This project focused on security improvements at an industrial plant in the Pacific Northwest.
The primary goal was to provide a new security access point into the research and development
building. Evergreen worked with the client in conjunction with the local municipality to modify
construction plans in a mutually acceptable manner. This was accomplished in two phases:
Entrance Road Design
Plan options were reviewed and plan with
optimal entrance location and alignment for
truck access to the R&D building was
determined. Evergreen provided final
design drawings of the site plan.
Automatic gate and card reader system
were specified, as well as the closest
available power source and terminal point
for communications data. This included a
preliminary routing of the electrical conduit to
the automatic gate and card reader.
Road design required relocation of existing sewer and water line. Evergreen worked closely with
the local municipality to accomplish this.
Evergreen coordinated permitting with the local jurisdiction.
Evergreen developed preliminary plans for the demolition of the existing equipment and
buildings. Our final design plans included the following:
 Existing Conditions
 Demolition
 Grading and Paving
 Pavement Striping
 Utilities
 Erosion and Sedimentation Control
 Guard House Foundation, Building,
and Security Gate
 Electrical Layout
 Electrical Panel Schedule
 Electrical Control and Communication Wiring Diagram
P
R
O
J
E
C
T
P
R
O
F
I
L
E
EVERGREEN ENGINEERING, INC.
Eugene, Oregon (541) 484-4771  Fax (541) 484-6759 www.evergreenengineering.com
Evergreen performed daily construction oversight throughout construction. Our Construction
Management Services included:
 Applying for and negotiating the building permit local authorities
 Reviewing, negotiating, and documenting resolution of change order requests
 Reviewing and responding to contractor submittals
 Documenting work progress and preparing monthly pay estimates
 Observation of material testing
 Facilitation of weekly contractor meetings
 Preparing and implementing punch lists
 Preparing record drawings
 Construction staking and surveying
Our engineering services overall comprised project management; final design plans and
specifications; permitting assistance; erosion sedimentation control, and construction
management services.
P
R
O
J
E
C
T
P
R
O
F
I
L
E

More Related Content

What's hot

What's hot (19)

CV ROBIN JACOB
CV ROBIN JACOBCV ROBIN JACOB
CV ROBIN JACOB
 
cv new
cv newcv new
cv new
 
Eddie Resume 2015 (1)
Eddie Resume 2015 (1)Eddie Resume 2015 (1)
Eddie Resume 2015 (1)
 
HVAC Engineer Resume
HVAC Engineer ResumeHVAC Engineer Resume
HVAC Engineer Resume
 
Thooyavun R 010715
Thooyavun R 010715Thooyavun R 010715
Thooyavun R 010715
 
166864 John Pappas Resume
166864 John Pappas Resume166864 John Pappas Resume
166864 John Pappas Resume
 
Resume
ResumeResume
Resume
 
Rama Rao MW CV
Rama Rao  MW CVRama Rao  MW CV
Rama Rao MW CV
 
Dave resume 2016 eng web
Dave resume 2016 eng webDave resume 2016 eng web
Dave resume 2016 eng web
 
Wilf's Resume
Wilf's ResumeWilf's Resume
Wilf's Resume
 
2014, GT ENGINEERING, LLC, BROCHURE
2014, GT ENGINEERING, LLC, BROCHURE2014, GT ENGINEERING, LLC, BROCHURE
2014, GT ENGINEERING, LLC, BROCHURE
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
Cv For Sitemanager
Cv For SitemanagerCv For Sitemanager
Cv For Sitemanager
 
MEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMERMEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMER
 
Sayooj cv
Sayooj cvSayooj cv
Sayooj cv
 
Jayabalan cv
Jayabalan  cvJayabalan  cv
Jayabalan cv
 
Karl j gabel resume
Karl j gabel resumeKarl j gabel resume
Karl j gabel resume
 
Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15
 
Richard Kildea. CV October 2016
Richard Kildea. CV October 2016Richard Kildea. CV October 2016
Richard Kildea. CV October 2016
 

Similar to Roads and Utilities 2015

Similar to Roads and Utilities 2015 (20)

Chee Wong - CV DEC2016
Chee Wong - CV DEC2016Chee Wong - CV DEC2016
Chee Wong - CV DEC2016
 
Wyco field services overview
Wyco field services overviewWyco field services overview
Wyco field services overview
 
Raymond Guo 2016
Raymond Guo 2016Raymond Guo 2016
Raymond Guo 2016
 
Resume lois 12-2015
Resume lois 12-2015Resume lois 12-2015
Resume lois 12-2015
 
Resume_Lois-12-2015
Resume_Lois-12-2015Resume_Lois-12-2015
Resume_Lois-12-2015
 
Resume of Eric Garvin
Resume of Eric GarvinResume of Eric Garvin
Resume of Eric Garvin
 
Scott Clayton Johnston ref
Scott Clayton Johnston refScott Clayton Johnston ref
Scott Clayton Johnston ref
 
Ken Doctor_CV (11-4-2016)
Ken Doctor_CV (11-4-2016)Ken Doctor_CV (11-4-2016)
Ken Doctor_CV (11-4-2016)
 
Resume
ResumeResume
Resume
 
Project Engineer Cv
Project Engineer CvProject Engineer Cv
Project Engineer Cv
 
2016 j
2016 j2016 j
2016 j
 
CLARK PE RESUME
CLARK PE RESUMECLARK PE RESUME
CLARK PE RESUME
 
CV imran-Asghar
CV imran-AsgharCV imran-Asghar
CV imran-Asghar
 
Resume-Taylor Harper
Resume-Taylor HarperResume-Taylor Harper
Resume-Taylor Harper
 
William keane. 03.25.2016 final
William keane. 03.25.2016 finalWilliam keane. 03.25.2016 final
William keane. 03.25.2016 final
 
volpe_resume
volpe_resumevolpe_resume
volpe_resume
 
Resume Apr 2015
Resume Apr 2015Resume Apr 2015
Resume Apr 2015
 
Unit 7-Project management(Edexel)-Lesson 1
Unit 7-Project management(Edexel)-Lesson 1 Unit 7-Project management(Edexel)-Lesson 1
Unit 7-Project management(Edexel)-Lesson 1
 
Bill resume
Bill resumeBill resume
Bill resume
 
RichmondApande PM
RichmondApande PMRichmondApande PM
RichmondApande PM
 

Roads and Utilities 2015

  • 1. EVERGREEN ENGINEERING, INC. Eugene, Oregon (541) 484-4771  Fax (541) 484-6759 www.evergreenengineering.com ROADS AND UTILITIES CLIENT: Confidential Client LOCATION: Springfield, Oregon This project focused on security improvements at an industrial plant in the Pacific Northwest. The primary goal was to provide a new security access point into the research and development building. Evergreen worked with the client in conjunction with the local municipality to modify construction plans in a mutually acceptable manner. This was accomplished in two phases: Entrance Road Design Plan options were reviewed and plan with optimal entrance location and alignment for truck access to the R&D building was determined. Evergreen provided final design drawings of the site plan. Automatic gate and card reader system were specified, as well as the closest available power source and terminal point for communications data. This included a preliminary routing of the electrical conduit to the automatic gate and card reader. Road design required relocation of existing sewer and water line. Evergreen worked closely with the local municipality to accomplish this. Evergreen coordinated permitting with the local jurisdiction. Evergreen developed preliminary plans for the demolition of the existing equipment and buildings. Our final design plans included the following:  Existing Conditions  Demolition  Grading and Paving  Pavement Striping  Utilities  Erosion and Sedimentation Control  Guard House Foundation, Building, and Security Gate  Electrical Layout  Electrical Panel Schedule  Electrical Control and Communication Wiring Diagram P R O J E C T P R O F I L E
  • 2. EVERGREEN ENGINEERING, INC. Eugene, Oregon (541) 484-4771  Fax (541) 484-6759 www.evergreenengineering.com Evergreen performed daily construction oversight throughout construction. Our Construction Management Services included:  Applying for and negotiating the building permit local authorities  Reviewing, negotiating, and documenting resolution of change order requests  Reviewing and responding to contractor submittals  Documenting work progress and preparing monthly pay estimates  Observation of material testing  Facilitation of weekly contractor meetings  Preparing and implementing punch lists  Preparing record drawings  Construction staking and surveying Our engineering services overall comprised project management; final design plans and specifications; permitting assistance; erosion sedimentation control, and construction management services. P R O J E C T P R O F I L E