 Sweden has more than
12,000 km of railway track
– 2,000 double tracks
– 10,000 single tracks
 SJ has a 55% share of the
total Swedish rail market
 SJ operates 90% of rail
passenger services in
Sweden exceeding 100 km
Rail traffic in Sweden
• SJ Regional
• SJ High speed
• SJ InterCity & SJ Night
Umeå/Luleå/Narvik
SJ AB
 Limited liability company
owned by the Swedish state
 The mandate
• To operate passenger rail
services
• both in competition and in
co-operation with others
 The requirement
• To be profit-making
• 10% return on equity
Dokumentnamn SJ 2004-04-19
SJ’s objective:
- A modern, profitable and customer oriented travel company -
 Approx. 4,000 employees
 Sales of SEK 8.5 billion in 2012
 Limited liability company
owned by the Swedish state
 110,000 passengers per day
 Travel services under our own
brand
 Contract rail services for
regional transport authorities
Modern milestones that
changed operations
 1988 Separation of operations
• Banverket - infrastructure
• SJ - passenger operation
 2001 SJ AB was founded
• from Public Authority
to Limited liability company
 Refined business
• Green Cargo, Jernhusen,
Euromaint, EDB, Unigrid
became separate operations
SJ as a limited liability Company
- modern history
 2001: -49 millions SEK
 2002: -994 millions
• ”Bancrupcy”
 2003: millions
• 1,8 billions in owner contribution
to stay in business (tax payers)
• New business model
Turn around
 2004: 192 millions
• New price model
– dynamic pricing
• 40 new trains are ordered (X40)
 2005: 1,2 billions
• Dynamic pricing in both
2 Class and 1 Class
 2006: 368 millions
 2007: 507 millions
• Internet auctions
 2008: 543 millions
• 20 new fast trains are ordered (2 billions SEK)
 2009: 460 millions
 2010: 294 millions
 2011: 38 millions
 2012: 498 millions
 2004-2012: 4,1 billions
Consolidation
Parameters of success
 Institutions of limited liability companies
– means operations on sound economic grounds
 Dynamic pricing
 Environmental thinking becomes share of mind
 Inter city-operations is easy travelling
 Modern segmentation of customers
 Regional clusters of comuting
1000 1000:- 1000:- 1000:- 1000:-
900:- 800:- 800:- 700:- 600:-
700:- 600:- 500:- 400:- 300:-
500:- 300:- 200:- 100:- 100:-
95:- 100:- 100:- 100:- 100:-
Seatsbooked
Time to departure, 3 months
Excess supply
Excessdemand
Dynamic pricing
Dynamic pricing
1000 1000:- 1000:- 1000:- 1000:-
900:- 800:- 800:- 700:- 600:-
700:- 600:- 500:- 400:- 300:-
500:- 300:- 200:- 100:- 100:-
95:- 100:- 100:- 100:- 100:-
Seatsbooked
Time to departure, 3 months
Dynamic pricing
Price index train tariffs Inflation
1985-1995 101% 66%
1995-2005 48% 10%
2005-2010 4% 12%
Dynamic pricing
2005 – 2012
Price index
train tariffs Inflation
2005 - index 0 0
2006 0 +1
2007 -6 +4
2008 -7 +7
2009 -4 +7
2010 +1 +8
2011 +4 +11
2012 +4 +12
Markets
Malmö-Sto Train Air
2001 23% 77%
2011 30% 70%
Gtb-Sto Train Air
2001 49% 51%
2011 69% 31%
Sundsvall-Sto Train Air
2001 30% 70%
2011 66% 34%
Karlstad-Sto Train Air
2001 66% 34%
2011 90% 10%
16
Train vs. flight market
Source: KTH Järnvägsgruppen, Centrum för forskning och utbildning i järnvägsteknik
3h!
Deregulation in three steps
Timetable
1. July 2009 – opening of weekend traffic
2. October 2009 – opening of international traffic (cabotage)
3. October 2010 – opening of all markets, general access
The free market argument
 Beneficial for passengers
 Triggers development and increases efficiency
 Also domestic markets should be opened
 Abolish monopolies, avoid concessions/restrictions
BLS-visit 2009-07-09
19
Facing full-fledged deregulation
 Customer satisfaction Improved quality of service
 Employee contribution Increased participation
 Sustained profitability Improved productivity
 Expansion New markets
Challenges
SJs journey of change
… to SJ specifics
… to SJ is good for
… to SJ & sustainability
From TRAIN generics…
From TRAIN is good for…
From TRAIN & sustainability
… to serving peopleFrom operating TRAINs
… to dialogueFrom information
The rolling stock ahead
38 SJ 2000
40 Double deckers
100 RC-locomotives
350 wagons
SJ 3000 is our latest new train
• 25-40% is recycled – vehicle can be recycled to 98%
• Sorting stations in each car
• Uses 10% less energy compared to SJ 2000
• Regenerative brakes enables - 12% energy recovery
245 seats
Total of 4500 seats
Availability
SJ 2000 Upgrade
Technology
 An SJ analysis suggested the possibility, from a technical
perspective, of a life extension of X2000 for the coming 15-20 years
27 2013-04-18
SJ 2000 Upgrade
 General project instructions:
• The X2 fleet strategy is to keep the trains in service until at least 2035
with high levels of comfort, service and reliability
• The intention is to maintain the position of SJ 2000 as our premium train
service and furthermore enhance their high profile
 Long-term flexibility:
• The train sets must, after the refurbishment, be flexible to adapt to future
requirements and changes
28
The refurbished X2 fleet shall improve the general image of SJ,
e.g. in the direction of higher reliability and quality of service
SJ2000 Actions
Two projects; Upgrade och Interior
Refurbishment
 Upgrade
29 2013-04-18
 Interior Refurbishment
30
Very High Speed – next step?
31
B. Westerberg,
31
Objective for SJ High Speed Trains
250 Km/h on existing tracks
 Change the way to travel!
– A new concept that drives travel
– Compare the introduction of the X2000
 Starting requirements
– Vehicles on the existing infrastructure
– Standard rolling stock, 250 km / h and tilting
– Sweden, Norway, Denmark and Germany
– Profitable business case
32
Stockholm-Göteborg
T11 X2: 2:45
Stockholm
Stockholm-Malmö
T11 X2: 4:04
Sundsvall
T11 X2 3:10
Umeå
T11 X55 6:30
Best travel by
direct train
today and with
the X250
0:00
Göteborg-Malmö
T11 X31: 2:30
2:45
3:00
4:40
5:40
2:30
2:45
3:35
4:00
2:00
2:10
4:40
5:40
Journey with X2/X55
Rounded to the even number
of minutes Including normal
additions
Assumption: the infrastructure is adapted to
250 mph in the relevant section of the lines
33Dokumentnamn SJ 2004-04-19
33
SJ main criterias for new rolling stock
Reliable Few errors / delays and cancelled train
Proven solutions to standard vehicle platform
Winter-assured solutions
Reliable
Operation: Medium Sized Train => Usability & many seats
Geography: Scandinavia and Germany
Over time: Service Concept & interior design, secondary market
Flexibility
Premium Product
Change the way to travel!
Design, service & comfort
Image
250km / h speeds important for travel time => tilt
Good performance to make up for delays
Design for short station stop Reduces the risk of delay
Short travel time
Standard solutions, production & delivery of quality
Approved vehicle platform (for EU countries) => lower riskFast delivery
34
Need for an upgraded infrastructure
Technical issues for 250 km / h
 Rail track technology
• Cant deficiency
• Rails, switches, track forces
• Buoyancy in the embankment
• Track Geometry, line optimization
• Track Location
• Line Conversion
• Bridges
• Catenary
• Level crossings
• Signalling system
• Bypass Track
 Traffic Issues
• Tilting
• Station Passages
• Noise
• Passing clearance between trains
• Winter Properties
• Capacity
Thank you
elisabeth.lindgren@sj.se

More Related Content

Similar to Scandinavian Rail Development 2013 - Elisabeth Lindgren

Scandinavian Rail Development 2013 - Bjarne Ivar Wist
Scandinavian Rail Development 2013 - Bjarne Ivar WistScandinavian Rail Development 2013 - Bjarne Ivar Wist
Scandinavian Rail Development 2013 - Bjarne Ivar WistRussell Publishing
 
Conférence TechnoArk 2016 - 09 sbb-cff
Conférence TechnoArk 2016 - 09 sbb-cffConférence TechnoArk 2016 - 09 sbb-cff
Conférence TechnoArk 2016 - 09 sbb-cff
Laurent Borella
 
09 sbb-cff
09 sbb-cff09 sbb-cff
09 sbb-cff
TechnoArk
 
Knut Eirik Gustavsen - Electric Vehicles Disrupting the Norwegian Grid
Knut Eirik Gustavsen - Electric Vehicles Disrupting the Norwegian GridKnut Eirik Gustavsen - Electric Vehicles Disrupting the Norwegian Grid
Knut Eirik Gustavsen - Electric Vehicles Disrupting the Norwegian Grid
Innovation Norway
 
What PRASA is doing to improve the passenger rail service in the Western Cape
What PRASA is doing to improve the passenger rail service in the Western CapeWhat PRASA is doing to improve the passenger rail service in the Western Cape
What PRASA is doing to improve the passenger rail service in the Western Cape
Tristan Wiggill
 
TRI15_Future of Rail_1st_TM235 330
TRI15_Future of Rail_1st_TM235 330TRI15_Future of Rail_1st_TM235 330
TRI15_Future of Rail_1st_TM235 330Nicolas Turner
 
SUPPLY CHAIN MANAGEMENT OF COLOMBO DOCKYARD PLC
SUPPLY CHAIN MANAGEMENT OF COLOMBO DOCKYARD PLCSUPPLY CHAIN MANAGEMENT OF COLOMBO DOCKYARD PLC
SUPPLY CHAIN MANAGEMENT OF COLOMBO DOCKYARD PLC
Nalin Perera
 
City of Stockholm: Smart Goods Distribution projects
City of Stockholm: Smart Goods Distribution projectsCity of Stockholm: Smart Goods Distribution projects
City of Stockholm: Smart Goods Distribution projects
GrowSmarter
 
Campbell mc nee tga symposium mac - nov 12 (3)
Campbell mc nee tga symposium   mac - nov 12 (3)Campbell mc nee tga symposium   mac - nov 12 (3)
Campbell mc nee tga symposium mac - nov 12 (3)Greg Bold
 
London underground presentation for Digital Railways competition event
London underground presentation for Digital Railways competition eventLondon underground presentation for Digital Railways competition event
London underground presentation for Digital Railways competition event
KTN
 
The ports as logistics platforms - the current metamorphosis of maritime ports
The ports as logistics platforms - the current metamorphosis of maritime portsThe ports as logistics platforms - the current metamorphosis of maritime ports
The ports as logistics platforms - the current metamorphosis of maritime portsParadigma Consulting
 
Extended metro in stockholm, stockholm county council
Extended metro in stockholm, stockholm county councilExtended metro in stockholm, stockholm county council
Extended metro in stockholm, stockholm county council
Business Finland
 
Bkt elektronik company presentation 2019
Bkt elektronik company presentation   2019Bkt elektronik company presentation   2019
Bkt elektronik company presentation 2019
Andrew Wilson
 
London underground key challenge areas
London underground key challenge areasLondon underground key challenge areas
London underground key challenge areas
KTN
 
Integrated Transport and Energy Modelling
Integrated Transport and Energy ModellingIntegrated Transport and Energy Modelling
Integrated Transport and Energy Modelling
IEA-ETSAP
 
Rail, the track to efficiency
Rail, the track to efficiencyRail, the track to efficiency
Rail, the track to efficiency
Tristan Wiggill
 
Keolis tramway expertise: Making cities more attractive places to live and work
Keolis tramway expertise: Making cities more attractive places to live and workKeolis tramway expertise: Making cities more attractive places to live and work
Keolis tramway expertise: Making cities more attractive places to live and work
Keolis
 
Sustainable Transport Conference
Sustainable Transport ConferenceSustainable Transport Conference
Sustainable Transport Conference
Scotland Europa, Scottish Enterprise
 
Rail Technical Strategy, Key Capability 6 - More Space on Trains
Rail Technical Strategy, Key Capability 6 - More Space on TrainsRail Technical Strategy, Key Capability 6 - More Space on Trains
Rail Technical Strategy, Key Capability 6 - More Space on Trains
James Brown
 
What does smartness mean - and how can it be achieved? - Stockholm Royal Seap...
What does smartness mean - and how can it be achieved? - Stockholm Royal Seap...What does smartness mean - and how can it be achieved? - Stockholm Royal Seap...
What does smartness mean - and how can it be achieved? - Stockholm Royal Seap...
IEA DSM Implementing Agreement (IA)
 

Similar to Scandinavian Rail Development 2013 - Elisabeth Lindgren (20)

Scandinavian Rail Development 2013 - Bjarne Ivar Wist
Scandinavian Rail Development 2013 - Bjarne Ivar WistScandinavian Rail Development 2013 - Bjarne Ivar Wist
Scandinavian Rail Development 2013 - Bjarne Ivar Wist
 
Conférence TechnoArk 2016 - 09 sbb-cff
Conférence TechnoArk 2016 - 09 sbb-cffConférence TechnoArk 2016 - 09 sbb-cff
Conférence TechnoArk 2016 - 09 sbb-cff
 
09 sbb-cff
09 sbb-cff09 sbb-cff
09 sbb-cff
 
Knut Eirik Gustavsen - Electric Vehicles Disrupting the Norwegian Grid
Knut Eirik Gustavsen - Electric Vehicles Disrupting the Norwegian GridKnut Eirik Gustavsen - Electric Vehicles Disrupting the Norwegian Grid
Knut Eirik Gustavsen - Electric Vehicles Disrupting the Norwegian Grid
 
What PRASA is doing to improve the passenger rail service in the Western Cape
What PRASA is doing to improve the passenger rail service in the Western CapeWhat PRASA is doing to improve the passenger rail service in the Western Cape
What PRASA is doing to improve the passenger rail service in the Western Cape
 
TRI15_Future of Rail_1st_TM235 330
TRI15_Future of Rail_1st_TM235 330TRI15_Future of Rail_1st_TM235 330
TRI15_Future of Rail_1st_TM235 330
 
SUPPLY CHAIN MANAGEMENT OF COLOMBO DOCKYARD PLC
SUPPLY CHAIN MANAGEMENT OF COLOMBO DOCKYARD PLCSUPPLY CHAIN MANAGEMENT OF COLOMBO DOCKYARD PLC
SUPPLY CHAIN MANAGEMENT OF COLOMBO DOCKYARD PLC
 
City of Stockholm: Smart Goods Distribution projects
City of Stockholm: Smart Goods Distribution projectsCity of Stockholm: Smart Goods Distribution projects
City of Stockholm: Smart Goods Distribution projects
 
Campbell mc nee tga symposium mac - nov 12 (3)
Campbell mc nee tga symposium   mac - nov 12 (3)Campbell mc nee tga symposium   mac - nov 12 (3)
Campbell mc nee tga symposium mac - nov 12 (3)
 
London underground presentation for Digital Railways competition event
London underground presentation for Digital Railways competition eventLondon underground presentation for Digital Railways competition event
London underground presentation for Digital Railways competition event
 
The ports as logistics platforms - the current metamorphosis of maritime ports
The ports as logistics platforms - the current metamorphosis of maritime portsThe ports as logistics platforms - the current metamorphosis of maritime ports
The ports as logistics platforms - the current metamorphosis of maritime ports
 
Extended metro in stockholm, stockholm county council
Extended metro in stockholm, stockholm county councilExtended metro in stockholm, stockholm county council
Extended metro in stockholm, stockholm county council
 
Bkt elektronik company presentation 2019
Bkt elektronik company presentation   2019Bkt elektronik company presentation   2019
Bkt elektronik company presentation 2019
 
London underground key challenge areas
London underground key challenge areasLondon underground key challenge areas
London underground key challenge areas
 
Integrated Transport and Energy Modelling
Integrated Transport and Energy ModellingIntegrated Transport and Energy Modelling
Integrated Transport and Energy Modelling
 
Rail, the track to efficiency
Rail, the track to efficiencyRail, the track to efficiency
Rail, the track to efficiency
 
Keolis tramway expertise: Making cities more attractive places to live and work
Keolis tramway expertise: Making cities more attractive places to live and workKeolis tramway expertise: Making cities more attractive places to live and work
Keolis tramway expertise: Making cities more attractive places to live and work
 
Sustainable Transport Conference
Sustainable Transport ConferenceSustainable Transport Conference
Sustainable Transport Conference
 
Rail Technical Strategy, Key Capability 6 - More Space on Trains
Rail Technical Strategy, Key Capability 6 - More Space on TrainsRail Technical Strategy, Key Capability 6 - More Space on Trains
Rail Technical Strategy, Key Capability 6 - More Space on Trains
 
What does smartness mean - and how can it be achieved? - Stockholm Royal Seap...
What does smartness mean - and how can it be achieved? - Stockholm Royal Seap...What does smartness mean - and how can it be achieved? - Stockholm Royal Seap...
What does smartness mean - and how can it be achieved? - Stockholm Royal Seap...
 

More from Russell Publishing

Stephen Thomas, QPM Assistant Chief Constable, Operations, British Transport ...
Stephen Thomas, QPM Assistant Chief Constable, Operations, British Transport ...Stephen Thomas, QPM Assistant Chief Constable, Operations, British Transport ...
Stephen Thomas, QPM Assistant Chief Constable, Operations, British Transport ...Russell Publishing
 
Robin Forrest, International Relations, SNCF Security
Robin Forrest, International Relations, SNCF SecurityRobin Forrest, International Relations, SNCF Security
Robin Forrest, International Relations, SNCF SecurityRussell Publishing
 
Richard Aaroe, CEO, WaveTrainSystems (WTS)
Richard Aaroe, CEO, WaveTrainSystems (WTS)Richard Aaroe, CEO, WaveTrainSystems (WTS)
Richard Aaroe, CEO, WaveTrainSystems (WTS)Russell Publishing
 
Peter Guy, Operational Security & Continuity Planning Manager, Network Rail
Peter Guy, Operational Security & Continuity Planning Manager, Network RailPeter Guy, Operational Security & Continuity Planning Manager, Network Rail
Peter Guy, Operational Security & Continuity Planning Manager, Network RailRussell Publishing
 
Martyn Guiver, Head of Crime Management, Northern Rail
Martyn Guiver, Head of Crime Management, Northern RailMartyn Guiver, Head of Crime Management, Northern Rail
Martyn Guiver, Head of Crime Management, Northern RailRussell Publishing
 
Marc Pearl, President & CEO, Homeland Security & Defense Business Council
Marc Pearl, President & CEO, Homeland Security & Defense Business CouncilMarc Pearl, President & CEO, Homeland Security & Defense Business Council
Marc Pearl, President & CEO, Homeland Security & Defense Business CouncilRussell Publishing
 
José Pires, Senior Security Advisor, International Union of Railways (UIC)
José Pires, Senior Security Advisor, International Union of Railways (UIC)José Pires, Senior Security Advisor, International Union of Railways (UIC)
José Pires, Senior Security Advisor, International Union of Railways (UIC)Russell Publishing
 
David Roney, Superintendent, Counter Terrorism, British Transport Police (BTP)
David Roney, Superintendent, Counter Terrorism, British Transport Police (BTP)David Roney, Superintendent, Counter Terrorism, British Transport Police (BTP)
David Roney, Superintendent, Counter Terrorism, British Transport Police (BTP)Russell Publishing
 
Daniel Berchtold, Head Business Unit Rail Automation, Schweizer Electronic
Daniel Berchtold, Head Business Unit Rail Automation, Schweizer ElectronicDaniel Berchtold, Head Business Unit Rail Automation, Schweizer Electronic
Daniel Berchtold, Head Business Unit Rail Automation, Schweizer ElectronicRussell Publishing
 
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...Russell Publishing
 
Thomas Kritzer, Head of Security & Service Department, Wiener Linien & Chair,...
Thomas Kritzer, Head of Security & Service Department, Wiener Linien & Chair,...Thomas Kritzer, Head of Security & Service Department, Wiener Linien & Chair,...
Thomas Kritzer, Head of Security & Service Department, Wiener Linien & Chair,...Russell Publishing
 
Airport IT&T 2013 Panel Discussion
Airport IT&T 2013 Panel DiscussionAirport IT&T 2013 Panel Discussion
Airport IT&T 2013 Panel DiscussionRussell Publishing
 

More from Russell Publishing (20)

Elisabeth sinclair
Elisabeth sinclairElisabeth sinclair
Elisabeth sinclair
 
Elisabeth sinclair
Elisabeth sinclairElisabeth sinclair
Elisabeth sinclair
 
Denis castanet
Denis castanetDenis castanet
Denis castanet
 
Tim gray
Tim grayTim gray
Tim gray
 
Kari rouhonen
Kari rouhonenKari rouhonen
Kari rouhonen
 
Gunther koller
Gunther kollerGunther koller
Gunther koller
 
David thomasson
David thomassonDavid thomasson
David thomasson
 
Johnny sorenson
Johnny sorensonJohnny sorenson
Johnny sorenson
 
Stephen Thomas, QPM Assistant Chief Constable, Operations, British Transport ...
Stephen Thomas, QPM Assistant Chief Constable, Operations, British Transport ...Stephen Thomas, QPM Assistant Chief Constable, Operations, British Transport ...
Stephen Thomas, QPM Assistant Chief Constable, Operations, British Transport ...
 
Robin Forrest, International Relations, SNCF Security
Robin Forrest, International Relations, SNCF SecurityRobin Forrest, International Relations, SNCF Security
Robin Forrest, International Relations, SNCF Security
 
Richard Aaroe, CEO, WaveTrainSystems (WTS)
Richard Aaroe, CEO, WaveTrainSystems (WTS)Richard Aaroe, CEO, WaveTrainSystems (WTS)
Richard Aaroe, CEO, WaveTrainSystems (WTS)
 
Peter Guy, Operational Security & Continuity Planning Manager, Network Rail
Peter Guy, Operational Security & Continuity Planning Manager, Network RailPeter Guy, Operational Security & Continuity Planning Manager, Network Rail
Peter Guy, Operational Security & Continuity Planning Manager, Network Rail
 
Martyn Guiver, Head of Crime Management, Northern Rail
Martyn Guiver, Head of Crime Management, Northern RailMartyn Guiver, Head of Crime Management, Northern Rail
Martyn Guiver, Head of Crime Management, Northern Rail
 
Marc Pearl, President & CEO, Homeland Security & Defense Business Council
Marc Pearl, President & CEO, Homeland Security & Defense Business CouncilMarc Pearl, President & CEO, Homeland Security & Defense Business Council
Marc Pearl, President & CEO, Homeland Security & Defense Business Council
 
José Pires, Senior Security Advisor, International Union of Railways (UIC)
José Pires, Senior Security Advisor, International Union of Railways (UIC)José Pires, Senior Security Advisor, International Union of Railways (UIC)
José Pires, Senior Security Advisor, International Union of Railways (UIC)
 
David Roney, Superintendent, Counter Terrorism, British Transport Police (BTP)
David Roney, Superintendent, Counter Terrorism, British Transport Police (BTP)David Roney, Superintendent, Counter Terrorism, British Transport Police (BTP)
David Roney, Superintendent, Counter Terrorism, British Transport Police (BTP)
 
Daniel Berchtold, Head Business Unit Rail Automation, Schweizer Electronic
Daniel Berchtold, Head Business Unit Rail Automation, Schweizer ElectronicDaniel Berchtold, Head Business Unit Rail Automation, Schweizer Electronic
Daniel Berchtold, Head Business Unit Rail Automation, Schweizer Electronic
 
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...
 
Thomas Kritzer, Head of Security & Service Department, Wiener Linien & Chair,...
Thomas Kritzer, Head of Security & Service Department, Wiener Linien & Chair,...Thomas Kritzer, Head of Security & Service Department, Wiener Linien & Chair,...
Thomas Kritzer, Head of Security & Service Department, Wiener Linien & Chair,...
 
Airport IT&T 2013 Panel Discussion
Airport IT&T 2013 Panel DiscussionAirport IT&T 2013 Panel Discussion
Airport IT&T 2013 Panel Discussion
 

Recently uploaded

LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Holger Mueller
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
SOFTTECHHUB
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
Kirill Klimov
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
Aggregage
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
FelixPerez547899
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
DerekIwanaka1
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
Adani case
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
WilliamRodrigues148
 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Boris Ziegler
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
daothibichhang1
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
ecamare2
 

Recently uploaded (20)

LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
 

Scandinavian Rail Development 2013 - Elisabeth Lindgren

  • 1. SJ – from Public Authority to Limited liability company Stockholm, April 16th, 2013 Elisabeth Lindgren, Vice President Markets, Corporate Communication & Sales
  • 2.  Sweden has more than 12,000 km of railway track – 2,000 double tracks – 10,000 single tracks  SJ has a 55% share of the total Swedish rail market  SJ operates 90% of rail passenger services in Sweden exceeding 100 km Rail traffic in Sweden
  • 3. • SJ Regional • SJ High speed • SJ InterCity & SJ Night Umeå/Luleå/Narvik
  • 4. SJ AB  Limited liability company owned by the Swedish state  The mandate • To operate passenger rail services • both in competition and in co-operation with others  The requirement • To be profit-making • 10% return on equity
  • 5. Dokumentnamn SJ 2004-04-19 SJ’s objective: - A modern, profitable and customer oriented travel company -  Approx. 4,000 employees  Sales of SEK 8.5 billion in 2012  Limited liability company owned by the Swedish state  110,000 passengers per day  Travel services under our own brand  Contract rail services for regional transport authorities
  • 6. Modern milestones that changed operations  1988 Separation of operations • Banverket - infrastructure • SJ - passenger operation  2001 SJ AB was founded • from Public Authority to Limited liability company  Refined business • Green Cargo, Jernhusen, Euromaint, EDB, Unigrid became separate operations
  • 7. SJ as a limited liability Company - modern history  2001: -49 millions SEK  2002: -994 millions • ”Bancrupcy”  2003: millions • 1,8 billions in owner contribution to stay in business (tax payers) • New business model
  • 8. Turn around  2004: 192 millions • New price model – dynamic pricing • 40 new trains are ordered (X40)  2005: 1,2 billions • Dynamic pricing in both 2 Class and 1 Class  2006: 368 millions
  • 9.  2007: 507 millions • Internet auctions  2008: 543 millions • 20 new fast trains are ordered (2 billions SEK)  2009: 460 millions  2010: 294 millions  2011: 38 millions  2012: 498 millions  2004-2012: 4,1 billions Consolidation
  • 10. Parameters of success  Institutions of limited liability companies – means operations on sound economic grounds  Dynamic pricing  Environmental thinking becomes share of mind  Inter city-operations is easy travelling  Modern segmentation of customers  Regional clusters of comuting
  • 11. 1000 1000:- 1000:- 1000:- 1000:- 900:- 800:- 800:- 700:- 600:- 700:- 600:- 500:- 400:- 300:- 500:- 300:- 200:- 100:- 100:- 95:- 100:- 100:- 100:- 100:- Seatsbooked Time to departure, 3 months Excess supply Excessdemand Dynamic pricing
  • 12. Dynamic pricing 1000 1000:- 1000:- 1000:- 1000:- 900:- 800:- 800:- 700:- 600:- 700:- 600:- 500:- 400:- 300:- 500:- 300:- 200:- 100:- 100:- 95:- 100:- 100:- 100:- 100:- Seatsbooked Time to departure, 3 months
  • 13. Dynamic pricing Price index train tariffs Inflation 1985-1995 101% 66% 1995-2005 48% 10% 2005-2010 4% 12%
  • 14. Dynamic pricing 2005 – 2012 Price index train tariffs Inflation 2005 - index 0 0 2006 0 +1 2007 -6 +4 2008 -7 +7 2009 -4 +7 2010 +1 +8 2011 +4 +11 2012 +4 +12
  • 15. Markets Malmö-Sto Train Air 2001 23% 77% 2011 30% 70% Gtb-Sto Train Air 2001 49% 51% 2011 69% 31% Sundsvall-Sto Train Air 2001 30% 70% 2011 66% 34% Karlstad-Sto Train Air 2001 66% 34% 2011 90% 10%
  • 16. 16 Train vs. flight market Source: KTH Järnvägsgruppen, Centrum för forskning och utbildning i järnvägsteknik 3h!
  • 17.
  • 18. Deregulation in three steps Timetable 1. July 2009 – opening of weekend traffic 2. October 2009 – opening of international traffic (cabotage) 3. October 2010 – opening of all markets, general access The free market argument  Beneficial for passengers  Triggers development and increases efficiency  Also domestic markets should be opened  Abolish monopolies, avoid concessions/restrictions
  • 19. BLS-visit 2009-07-09 19 Facing full-fledged deregulation  Customer satisfaction Improved quality of service  Employee contribution Increased participation  Sustained profitability Improved productivity  Expansion New markets Challenges
  • 20. SJs journey of change … to SJ specifics … to SJ is good for … to SJ & sustainability From TRAIN generics… From TRAIN is good for… From TRAIN & sustainability … to serving peopleFrom operating TRAINs … to dialogueFrom information
  • 21. The rolling stock ahead 38 SJ 2000 40 Double deckers 100 RC-locomotives 350 wagons
  • 22. SJ 3000 is our latest new train • 25-40% is recycled – vehicle can be recycled to 98% • Sorting stations in each car • Uses 10% less energy compared to SJ 2000 • Regenerative brakes enables - 12% energy recovery
  • 24. Total of 4500 seats
  • 26.
  • 27. SJ 2000 Upgrade Technology  An SJ analysis suggested the possibility, from a technical perspective, of a life extension of X2000 for the coming 15-20 years 27 2013-04-18
  • 28. SJ 2000 Upgrade  General project instructions: • The X2 fleet strategy is to keep the trains in service until at least 2035 with high levels of comfort, service and reliability • The intention is to maintain the position of SJ 2000 as our premium train service and furthermore enhance their high profile  Long-term flexibility: • The train sets must, after the refurbishment, be flexible to adapt to future requirements and changes 28 The refurbished X2 fleet shall improve the general image of SJ, e.g. in the direction of higher reliability and quality of service
  • 29. SJ2000 Actions Two projects; Upgrade och Interior Refurbishment  Upgrade 29 2013-04-18  Interior Refurbishment
  • 30. 30 Very High Speed – next step?
  • 31. 31 B. Westerberg, 31 Objective for SJ High Speed Trains 250 Km/h on existing tracks  Change the way to travel! – A new concept that drives travel – Compare the introduction of the X2000  Starting requirements – Vehicles on the existing infrastructure – Standard rolling stock, 250 km / h and tilting – Sweden, Norway, Denmark and Germany – Profitable business case
  • 32. 32 Stockholm-Göteborg T11 X2: 2:45 Stockholm Stockholm-Malmö T11 X2: 4:04 Sundsvall T11 X2 3:10 Umeå T11 X55 6:30 Best travel by direct train today and with the X250 0:00 Göteborg-Malmö T11 X31: 2:30 2:45 3:00 4:40 5:40 2:30 2:45 3:35 4:00 2:00 2:10 4:40 5:40 Journey with X2/X55 Rounded to the even number of minutes Including normal additions Assumption: the infrastructure is adapted to 250 mph in the relevant section of the lines
  • 33. 33Dokumentnamn SJ 2004-04-19 33 SJ main criterias for new rolling stock Reliable Few errors / delays and cancelled train Proven solutions to standard vehicle platform Winter-assured solutions Reliable Operation: Medium Sized Train => Usability & many seats Geography: Scandinavia and Germany Over time: Service Concept & interior design, secondary market Flexibility Premium Product Change the way to travel! Design, service & comfort Image 250km / h speeds important for travel time => tilt Good performance to make up for delays Design for short station stop Reduces the risk of delay Short travel time Standard solutions, production & delivery of quality Approved vehicle platform (for EU countries) => lower riskFast delivery
  • 34. 34 Need for an upgraded infrastructure Technical issues for 250 km / h  Rail track technology • Cant deficiency • Rails, switches, track forces • Buoyancy in the embankment • Track Geometry, line optimization • Track Location • Line Conversion • Bridges • Catenary • Level crossings • Signalling system • Bypass Track  Traffic Issues • Tilting • Station Passages • Noise • Passing clearance between trains • Winter Properties • Capacity