Status of Sectoral Agenda
and Major Accomplishments
for 2012 to 2014
9 May 2014
SRC Discussion with the NAPC Secretary
www.napc.gov.ph @NAPC_ph
Urban Poor
NUPSC TOP 3 Agenda www.napc.gov.ph @NAPC_ph
Agenda 1
Agenda 2
PRESIDENTIAL PROCLAMATION OF GOVERNMENT LANDS
Agenda 3
EVICTION AND DEMOLITION
JMC ON P50B FUND
(FOR RESETTLEMENT OF ISFs LIVING IN DANGER AREAS IN NCR)
www.napc.gov.ph @NAPC_ph
Accomplishments
2011 -2013 NTWG crafted /signed the Joint Memorandum Circular (JMC)
July 12, 2013 NAPC Sectoral Representatives and Cabinet Secretaries
Meeting agreed on a CSW on the ISF Fund agenda
Background
Dec 2010 President Noy directed the creation of NTWG for ISFs
Apr 2011 President Noy allocated ISF P10B Fund per year or P50B over 5 years (2011-2015)
ISSUANCE OF JOINT MEMORANDUM CIRCULAR ON P50B FUND
Agenda 1
www.napc.gov.ph @NAPC_ph
Status/Challenge
• JMC awaits the signature of HUDCC Chair VP Binay
• Signed JMC should finalize the government policy on the resettlement of ISFs living in danger areas
and waterways
• 37 People’s Plans are undergoing validation or being scheduled for consideration by boards of SHFC,
NHA, DSWD; and LGUs
• PMO is finalizing the Implementing and Operations Guidelines and the People’s Plan Pro-Forma based
on the standard form of each implementing agency
Next Steps
Social Preparation fund should establish and assist the production of people’s proposals/plans in
the six (6) major waterways and two (2) esteros in NCR
Facilitate the fast-tracking of implementation of the 37 ISF People’s Proposals/Plans
Agenda 1
Implementing agencies to fast-track the establishment of Local Project Management Team
(LPMT) in each of the six (6) major water ways and two (2) esteros
ISSUANCE OF JOINT MEMORANDUM CIRCULAR ON P50B FUND
Accomplishments
2012 Inter-agency meetings agreed to study the Presidential Proclamation as
major asset reform program of the PNoy administration
2013 NUPSC identified 13 select priority sites (Pre and Post Proclamation)
2013 PCUP allocated P500,000 as support fund for the CSW in the 13 sites
Background
NUPSC decided to pilot CSW priority sites as basis in crafting the policy reform
The learnings in the 13 sites should provide the basis for amending the implementation
guidelines and procedures of the Pre and Post Proclamations.
PRESIDENTIAL PROCLAMATION OF GOVERNMENT LANDS
Agenda 2
2014 PCUP convened a 3-day Joint National Strategizing Workshop on 14-16 March
2014 (fund outside of the P500k support for year 2014).
www.napc.gov.ph @NAPC_ph
Challenges
The CSW in the 13 sites should provide the basis for amending the implementation guidelines
and procedures for both the pre and post proclamations.
Crucial need to review the guidelines for policy reform and for identification of bottlenecks for
the effective operationalization of the Presidential proclamation as an asset reform program
of government.
Next Steps
Facilitate the establishment of NTWG for Presidential Proclamation
PRESIDENTIAL PROCLAMATION OF GOVERNMENT LANDS
Facilitate the convening and CSW for the establishment of pre and post Proclamation
Committees in the 13 priority sites
Agenda 2
Facilitation of PCUP to assist the NUPSC and the actual beneficiaries to meet the President on the
establishments of the proclamation committees (pre and post)
www.napc.gov.ph @NAPC_ph
Accomplishments
Sept 25, 2012 Inter-Agency Discussion/Agreements to study options to end E &D;
July 12, 2013 Cabinet Secretaries' meeting agreed for DILG and PCUP to lead an
interagency TWG to study to convene the Judicial, Executive and
Legislative Consultative Council (JELACC)
PCUP explored the utilization of Pre Demolition Conference to ensure consultation of ISFs
DILG agreed to study and facilitate the inclusion of the Certificate of Compliance (COC)
requirements in the Seal of Good Housekeeping
2013: DILG allocated support fund to NUPSC to a maximum of P500,000 per year
Background
The NUPSC discussed the agenda on violations and effective implementation of law on “forced eviction
and demolition” invoking
Section 28 of RA 7279 (UDHA), RA 7160 (Local Government Code), EO 152 & 708, DILG MCs (2008-143;
2009-05; 2010-134) and the CHR Advisory on Adequate Housing and Humane Eviction
Eviction and Demolition
Agenda 3
Challenges
Need to study and craft the appropriate policy reform for LGU compliance to the
requirements of RA 7279, particularly section 28 on relocation, and of EO 152 and EO 708
prior to issuance of Certificate of Compliance (COC)
Need to review the necessary amendment to RA 7279 that will ensure the effective
Resettlement Action Plan (RAP) and peoples representation in the Local Housing Board (LHBs)
before issuance of COC
EVICTION AND DEMOLITION
Agenda 3
www.napc.gov.ph @NAPC_ph
Next Steps
Review of proposed bills on LHB and UDHA amendments and related laws and issuances
EVICTION AND DEMOLITION
DILG and PCUP to facilitate the convening of Justice Sector Coordinating Council (JSCC)
Agenda 3
Craft MOA among concerned agencies including DILG and PNP on Pre Demolition Conference
(PDC) under the lead of PCUP
Study/facilitate the creation of policy mechanism to ensure genuine PO representation in LHBs
and ensuring RAP of LHBs as requirements before any demolition
#NAPCenbanc www.napc.gov.ph @NAPC_ph
Thank you!

More Related Content

What's hot

Approaches and Techniques of Budgeting: The Philippine Setting
Approaches and Techniques of Budgeting: The Philippine SettingApproaches and Techniques of Budgeting: The Philippine Setting
Approaches and Techniques of Budgeting: The Philippine Settingethelvera
 
KERALA TOWN AND COUNTRY PLANNING ACT, 2016
KERALA TOWN AND COUNTRY PLANNING ACT, 2016KERALA TOWN AND COUNTRY PLANNING ACT, 2016
KERALA TOWN AND COUNTRY PLANNING ACT, 2016Tulika Kumar
 
Department of Budget and Managemet
Department of Budget and ManagemetDepartment of Budget and Managemet
Department of Budget and Managemetabdulmohayminm
 
Affidavit of state of haryana dated 21.07.2016 reporting completion of ground...
Affidavit of state of haryana dated 21.07.2016 reporting completion of ground...Affidavit of state of haryana dated 21.07.2016 reporting completion of ground...
Affidavit of state of haryana dated 21.07.2016 reporting completion of ground...National Citizens Movement
 
Local development planning
Local development planningLocal development planning
Local development planningGil Sr.
 

What's hot (6)

Approaches and Techniques of Budgeting: The Philippine Setting
Approaches and Techniques of Budgeting: The Philippine SettingApproaches and Techniques of Budgeting: The Philippine Setting
Approaches and Techniques of Budgeting: The Philippine Setting
 
CDP Quick Guide
CDP Quick GuideCDP Quick Guide
CDP Quick Guide
 
KERALA TOWN AND COUNTRY PLANNING ACT, 2016
KERALA TOWN AND COUNTRY PLANNING ACT, 2016KERALA TOWN AND COUNTRY PLANNING ACT, 2016
KERALA TOWN AND COUNTRY PLANNING ACT, 2016
 
Department of Budget and Managemet
Department of Budget and ManagemetDepartment of Budget and Managemet
Department of Budget and Managemet
 
Affidavit of state of haryana dated 21.07.2016 reporting completion of ground...
Affidavit of state of haryana dated 21.07.2016 reporting completion of ground...Affidavit of state of haryana dated 21.07.2016 reporting completion of ground...
Affidavit of state of haryana dated 21.07.2016 reporting completion of ground...
 
Local development planning
Local development planningLocal development planning
Local development planning
 

Similar to Sectoral Agenda _URBAN POOR (1)

Terminal Report_UP 1
Terminal Report_UP 1Terminal Report_UP 1
Terminal Report_UP 1Joseph Aquino
 
Decoding Changes in the PPP Regulatory Regime.pdf
Decoding Changes in the PPP Regulatory Regime.pdfDecoding Changes in the PPP Regulatory Regime.pdf
Decoding Changes in the PPP Regulatory Regime.pdfAHRP Law Firm
 
Progress Status NUPSC Agenda
Progress Status NUPSC AgendaProgress Status NUPSC Agenda
Progress Status NUPSC AgendaJoseph Aquino
 
#Mp2014 Presentation by the Federal Ministry of Lands, Housing and Urban Deve...
#Mp2014 Presentation by the Federal Ministry of Lands, Housing and Urban Deve...#Mp2014 Presentation by the Federal Ministry of Lands, Housing and Urban Deve...
#Mp2014 Presentation by the Federal Ministry of Lands, Housing and Urban Deve...FMINigeria
 
Annual performance plan 2013 2014
Annual performance plan 2013 2014Annual performance plan 2013 2014
Annual performance plan 2013 2014Dr Lendy Spires
 
Abuja-CPPR NE Report 200314final
Abuja-CPPR NE Report 200314finalAbuja-CPPR NE Report 200314final
Abuja-CPPR NE Report 200314finalGerald Ogoko
 
Pair public final
Pair public finalPair public final
Pair public finalSammy Kibet
 
Local Planning and Budgeting Linkage
Local Planning and Budgeting LinkageLocal Planning and Budgeting Linkage
Local Planning and Budgeting Linkageyee tandog
 
Rationalizing the Local Planning System and the Local Planning Structure.pptx
Rationalizing the Local Planning System and the Local Planning Structure.pptxRationalizing the Local Planning System and the Local Planning Structure.pptx
Rationalizing the Local Planning System and the Local Planning Structure.pptxHanin Laguindab
 
Eversheds PPP in Africa Guide - Nov 2016
Eversheds PPP in Africa Guide - Nov 2016Eversheds PPP in Africa Guide - Nov 2016
Eversheds PPP in Africa Guide - Nov 2016Bukky Fatusin
 
localdevelopmentplanning-150727051620-lva1-app6892.pdf
localdevelopmentplanning-150727051620-lva1-app6892.pdflocaldevelopmentplanning-150727051620-lva1-app6892.pdf
localdevelopmentplanning-150727051620-lva1-app6892.pdflancelotlabajo
 
Bukidnon Provincial Development and Physical Framework Plan
Bukidnon Provincial Development and Physical Framework PlanBukidnon Provincial Development and Physical Framework Plan
Bukidnon Provincial Development and Physical Framework PlanIan Necosia
 
Barangay Development Planning, Barangay Development Planning
Barangay Development Planning, Barangay Development PlanningBarangay Development Planning, Barangay Development Planning
Barangay Development Planning, Barangay Development PlanningCarloDescutido1
 
National Treasury, PPP Unit. PPPs in Kenya. Context, Legal and Institutional ...
National Treasury, PPP Unit. PPPs in Kenya. Context, Legal and Institutional ...National Treasury, PPP Unit. PPPs in Kenya. Context, Legal and Institutional ...
National Treasury, PPP Unit. PPPs in Kenya. Context, Legal and Institutional ...Emmanuel Mosoti Machani
 
The Presidency Annual Report 2013-2014
The Presidency Annual Report 2013-2014The Presidency Annual Report 2013-2014
The Presidency Annual Report 2013-2014Dr Lendy Spires
 
Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)
Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)
Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)zubeditufail
 
GEOG 320 Resources And Environmental Management.docx
GEOG 320 Resources And Environmental Management.docxGEOG 320 Resources And Environmental Management.docx
GEOG 320 Resources And Environmental Management.docx4934bk
 

Similar to Sectoral Agenda _URBAN POOR (1) (20)

Terminal Report_UP 1
Terminal Report_UP 1Terminal Report_UP 1
Terminal Report_UP 1
 
Decoding Changes in the PPP Regulatory Regime.pdf
Decoding Changes in the PPP Regulatory Regime.pdfDecoding Changes in the PPP Regulatory Regime.pdf
Decoding Changes in the PPP Regulatory Regime.pdf
 
Progress Status NUPSC Agenda
Progress Status NUPSC AgendaProgress Status NUPSC Agenda
Progress Status NUPSC Agenda
 
#Mp2014 Presentation by the Federal Ministry of Lands, Housing and Urban Deve...
#Mp2014 Presentation by the Federal Ministry of Lands, Housing and Urban Deve...#Mp2014 Presentation by the Federal Ministry of Lands, Housing and Urban Deve...
#Mp2014 Presentation by the Federal Ministry of Lands, Housing and Urban Deve...
 
2016 Philippine Budget of DPWH
2016 Philippine Budget of DPWH2016 Philippine Budget of DPWH
2016 Philippine Budget of DPWH
 
Annual performance plan 2013 2014
Annual performance plan 2013 2014Annual performance plan 2013 2014
Annual performance plan 2013 2014
 
Abuja-CPPR NE Report 200314final
Abuja-CPPR NE Report 200314finalAbuja-CPPR NE Report 200314final
Abuja-CPPR NE Report 200314final
 
Pair public final
Pair public finalPair public final
Pair public final
 
Local Planning and Budgeting Linkage
Local Planning and Budgeting LinkageLocal Planning and Budgeting Linkage
Local Planning and Budgeting Linkage
 
Rationalizing the Local Planning System and the Local Planning Structure.pptx
Rationalizing the Local Planning System and the Local Planning Structure.pptxRationalizing the Local Planning System and the Local Planning Structure.pptx
Rationalizing the Local Planning System and the Local Planning Structure.pptx
 
Eversheds PPP in Africa Guide - Nov 2016
Eversheds PPP in Africa Guide - Nov 2016Eversheds PPP in Africa Guide - Nov 2016
Eversheds PPP in Africa Guide - Nov 2016
 
localdevelopmentplanning-150727051620-lva1-app6892.pdf
localdevelopmentplanning-150727051620-lva1-app6892.pdflocaldevelopmentplanning-150727051620-lva1-app6892.pdf
localdevelopmentplanning-150727051620-lva1-app6892.pdf
 
Public Private Partnership
Public Private PartnershipPublic Private Partnership
Public Private Partnership
 
Bukidnon Provincial Development and Physical Framework Plan
Bukidnon Provincial Development and Physical Framework PlanBukidnon Provincial Development and Physical Framework Plan
Bukidnon Provincial Development and Physical Framework Plan
 
Geoff dixon presentation for workshop sunday evening
Geoff dixon presentation for workshop sunday eveningGeoff dixon presentation for workshop sunday evening
Geoff dixon presentation for workshop sunday evening
 
Barangay Development Planning, Barangay Development Planning
Barangay Development Planning, Barangay Development PlanningBarangay Development Planning, Barangay Development Planning
Barangay Development Planning, Barangay Development Planning
 
National Treasury, PPP Unit. PPPs in Kenya. Context, Legal and Institutional ...
National Treasury, PPP Unit. PPPs in Kenya. Context, Legal and Institutional ...National Treasury, PPP Unit. PPPs in Kenya. Context, Legal and Institutional ...
National Treasury, PPP Unit. PPPs in Kenya. Context, Legal and Institutional ...
 
The Presidency Annual Report 2013-2014
The Presidency Annual Report 2013-2014The Presidency Annual Report 2013-2014
The Presidency Annual Report 2013-2014
 
Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)
Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)
Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)
 
GEOG 320 Resources And Environmental Management.docx
GEOG 320 Resources And Environmental Management.docxGEOG 320 Resources And Environmental Management.docx
GEOG 320 Resources And Environmental Management.docx
 

Sectoral Agenda _URBAN POOR (1)

  • 1. www.napc.gov.ph @NAPC_ph Status of Sectoral Agenda and Major Accomplishments for 2012 to 2014 9 May 2014 SRC Discussion with the NAPC Secretary
  • 3. NUPSC TOP 3 Agenda www.napc.gov.ph @NAPC_ph Agenda 1 Agenda 2 PRESIDENTIAL PROCLAMATION OF GOVERNMENT LANDS Agenda 3 EVICTION AND DEMOLITION JMC ON P50B FUND (FOR RESETTLEMENT OF ISFs LIVING IN DANGER AREAS IN NCR)
  • 4. www.napc.gov.ph @NAPC_ph Accomplishments 2011 -2013 NTWG crafted /signed the Joint Memorandum Circular (JMC) July 12, 2013 NAPC Sectoral Representatives and Cabinet Secretaries Meeting agreed on a CSW on the ISF Fund agenda Background Dec 2010 President Noy directed the creation of NTWG for ISFs Apr 2011 President Noy allocated ISF P10B Fund per year or P50B over 5 years (2011-2015) ISSUANCE OF JOINT MEMORANDUM CIRCULAR ON P50B FUND Agenda 1
  • 5. www.napc.gov.ph @NAPC_ph Status/Challenge • JMC awaits the signature of HUDCC Chair VP Binay • Signed JMC should finalize the government policy on the resettlement of ISFs living in danger areas and waterways • 37 People’s Plans are undergoing validation or being scheduled for consideration by boards of SHFC, NHA, DSWD; and LGUs • PMO is finalizing the Implementing and Operations Guidelines and the People’s Plan Pro-Forma based on the standard form of each implementing agency Next Steps Social Preparation fund should establish and assist the production of people’s proposals/plans in the six (6) major waterways and two (2) esteros in NCR Facilitate the fast-tracking of implementation of the 37 ISF People’s Proposals/Plans Agenda 1 Implementing agencies to fast-track the establishment of Local Project Management Team (LPMT) in each of the six (6) major water ways and two (2) esteros ISSUANCE OF JOINT MEMORANDUM CIRCULAR ON P50B FUND
  • 6. Accomplishments 2012 Inter-agency meetings agreed to study the Presidential Proclamation as major asset reform program of the PNoy administration 2013 NUPSC identified 13 select priority sites (Pre and Post Proclamation) 2013 PCUP allocated P500,000 as support fund for the CSW in the 13 sites Background NUPSC decided to pilot CSW priority sites as basis in crafting the policy reform The learnings in the 13 sites should provide the basis for amending the implementation guidelines and procedures of the Pre and Post Proclamations. PRESIDENTIAL PROCLAMATION OF GOVERNMENT LANDS Agenda 2 2014 PCUP convened a 3-day Joint National Strategizing Workshop on 14-16 March 2014 (fund outside of the P500k support for year 2014).
  • 7. www.napc.gov.ph @NAPC_ph Challenges The CSW in the 13 sites should provide the basis for amending the implementation guidelines and procedures for both the pre and post proclamations. Crucial need to review the guidelines for policy reform and for identification of bottlenecks for the effective operationalization of the Presidential proclamation as an asset reform program of government. Next Steps Facilitate the establishment of NTWG for Presidential Proclamation PRESIDENTIAL PROCLAMATION OF GOVERNMENT LANDS Facilitate the convening and CSW for the establishment of pre and post Proclamation Committees in the 13 priority sites Agenda 2 Facilitation of PCUP to assist the NUPSC and the actual beneficiaries to meet the President on the establishments of the proclamation committees (pre and post)
  • 8. www.napc.gov.ph @NAPC_ph Accomplishments Sept 25, 2012 Inter-Agency Discussion/Agreements to study options to end E &D; July 12, 2013 Cabinet Secretaries' meeting agreed for DILG and PCUP to lead an interagency TWG to study to convene the Judicial, Executive and Legislative Consultative Council (JELACC) PCUP explored the utilization of Pre Demolition Conference to ensure consultation of ISFs DILG agreed to study and facilitate the inclusion of the Certificate of Compliance (COC) requirements in the Seal of Good Housekeeping 2013: DILG allocated support fund to NUPSC to a maximum of P500,000 per year Background The NUPSC discussed the agenda on violations and effective implementation of law on “forced eviction and demolition” invoking Section 28 of RA 7279 (UDHA), RA 7160 (Local Government Code), EO 152 & 708, DILG MCs (2008-143; 2009-05; 2010-134) and the CHR Advisory on Adequate Housing and Humane Eviction Eviction and Demolition Agenda 3
  • 9. Challenges Need to study and craft the appropriate policy reform for LGU compliance to the requirements of RA 7279, particularly section 28 on relocation, and of EO 152 and EO 708 prior to issuance of Certificate of Compliance (COC) Need to review the necessary amendment to RA 7279 that will ensure the effective Resettlement Action Plan (RAP) and peoples representation in the Local Housing Board (LHBs) before issuance of COC EVICTION AND DEMOLITION Agenda 3
  • 10. www.napc.gov.ph @NAPC_ph Next Steps Review of proposed bills on LHB and UDHA amendments and related laws and issuances EVICTION AND DEMOLITION DILG and PCUP to facilitate the convening of Justice Sector Coordinating Council (JSCC) Agenda 3 Craft MOA among concerned agencies including DILG and PNP on Pre Demolition Conference (PDC) under the lead of PCUP Study/facilitate the creation of policy mechanism to ensure genuine PO representation in LHBs and ensuring RAP of LHBs as requirements before any demolition

Editor's Notes

  1. -President Benigno S. Aquino III directed the creation of Informal Settler Families-National Technical Working Group (ISF-NTWG) to study and recommend permanent resettlement as poverty reduction strategy; -President Benigno S. Aquino III allocated P50B over 5 years (2011-2015) for the permanent resettlement of around 104,219 ISFs living in danger zones in NCR; -ISF relocation shall be on-site, in-city, and near-city in accordance with the CHR advisory & based on People’s Plans; Off-site (outside NCR) to be allowed only upon request of ISFs; the ISFs who live within the three-meter legal waterways easement shall be prioritized;-People’s plans require social preparation component; access to potable water & sanitation, schools & health facilities & sources of livelihood & employment; Local Project Management Team (LPMT) as local implementer; - In the July 12, 2013 meeting, the SRs and CabSec agreed to include in beginning 2014 GAA the social preparation fund to assist the ISFs in the production of People’s Plans/Proposals. DILG will fast track implementation of submitted around 37 People’s Plans;
  2. -ISF relocation shall be on-site, in-city, and near-city. Off-site (outside NCR) to be allowed only upon request of ISFs. The ISFs who live within the three-meter legal waterways easement shall be prioritized. - Relocation Action Plan (RAP) will be crafted through People’s Plan mechanism to provide safe, affordable, and decent permanent housing, and prevent forced eviction of ISFs. Housing solutions to be validated and accepted by beneficiaries. The implementing agencies are DSWD, NHA, SHFC, and Local Government Units.; Local Project Management Team (LPMT) will be the direct implementer; and the PMO will prepare the implementing guidelines. - Finalize government policy and implementation on the resettlement of ISFs living in danger areas in NCR as contained in the JMC and facilitate the signature of HUDCC on the JMC