Sai Innovations
 Empowering your business with
 Technology
Disclaimer
This document has been prepared by SAI Innovation Inc solely for presentation purposes. It must be treated
confidentially by attendees and should not be reproduced, redistributed or passed to any other person. The
information contained in this document has not been independently verified and no representation or warranty,
expressed or implied, is made as to, and no reliance should be placed on, the fairness, accuracy,
completeness or correctness of the information contained herein. The Company shall not have any liability
whatsoever (in negligence or otherwise) for any loss whatsoever arising from any use of this document, or its
contents, or otherwise arising in connection with this document.

This document does not constitute an offer or invitation to purchase any shares in the Company and neither it
nor any part of it shall form the basis of, or be relied upon in connection with, any contract or commitment
whatsoever.

Any decision to purchase shares in the Company is the sole responsibility of the investor who shall be
responsible for his own due diligence.

This document may contain forward looking statements that constitutes SAI beliefs and expectations about
future performance. Except for historical information, any forward looking statement based on current
expectations, assumptions, projections about future events are subject to certain economic and market risks
and uncertainties that could turn out actual results to differ materially or may not occur.
Presentation Agenda

    Corporate Overview

    Mission & Vision

    Solutions Portfolio

    An Introduction to the Services

    Services Portfolio

    Product Portfolio

    Management Team
Corporate Overview
Sai Innovation is a Microsoft Business Solutions Partner providing consultation, solution & implementation and support services
using the best-in-class technology, which are heavily invested and continuously improved by Microsoft. Sai Innovations 's experts
have hands-on experiences in working with the Microsoft Customer Relationship Management (CRM) Solution and Share Point
Services.

Sai Innovations provides an end-to-end business solutions using SharePoint, to customize and deploy MOSS 2007 applications
that address functional requirements for Collaboration, Portal, Knowledge retention, and Compliance management. SAI' award
winning SAI Workspace Suite, which is a Collaborative Drawing Board for SharePoint application development allows end users
to realize the business requirements in the SharePoint applications, without the need for any knowledge in programming.


 Our mission
 To empower our clients to respond faster and more intuitively to changing market dynamics. We enable them to become more
 agile and competitive through leveraging new Technologies. The seamless collaboration of our Consultants, , IT Specialists and
 Outsourcing Experts forms the backbone of our unique approach, creating truly integrated services.


 Our vision
  To become globally benchmarked solution provider in MS CRM & SharePoint Applications ,
  To become a preferred partner through creation of high values for customers,
  An enriching workplace for employees to excel through innovation & teamwork.
Solutions Portfolio

    Data Backup & Disaster Recovery
              Solutions

Any backup is only as reliable as its ability to rest restore business data and applications when they are needed most. We
do provide all following solutions for Data Backup and Disaster Recovery for SMBs and Enterprise Vertical.



  The key features and benefits of our solution are:

   Continuous Data Backup

   Offsite Protection

   Instant Recovery and File Versions

   Central Management

   Remote Administration

   Bare Metal Recovery

   Local Archiving
Software Applications


        Infrastructur                                Business                                  Outsourcing
               e                                     Application                                  Services
           Solutions                                    s&                                       (Software
          & Services                                  Services                                  Solutions)


SharePoint Application
Sai Innovations provides an end-to-end business solutions using SharePoint, to customize and deploy MOSS 2007 solution
that addresses your business requirements for Collaboration, Portal, Knowledge retention and Compliance management.
SAI has designed, built, and implemented MOSS 2007 solutions for customers, across all industry sectors.SAI helps our
customers to implement SharePoint to effectively bring together the People, Processes and Systems within and outside the
Enterprise, and deliver an integrated, collaborative environment on SharePoint platform


 Discovery Workshops
 Enterprise SharePoint Rollout
 Taxonomy Design and Implementation
 Collaboration Intranets and Extranets
 Application Development & Customization
 Enterprise Document & Content Management
 Business Process Management
 Business Intelligence
 Dashboard Implementation
 Content Analysis and Migration Services
 SharePoint Administration and Support
 Farm Architecture and Deployment Planning
Customer Relationship Management Application

Sai Innovations (SI) dedicates 100% of our resources and services for CRM             consultation and
implementation .Our full team of expertise and dedication is ready to serve you starting from the very
beginning of CRM project like data management solutions to CRM add-ons solutions that fit your vertical
industry and specific requirements.

  Data Management Solutions (Data Cleansing and
 Data Structuring)
 Business Intelligence(BI) Solutions CRM and Call
 Center Trainings & Seminar
 CRM Consultation & Implementation
  Microsoft Dynamics CRM 4.0
  Microsoft Technology related to CRM project
  CRM solutions add-ons that fit your industry and
 specific requirement
 Outsource Man-Power
 Maintenance & Support Services
Services Portfolio

An Introduction to the Services
Offshore software services outsourcing company specializes in providing web and software development
services including solution integration and offshore IT outsourcing..We can help you develop customized
software solutions and assist you thorough out the entire application life cycle management (ALM), including
project management, systems analysis and design, software development, implementation and training
delivering the results on time and on budget.

 Offshore software services                             Enterprise application services

Client server application development services        Database administration
Offshore web development services                     e-business solutions
Desktop based application development                 Application re-Engineering Services/ enhancement
services                                               services
Custom application development services               Enterprise portal development services
Database application development services             Enterprise integration solutions
Distributed application services                      EAI platform development services
Application life cycle management services            Enterprise resource planning (ERP)
Application maintenance services                      Sales force automation (SFA)
Application migration services                        Enterprise content management system (CMS)
Application integration services                      Enterprise customer relationship management
Rich internet applications                            system (CRM)
Application Management Services

Sai Innovations brings together a unique combination of a mid-sized IT services provider with a broad service
portfolio that makes us the “right-sized application outsourcing partner” for upper mid-market enterprises. Our
services are delivered using an innovative Hybrid team structure -- consisting of dedicated core team,
complemented by shared and variable teams

Lower cost of ownership
 Higher productivity over time through proven techniques
like “cross-skilling,” “risk-based testing” and “smart-bunching,”
which helps you “do more with         less”
 Standardized, proven processes for service delivery and
governance, templates and tools – driving productivity and
consistency
Enhanced application quality
Proactive analysis to make the application more robust
over time
Effective framework-driven test automation, that reduces
the regression testing cycle time by almost 40%, while
increasing test coverage
Relentless focus on customer satisfaction
Continuous monitoring of service levels, including end-user
customer satisfaction
 Services measured to rigorous SLAs & backed by SLA-
based pricing models
Enterprise Application Services (EAS)
                                                                       solutions Frame work on
SAI- Microsoft Dynamics Center of Excellence (CoE) is geared                Dynamics CRM
to help organizations and their divisions meet their business
objectives of ERP / CRM implementation.
Microsoft Dynamics CoE:

Focuses Dynamics CRM.
Comprises experienced technical and functional
experts.
Is a part of various early adoption programs. The
knowledge acquired through various early adoption
programs is directly translated to the customer in terms
of implementation, creating deployment roadmap,
evaluating new functionalities, etc.
Helps organizations harness the rich features and
functionalities of Microsoft Dynamics , CRM by bringing
in industry-specific adoption accelerators, effective
migration and upgrade methodologies, best practices,
toolkits and value-added supplements.

Microsoft Dynamics CoE goes an extra mile in understanding organizations’ business pains and implementing
the right technology
SAI Software Factory Approach (SFA)
SAI Innovations unique Software Factory Approach (SFA) of software development is a methodology designed
to ensure maintainability of code and consistent software quality.
SAI –SFA Features
Every member of the project is an integral part of the
whole team
Every team use a simple form of planning and
tracking to decide what should be done next
Team members work together as a group, improving
the design continually to keep it always just right for the
current needs
Every team shares a common picture of what the
system looks like
Job rotation within team members to eliminate project
delay in case of attrition
Proper documentation of each day's technical
progress on the project
Technical guidance to the new entrants on the
running projects via interactive sessions
Conformity with the coding standard guidelines for all
languages as provided by the Quality Assurance Group
Extensive Quality Control and Assurance Process
before client delivery
Technical Support Services

Managing the People: SAI TSG has a highly refined
people practice, which involves recruiting, retaining and
training employees to have the right skills for providing
high-quality customer service and being able to problem-
solve technical issues.
Managing the Problem :The process of problem
management involves the ability to log, track, escalate, and
report on a wide variety of data including calls, online
history, call types, caller ID and downtime outage statistics.
In SAI TSG each problem has one, and only one, clearly
defined problem owner with clear accountability to manage
overall situation to acceptable resolution.
Managing the Knowledge: Knowledge Management (KM)
is a key element in SAI TSG that provides proactive
support. It is a business process, enabled by a tool for
managing the problem resolution information relating to
past incidents.
Managing the Service:
Service Level Management involves the activities and
services covered by an SLA and must be built around
measurable events. These events ensure the SLA is
meeting performance standard and customer expectations
are being met.
Business Solutions Services

SAI Innovations core competence lies in the use of Microsoft Business Solutions to provide software solution to
our customers. Our Center of Excellence (COE) has been specifically set up to provide a steady flow of
Microsoft Certified Professionals to support & scale up a project involving Microsoft technology - anytime,
anywhere. The Center of Excellence (COE) has the right mix of functional and technical experts to address the
issues of business process implementation along with the programming and coding requirements
Our Strengths                                          Services we offer on Microsoft Business Solutions
Local presence for onsite consulting and
implementation                                         GAP Analysis
Methodology for offshore based delivery of            Solution Fit Assessment
services and support for Business Solution products.   Scope & Specification Generation
Flexible models for client engagement over the        Functional & Technical Consulting
long term                                              Customization
Value propositions –                                   Integration with other Microsoft Products, 3rd Party
Trained resources available locally and offshore      Systems and other home grown applications
Cost Effective Delivery                               Implementation & Performance Tuning
Better Measurement & Management of Business           Rollout
Performance                                            End User Training
                                                       Maintenance & Support
SAI Pricing Model
Product Portfolio

  SAI SharePoint Products Overview

Decrease the cost of ownership in developing new applications by 70 percent. Dashboard, Portal and Reports
can be delivered in less than a week compared to 2 months of development cycle. Realize significant Time and
Cost savings by using SAI products

SAI product ranges from building blocks (Web
Parts and Features) to complete SharePoint
solutions, enabling users to increase their
productivity when using SharePoint platform for
collaboration. All of our solutions can be used out-
of-box to address your business issues without
the need for additional training and complex
setup.

 SAI Workspace Suite for SharePoint

 SAI Web Parts and Features

 SAI MOSS Helper
SAI Workspace Suite for SharePoint

Composite Framework Offerings
Modular architecture allows clients to use the modules    SAI Workspace Suite is a productivity tool for
individually or take advantage of complete SharePoint      designing, building, and deploying collaboration
application available as solutions.                        applications on SharePoint platform. Suite
                                                           provides the application development layer and is
Web parts and Features provide functionality as           complemented by other product and service
modular components to store, search, connect to,           offerings from SAI
aggregate and display SharePoint data. Users can act on
the aggregated data from the same screen for efficiency.

Design Patterns for SharePoint development provides
guidance and training for SharePoint application
development, architecture and administration.

Solutions are 12 pre-built SharePoint applications. The
applications can be rolled out with only light
customization for corporate branding.

Support from SAI includes 24/7 online & phone support,
documentation and knowledge base. SLA is managed as
per ITIL standards and we are one of the few companies
which will allow our client to discuss with our
development team on your issues
SAI MOSS Helper

Enterprise-level management tool for Migration, Administration and Replication, Compliance and Management
of SharePoint Infrastructure
This is one-of-a-kind solution for complete SharePoint backend management and administration, for tasks like
Migration, Administration and Replication, Compliance and Management of SharePoint Infrastructure. SAI
MOSS Helper uses a business-centric approach to features management, which allows administrators to
manage Web Parts and Controls across the farm. The tool was built based on our experience working with
SharePoint since 2001 for clients including Fortune 500 firms.
SAI MOSS Helper solutions include the following modules.
Migration
      SharePoint Migrator
      Public Folder Migrator
      File System Migrator
      Lotus Notes Migrator
      Documentum and eRoom Migrator

Administration & Replication

Compliance

Farms Management
SharePoint Web Parts and Features


SAI Web Parts can address many inherent complexities and increase flexibility on how users use their
SharePoint environment. Our Web Parts can be targeted to end users, power users and also administrators.
Our Web Parts can grouped based on the type of functionality.

 End User Collaboration                 Portal Administration
 Calendar Web Parts                    Group Notification Web Parts # User Self Service Web Parts
 Chart Web Parts                       User Profile Management we part
 Rollup Web Parts
 Data Viewer Web Parts                 Data and Content Management
 Mash Up List Web Parts                List Search Web Parts
 User Self Service Web Parts           Navigation Web Parts
 Alerts Organizer Web Parts            PDF Generator Solution

 Business Intelligence
 Chart Web Parts
 KPI plus Web Parts
SAI EDM Software

An intuitive, seamless document-handling
solution to improve your productivity.

Managing documents effectively is a key challenge that many companies face in the current business
environment. Most organizations have multiple data streams that consist of digital and paper documents from
various sources and in many formats. For effective communication, fuss-free archiving and appropriate sharing,
this information must be managed properly

                            Benefits Of PAGELIGHT
                            User-friendly and quick.
                            Newly-redesigned UI eases operability by
                            simplifying tasks and increasing visibility.

                            Reduction of Total Cost Ownership.
                            Minimizes expenditure by integrating
                            seamlessly with existing software and
                            hardware.


   Environmentally friendly (Green Office).Paperless document
   management encourages a greener work environment.

   Simple and easy document management. Digitize, share, handle
   and protect documents in a variety of formats via a single platform.
SAI Management Team –Singapore & Malaysia

Empowered management team
 Partnership-based approach to engagements
 Comprehensive client care practices for facilitating long-term relationships
 Rich, diverse and global background experience bringing international expertise with local responsiveness
SAI Management – Operational Model
Clients We Serve

Sai profile

  • 1.
    Sai Innovations Empoweringyour business with Technology
  • 2.
    Disclaimer This document hasbeen prepared by SAI Innovation Inc solely for presentation purposes. It must be treated confidentially by attendees and should not be reproduced, redistributed or passed to any other person. The information contained in this document has not been independently verified and no representation or warranty, expressed or implied, is made as to, and no reliance should be placed on, the fairness, accuracy, completeness or correctness of the information contained herein. The Company shall not have any liability whatsoever (in negligence or otherwise) for any loss whatsoever arising from any use of this document, or its contents, or otherwise arising in connection with this document. This document does not constitute an offer or invitation to purchase any shares in the Company and neither it nor any part of it shall form the basis of, or be relied upon in connection with, any contract or commitment whatsoever. Any decision to purchase shares in the Company is the sole responsibility of the investor who shall be responsible for his own due diligence. This document may contain forward looking statements that constitutes SAI beliefs and expectations about future performance. Except for historical information, any forward looking statement based on current expectations, assumptions, projections about future events are subject to certain economic and market risks and uncertainties that could turn out actual results to differ materially or may not occur.
  • 3.
    Presentation Agenda Corporate Overview Mission & Vision Solutions Portfolio An Introduction to the Services Services Portfolio Product Portfolio Management Team
  • 4.
    Corporate Overview Sai Innovationis a Microsoft Business Solutions Partner providing consultation, solution & implementation and support services using the best-in-class technology, which are heavily invested and continuously improved by Microsoft. Sai Innovations 's experts have hands-on experiences in working with the Microsoft Customer Relationship Management (CRM) Solution and Share Point Services. Sai Innovations provides an end-to-end business solutions using SharePoint, to customize and deploy MOSS 2007 applications that address functional requirements for Collaboration, Portal, Knowledge retention, and Compliance management. SAI' award winning SAI Workspace Suite, which is a Collaborative Drawing Board for SharePoint application development allows end users to realize the business requirements in the SharePoint applications, without the need for any knowledge in programming. Our mission To empower our clients to respond faster and more intuitively to changing market dynamics. We enable them to become more agile and competitive through leveraging new Technologies. The seamless collaboration of our Consultants, , IT Specialists and Outsourcing Experts forms the backbone of our unique approach, creating truly integrated services. Our vision  To become globally benchmarked solution provider in MS CRM & SharePoint Applications ,  To become a preferred partner through creation of high values for customers,  An enriching workplace for employees to excel through innovation & teamwork.
  • 5.
    Solutions Portfolio Data Backup & Disaster Recovery Solutions Any backup is only as reliable as its ability to rest restore business data and applications when they are needed most. We do provide all following solutions for Data Backup and Disaster Recovery for SMBs and Enterprise Vertical. The key features and benefits of our solution are:  Continuous Data Backup  Offsite Protection  Instant Recovery and File Versions  Central Management  Remote Administration  Bare Metal Recovery  Local Archiving
  • 6.
    Software Applications Infrastructur Business Outsourcing e Application Services Solutions s& (Software & Services Services Solutions) SharePoint Application Sai Innovations provides an end-to-end business solutions using SharePoint, to customize and deploy MOSS 2007 solution that addresses your business requirements for Collaboration, Portal, Knowledge retention and Compliance management. SAI has designed, built, and implemented MOSS 2007 solutions for customers, across all industry sectors.SAI helps our customers to implement SharePoint to effectively bring together the People, Processes and Systems within and outside the Enterprise, and deliver an integrated, collaborative environment on SharePoint platform Discovery Workshops Enterprise SharePoint Rollout Taxonomy Design and Implementation Collaboration Intranets and Extranets Application Development & Customization Enterprise Document & Content Management Business Process Management Business Intelligence Dashboard Implementation Content Analysis and Migration Services SharePoint Administration and Support Farm Architecture and Deployment Planning
  • 7.
    Customer Relationship ManagementApplication Sai Innovations (SI) dedicates 100% of our resources and services for CRM consultation and implementation .Our full team of expertise and dedication is ready to serve you starting from the very beginning of CRM project like data management solutions to CRM add-ons solutions that fit your vertical industry and specific requirements.  Data Management Solutions (Data Cleansing and Data Structuring) Business Intelligence(BI) Solutions CRM and Call Center Trainings & Seminar CRM Consultation & Implementation  Microsoft Dynamics CRM 4.0  Microsoft Technology related to CRM project  CRM solutions add-ons that fit your industry and specific requirement Outsource Man-Power Maintenance & Support Services
  • 8.
    Services Portfolio An Introductionto the Services Offshore software services outsourcing company specializes in providing web and software development services including solution integration and offshore IT outsourcing..We can help you develop customized software solutions and assist you thorough out the entire application life cycle management (ALM), including project management, systems analysis and design, software development, implementation and training delivering the results on time and on budget. Offshore software services Enterprise application services Client server application development services Database administration Offshore web development services e-business solutions Desktop based application development Application re-Engineering Services/ enhancement services services Custom application development services Enterprise portal development services Database application development services Enterprise integration solutions Distributed application services EAI platform development services Application life cycle management services Enterprise resource planning (ERP) Application maintenance services Sales force automation (SFA) Application migration services Enterprise content management system (CMS) Application integration services Enterprise customer relationship management Rich internet applications system (CRM)
  • 9.
    Application Management Services SaiInnovations brings together a unique combination of a mid-sized IT services provider with a broad service portfolio that makes us the “right-sized application outsourcing partner” for upper mid-market enterprises. Our services are delivered using an innovative Hybrid team structure -- consisting of dedicated core team, complemented by shared and variable teams Lower cost of ownership  Higher productivity over time through proven techniques like “cross-skilling,” “risk-based testing” and “smart-bunching,” which helps you “do more with less”  Standardized, proven processes for service delivery and governance, templates and tools – driving productivity and consistency Enhanced application quality Proactive analysis to make the application more robust over time Effective framework-driven test automation, that reduces the regression testing cycle time by almost 40%, while increasing test coverage Relentless focus on customer satisfaction Continuous monitoring of service levels, including end-user customer satisfaction  Services measured to rigorous SLAs & backed by SLA- based pricing models
  • 10.
    Enterprise Application Services(EAS) solutions Frame work on SAI- Microsoft Dynamics Center of Excellence (CoE) is geared Dynamics CRM to help organizations and their divisions meet their business objectives of ERP / CRM implementation. Microsoft Dynamics CoE: Focuses Dynamics CRM. Comprises experienced technical and functional experts. Is a part of various early adoption programs. The knowledge acquired through various early adoption programs is directly translated to the customer in terms of implementation, creating deployment roadmap, evaluating new functionalities, etc. Helps organizations harness the rich features and functionalities of Microsoft Dynamics , CRM by bringing in industry-specific adoption accelerators, effective migration and upgrade methodologies, best practices, toolkits and value-added supplements. Microsoft Dynamics CoE goes an extra mile in understanding organizations’ business pains and implementing the right technology
  • 11.
    SAI Software FactoryApproach (SFA) SAI Innovations unique Software Factory Approach (SFA) of software development is a methodology designed to ensure maintainability of code and consistent software quality. SAI –SFA Features Every member of the project is an integral part of the whole team Every team use a simple form of planning and tracking to decide what should be done next Team members work together as a group, improving the design continually to keep it always just right for the current needs Every team shares a common picture of what the system looks like Job rotation within team members to eliminate project delay in case of attrition Proper documentation of each day's technical progress on the project Technical guidance to the new entrants on the running projects via interactive sessions Conformity with the coding standard guidelines for all languages as provided by the Quality Assurance Group Extensive Quality Control and Assurance Process before client delivery
  • 12.
    Technical Support Services Managingthe People: SAI TSG has a highly refined people practice, which involves recruiting, retaining and training employees to have the right skills for providing high-quality customer service and being able to problem- solve technical issues. Managing the Problem :The process of problem management involves the ability to log, track, escalate, and report on a wide variety of data including calls, online history, call types, caller ID and downtime outage statistics. In SAI TSG each problem has one, and only one, clearly defined problem owner with clear accountability to manage overall situation to acceptable resolution. Managing the Knowledge: Knowledge Management (KM) is a key element in SAI TSG that provides proactive support. It is a business process, enabled by a tool for managing the problem resolution information relating to past incidents. Managing the Service: Service Level Management involves the activities and services covered by an SLA and must be built around measurable events. These events ensure the SLA is meeting performance standard and customer expectations are being met.
  • 13.
    Business Solutions Services SAIInnovations core competence lies in the use of Microsoft Business Solutions to provide software solution to our customers. Our Center of Excellence (COE) has been specifically set up to provide a steady flow of Microsoft Certified Professionals to support & scale up a project involving Microsoft technology - anytime, anywhere. The Center of Excellence (COE) has the right mix of functional and technical experts to address the issues of business process implementation along with the programming and coding requirements Our Strengths Services we offer on Microsoft Business Solutions Local presence for onsite consulting and implementation GAP Analysis Methodology for offshore based delivery of Solution Fit Assessment services and support for Business Solution products. Scope & Specification Generation Flexible models for client engagement over the Functional & Technical Consulting long term Customization Value propositions – Integration with other Microsoft Products, 3rd Party Trained resources available locally and offshore Systems and other home grown applications Cost Effective Delivery Implementation & Performance Tuning Better Measurement & Management of Business Rollout Performance End User Training Maintenance & Support
  • 14.
  • 15.
    Product Portfolio SAI SharePoint Products Overview Decrease the cost of ownership in developing new applications by 70 percent. Dashboard, Portal and Reports can be delivered in less than a week compared to 2 months of development cycle. Realize significant Time and Cost savings by using SAI products SAI product ranges from building blocks (Web Parts and Features) to complete SharePoint solutions, enabling users to increase their productivity when using SharePoint platform for collaboration. All of our solutions can be used out- of-box to address your business issues without the need for additional training and complex setup. SAI Workspace Suite for SharePoint SAI Web Parts and Features SAI MOSS Helper
  • 16.
    SAI Workspace Suitefor SharePoint Composite Framework Offerings Modular architecture allows clients to use the modules SAI Workspace Suite is a productivity tool for individually or take advantage of complete SharePoint designing, building, and deploying collaboration application available as solutions. applications on SharePoint platform. Suite provides the application development layer and is Web parts and Features provide functionality as complemented by other product and service modular components to store, search, connect to, offerings from SAI aggregate and display SharePoint data. Users can act on the aggregated data from the same screen for efficiency. Design Patterns for SharePoint development provides guidance and training for SharePoint application development, architecture and administration. Solutions are 12 pre-built SharePoint applications. The applications can be rolled out with only light customization for corporate branding. Support from SAI includes 24/7 online & phone support, documentation and knowledge base. SLA is managed as per ITIL standards and we are one of the few companies which will allow our client to discuss with our development team on your issues
  • 17.
    SAI MOSS Helper Enterprise-levelmanagement tool for Migration, Administration and Replication, Compliance and Management of SharePoint Infrastructure This is one-of-a-kind solution for complete SharePoint backend management and administration, for tasks like Migration, Administration and Replication, Compliance and Management of SharePoint Infrastructure. SAI MOSS Helper uses a business-centric approach to features management, which allows administrators to manage Web Parts and Controls across the farm. The tool was built based on our experience working with SharePoint since 2001 for clients including Fortune 500 firms. SAI MOSS Helper solutions include the following modules. Migration  SharePoint Migrator  Public Folder Migrator  File System Migrator  Lotus Notes Migrator  Documentum and eRoom Migrator Administration & Replication Compliance Farms Management
  • 18.
    SharePoint Web Partsand Features SAI Web Parts can address many inherent complexities and increase flexibility on how users use their SharePoint environment. Our Web Parts can be targeted to end users, power users and also administrators. Our Web Parts can grouped based on the type of functionality. End User Collaboration Portal Administration Calendar Web Parts Group Notification Web Parts # User Self Service Web Parts Chart Web Parts User Profile Management we part Rollup Web Parts Data Viewer Web Parts Data and Content Management Mash Up List Web Parts List Search Web Parts User Self Service Web Parts Navigation Web Parts Alerts Organizer Web Parts PDF Generator Solution Business Intelligence Chart Web Parts KPI plus Web Parts
  • 19.
    SAI EDM Software Anintuitive, seamless document-handling solution to improve your productivity. Managing documents effectively is a key challenge that many companies face in the current business environment. Most organizations have multiple data streams that consist of digital and paper documents from various sources and in many formats. For effective communication, fuss-free archiving and appropriate sharing, this information must be managed properly Benefits Of PAGELIGHT User-friendly and quick. Newly-redesigned UI eases operability by simplifying tasks and increasing visibility. Reduction of Total Cost Ownership. Minimizes expenditure by integrating seamlessly with existing software and hardware. Environmentally friendly (Green Office).Paperless document management encourages a greener work environment. Simple and easy document management. Digitize, share, handle and protect documents in a variety of formats via a single platform.
  • 20.
    SAI Management Team–Singapore & Malaysia Empowered management team  Partnership-based approach to engagements  Comprehensive client care practices for facilitating long-term relationships  Rich, diverse and global background experience bringing international expertise with local responsiveness
  • 21.
    SAI Management –Operational Model
  • 22.