This document is a project proposal submitted by Saad Sakhawat and Waleed Mujtaba to their supervisor Kiran Farasat for a school architectural project. The proposal outlines the problem of substandard small schools with poor lighting and ventilation. The objectives are to create an optimal learning environment with sustainable design providing proper lighting and ventilation. The proposal includes sections on literature review, methodology, schedule, budget, and references.