This document provides details on the components of the Safeguard Fastframe Drylining System including plasterboard, seals, tapes, drainage systems, insulation, and cladding materials. It also includes section details showing wall, floor, roof, window, and fire protection construction elements. Floor plans show the layout of the lower basement, upper basement, ground floor, mezzanine, and first through eighth floors including areas, dimensions, and functional spaces. Building sections and elevations provide additional construction information.
APC has become one of the leading businesses of its type by providing professional service & advice. We are now one of the most successful suppliers of masonry products in Australia. APC personnel have a diverse knowledge of the products we sell. Our customers demand this!!
It is our focus to have every person in APC concentrate on exceeding customer needs & expectations. We achieve this by sourcing & appointing good quality products, new ideas, new styles, & new finishes; all at the value for money prices! When APC displays all of these products & ideas within the best displays around Australia, you have a chance to get an incredible shopping advantage. APC displays are landscaped, in situ, well maintained, well designed, & truly amazing!!
Foam concentrates application rate and their flow rateseSAT Journals
Abstract
The basic characteristics of foam concentrates application rate and their flow rates for fire fighting to extinguish tank fire are briefed. It is pointed out that the present fire fighting systems of large scale crude oil storage depots cannot meet the need to extinguish tank fires. In petroleum refinery, various hydrocarbons, both liquid and gaseous are handled. These hydrocarbons are flammable and explosive in nature and volatile to varying degrees depending upon their operating conditions. As the process operations are carried out at elevated temperatures and pressures, they offer high risk of fire and explosions and therefore it is imperative that proper safety precautions are taken in carrying out operations safely and prevent incidence of fires and explosions. This paper covers the application rate and flow rates of foam onto a fire is normally expressed as the amount of foam solution, in litres per minute, to be applied to every square metre of the total area to be covered with foam. Keywords: Foam concentrates application rate; flow rate; pool fire; tank fire; fire suppression system;
APC has become one of the leading businesses of its type by providing professional service & advice. We are now one of the most successful suppliers of masonry products in Australia. APC personnel have a diverse knowledge of the products we sell. Our customers demand this!!
It is our focus to have every person in APC concentrate on exceeding customer needs & expectations. We achieve this by sourcing & appointing good quality products, new ideas, new styles, & new finishes; all at the value for money prices! When APC displays all of these products & ideas within the best displays around Australia, you have a chance to get an incredible shopping advantage. APC displays are landscaped, in situ, well maintained, well designed, & truly amazing!!
Foam concentrates application rate and their flow rateseSAT Journals
Abstract
The basic characteristics of foam concentrates application rate and their flow rates for fire fighting to extinguish tank fire are briefed. It is pointed out that the present fire fighting systems of large scale crude oil storage depots cannot meet the need to extinguish tank fires. In petroleum refinery, various hydrocarbons, both liquid and gaseous are handled. These hydrocarbons are flammable and explosive in nature and volatile to varying degrees depending upon their operating conditions. As the process operations are carried out at elevated temperatures and pressures, they offer high risk of fire and explosions and therefore it is imperative that proper safety precautions are taken in carrying out operations safely and prevent incidence of fires and explosions. This paper covers the application rate and flow rates of foam onto a fire is normally expressed as the amount of foam solution, in litres per minute, to be applied to every square metre of the total area to be covered with foam. Keywords: Foam concentrates application rate; flow rate; pool fire; tank fire; fire suppression system;
Pieces of evidence which include Art A-Level work and other drawings. There are also photos which were taken at the Richard Rogers exhibition at the designn museum in London.
KERKSTOEL PRECAST TWIN WALLS AND WIDE SLABS PRESENTATIONGuy Pomphrey
Belgian company Kerkstoel is one of Europe's largest manufacturers of precast concret twin wallsand wide slabs. This presentation explains more about the company and how their products can benefit your construction project.
INTRODUCTION
A developer has acquired a plot measuring about 43 by 21m,between Ndia kuu and thika street of old town mombasa,and has approached you
to redevelop the plot.an existing building built around 1900,was demolisjed under mysterious circumstances. The developer's intentionis to develop
a mixed urban development to maximize the potential for the site,while adhering to the concservation requirements posed by the stakeholder of oldtown
mombasa
The challenge presented by the project is in responding to the diversity of requirements in comprehensive urban development,site conditions and local
authority requirements and in achieving a sustainable design
REQUIREMENTS AND ACCOMMODATION SCHEDULE
1.commercial shop front
2.2bedroom unit
3.3bedroom units
3.club house
4.swimming pool
5.gym
6.parking
Hereford Archive and Records Centre (HARC) is the first Certified Passivhaus Archive building in the UK and only the second in the world. The building was designed by Architects Architype and constructed by Kier Construction. This presentation describes some of the lessons learnt and presents monitoring data from the first year of operation.
Technoblade The Legacy of a Minecraft Legend.Techno Merch
Technoblade, born Alex on June 1, 1999, was a legendary Minecraft YouTuber known for his sharp wit and exceptional PvP skills. Starting his channel in 2013, he gained nearly 11 million subscribers. His private battle with metastatic sarcoma ended in June 2022, but his enduring legacy continues to inspire millions.
White wonder, Work developed by Eva TschoppMansi Shah
White Wonder by Eva Tschopp
A tale about our culture around the use of fertilizers and pesticides visiting small farms around Ahmedabad in Matar and Shilaj.
Transforming Brand Perception and Boosting Profitabilityaaryangarg12
In today's digital era, the dynamics of brand perception, consumer behavior, and profitability have been profoundly reshaped by the synergy of branding, social media, and website design. This research paper investigates the transformative power of these elements in influencing how individuals perceive brands and products and how this transformation can be harnessed to drive sales and profitability for businesses.
Through an exploration of brand psychology and consumer behavior, this study sheds light on the intricate ways in which effective branding strategies, strategic social media engagement, and user-centric website design contribute to altering consumers' perceptions. We delve into the principles that underlie successful brand transformations, examining how visual identity, messaging, and storytelling can captivate and resonate with target audiences.
Methodologically, this research employs a comprehensive approach, combining qualitative and quantitative analyses. Real-world case studies illustrate the impact of branding, social media campaigns, and website redesigns on consumer perception, sales figures, and profitability. We assess the various metrics, including brand awareness, customer engagement, conversion rates, and revenue growth, to measure the effectiveness of these strategies.
The results underscore the pivotal role of cohesive branding, social media influence, and website usability in shaping positive brand perceptions, influencing consumer decisions, and ultimately bolstering sales and profitability. This paper provides actionable insights and strategic recommendations for businesses seeking to leverage branding, social media, and website design as potent tools to enhance their market position and financial success.
Connect Conference 2022: Passive House - Economic and Environmental Solution...TE Studio
Passive House: The Economic and Environmental Solution for Sustainable Real Estate. Lecture by Tim Eian of TE Studio Passive House Design in November 2022 in Minneapolis.
- The Built Environment
- Let's imagine the perfect building
- The Passive House standard
- Why Passive House targets
- Clean Energy Plans?!
- How does Passive House compare and fit in?
- The business case for Passive House real estate
- Tools to quantify the value of Passive House
- What can I do?
- Resources
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...Mansi Shah
This study examines cattle rearing in urban and rural settings, focusing on milk production and consumption. By exploring a case in Ahmedabad, it highlights the challenges and processes in dairy farming across different environments, emphasising the need for sustainable practices and the essential role of milk in daily consumption.
Can AI do good? at 'offtheCanvas' India HCI preludeAlan Dix
Invited talk at 'offtheCanvas' IndiaHCI prelude, 29th June 2024.
https://www.alandix.com/academic/talks/offtheCanvas-IndiaHCI2024/
The world is being changed fundamentally by AI and we are constantly faced with newspaper headlines about its harmful effects. However, there is also the potential to both ameliorate theses harms and use the new abilities of AI to transform society for the good. Can you make the difference?
1. Safeguard Fastframe Drylining System Components
Plasterboard
Oldroyd Brick Plug with compression seal
Oldroyd Overseal Tape 75mm
Oldroyd Rope Seal
Oldroyd Overseal Tape 75mm
Skirting Board
Oldroyd Aquadrain
Oldroyd Xv Membrane
Oldroyd Flat Top Aquadrain
38mm Floor panel
Shingle
Detail G - Secant Pile and
Internal Cavity Drain Basement
and Waterproofing System 1:10
Secant Pile
Concrete Slab
Safeguard Sentry Sump
System
Sealed Manhole Cover
Screed
215.0
50mm Rockwool
Insulation
12mm Pack
30mm thick
Stone Cladding Panel
215mm Stone Face
Sliding Type Bracket
80mm Face Top Hat to suit
sliding type bracket
Cladding panel support clips
Detail A - Typical
External Wall
Construction 1:20
Detail B - Warm
Flat Roof 1:20
Cavity Tray
Flashing
36/6 Poyfoam Eco High Impact And
Upstand Board Seperated From Mastic
Asphalt By Polyester Fleece
Rocksilk Krimpact Flat Roof Slab
Bonded To Vapour Control Layer
Vapour Control Layer
Mastic Asphalt Waterproofing
Isolation Felt
12mm Bitumen
Impregnated Fibreboard
Gravel Guard
Concrete Slimdek
Alutec Roof Drainage
100mm Vertical
Spigot Outlet
Gravel Ballast
Icopal FireSmart Monofutur
Single Layer Capsheet -
bitumen single ply membrane
Detail C -
Window Header
1:20
Sliding type bracket
50mm Rockwool
Duoslab Insulation
12mm Pack
80mm Face top hat to
suit sliding type bracket
Cladding panel
support clips
Cladding panel
support rail
Lintel
Detail D -
Window Sill 1:20
Blairs Window
Cill Board
100mm Blockwork
30mm Thick Stone
Cladding Panel
Window Cill
Cavity Closer
Detail E - Tata
Steel SlimDek
Flooring 1:20
Pedestals
100mm Blockwork
50mm Rigid Insulation
Column
Beam
Slimdek Flooring ComFloor 225
Ceiling Tiles
Ceiling Void
Wickes Pine Skirting Board
Raised Access Floor
12.5mm Plasterboard
38mm Floor Panel
Detail F - Ground Floor
External Wall Junction 1:10
Slimdek Flooring ComFloor 225
Ceiling Tiles
Ceiling Void
Raised Access Floor
Gutter
Insitu cast reinforced
concrete skin to existing
retaining structure
Paving slabs
50mm rigid insulation
Existing retaining structure
Cavity closer
Ancon IHR-B
Internal Head Restraint
20mm Compressible Board
Movement Joint
Cavity Drain Membrane
Studded 1mm thick
high density polyethylene
drain board
Celotex GA4000 Insulation
60mm thickness
Proprietary Drainage
Channel
12.5mm T Edge Wickes Plasterboard
Hardcore
12.5mm Plasterboard
38mm Floor Panel
Detail H - Fire
Protected steel
Column 1:20
2 layers of 15mm Gyproc Fireline
plasterboard fixed with Knauf fireboard
screws
300mmx300mm Columns
2 layers Gyproc Fireline fixed with
British Gypsum Jack-point screws at 300mm centres
19mm Gyproc CoreBoard
Isover insulation where required
Gypframe G102 Retaining Channel
Detail I - Fire Protection
around retail lift 1:20
Drawn by:
Daniel Burge
Rev:
-
Project:
Southampton Solent
University
Rev. Date Rev by Description
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
2. CAR1600
CAR 1750
GoodsmasterCDModel
Controllersize600wide
x260deepx1050high
positionTBC
Lower Basement
Lower Basement
Retail
Required Area: 179m2
Achieved Area:
375.84m2
Store Disabled
Refuge
Disabled
Refuge
Plant Room
Achieved Area:
128m2
Disabled
Refuge
2 3 4 5
B
C
A
1 6 7
Dry
Riser
Wet
Riser
Stannah service lift
Jermyn St.
Church
Place
Piccadilly
Unisex WC Disabled WC
Service
Area
Fire Escape
with 2HFD
Fire Escape
with 2HFD
Fire Escape
with 2HFD
Section B-B
Section A-A
CAR1600
CAR 1750
GoodsmasterCDModel
Controllersize600wide
x260deepx1050high
positionTBC
Upper Basement
Store
Upper Basement
Retail
Required Area:
781m2
Achieved Area:
1,181.97m2
Disabled
Refuge
Disabled
Refuge
Disabled
RefugeStore
Room
2 3 4 5
B
C
D
A
E
1 6 7
Dry
Riser
Wet
Riser
Stannah
service lift
Church
Place
Piccadilly
Unisex WC Disabled WC
Service
Area
Fire Escape
with 2HFD
Fire Escape
with 2HFD
Stairs from Ground
Floor
Fire Escape
with 2HFD
Section B-B
Section A-A
MinimumPit/Clearance
1360+10
0
Midilift SL
1100 x 1400
Through entry
CAR1600
CAR 1750
GoodsmasterCDModel
Controllersize600wide
x260deepx1050high
positionTBC
Jermyn St.
Church
Place
Ground Floor
Dry
Riser
Wet
Riser
Office Entrance/Lobby
Required Area:
Achieved Area:114.70m2
Platform
Lift
Stairs to
mezzanine
Stairs from UB
Bin
Store
Ground Floor Retail
Achieved Area:702.38m2
Ground Floor
Retail
Required Combined Area:
860m2
Achieved Combined Area:
1,040.14m2
Fire Escape
with 2HFD
Office Lifts
Reception Desk
Store
Store
Retail Lift
Bin
Store
2 3 4 5
B
C
D
A
E
1 6 7
Bin
Store
Bin
StoreCurtain Wall
Double Sliding
Door
Fire Proofing
round column,
see detail H
Stannah
service lift
Curtain Wall Curtain Wall
Curtain Wall
Curtain Wall
Curtain Wall
Curtain Wall
Curtain Wall
Curtain Wall
700070004135
8250
1200
Achieved Area:337.76m2
Male WC
Female WC Disabled WC
Unisex WC
Store
Service Area
Achieved Area
:38.9m2
Fire Escape
with 2HFD
Fire Escape
with 2HFD
Fire Escape
with 2HFD
Fire Escape
with 2HFD
450mm radius
Section B-B
Section A-A
MinimumPit/Clearance
1360+10
0
Midilift SL
1100 x 1400
Through entry
Platform Lift
Disabled
Refuge
Female
WC
Male
WC
Disabled
WC
Office Lifts Shafts
2 3 4 5
B
C
D
A
E
1 6 7
Mezzanine
CAR1600
CAR 1750
GoodsmasterCDModel
Controllersize600wide
x260deepx1050high
positionTBC
Stannah
service lift
Jermyn St.
Church
Place
Piccadilly Curtain Wall
Curtain Wall
Curtain Wall
Curtain WallCurtain Wall
Mezzanine
Required Area: 193m2
Achieved Area: 421m2
Service Area
Achieved Area
:44.9m2
Fire Escape
with 2HFD
Section B-B
Section A-A
ARCHITECTURAL
DESIGN
PROPOSED OFFICE/RETAIL
ACCOMODATION 198-202
PICCADILLY LONDON
Date:
16/05/14
Drawn by:
Daniel Burge
Drawing No:
ARC500/2
Drawing:
PROPOSED FLOOR PLANS
Scale:
1:200
Rev:
-
Project:
Southampton Solent
University
Rev. Date Rev by Description
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
3. CAR1600
CAR 1750
GoodsmasterCDModel
Controllersize600wide
x260deepx1050high
positionTBC
First Floor
Service Area
Achieved Area
:44.9m2
First Floor
Retail
Required Area:
442m2
Achieved
Area:445.43m2
First Floor
Office
Required Area: 674m2
Achieved Area:692.75m2
Female
WC
Male
WC Office Lifts
Disabled
Refuge
Disabled
Refuge
Retail
Lift -
See
detail I
Store
Disabled
Refuge
2 3 4 5
B
C
D
A
E
1 6 7
Windows
Dry
Riser
Wet
Riser
Stannah
service lift
Curtain Wall
Curtain Wall
Curtain Wall
Curtain Wall
Curtain Wall Curtain Wall
Jermyn St.
Church
Place
Piccadilly
Male WC
Female WC Disabled WC
Store
Fire Escape
with 2HFD
Fire Escape
with 2HFD
Disabled
WC
Section B-B
Section A-A
Second - Seventh Floor
Second Floor
Office
Required Area:
1,087m2
Achieved
Area:1,171.5m2
Disabled
Refuge
Disabled
Refuge
2 3 4 5
B
C
D
A
E
1 6 7
Service Area
Achieved Area
:44.9m2
Dry
Riser
Wet
Riser
Stannah
service lift
Jermyn St.
Church
Place
Piccadilly
Store
Female
WC
Male
WC
Fire Escape
with 2HFD
Fire Escape
with 2HFD
Fire Escape
with 2HFD
Office LiftsDisabled
WC
Section B-B
Section A-A
Piccadilly
Eighth Floor
Plant Room
Jermyn St.
Church
Place
Disabled
Refuge
CAR1600
CAR 1750
GoodsmasterCDModel
Controllersize600wide
x260deepx1050high
positionTBC
2 3 4 5
B
C
D
A
E
1 6 7
Drainage
Stannah
service lift
Service
Area
Drainage
Drainage
Drainage
Fire Escape
with 2HFD
Section B-B
Section A-A
ARCHITECTURAL
DESIGN
PROPOSED OFFICE/RETAIL
ACCOMODATION 198-202
PICCADILLY LONDON
Date:
16/05/14
Drawn by:
Daniel Burge
Drawing No:
ARC500/3
Drawing:
PROPOSED FLOOR PLANS
Scale:
1:200
Rev:
-
Project:
Southampton Solent
University
Rev. Date Rev by Description
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
4. Mezzanine
Ground Floor - Retail
Retail
Lift
Dry
Riser
Wet
Riser
StoreMale
WC
Female
WC
Unisex
WC
Female
WC
Male
WC
Disabled
WC
Fire
EscapeOffice Lifts
Female
WC
Male
WC
Disabled
WC
Fire
Escape
Female
WC
Male WC Disabled
WC
Fire
Escape
Female
WC
Male
WC
Disabled
WC
Fire
EscapeOffice Lifts
Female
WC
Male
WC
Disabled
WC
Fire
EscapeOffice Lifts
Female
WC
Male
WC
Disabled
WC
Fire
EscapeOffice Lifts
Female
WC
Male
WC
Disabled
WC
Fire
EscapeOffice Lifts
First Floor-Retail
First Floor -
Office
Second Floor -
Office
Third Floor -
Office
Fourth Floor -
Office
Fifth Floor -
Office
Sixth Floor -
Office
Seventh Floor -
Office
Eighth Floor -
Plant Room
Ground Floor -
Retail
Upper Basement -
Retail
Lower Basement -
Retail
GRD FFL 18.880
1st FFL +24.180
2nd FFL +27.830
3rd FFL +31,480
4th FFL +35,130
5th FFL +38,780
6th FFL +42,430
7th FFL +46,080
8th FFL +49,730
Roof +53,425
UB FFL +13,230
LB FFL +9,580
GRD FFL +16,880
Mezzanine FFL +19,530
Detail E -
Tata Steel
Slimdek Flooring
Detail F - Ground Floor
External Wall Junction
Detail G -
Internal Cavity Drain
Basement and
Waterproofing System
Detail A -
Typical Wall
External Detail
Detail B - Warm Flat Roof
Detail C -
Window Header
Detail D -
Window Sill
Fire Escape
Columns
Secant Pile
Foundation
Piccadilly
Jermyn St.
Section A-A
Section A-A
Service Area
Service Area
First Floor -
Office
Second Floor -
Office
Third Floor -
Office
Fourth Floor -
Office
Fifth Floor -
Office
Sixth Floor -
Office
Seventh Floor -
Office
Ground Floor -
Retail
Upper Basement -
Retail
Lower Basement -
Retail
Eighth Floor -
Plant Room
Stairs to
mezznine
Mezzanine
Platform
Lift
GRD FFL +17,880
GRD FFL 18.880
1st FFL +24.180
2nd FFL +27.830
3rd FFL +31,480
4th FFL +35,130
5th FFL +38,780
6th FFL +42,430
7th FFL +46,080
8th FFL +49,730
Roof +53,425
UB FFL +13,230
LB FFL +9,580
Church Place
Section B-B
ARCHITECTURAL
DESIGN
PROPOSED OFFICE/RETAIL
ACCOMODATION 198-202
PICCADILLY LONDON
Date:
16/05/14
Drawn by:
Daniel Burge
Drawing No:
ARC500/4
Drawing:
PROPOSED Sections
Scale:
1:200
Rev:
-
Project:
Southampton Solent
University
Rev. Date Rev by Description
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
5. First Floor
Lower Basement
Upper Basement
Midilift SL
1100 x 1400
Through entry
Ground Floor
2 3 4 5
B
C
D
A
E
1 6 7 2 3 4 5
B
C
D
A
E
1 6 7
2 3 4 5
B
C
D
A
E
1 6 7
2 3 4 5
B
C
A
1 6 7
Site Plan 1:200
Eighth Floor
Second - Seventh Floor
Midilift SL
1100 x 1400
Through entry
2 3 4 5
B
C
D
A
E
1 6 7
2 3 4 5
B
C
D
A
E
1 6 7
2 3 4 5
B
C
D
A
E
1 6 7
Mezzanine
Fire Strategy escape plan all under 30m
in accordance to Fire Safety Approved Document B
1:500
ARCHITECTURAL
DESIGN
PROPOSED OFFICE/RETAIL
ACCOMODATION 198-202
PICCADILLY LONDON
Date:
16/05/14
Drawn by:
Daniel Burge
Drawing No:
ARC500/6
Drawing:
Site Plan and Fire Strategy
Scale:
As Indicated
Rev:
-
Project:
Southampton Solent
University
Rev. Date Rev by Description
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT