The document summarizes work done by a senior design team on replacing the Pine Road bridge over Pennypack Creek. The bridge is deteriorating and in need of replacement. The team modeled the existing structure, analyzed hydrology and hydraulics of the creek, and considered replacement alternatives. Their recommended alternative is to replace the bridge with a new structure using prestressed concrete beams that would provide sufficient clearance above future flood levels while addressing drainage and foundation issues.