
Lawrence Park PIC 3 slides
Lawrence Park PIC 3 slidesLawrence Park PIC 3 slides
Lawrence Park PIC 3 slides
 
Lakevale Estates Collection Improvements Community Meeting
Lakevale Estates Collection Improvements Community MeetingLakevale Estates Collection Improvements Community Meeting
Lakevale Estates Collection Improvements Community Meeting
 
Canal City - Poster-
Canal City - Poster-Canal City - Poster-
Canal City - Poster-
 
Investigation for bridge construction
Investigation for bridge constructionInvestigation for bridge construction
Investigation for bridge construction
 
Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015
 
Natural Gas an Inside Propective 2-19-14
Natural Gas an Inside Propective 2-19-14Natural Gas an Inside Propective 2-19-14
Natural Gas an Inside Propective 2-19-14
 
Water transportation to drilling sites
Water transportation to drilling sitesWater transportation to drilling sites
Water transportation to drilling sites
 
Powering sydneys future workshop
Powering sydneys future workshopPowering sydneys future workshop
Powering sydneys future workshop
 

Senior Design Presentation - Winter Term

  • 1. Pine Road over Pennypack Creek Senior Design Team 26 Matan Alexander, Gary Reiff, Derek Zaccheo, Cassandra Pruefer, & Steven Kreeley Faculty Advisor: Dr. Ivan Bartoli Technical Advisors: Dr. Emin Aktan and Mr. Benjamin Cohen, E.I.T. 80’
  • 2. Outline • Problem Statement • Background • Modeling • Utilities • Hydrology and Hydraulics 2 • Life Cycle Cost Assessment • Alternatives • Future - Continuing Work • Conclusion
  • 3. Problem Statement • Deterioration • Load reduction • Emergency retrofit • Consideration of different alternatives • Recommend efficient long term solution 3
  • 4. Background - Location 4 Project Location Drexel University Project Location Project Location
  • 5. Background - Structural Description • Single span, 80 feet long • Two lanes of traffic • 44 foot wide roadway • 82° abut. skew to road • North-south orientation • Reinforced concrete deck • 8 weathering steel girders 5
  • 6. Background - Future and Community Impact • Desire of increasing public transit and commercial revitalization • Goal to alleviate traffic congestion • Current heavy use of bus/train • Upkeep of retail and industrial parks an issue • Growing trend of single to multi-family home conversions 6 Project Location Project Location
  • 7. Community Impact - Potential Detour Route • Total distance of approximately 2.36 miles • Emergency Response Located on either side of the structure • Verree Road (SR 1001) bridge also allows for mounted police patrol 7 Project Location
  • 8. Background-Inspections and Current Condition • Last City inspection: June 18th, 2014 • Team site visit: Nov. 18, 2015 • Deck: cracking on parapets, spalling, and potholes on deck • North expansion joint in poor condition 8
  • 9. Superstructure Inspection • Eight W33x130 girders with cross braces • Section loss evident on girders • Rusting of cross braces & bearings 9
  • 10. Substructure Inspection • Both abutments have 3-4” settlement 10 • South abutment - minor cracking, delamination of bridge seats • North abutment - cracked pedestals, pooling water behind bridge seats
  • 11. Modeling - AutoCAD • Developed a model to import into SAP2000 • Combination of shell elements (bridge deck), frame elements (beams), and rigid links • Only superstructure 11
  • 12. Modeling - SAP2000 • Current condition • Application of loads and load cases • Results: • L/800 deflection • Stress 12
  • 13. Utilities • PWD - 20” Main • PGW - 8” Main • 10” sewer and 42” storm sewer run under creek - encased in concrete 13
  • 14. Hydraulics and Hydrology 14 • Downstream of structure looking downstream
  • 17. Hydraulic Analysis • Normal Clearance 12’-3” • 100-yr Clearance 12’-8” • 500-yr Clearance 15’-4 ½” • Lift Low Chord 6” 17 HY-8 Output Table
  • 18. 18
  • 19. 19
  • 20. Life Cycle Cost Assessment • Maintenance Records • Present Net Worth 20 Pine Road over Pennypack Creek Wyoming Avenue over Frankford Creek
  • 21. Do Nothing Alternative • Structure in a state of deterioration • Average weight of garbage truck is 32 tons • Impact on community and environment 21
  • 22. Repair Alternative • Deterioration of structure due to drainage design flaws • Replace beam ends, deck, and bearings • Very expensive to install temporary supports 22
  • 23. Rehabilitation Alternative • Fix abutment for settlement issues • Fix drainage issues • Hydraulic considerations 23
  • 24. Replacement Alternative • Need to lift bridge above 100 year storm • Completed Scupper Design Calculations • Fix drainage design issues by adding expansion joint • Abutment to Approach Slab • Fix settlement issues • Propose Prestressed Concrete Beams 24
  • 25. Structural Design - Material Considerations 25 Current: Weathering Steel Proposed: Prestressed Concrete • Performs better under wet conditions • Low maintenance • Less expensive than weathering steel • Forms patina • Poor performance under wet conditions • Not recommended in areas wetter greater than 60% of the time
  • 26. 8 - Beam Configuration • 80’ long • 8” Deck • 36” Top Flange 26
  • 27. 6 - Beam Configuration • 80’ long • 8” Deck • 48” Top Flange 27
  • 31. Future - Continuing Work • Completion of Superstructure design • Geotechnical Analysis • Abutment Design • Transportation Design • Modeling • Life Cycle Cost Assessment 31
  • 32. Conclusion • Bridge is necessary for community • Recommend replacement alternative • Modeling • Accounted for hydrologic impacts • Structural design calculations • Looked into life cycle cost assessment 32