The document is a project proposal template for students at Jimma University, detailing the structure and required components for a B.Sc. electrical engineering project. It includes sections such as problem statement, objectives, literature review, methodology, project schedule, budget, references, and supervisor comments. Additionally, it outlines formatting guidelines for submission, including font size, spacing, and binding requirements.