SlideShare a Scribd company logo
RESUME
SOURAV SARKAR
E-Mail- sourav.sarkar@acclimited.com
ssssarkar91@gmail.com Mobile: 09785259374
PROFESSIONAL SNAPSHOT
 A competent professional with over 13yrs years of experience in cement Plant and 04
years of experience in ceramic industry.
 Currently associated with ACC LTD as a Engineer Mech.
 Displayed Skills in analyzing existing maintenance system and conducting critical
analysis for finding out shortcomings and suggesting and implementing
improvements measures.
 Departmental safety.
CORE COMPETENCIES
□ Supervising overall plant maintenance activities
□ Assisting in achieving maximum efficiency by maintaining health of the
equipment
□ Identifying areas of Obstruction/ breakdowns in plant and taking steps to rectify
the equipment through application of trouble shooting tools
□ Carrying out inspection tests for engineering and development to ensure
performance capacity of various machines & equipments
□ Applying the best maintenance practices to reduce energy consumption
□ Maintenance of rotating machineries.
□ Vibration measurement & analysis
□ Dynamic balancing of fans
□ Alignment of rotating equipment
ORGANISATIONAL EXPERIENCE
Company : ACC LTD,
Present Designation : Engineer Mech
Accomplishments;
□ Maintenance & Commissioning of all compressors (Reciprocating& Screw), all
pumps, fans, PD Blowers.
□ Involved in maintenance & alignment of all types of Rotating equipments.
WORKING EXPERIENCE
□ Joined ACC AMBG (Advanced material Business Group), manufacturer of
Ceramic product for electronic application in the year 1998 as a Technical Asst.
up to 2003 January.
Job responsibilities were operation & maintenance of Numeric Control Grinding
machine (makes Peter Wolter Germany, Parishudh), diamond based cutting
machine.
Involved in Belt alignment, Vertical & horizontal grinding wheel replacement of
Dia more than 300mm.
Erection, maintenance of reciprocating compressor (makes Chicago pneumatics)
of 2.8 cubic meter/min capacity.
Also worked in Numeric Control Grinding machine & cutting machine at a job
tolerance of +/- 0.02mm.
□ Transferred to ACC Cement sector in the year 2003 at Lakheri Cement Works in
Workshop Dept since January 2003 to February 2005.
During this period involve in various maintenance activities such as gear box
over hauling, thrust checking, tooth impression checking, tooth profile checking,
checking of bearing clearance & Gear box shaft alignment of VRM (150TPH,
Pfeiffer make mill), Emill ( Alstom make, 32TPH),
Shaft alignment of cooler fans
Maintenance of Grate Cooler (Krupp Polysius make-4500TPD)
□ From 2005 February to July 2006 worked at Project Store.
Job responsibilities were related to Material Handling & maintain the record of
the same
□ From July 2006 to April 2009 worked in Compressor Department.
Having experience of over all erection, commission & maintenance of
Reciprocating & screw compressor (makes Chicago pneumatics & ELGI) of
capacity 2.3 cubic meter/min to 18.63 cubic meter/min.
Having experience of erection commission & maintenance of PD Blowers
Having experience of supervision of maintenance of 18 Reciprocating
Compressors & 13 Screw Compressors
□ From 2009 May to till date working in MIPS department .
Job responsibilities are Condition Based Monitoring of Equipment-
Periodical Vibration checking .Shock pulse Analysis of Fans & gearbox by
Shock Pulse analyzer (make SPM A 4011).
Temperature recording of bearings & Pinion profile
Static & Dynamic balancing of Fans
Shaft alignment checking of fans & Gear box
Laser V-Belt alignment checking (equipment makes SKF TMEB2)
Periodical checking of KILN shell, Cement mill Shell & Chimneys thickness
(Equipment makes PULSECHO, mp 200L)
Checking of root clearance & backlash of Girth gear & Pinion & checking of tooth
profile during plant shutdown.
VRM Table liners & Roller wear measurement checking by Template.
Shore Hardness measurement of Belt of bucket Elevator.
Spray pattern of Girth gear lubrication system.
Supervision of third party service regarding Ultrasound testing, MPT, Oil
analysis.
Knowledge of Equipment Handling- Vibration meter & Analyzer, Stroboscope,
SPM analyzer, Thickness measuring instrument, Laser V-Belt alignment tool,
Stethoscope, Shore hardness testing equipment.
□ Knowledge of MS Office, MS Windows & SAP system (PM Module)
ACADEMIC CREDENTIAL
Bsc from Kolkata University in the year 1990
TECHNICAL QUALIFICATION
3yrs Trade apprenticeship Training in STRUCTURAL FITTING from Garden Reach
Ship Builders & Engineers Ltd.(Ministry of Defense) ,Kolkata from 1998 to 1991.
5yrs Part time DIPLOMA IN MECHANICAL ENGINEERING from West Bengal State
Council for Technical Education. Duration 1992 to 1997
PERSONAL DETAILS
Date of birth : 24.03.1970
Martial Status : Married
Address : S/o Shri Late G.S.Sarkar
: Quarter No-L 22 ACC Colony,
: Bottom Level, LAKHERI
: Dist.: Bundi (Raj.)
: PIN 323603
: MOB NO-09785259374, 08107036840
C.T.C : 456967
C.T.C EXPECTED : 600000
(SOURAV SARKAR)

More Related Content

What's hot

BUCKET WHEEL EXCAVATOR GEARBOX ( O&K 1420 ) & DYNAMIC STEEL STRUCTUE
BUCKET WHEEL EXCAVATOR GEARBOX ( O&K 1420 ) & DYNAMIC STEEL STRUCTUE BUCKET WHEEL EXCAVATOR GEARBOX ( O&K 1420 ) & DYNAMIC STEEL STRUCTUE
BUCKET WHEEL EXCAVATOR GEARBOX ( O&K 1420 ) & DYNAMIC STEEL STRUCTUE
Arun Kumar
 
Xtreme engineering-equipment-pvt-ltd
Xtreme engineering-equipment-pvt-ltdXtreme engineering-equipment-pvt-ltd
Xtreme engineering-equipment-pvt-ltd
Xtreme Engineering Equipment Pvt. Ltd.
 
Setco Spinlde Service of Avtec Company's product
Setco Spinlde Service of Avtec Company's productSetco Spinlde Service of Avtec Company's product
Setco Spinlde Service of Avtec Company's product
Vittal Kulkarni
 
FLSMIDTH-PROFILE
FLSMIDTH-PROFILEFLSMIDTH-PROFILE
FLSMIDTH-PROFILESarnath R
 
FMS Layout for Manufacturing of Marine Gears
FMS Layout for Manufacturing of Marine GearsFMS Layout for Manufacturing of Marine Gears
FMS Layout for Manufacturing of Marine Gears
Somesh Saurabh
 
Suspension optimization ppt
Suspension optimization pptSuspension optimization ppt
Suspension optimization ppt
gautam makeshbabu
 
Windsor probe test
Windsor probe testWindsor probe test
Windsor probe test
Aglaia Connect
 
British pendulum skid resistance tester
British pendulum skid resistance testerBritish pendulum skid resistance tester
British pendulum skid resistance tester
ChintuPeta
 
Static load test method statement cm - ms- bw - 003
Static load test method statement  cm - ms- bw - 003Static load test method statement  cm - ms- bw - 003
Static load test method statement cm - ms- bw - 003Minh Bui Si
 
Exemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignmentExemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignment
mkpq pasha
 
Richie New CV 2016
Richie  New CV 2016Richie  New CV 2016
Richie New CV 2016Richard Ward
 
Geoff Stevens Resume -Mech Eng 2.6.15
Geoff Stevens Resume -Mech Eng 2.6.15Geoff Stevens Resume -Mech Eng 2.6.15
Geoff Stevens Resume -Mech Eng 2.6.15Geoff Stevens
 
Method of Statement - Pavement works
Method of Statement - Pavement worksMethod of Statement - Pavement works
Method of Statement - Pavement works
Mohd Nizam Mohd Zan
 
Maxoforge profile: Investment Casting
Maxoforge profile: Investment Casting Maxoforge profile: Investment Casting
Maxoforge profile: Investment Casting
Rohit Mishra
 

What's hot (18)

BUCKET WHEEL EXCAVATOR GEARBOX ( O&K 1420 ) & DYNAMIC STEEL STRUCTUE
BUCKET WHEEL EXCAVATOR GEARBOX ( O&K 1420 ) & DYNAMIC STEEL STRUCTUE BUCKET WHEEL EXCAVATOR GEARBOX ( O&K 1420 ) & DYNAMIC STEEL STRUCTUE
BUCKET WHEEL EXCAVATOR GEARBOX ( O&K 1420 ) & DYNAMIC STEEL STRUCTUE
 
CV DUANE DAWSON
CV DUANE DAWSONCV DUANE DAWSON
CV DUANE DAWSON
 
Xtreme engineering-equipment-pvt-ltd
Xtreme engineering-equipment-pvt-ltdXtreme engineering-equipment-pvt-ltd
Xtreme engineering-equipment-pvt-ltd
 
Setco Spinlde Service of Avtec Company's product
Setco Spinlde Service of Avtec Company's productSetco Spinlde Service of Avtec Company's product
Setco Spinlde Service of Avtec Company's product
 
FLSMIDTH-PROFILE
FLSMIDTH-PROFILEFLSMIDTH-PROFILE
FLSMIDTH-PROFILE
 
FMS Layout for Manufacturing of Marine Gears
FMS Layout for Manufacturing of Marine GearsFMS Layout for Manufacturing of Marine Gears
FMS Layout for Manufacturing of Marine Gears
 
Suspension optimization ppt
Suspension optimization pptSuspension optimization ppt
Suspension optimization ppt
 
Windsor probe test
Windsor probe testWindsor probe test
Windsor probe test
 
New CV
New CVNew CV
New CV
 
NEW RESUME
NEW RESUMENEW RESUME
NEW RESUME
 
Brandon Resume (1)
Brandon Resume (1)Brandon Resume (1)
Brandon Resume (1)
 
British pendulum skid resistance tester
British pendulum skid resistance testerBritish pendulum skid resistance tester
British pendulum skid resistance tester
 
Static load test method statement cm - ms- bw - 003
Static load test method statement  cm - ms- bw - 003Static load test method statement  cm - ms- bw - 003
Static load test method statement cm - ms- bw - 003
 
Exemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignmentExemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignment
 
Richie New CV 2016
Richie  New CV 2016Richie  New CV 2016
Richie New CV 2016
 
Geoff Stevens Resume -Mech Eng 2.6.15
Geoff Stevens Resume -Mech Eng 2.6.15Geoff Stevens Resume -Mech Eng 2.6.15
Geoff Stevens Resume -Mech Eng 2.6.15
 
Method of Statement - Pavement works
Method of Statement - Pavement worksMethod of Statement - Pavement works
Method of Statement - Pavement works
 
Maxoforge profile: Investment Casting
Maxoforge profile: Investment Casting Maxoforge profile: Investment Casting
Maxoforge profile: Investment Casting
 

Similar to sarkar_resume

CV-PPalo.tata.sinter.manager.jun15
CV-PPalo.tata.sinter.manager.jun15CV-PPalo.tata.sinter.manager.jun15
CV-PPalo.tata.sinter.manager.jun15priyabrata palo
 
Resume ck.
Resume ck.Resume ck.
Resume ck.
chetan kava
 
Resume ck.
Resume ck.Resume ck.
Resume ck.
chetan kava
 
Curriculum Vitae, Ashraf Gharieb to ahmed omar
Curriculum Vitae, Ashraf Gharieb to ahmed omarCurriculum Vitae, Ashraf Gharieb to ahmed omar
Curriculum Vitae, Ashraf Gharieb to ahmed omarAshraf Gharib
 
COMPANY PRESENTATION
COMPANY PRESENTATIONCOMPANY PRESENTATION
COMPANY PRESENTATIONSilvia Iovu
 
SENIOR MECHANICAL TECHNICIAN
SENIOR MECHANICAL TECHNICIANSENIOR MECHANICAL TECHNICIAN
SENIOR MECHANICAL TECHNICIAN
ABDULSATTAR KARACHI
 
Mechanical resume (1)
Mechanical resume (1)Mechanical resume (1)
Mechanical resume (1)
jesu lambert
 
hassan mohamed chief mech resume
hassan mohamed chief mech resumehassan mohamed chief mech resume
hassan mohamed chief mech resumehassan khattab
 

Similar to sarkar_resume (20)

Engr,imran cv.cement.
Engr,imran cv.cement.Engr,imran cv.cement.
Engr,imran cv.cement.
 
CV-PPalo.tata.sinter.manager.jun15
CV-PPalo.tata.sinter.manager.jun15CV-PPalo.tata.sinter.manager.jun15
CV-PPalo.tata.sinter.manager.jun15
 
SENIOR EXECUTIVE NEW
SENIOR EXECUTIVE NEWSENIOR EXECUTIVE NEW
SENIOR EXECUTIVE NEW
 
nasrulla resume
nasrulla resumenasrulla resume
nasrulla resume
 
-TGK -KFC-PROFILE
-TGK -KFC-PROFILE-TGK -KFC-PROFILE
-TGK -KFC-PROFILE
 
CV ANKUR RAMWALA
CV ANKUR RAMWALACV ANKUR RAMWALA
CV ANKUR RAMWALA
 
MAINTENANCE C V
MAINTENANCE C V MAINTENANCE C V
MAINTENANCE C V
 
2015
20152015
2015
 
CV Dewaharbabu
CV DewaharbabuCV Dewaharbabu
CV Dewaharbabu
 
Jayshish (1)
Jayshish (1)Jayshish (1)
Jayshish (1)
 
Resume_ck.
Resume_ck.Resume_ck.
Resume_ck.
 
Resume ck.
Resume ck.Resume ck.
Resume ck.
 
Resume ck.
Resume ck.Resume ck.
Resume ck.
 
KOC
KOCKOC
KOC
 
Curriculum Vitae, Ashraf Gharieb to ahmed omar
Curriculum Vitae, Ashraf Gharieb to ahmed omarCurriculum Vitae, Ashraf Gharieb to ahmed omar
Curriculum Vitae, Ashraf Gharieb to ahmed omar
 
my_resume-1
my_resume-1my_resume-1
my_resume-1
 
COMPANY PRESENTATION
COMPANY PRESENTATIONCOMPANY PRESENTATION
COMPANY PRESENTATION
 
SENIOR MECHANICAL TECHNICIAN
SENIOR MECHANICAL TECHNICIANSENIOR MECHANICAL TECHNICIAN
SENIOR MECHANICAL TECHNICIAN
 
Mechanical resume (1)
Mechanical resume (1)Mechanical resume (1)
Mechanical resume (1)
 
hassan mohamed chief mech resume
hassan mohamed chief mech resumehassan mohamed chief mech resume
hassan mohamed chief mech resume
 

sarkar_resume

  • 1. RESUME SOURAV SARKAR E-Mail- sourav.sarkar@acclimited.com ssssarkar91@gmail.com Mobile: 09785259374 PROFESSIONAL SNAPSHOT  A competent professional with over 13yrs years of experience in cement Plant and 04 years of experience in ceramic industry.  Currently associated with ACC LTD as a Engineer Mech.  Displayed Skills in analyzing existing maintenance system and conducting critical analysis for finding out shortcomings and suggesting and implementing improvements measures.  Departmental safety. CORE COMPETENCIES □ Supervising overall plant maintenance activities □ Assisting in achieving maximum efficiency by maintaining health of the equipment □ Identifying areas of Obstruction/ breakdowns in plant and taking steps to rectify the equipment through application of trouble shooting tools □ Carrying out inspection tests for engineering and development to ensure performance capacity of various machines & equipments □ Applying the best maintenance practices to reduce energy consumption □ Maintenance of rotating machineries. □ Vibration measurement & analysis □ Dynamic balancing of fans □ Alignment of rotating equipment ORGANISATIONAL EXPERIENCE Company : ACC LTD, Present Designation : Engineer Mech Accomplishments;
  • 2. □ Maintenance & Commissioning of all compressors (Reciprocating& Screw), all pumps, fans, PD Blowers. □ Involved in maintenance & alignment of all types of Rotating equipments. WORKING EXPERIENCE □ Joined ACC AMBG (Advanced material Business Group), manufacturer of Ceramic product for electronic application in the year 1998 as a Technical Asst. up to 2003 January. Job responsibilities were operation & maintenance of Numeric Control Grinding machine (makes Peter Wolter Germany, Parishudh), diamond based cutting machine. Involved in Belt alignment, Vertical & horizontal grinding wheel replacement of Dia more than 300mm. Erection, maintenance of reciprocating compressor (makes Chicago pneumatics) of 2.8 cubic meter/min capacity. Also worked in Numeric Control Grinding machine & cutting machine at a job tolerance of +/- 0.02mm. □ Transferred to ACC Cement sector in the year 2003 at Lakheri Cement Works in Workshop Dept since January 2003 to February 2005. During this period involve in various maintenance activities such as gear box over hauling, thrust checking, tooth impression checking, tooth profile checking, checking of bearing clearance & Gear box shaft alignment of VRM (150TPH, Pfeiffer make mill), Emill ( Alstom make, 32TPH), Shaft alignment of cooler fans Maintenance of Grate Cooler (Krupp Polysius make-4500TPD) □ From 2005 February to July 2006 worked at Project Store. Job responsibilities were related to Material Handling & maintain the record of the same □ From July 2006 to April 2009 worked in Compressor Department. Having experience of over all erection, commission & maintenance of Reciprocating & screw compressor (makes Chicago pneumatics & ELGI) of capacity 2.3 cubic meter/min to 18.63 cubic meter/min. Having experience of erection commission & maintenance of PD Blowers Having experience of supervision of maintenance of 18 Reciprocating Compressors & 13 Screw Compressors □ From 2009 May to till date working in MIPS department . Job responsibilities are Condition Based Monitoring of Equipment- Periodical Vibration checking .Shock pulse Analysis of Fans & gearbox by Shock Pulse analyzer (make SPM A 4011). Temperature recording of bearings & Pinion profile Static & Dynamic balancing of Fans Shaft alignment checking of fans & Gear box Laser V-Belt alignment checking (equipment makes SKF TMEB2)
  • 3. Periodical checking of KILN shell, Cement mill Shell & Chimneys thickness (Equipment makes PULSECHO, mp 200L) Checking of root clearance & backlash of Girth gear & Pinion & checking of tooth profile during plant shutdown. VRM Table liners & Roller wear measurement checking by Template. Shore Hardness measurement of Belt of bucket Elevator. Spray pattern of Girth gear lubrication system. Supervision of third party service regarding Ultrasound testing, MPT, Oil analysis. Knowledge of Equipment Handling- Vibration meter & Analyzer, Stroboscope, SPM analyzer, Thickness measuring instrument, Laser V-Belt alignment tool, Stethoscope, Shore hardness testing equipment. □ Knowledge of MS Office, MS Windows & SAP system (PM Module) ACADEMIC CREDENTIAL Bsc from Kolkata University in the year 1990 TECHNICAL QUALIFICATION 3yrs Trade apprenticeship Training in STRUCTURAL FITTING from Garden Reach Ship Builders & Engineers Ltd.(Ministry of Defense) ,Kolkata from 1998 to 1991. 5yrs Part time DIPLOMA IN MECHANICAL ENGINEERING from West Bengal State Council for Technical Education. Duration 1992 to 1997 PERSONAL DETAILS Date of birth : 24.03.1970 Martial Status : Married Address : S/o Shri Late G.S.Sarkar : Quarter No-L 22 ACC Colony, : Bottom Level, LAKHERI : Dist.: Bundi (Raj.) : PIN 323603 : MOB NO-09785259374, 08107036840 C.T.C : 456967 C.T.C EXPECTED : 600000