Ionic Soil Stabiliser Stabilisation of Higher P.I. Clay Based Material
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Corrigin - Narembeen Rd. Re-constructed with CLAYCRETE April 2002
Photo Taken Sept. 2003 Photo Taken May 2002 Re-constructed with Claycrete  April 2002 and sealed within 4 weeks
Photo taken Jan. 2006 Photo taken Jan. 2006 This area has a high clay material with high water retention. Major drainage required as shown in photo. When revisited the road looked as new, with the shoulders and seal in un-marked condition
Travelling on this road at 110kph there was absolutely  no undulations or suspension vibrations Photo taken Jan. 2006
Spurr Road Kondinin  Re-constructed with  CLAYCRETE  October 1995
Road re-constructed October 1995  Nuclear Density CBR test October 1996 Test results, taken after 12 months, show   a significant CBR increase
Spurr Road section re-constructed with Claycrete  by Shire of Kondinin—October 1995 Picture taken September 2003. Inspection shows  road in excellent shape. NO Shire records of any maintenance grading since construction.   Photo taken Sept. 2003
September 2003 January 2006 Loose material is easily brushed off to reveal a firm well bound and solid pavement Regular on-site inspections confirm NO deterioration in the pavement or any rutting and corrugations. In recent week there was rain on this road as the next slide will illustrate
This first section of Spurr Rd. was never stabilised with Claycrete and has been  re-sheeted and re-constructed twice since 1995. This area received a large downpour from cyclonic rains The truck that travelled on this section of Spurr road also travelled on the Claycrete constructed section adjoining approx 800m away. Next slide shows a dramatic difference. Photo taken Jan. 2006 Photo taken Jan. 2006
Spurr Road  Both photo’s taken the same day and the vehicle MUST have travelled on both sections. January 2006 Constructed with Claycrete in 1995 Un-stabilised section adjoining the Claycrete section
Carstairs Rd. Lake Varley  Forestania Nickel Mine  28 km Haul Road Re-constructed with CLAYCRETE  October 1996
Carstairs Road – Lake Varley Haul road for Forestania Nickel Mine 28km re-constructed with Claycrete 1996 Mine decommissioned 2000  now sheep & wheat farming traffic
An excellent grading of gravel stone & clay  re-constructed with Claycrete resulting in a first class tight & well bound pavement
Carstairs Road re-visited Jan. 2006  This area received cyclonic rains and flooding  2 weeks prior. Road still in excellent  trafficable & Roadworthy condition
Forestania Nickel Mine – Lake Varley - Western Australia – 1996 Project: The haul route from mine to highway was used by light vehicles and school buses. Several near accidents caused the Local Government  Shire to close the haul road during rain. This 28km haul road was re-constructed with Claycrete providing an  ‘all weather’  pavement, with a view to safety for local & school bus traffic. Work was performed & controlled by the Shire of Lake Grace. Problem: For safety reasons, due to main school bus route, the road was closed to mine traffic during wet weather. The road was badly corrugated with un-ravelling and creating excessive dust, needing constant maintenance, also very slippery in the wet due to high clay content. The local Government Shire required an ‘All Weather’ road to safely accommodate the heavy mine hauling trucks as well as local and school bus traffic.  Solution:   The in-situ material had a high clay content with high plasticity and good stone content. This in-situ material was re-constructed with Claycrete resulting in considerable savings, compared with the need to import 20cm of new material for a complete re-sheeting program. The crew finished mixing one section on a Friday afternoon and decided to trim and finish the section on the following Monday. When they returned to site the road had set up with truck tyre marks in the surface. The Shire grader was unable to cut the surface and was forced to leave the marks on the pavement surface.
The tight well bound surface achieved by the Claycrete method of construction resulted with a significant reduction in ‘billowing dust’, meaning that the ‘strength’ material of the road was not blown away and lost. In an un-stabilised situation the continual loss of road ‘strength’ materials in the billowing dust blowing off the road would result with requiring re-sheeting & re-construction of the road every 18 to 24 months. This road  DID NOT  require any major re-sheeting during the life of the road, also what was noticeable was  NO LOSS  of surface pavement material. Conclusion: The road was  never closed  during wet weather for the life of the mine once the road had been re-constructed with Claycrete, also maintenance was not required on the road.  A nuclear density test for CBR increase was taken 12 months after the road was re-constructed and showed a large increase.  This road was re-visited January 2006 and photo’s & movies taken.  The road, today, is still a very good trafficable AND ‘all weather’ surface with evidence the road had sustained cyclonic rains in the last 2 weeks. A major issue with this road is that should the Authorities decide to upgrade the road and maybe even sealing it there is no need to re-stabilise the material, even tho it was stabilised in 1996. All that would be required is to rip the road and re-waterbind with  ONLY 10% Claycrete added.
Still A Good Well Bound Surface with Signs of only Minimal Wear, as in loose material.  Photo’s January 2006 Re-constructed with  Claycrete in 1996
East Hyden Bin Road Kondinin  Western Australia  Re-constructed with  CLAYCRETE Project Completed  November 2001
Road was starting to deform and pothole with the asphalt deteriorating. The road was ripped and the in-situ high clay gravel material was  re-constructed using Claycrete. Project  completed November 2001
East Hyden Bin Road Section of Pavement Failure Across A Salt Pan The road Pavement was extensively rutted and undulating, with evidence of considerable movement under the seal. It was evident that the material was plastic and holding water. The decision was to re-work the section and stabilise with Claycrete. The existing seal was chopped & mixed into the  re-worked in-situ material thus saving cost of disposal and cartage away. This photo is of the re-constructed and sealed Claycrete Pavement     Construction was undertaken by Manager of Works Shire of Kondinin, November 2001 This Picture Taken September 2003. Details From CBH Show 2002-2003 Grain Haulage On This Road was 27,339 Tonnes In 365 (each way) Triple Road Train Movements Hauling An Average Of 75 Tonnes Per Load, Over & Above Local Farming Traffic Also Tourist Traffic To Wave Rock This Section of Road Is Now One Of The Main Connecting Routes To The Eastern States and used by heavy haulage interstate vehicles. Photo taken Sept. 2003
Project re-visited October 2004  Road in first class condition with NO  Deformations or sign of damage Photo taken Oct. 2004
Project re-visited January 2006  Crossed the road at 110kmh and there was NO sign of deformations or faults in the pavement. The asphalt is now showing signs of ‘bleeding’ due to the current heavy haulage use Photo taken Jan. 2006
East Kalgarin Crossing  re-constructed with  CLAYCRETE  December 2001
East Kalgarin access road Section of flood crossing re-constructed with  Claycrete by Manager of  Works Shire of Kondinin—December 2001 Project re-visited Sept. 2003 & Jan. 2006 Inspection shows road in excellent shape. Every year prior to the Claycrete re-construction this crossing was washed away & totally  lost  after every overflow during a wet season. Pic taken after a flow over the crossing. NO Maintenance has been required since  re-constructed in December 2001    
Evidence of Water Flow Over Road Is Clearly Seen   Photo taken Sept. 2003 and water flow  from right to left clearly visible
September 2003 January 2006 Both photo’s show evidence of water flow over the crossing. The latest shows considerable silt deposited on the road
January 2006 This photo clearly shows the heavy scouring caused by the large volume of water flowing over the crossing
Bridge washaway - Kondinin Cyclonic Rains January 2006  CLAYCRETE  re-constructed 2002
Water reached here The water flowed over this road to width of the arrow mark and a depth of 40cm over the asphalt. The current was sufficient to wash away the bridge section Water reached knee cap height
January 2006 Cyclone Clare dumped a record 223mm (in 24 hours) of rain on and around  Lake Grace & districts. Reported as -  A ‘once in 500 year event’ Lake Grace is located approx 200km South East  of Kondinin. The large volume of water dumped on Lake Grace has flowed to many surrounding areas via the lake system & thus also caused flooding, even as far as Kondinin. This damage at Kondinin was caused by the water flow from Lake Grace’s deluge, rather than directly from the cyclone.
Extract from West Australian newspaper Sat. 28 th  Jan. 2006
Extract from West Australian newspaper Sat. 28th Jan. 2006
 
3 weeks after the cyclonic rains roads and rail still remain submerged by the flooding. Article from West Australian newspaper  1 st  February 2006
The base course was a high clay gravel material with good stone and  re-constructed with Claycrete. This photo clearly shows the Claycrete material to the right of the yellow line. When inspected the Claycrete section was dry, firm & well bound with no scouring marks even tho water to 40cm deep washed over this road. Material left of the line was holding moisture. The flow of water started to lift the asphalt seal. The area was totally submerged for several days Note Next Slide
This photo shows the Claycrete clay gravel material still attached to the asphalt seal. This material has not broken down or washed away under the worst conditions  of flooding & complete submersion for several days. Photo taken Jan. 2006
Hyden – Southern Cross Road Re-constructed with CLAYCRETE  December 2004
Photo taken January 2006 3km section of road re-constructed with Claycrete.  Driving on this road at 110kpm was extremely smooth with no vibrations thru the shock absorbers or steering wheel. This area received cyclonic rains 2 weeks prior to my visit.
The road is well constructed with excellent drainage and constructed with Claycrete from shoulder to shoulder.  Thus if a vehicle's tyres leave the asphalt they will not damage the un-sealed areas nor the asphalt edge Photo taken Jan. 2006
16/100 Briggs Street Welshpool 6106 Western Australia   Email :  [email_address]   [email_address] TEL : +61(8) 9470 9117 FAX : +61(8) 9472 4366

More Related Content

What's hot

Thermal vs Metallurgical Coal
Thermal vs Metallurgical CoalThermal vs Metallurgical Coal
Thermal vs Metallurgical CoalAlan Stagg
 
Ferry disruption in Rothesay
Ferry disruption in RothesayFerry disruption in Rothesay
Ferry disruption in RothesayNino Robertson
 
Innovative Slope Stabilisation
Innovative Slope StabilisationInnovative Slope Stabilisation
Innovative Slope Stabilisationselvem
 
NostalgicOutdoors™- Acadia National Park- Carriage Road Trails
NostalgicOutdoors™- Acadia National Park- Carriage Road TrailsNostalgicOutdoors™- Acadia National Park- Carriage Road Trails
NostalgicOutdoors™- Acadia National Park- Carriage Road TrailsNostalgicOutdoors™
 
Lecture04 AASHTO girder bridge ( Highway Engineering )
Lecture04   AASHTO girder bridge ( Highway Engineering )Lecture04   AASHTO girder bridge ( Highway Engineering )
Lecture04 AASHTO girder bridge ( Highway Engineering )Hossam Shafiq I
 
History of emmer green
History of emmer greenHistory of emmer green
History of emmer greenmdasma2012
 
2017 Fairfax County Walkway Rehab Projects
2017 Fairfax County Walkway Rehab Projects2017 Fairfax County Walkway Rehab Projects
2017 Fairfax County Walkway Rehab ProjectsFairfax County
 
Martin Goodman Trail West – Project Overview
Martin Goodman Trail West – Project OverviewMartin Goodman Trail West – Project Overview
Martin Goodman Trail West – Project OverviewWaterfrontTO
 
Fort Allen Park HPB Presentation 2.15.12
Fort Allen Park HPB Presentation 2.15.12Fort Allen Park HPB Presentation 2.15.12
Fort Allen Park HPB Presentation 2.15.12EasternPromenade
 
A Walk through Somerset - Day 7- Cocklake to Compton Martin
A Walk through Somerset - Day 7-  Cocklake to Compton MartinA Walk through Somerset - Day 7-  Cocklake to Compton Martin
A Walk through Somerset - Day 7- Cocklake to Compton MartinJohn Downs
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 finalToronto Public Consultation Unit
 
Er&M Slideshow
Er&M SlideshowEr&M Slideshow
Er&M Slideshowgrnthumb07
 
Dale Lochhead Resume
Dale Lochhead  Resume Dale Lochhead  Resume
Dale Lochhead Resume Dale Lochhead
 

What's hot (20)

Copper Transforms Roofs Across North America
Copper Transforms Roofs Across North AmericaCopper Transforms Roofs Across North America
Copper Transforms Roofs Across North America
 
Thermal vs Metallurgical Coal
Thermal vs Metallurgical CoalThermal vs Metallurgical Coal
Thermal vs Metallurgical Coal
 
Ferry disruption in Rothesay
Ferry disruption in RothesayFerry disruption in Rothesay
Ferry disruption in Rothesay
 
Innovative Slope Stabilisation
Innovative Slope StabilisationInnovative Slope Stabilisation
Innovative Slope Stabilisation
 
NostalgicOutdoors™- Acadia National Park- Carriage Road Trails
NostalgicOutdoors™- Acadia National Park- Carriage Road TrailsNostalgicOutdoors™- Acadia National Park- Carriage Road Trails
NostalgicOutdoors™- Acadia National Park- Carriage Road Trails
 
Lecture04 AASHTO girder bridge ( Highway Engineering )
Lecture04   AASHTO girder bridge ( Highway Engineering )Lecture04   AASHTO girder bridge ( Highway Engineering )
Lecture04 AASHTO girder bridge ( Highway Engineering )
 
History of emmer green
History of emmer greenHistory of emmer green
History of emmer green
 
Fallingwater Residence
Fallingwater ResidenceFallingwater Residence
Fallingwater Residence
 
2017 Fairfax County Walkway Rehab Projects
2017 Fairfax County Walkway Rehab Projects2017 Fairfax County Walkway Rehab Projects
2017 Fairfax County Walkway Rehab Projects
 
Martin Goodman Trail West – Project Overview
Martin Goodman Trail West – Project OverviewMartin Goodman Trail West – Project Overview
Martin Goodman Trail West – Project Overview
 
Fort Allen Park HPB Presentation 2.15.12
Fort Allen Park HPB Presentation 2.15.12Fort Allen Park HPB Presentation 2.15.12
Fort Allen Park HPB Presentation 2.15.12
 
DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...
DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...
DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...
 
Edward Rice House
Edward Rice HouseEdward Rice House
Edward Rice House
 
A Walk through Somerset - Day 7- Cocklake to Compton Martin
A Walk through Somerset - Day 7-  Cocklake to Compton MartinA Walk through Somerset - Day 7-  Cocklake to Compton Martin
A Walk through Somerset - Day 7- Cocklake to Compton Martin
 
Paverpresentation
PaverpresentationPaverpresentation
Paverpresentation
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
 
Er&M Slideshow
Er&M SlideshowEr&M Slideshow
Er&M Slideshow
 
Display boards
Display boardsDisplay boards
Display boards
 
Dale Lochhead Resume
Dale Lochhead  Resume Dale Lochhead  Resume
Dale Lochhead Resume
 
Glacier Skywalk
Glacier SkywalkGlacier Skywalk
Glacier Skywalk
 

Viewers also liked

China Qing Yang Road Bureau, Gansu Province (1999)
China Qing Yang Road Bureau, Gansu Province (1999)China Qing Yang Road Bureau, Gansu Province (1999)
China Qing Yang Road Bureau, Gansu Province (1999)Claycrete
 
Introduction of Prefabricated structures
Introduction  of Prefabricated structuresIntroduction  of Prefabricated structures
Introduction of Prefabricated structuresYogi Yogesh
 
PREFABRICATED STRUCTURES
PREFABRICATED STRUCTURESPREFABRICATED STRUCTURES
PREFABRICATED STRUCTURESRajendran s.
 
Presentation railways
Presentation railwaysPresentation railways
Presentation railwaysjags_champ
 
Railway track construction, drainage & maintenence
Railway track  construction, drainage & maintenenceRailway track  construction, drainage & maintenence
Railway track construction, drainage & maintenenceGhanashyam Prajapati
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structuresFAIZAL MUHAMMED
 

Viewers also liked (10)

China Qing Yang Road Bureau, Gansu Province (1999)
China Qing Yang Road Bureau, Gansu Province (1999)China Qing Yang Road Bureau, Gansu Province (1999)
China Qing Yang Road Bureau, Gansu Province (1999)
 
History of Prefabricated Houses
History of Prefabricated HousesHistory of Prefabricated Houses
History of Prefabricated Houses
 
Introduction of Prefabricated structures
Introduction  of Prefabricated structuresIntroduction  of Prefabricated structures
Introduction of Prefabricated structures
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structures
 
Design of Pedestrian Bridge
Design of Pedestrian BridgeDesign of Pedestrian Bridge
Design of Pedestrian Bridge
 
PREFABRICATED STRUCTURES
PREFABRICATED STRUCTURESPREFABRICATED STRUCTURES
PREFABRICATED STRUCTURES
 
Railway track:An Introduction
Railway track:An IntroductionRailway track:An Introduction
Railway track:An Introduction
 
Presentation railways
Presentation railwaysPresentation railways
Presentation railways
 
Railway track construction, drainage & maintenence
Railway track  construction, drainage & maintenenceRailway track  construction, drainage & maintenence
Railway track construction, drainage & maintenence
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structures
 

Similar to Selection of Claycrete Projects from 1995 - 2004 Re-visited (2006)

Mechanisms and mitigation of highway landslide collapse in indiana by by Male...
Mechanisms and mitigation of highway landslide collapse in indiana by by Male...Mechanisms and mitigation of highway landslide collapse in indiana by by Male...
Mechanisms and mitigation of highway landslide collapse in indiana by by Male...Dr. Malek Smadi
 
EMIN SG - Geoceldas Envirogrid Caso El Valle del Anton (ingles)
EMIN SG - Geoceldas Envirogrid Caso El Valle del Anton (ingles)EMIN SG - Geoceldas Envirogrid Caso El Valle del Anton (ingles)
EMIN SG - Geoceldas Envirogrid Caso El Valle del Anton (ingles)EMIN Sistemas Geotecnicos
 
Bioengineering A Streambank
Bioengineering A StreambankBioengineering A Streambank
Bioengineering A StreambankMonte Martin
 
Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018
Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018
Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018Crosstown TO
 
Brentcliffe to Victoria Park CLC Meeting - Presentation - November 4, 2021
Brentcliffe to Victoria Park CLC Meeting -  Presentation - November 4, 2021 Brentcliffe to Victoria Park CLC Meeting -  Presentation - November 4, 2021
Brentcliffe to Victoria Park CLC Meeting - Presentation - November 4, 2021 Crosstown TO
 
Jeff Polenik, Robindale Energy,"Leanor GFCC - A Positive Impact
Jeff Polenik, Robindale Energy,"Leanor GFCC - A Positive ImpactJeff Polenik, Robindale Energy,"Leanor GFCC - A Positive Impact
Jeff Polenik, Robindale Energy,"Leanor GFCC - A Positive ImpactMichael Hewitt, GISP
 
CLC Pharmacy to Kennedy - March 29, 2022 Compressed.pptx
CLC Pharmacy to Kennedy - March 29, 2022 Compressed.pptxCLC Pharmacy to Kennedy - March 29, 2022 Compressed.pptx
CLC Pharmacy to Kennedy - March 29, 2022 Compressed.pptxCrosstown TO
 
Pebbles II site report
Pebbles II site reportPebbles II site report
Pebbles II site reportkalyani kadam
 
Pharmacy kennedy clc meeting -january 29 2019
Pharmacy kennedy clc meeting -january 29 2019Pharmacy kennedy clc meeting -january 29 2019
Pharmacy kennedy clc meeting -january 29 2019Crosstown TO
 
D1 Newsletter_2016 vol1
D1 Newsletter_2016 vol1D1 Newsletter_2016 vol1
D1 Newsletter_2016 vol1Jose Moreno
 
case study for leaning tower of pisa ,infinity tower, dam failure
case study for leaning tower of pisa ,infinity tower, dam failurecase study for leaning tower of pisa ,infinity tower, dam failure
case study for leaning tower of pisa ,infinity tower, dam failureJainam Shah
 
Chaplin-Avenue CLC - May 4 2022-compressed.pptx
Chaplin-Avenue CLC - May 4 2022-compressed.pptxChaplin-Avenue CLC - May 4 2022-compressed.pptx
Chaplin-Avenue CLC - May 4 2022-compressed.pptxCrosstown TO
 
Chaplin-Avenue CLC - March 2, 2022-compressed.pptx
Chaplin-Avenue CLC - March 2, 2022-compressed.pptxChaplin-Avenue CLC - March 2, 2022-compressed.pptx
Chaplin-Avenue CLC - March 2, 2022-compressed.pptxCrosstown TO
 
American Leak Detection - American Waterworks Association
American Leak Detection - American Waterworks AssociationAmerican Leak Detection - American Waterworks Association
American Leak Detection - American Waterworks AssociationJoshua Butler
 

Similar to Selection of Claycrete Projects from 1995 - 2004 Re-visited (2006) (20)

Rd cs steele_county
Rd cs steele_countyRd cs steele_county
Rd cs steele_county
 
Mechanisms and mitigation of highway landslide collapse in indiana by by Male...
Mechanisms and mitigation of highway landslide collapse in indiana by by Male...Mechanisms and mitigation of highway landslide collapse in indiana by by Male...
Mechanisms and mitigation of highway landslide collapse in indiana by by Male...
 
EMIN SG - Geoceldas Envirogrid Caso El Valle del Anton (ingles)
EMIN SG - Geoceldas Envirogrid Caso El Valle del Anton (ingles)EMIN SG - Geoceldas Envirogrid Caso El Valle del Anton (ingles)
EMIN SG - Geoceldas Envirogrid Caso El Valle del Anton (ingles)
 
lama to lai3 report.
lama to lai3 report.lama to lai3 report.
lama to lai3 report.
 
Bioengineering A Streambank
Bioengineering A StreambankBioengineering A Streambank
Bioengineering A Streambank
 
Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018
Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018
Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018
 
FG Gardiner New Simcoe Ramp - display boards
FG Gardiner   New Simcoe Ramp - display boardsFG Gardiner   New Simcoe Ramp - display boards
FG Gardiner New Simcoe Ramp - display boards
 
Brentcliffe to Victoria Park CLC Meeting - Presentation - November 4, 2021
Brentcliffe to Victoria Park CLC Meeting -  Presentation - November 4, 2021 Brentcliffe to Victoria Park CLC Meeting -  Presentation - November 4, 2021
Brentcliffe to Victoria Park CLC Meeting - Presentation - November 4, 2021
 
Jeff Polenik, Robindale Energy,"Leanor GFCC - A Positive Impact
Jeff Polenik, Robindale Energy,"Leanor GFCC - A Positive ImpactJeff Polenik, Robindale Energy,"Leanor GFCC - A Positive Impact
Jeff Polenik, Robindale Energy,"Leanor GFCC - A Positive Impact
 
CLC Pharmacy to Kennedy - March 29, 2022 Compressed.pptx
CLC Pharmacy to Kennedy - March 29, 2022 Compressed.pptxCLC Pharmacy to Kennedy - March 29, 2022 Compressed.pptx
CLC Pharmacy to Kennedy - March 29, 2022 Compressed.pptx
 
Pebbles II site report
Pebbles II site reportPebbles II site report
Pebbles II site report
 
Pharmacy kennedy clc meeting -january 29 2019
Pharmacy kennedy clc meeting -january 29 2019Pharmacy kennedy clc meeting -january 29 2019
Pharmacy kennedy clc meeting -january 29 2019
 
D1 Newsletter_2016 vol1
D1 Newsletter_2016 vol1D1 Newsletter_2016 vol1
D1 Newsletter_2016 vol1
 
case study for leaning tower of pisa ,infinity tower, dam failure
case study for leaning tower of pisa ,infinity tower, dam failurecase study for leaning tower of pisa ,infinity tower, dam failure
case study for leaning tower of pisa ,infinity tower, dam failure
 
SFPR-Project-Profile_0
SFPR-Project-Profile_0SFPR-Project-Profile_0
SFPR-Project-Profile_0
 
Cp 2 AssignmentV2 15092015
Cp 2 AssignmentV2    15092015Cp 2 AssignmentV2    15092015
Cp 2 AssignmentV2 15092015
 
Chaplin-Avenue CLC - May 4 2022-compressed.pptx
Chaplin-Avenue CLC - May 4 2022-compressed.pptxChaplin-Avenue CLC - May 4 2022-compressed.pptx
Chaplin-Avenue CLC - May 4 2022-compressed.pptx
 
Chaplin-Avenue CLC - March 2, 2022-compressed.pptx
Chaplin-Avenue CLC - March 2, 2022-compressed.pptxChaplin-Avenue CLC - March 2, 2022-compressed.pptx
Chaplin-Avenue CLC - March 2, 2022-compressed.pptx
 
American Leak Detection - American Waterworks Association
American Leak Detection - American Waterworks AssociationAmerican Leak Detection - American Waterworks Association
American Leak Detection - American Waterworks Association
 
Linn Cove Viaduct
Linn Cove ViaductLinn Cove Viaduct
Linn Cove Viaduct
 

Recently uploaded

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
The Evolution of Money: Digital Transformation and CBDCs in Central Banking
The Evolution of Money: Digital Transformation and CBDCs in Central BankingThe Evolution of Money: Digital Transformation and CBDCs in Central Banking
The Evolution of Money: Digital Transformation and CBDCs in Central BankingSelcen Ozturkcan
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 

Recently uploaded (20)

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
The Evolution of Money: Digital Transformation and CBDCs in Central Banking
The Evolution of Money: Digital Transformation and CBDCs in Central BankingThe Evolution of Money: Digital Transformation and CBDCs in Central Banking
The Evolution of Money: Digital Transformation and CBDCs in Central Banking
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 

Selection of Claycrete Projects from 1995 - 2004 Re-visited (2006)

  • 1. Ionic Soil Stabiliser Stabilisation of Higher P.I. Clay Based Material
  • 2.
  • 3. Corrigin - Narembeen Rd. Re-constructed with CLAYCRETE April 2002
  • 4. Photo Taken Sept. 2003 Photo Taken May 2002 Re-constructed with Claycrete April 2002 and sealed within 4 weeks
  • 5. Photo taken Jan. 2006 Photo taken Jan. 2006 This area has a high clay material with high water retention. Major drainage required as shown in photo. When revisited the road looked as new, with the shoulders and seal in un-marked condition
  • 6. Travelling on this road at 110kph there was absolutely no undulations or suspension vibrations Photo taken Jan. 2006
  • 7. Spurr Road Kondinin Re-constructed with CLAYCRETE October 1995
  • 8. Road re-constructed October 1995 Nuclear Density CBR test October 1996 Test results, taken after 12 months, show a significant CBR increase
  • 9. Spurr Road section re-constructed with Claycrete by Shire of Kondinin—October 1995 Picture taken September 2003. Inspection shows road in excellent shape. NO Shire records of any maintenance grading since construction.   Photo taken Sept. 2003
  • 10. September 2003 January 2006 Loose material is easily brushed off to reveal a firm well bound and solid pavement Regular on-site inspections confirm NO deterioration in the pavement or any rutting and corrugations. In recent week there was rain on this road as the next slide will illustrate
  • 11. This first section of Spurr Rd. was never stabilised with Claycrete and has been re-sheeted and re-constructed twice since 1995. This area received a large downpour from cyclonic rains The truck that travelled on this section of Spurr road also travelled on the Claycrete constructed section adjoining approx 800m away. Next slide shows a dramatic difference. Photo taken Jan. 2006 Photo taken Jan. 2006
  • 12. Spurr Road Both photo’s taken the same day and the vehicle MUST have travelled on both sections. January 2006 Constructed with Claycrete in 1995 Un-stabilised section adjoining the Claycrete section
  • 13. Carstairs Rd. Lake Varley Forestania Nickel Mine 28 km Haul Road Re-constructed with CLAYCRETE October 1996
  • 14. Carstairs Road – Lake Varley Haul road for Forestania Nickel Mine 28km re-constructed with Claycrete 1996 Mine decommissioned 2000 now sheep & wheat farming traffic
  • 15. An excellent grading of gravel stone & clay re-constructed with Claycrete resulting in a first class tight & well bound pavement
  • 16. Carstairs Road re-visited Jan. 2006 This area received cyclonic rains and flooding 2 weeks prior. Road still in excellent trafficable & Roadworthy condition
  • 17. Forestania Nickel Mine – Lake Varley - Western Australia – 1996 Project: The haul route from mine to highway was used by light vehicles and school buses. Several near accidents caused the Local Government Shire to close the haul road during rain. This 28km haul road was re-constructed with Claycrete providing an ‘all weather’ pavement, with a view to safety for local & school bus traffic. Work was performed & controlled by the Shire of Lake Grace. Problem: For safety reasons, due to main school bus route, the road was closed to mine traffic during wet weather. The road was badly corrugated with un-ravelling and creating excessive dust, needing constant maintenance, also very slippery in the wet due to high clay content. The local Government Shire required an ‘All Weather’ road to safely accommodate the heavy mine hauling trucks as well as local and school bus traffic. Solution: The in-situ material had a high clay content with high plasticity and good stone content. This in-situ material was re-constructed with Claycrete resulting in considerable savings, compared with the need to import 20cm of new material for a complete re-sheeting program. The crew finished mixing one section on a Friday afternoon and decided to trim and finish the section on the following Monday. When they returned to site the road had set up with truck tyre marks in the surface. The Shire grader was unable to cut the surface and was forced to leave the marks on the pavement surface.
  • 18. The tight well bound surface achieved by the Claycrete method of construction resulted with a significant reduction in ‘billowing dust’, meaning that the ‘strength’ material of the road was not blown away and lost. In an un-stabilised situation the continual loss of road ‘strength’ materials in the billowing dust blowing off the road would result with requiring re-sheeting & re-construction of the road every 18 to 24 months. This road DID NOT require any major re-sheeting during the life of the road, also what was noticeable was NO LOSS of surface pavement material. Conclusion: The road was never closed during wet weather for the life of the mine once the road had been re-constructed with Claycrete, also maintenance was not required on the road. A nuclear density test for CBR increase was taken 12 months after the road was re-constructed and showed a large increase. This road was re-visited January 2006 and photo’s & movies taken. The road, today, is still a very good trafficable AND ‘all weather’ surface with evidence the road had sustained cyclonic rains in the last 2 weeks. A major issue with this road is that should the Authorities decide to upgrade the road and maybe even sealing it there is no need to re-stabilise the material, even tho it was stabilised in 1996. All that would be required is to rip the road and re-waterbind with ONLY 10% Claycrete added.
  • 19. Still A Good Well Bound Surface with Signs of only Minimal Wear, as in loose material. Photo’s January 2006 Re-constructed with Claycrete in 1996
  • 20. East Hyden Bin Road Kondinin Western Australia Re-constructed with CLAYCRETE Project Completed November 2001
  • 21. Road was starting to deform and pothole with the asphalt deteriorating. The road was ripped and the in-situ high clay gravel material was re-constructed using Claycrete. Project completed November 2001
  • 22. East Hyden Bin Road Section of Pavement Failure Across A Salt Pan The road Pavement was extensively rutted and undulating, with evidence of considerable movement under the seal. It was evident that the material was plastic and holding water. The decision was to re-work the section and stabilise with Claycrete. The existing seal was chopped & mixed into the re-worked in-situ material thus saving cost of disposal and cartage away. This photo is of the re-constructed and sealed Claycrete Pavement   Construction was undertaken by Manager of Works Shire of Kondinin, November 2001 This Picture Taken September 2003. Details From CBH Show 2002-2003 Grain Haulage On This Road was 27,339 Tonnes In 365 (each way) Triple Road Train Movements Hauling An Average Of 75 Tonnes Per Load, Over & Above Local Farming Traffic Also Tourist Traffic To Wave Rock This Section of Road Is Now One Of The Main Connecting Routes To The Eastern States and used by heavy haulage interstate vehicles. Photo taken Sept. 2003
  • 23. Project re-visited October 2004 Road in first class condition with NO Deformations or sign of damage Photo taken Oct. 2004
  • 24. Project re-visited January 2006 Crossed the road at 110kmh and there was NO sign of deformations or faults in the pavement. The asphalt is now showing signs of ‘bleeding’ due to the current heavy haulage use Photo taken Jan. 2006
  • 25. East Kalgarin Crossing re-constructed with CLAYCRETE December 2001
  • 26. East Kalgarin access road Section of flood crossing re-constructed with Claycrete by Manager of Works Shire of Kondinin—December 2001 Project re-visited Sept. 2003 & Jan. 2006 Inspection shows road in excellent shape. Every year prior to the Claycrete re-construction this crossing was washed away & totally lost after every overflow during a wet season. Pic taken after a flow over the crossing. NO Maintenance has been required since re-constructed in December 2001    
  • 27. Evidence of Water Flow Over Road Is Clearly Seen Photo taken Sept. 2003 and water flow from right to left clearly visible
  • 28. September 2003 January 2006 Both photo’s show evidence of water flow over the crossing. The latest shows considerable silt deposited on the road
  • 29. January 2006 This photo clearly shows the heavy scouring caused by the large volume of water flowing over the crossing
  • 30. Bridge washaway - Kondinin Cyclonic Rains January 2006 CLAYCRETE re-constructed 2002
  • 31. Water reached here The water flowed over this road to width of the arrow mark and a depth of 40cm over the asphalt. The current was sufficient to wash away the bridge section Water reached knee cap height
  • 32. January 2006 Cyclone Clare dumped a record 223mm (in 24 hours) of rain on and around Lake Grace & districts. Reported as - A ‘once in 500 year event’ Lake Grace is located approx 200km South East of Kondinin. The large volume of water dumped on Lake Grace has flowed to many surrounding areas via the lake system & thus also caused flooding, even as far as Kondinin. This damage at Kondinin was caused by the water flow from Lake Grace’s deluge, rather than directly from the cyclone.
  • 33. Extract from West Australian newspaper Sat. 28 th Jan. 2006
  • 34. Extract from West Australian newspaper Sat. 28th Jan. 2006
  • 35.  
  • 36. 3 weeks after the cyclonic rains roads and rail still remain submerged by the flooding. Article from West Australian newspaper 1 st February 2006
  • 37. The base course was a high clay gravel material with good stone and re-constructed with Claycrete. This photo clearly shows the Claycrete material to the right of the yellow line. When inspected the Claycrete section was dry, firm & well bound with no scouring marks even tho water to 40cm deep washed over this road. Material left of the line was holding moisture. The flow of water started to lift the asphalt seal. The area was totally submerged for several days Note Next Slide
  • 38. This photo shows the Claycrete clay gravel material still attached to the asphalt seal. This material has not broken down or washed away under the worst conditions of flooding & complete submersion for several days. Photo taken Jan. 2006
  • 39. Hyden – Southern Cross Road Re-constructed with CLAYCRETE December 2004
  • 40. Photo taken January 2006 3km section of road re-constructed with Claycrete. Driving on this road at 110kpm was extremely smooth with no vibrations thru the shock absorbers or steering wheel. This area received cyclonic rains 2 weeks prior to my visit.
  • 41. The road is well constructed with excellent drainage and constructed with Claycrete from shoulder to shoulder. Thus if a vehicle's tyres leave the asphalt they will not damage the un-sealed areas nor the asphalt edge Photo taken Jan. 2006
  • 42. 16/100 Briggs Street Welshpool 6106 Western Australia Email : [email_address] [email_address] TEL : +61(8) 9470 9117 FAX : +61(8) 9472 4366