    Radio Network Drive Test Guide

             Radio          Network
Prepared
             Planning      Technical   Date:      2004/12/17
   by:
             Support Dept.
Reviewed
                                       Date:
   by:
Reviewed
                                       Date:
   by:
Approved
                                       Date:
   by:




             Huawei Technologies Co., Ltd.
                           All rights reserved
Radio Network Drive Test Guide                                                                      Internal open




                                               Table of Contents

1 ABOUT THIS DOCUMENT......................................................................................................3

2 INTENDED USERS.....................................................................................................................3

3 SPECIFICATIONS......................................................................................................................3

    3.1 BEFORE A DRIVE TEST............................................................................................................3

        3.1.1 Determining Methods and Engineers.............................................................................3

        3.1.2 Checking Instruments.....................................................................................................3

        3.1.3 Collecting Network Information Data............................................................................4

        3.1.4 Selecting Routes..............................................................................................................4

        3.1.5 Vehicles and Time Arrangement.....................................................................................4

    3.2 DURING A DRIVE TEST...........................................................................................................5

        3.2.1 Antenna Position of Test Terminals................................................................................5

        3.2.2 Vehicle Speed and Carriage Environment during a Test...............................................5

        3.2.3 Recording Test File Information....................................................................................5

    3.3 AFTER A DRIVE TEST..............................................................................................................6




2005-01-10                                     All rights reserved                                                    Page two of six
Radio Network Drive Test Guide                     Internal open




1      About this Document

         This guide is designed to specify radio network drive test for smooth
process and ensure the accuracy and consistency of the tested data.
         For instrument usage of specific products and drive test technologies,
please refer to corresponding instrument usage guide and drive test guide.


2 Intended Users

         This guide is drafted for radio network planning optimization engineers
and drive test engineers to carry out drive tests.




3 Specifications

3.1     Before a Drive Test

3.1.1 Determining Methods and Engineers


            Based on test objectives and requirements, determine the following:

             Drive test methods

             Engineers and cooperative engineers

             Test area

             instruments and devices.

            For comparison tests on the same network, should adopt the same
        test devices and methods to ensure the results consistent.

3.1.2 Checking Instruments


            To check the instruments, proceed as follows:

            1. The required instruments should be complete and normal.

      2005-01-10                    All rights reserved              Page two of six
Radio Network Drive Test Guide                      Internal open




         2. Accessories of drive test instruments should be complete and
     normal.

         3. Power supply devices and batteries should be well prepared for
     drive test.

         4. The software of drive test should be correctly installed and used.

         5. The engineers must normally connect the required instruments
     with relevant accessories and confirm that both drive test software and
     devices can work normally.




3.1.3 Collecting Network Information Data


         Drive test engineers must collect relevant information, such as data
     of the network to be tested (including engineering parameters and cell
     information) and maps, and then import them to drive test devices before
     a test.

3.1.4 Selecting Routes


         Select drive test routes based on test scope, objectives and


     requirements. For example , to ensure popularity of the drive test, avoid

     selecting repetitive routes for a city test. However, specific requirements
     from operators should be satisfied.

3.1.5 Vehicles and Time Arrangement


         Arranging appropriate vehicles and test time based on drive test
     requirements and objectives.

         For example, specific requirements of operators for time should be


   2005-01-10                    All rights reserved               Page two of six
Radio Network Drive Test Guide                        Internal open




        satisfied. To diagnose network problems, select the time period when
        call traffic is busy, such as 10:00am to 11:00am. Usually, saloon cars for
        passengers or automobiles are selected for drive test. Trunks/vans are
        not recommended but dedicated test vehicles are preferred. For
        coverage comparison tests, should use the same test vehicles and
        select consistent test time period.

3.2     During a Drive Test

3.2.1 Antenna Position of Test Terminals


            The external antenna should be installed on the roof above the
        assistant driver’s seat in the test vehicle.

            If there is a dedicated test workbench (or drive test box), the test
        terminal should be placed at the special purpose position on the test
        workbench. If there is no test workbench (or drive test box), the test
        terminal should be placed on the position almost satisfying the above
        requirements. Note that all tests should be carried out at the assistant
        driver’s seat in case of no test workbench.

            Engineers must record actual situations not in compliance with the
        above cases. Test terminals must not be placed randomly.

3.2.2 Vehicle Speed and Carriage Environment during a Test


            Drive a vehicle at a required speed.

            If an external antenna is installed, there is no requirement for the
        carriage; if not, it is recommended to close windows in the carriage.

3.2.3 Recording Test File Information


            During a drive test, record the test file name and the information
        related to actual test routes, and fill in drive test information table. Note
      2005-01-10                    All rights reserved                 Page two of six
Radio Network Drive Test Guide                       Internal open




        that this table and the drive test data should be saved into same
        directory.




3.3     After a Drive Test

            Based on test requirements and drive test guides for specific
        products, perform corresponding background processing on test data
        and output corresponding test result documents. Where, it is
        recommended to set legends based on the software default value.



            List of references for common drive test instruments:

            1. ANT Drive Test Instrument Guide (V1.0)-20020508-B-1.0

            2. EDGE Test Supported by TEMS Guide (G)-20041102-B-1.0

            3. GPRS Drive Test E7478A Guide -20010301-A-1.0

            4. CDMA1X Drive Test Equipment Guide -20021205-B-1.02

            5. RG001604 Drive Test Tool -20030618-A-1.0




      2005-01-10                    All rights reserved                Page two of six

More Related Content

What's hot

ERAP GSE 2015_e catalogue
ERAP GSE  2015_e catalogueERAP GSE  2015_e catalogue
ERAP GSE 2015_e catalogue
Sashi B
 
Operating Procedure Manual for Transmission And Security Desk
Operating Procedure Manual for Transmission And Security DeskOperating Procedure Manual for Transmission And Security Desk
Operating Procedure Manual for Transmission And Security Desk
Power System Operation
 

What's hot (6)

ERAP GSE 2015_e catalogue
ERAP GSE  2015_e catalogueERAP GSE  2015_e catalogue
ERAP GSE 2015_e catalogue
 
Programming of the ATE for Fuze calibration using Lab View Software
Programming of the ATE for Fuze calibration using Lab View SoftwareProgramming of the ATE for Fuze calibration using Lab View Software
Programming of the ATE for Fuze calibration using Lab View Software
 
Delta v sis safety manual, may 2011
Delta v sis safety manual, may 2011Delta v sis safety manual, may 2011
Delta v sis safety manual, may 2011
 
David Correia Cv
David Correia CvDavid Correia Cv
David Correia Cv
 
Operating Procedure Manual for Transmission And Security Desk
Operating Procedure Manual for Transmission And Security DeskOperating Procedure Manual for Transmission And Security Desk
Operating Procedure Manual for Transmission And Security Desk
 
SMC PTE-100-C Current & Voltage Relay Testing
SMC PTE-100-C Current & Voltage Relay TestingSMC PTE-100-C Current & Voltage Relay Testing
SMC PTE-100-C Current & Voltage Relay Testing
 

Similar to Rnp radio network planning drive test guide-20041217-b-1.0

Group 4 STS final version
Group 4 STS final versionGroup 4 STS final version
Group 4 STS final version
zenchi0
 
Wcdma rno handover algorithm analysis and parameter configurtaion guidance 20...
Wcdma rno handover algorithm analysis and parameter configurtaion guidance 20...Wcdma rno handover algorithm analysis and parameter configurtaion guidance 20...
Wcdma rno handover algorithm analysis and parameter configurtaion guidance 20...
Dani Indra Kumara
 
77697973 inspection-and-testing-of-signalling-inspection-and-testing-procedures
77697973 inspection-and-testing-of-signalling-inspection-and-testing-procedures77697973 inspection-and-testing-of-signalling-inspection-and-testing-procedures
77697973 inspection-and-testing-of-signalling-inspection-and-testing-procedures
omeradeniz
 

Similar to Rnp radio network planning drive test guide-20041217-b-1.0 (20)

Group 4 STS final version
Group 4 STS final versionGroup 4 STS final version
Group 4 STS final version
 
Specification and key points for gprs&edge cqt&dt v1.1
Specification and key points for gprs&edge cqt&dt v1.1Specification and key points for gprs&edge cqt&dt v1.1
Specification and key points for gprs&edge cqt&dt v1.1
 
software testing unit 3 notes anna university 2017
software testing unit 3 notes anna university 2017software testing unit 3 notes anna university 2017
software testing unit 3 notes anna university 2017
 
Ijett v4 i10p113
Ijett v4 i10p113Ijett v4 i10p113
Ijett v4 i10p113
 
MobileXPRT 2015 User Manual
MobileXPRT 2015 User ManualMobileXPRT 2015 User Manual
MobileXPRT 2015 User Manual
 
Exploring the BatteryXPRT 2014 for Android Benchmark
Exploring the BatteryXPRT 2014 for Android BenchmarkExploring the BatteryXPRT 2014 for Android Benchmark
Exploring the BatteryXPRT 2014 for Android Benchmark
 
Oracle Analytics Server Infrastructure Tuning guide v2.pdf
Oracle Analytics Server Infrastructure Tuning guide v2.pdfOracle Analytics Server Infrastructure Tuning guide v2.pdf
Oracle Analytics Server Infrastructure Tuning guide v2.pdf
 
Avionics Test Station Setup
Avionics Test Station Setup Avionics Test Station Setup
Avionics Test Station Setup
 
ASQ RD Webinar: Design for reliability a roadmap for design robustness
ASQ RD Webinar: Design for reliability   a roadmap for design robustnessASQ RD Webinar: Design for reliability   a roadmap for design robustness
ASQ RD Webinar: Design for reliability a roadmap for design robustness
 
MaxEye DAB/DAB+/DMB Receiver Test Solution - Application Note
MaxEye DAB/DAB+/DMB Receiver Test Solution - Application NoteMaxEye DAB/DAB+/DMB Receiver Test Solution - Application Note
MaxEye DAB/DAB+/DMB Receiver Test Solution - Application Note
 
Txet Document
Txet DocumentTxet Document
Txet Document
 
Wcdma rno handover algorithm analysis and parameter configurtaion guidance 20...
Wcdma rno handover algorithm analysis and parameter configurtaion guidance 20...Wcdma rno handover algorithm analysis and parameter configurtaion guidance 20...
Wcdma rno handover algorithm analysis and parameter configurtaion guidance 20...
 
77697973 inspection-and-testing-of-signalling-inspection-and-testing-procedures
77697973 inspection-and-testing-of-signalling-inspection-and-testing-procedures77697973 inspection-and-testing-of-signalling-inspection-and-testing-procedures
77697973 inspection-and-testing-of-signalling-inspection-and-testing-procedures
 
Temp efv
Temp efvTemp efv
Temp efv
 
REMOTE RADIO HEAD TESTING: 5G case study
REMOTE RADIO HEAD TESTING: 5G  case studyREMOTE RADIO HEAD TESTING: 5G  case study
REMOTE RADIO HEAD TESTING: 5G case study
 
Ts09v6.3
Ts09v6.3Ts09v6.3
Ts09v6.3
 
Engineering Test Rig
Engineering Test RigEngineering Test Rig
Engineering Test Rig
 
2 g dt and mapinfo
2 g dt and mapinfo2 g dt and mapinfo
2 g dt and mapinfo
 
Mobility testing overview and instructions
Mobility testing overview and instructionsMobility testing overview and instructions
Mobility testing overview and instructions
 
Controlling interests editors
Controlling interests editorsControlling interests editors
Controlling interests editors
 

Rnp radio network planning drive test guide-20041217-b-1.0

  • 1. Document Product number name Applicabl Product e for version Document Drafted by version Radio Network Drive Test Guide Radio Network Prepared Planning Technical Date: 2004/12/17 by: Support Dept. Reviewed Date: by: Reviewed Date: by: Approved Date: by: Huawei Technologies Co., Ltd. All rights reserved
  • 2. Radio Network Drive Test Guide Internal open Table of Contents 1 ABOUT THIS DOCUMENT......................................................................................................3 2 INTENDED USERS.....................................................................................................................3 3 SPECIFICATIONS......................................................................................................................3 3.1 BEFORE A DRIVE TEST............................................................................................................3 3.1.1 Determining Methods and Engineers.............................................................................3 3.1.2 Checking Instruments.....................................................................................................3 3.1.3 Collecting Network Information Data............................................................................4 3.1.4 Selecting Routes..............................................................................................................4 3.1.5 Vehicles and Time Arrangement.....................................................................................4 3.2 DURING A DRIVE TEST...........................................................................................................5 3.2.1 Antenna Position of Test Terminals................................................................................5 3.2.2 Vehicle Speed and Carriage Environment during a Test...............................................5 3.2.3 Recording Test File Information....................................................................................5 3.3 AFTER A DRIVE TEST..............................................................................................................6 2005-01-10 All rights reserved Page two of six
  • 3. Radio Network Drive Test Guide Internal open 1 About this Document This guide is designed to specify radio network drive test for smooth process and ensure the accuracy and consistency of the tested data. For instrument usage of specific products and drive test technologies, please refer to corresponding instrument usage guide and drive test guide. 2 Intended Users This guide is drafted for radio network planning optimization engineers and drive test engineers to carry out drive tests. 3 Specifications 3.1 Before a Drive Test 3.1.1 Determining Methods and Engineers Based on test objectives and requirements, determine the following:  Drive test methods  Engineers and cooperative engineers  Test area  instruments and devices. For comparison tests on the same network, should adopt the same test devices and methods to ensure the results consistent. 3.1.2 Checking Instruments To check the instruments, proceed as follows: 1. The required instruments should be complete and normal. 2005-01-10 All rights reserved Page two of six
  • 4. Radio Network Drive Test Guide Internal open 2. Accessories of drive test instruments should be complete and normal. 3. Power supply devices and batteries should be well prepared for drive test. 4. The software of drive test should be correctly installed and used. 5. The engineers must normally connect the required instruments with relevant accessories and confirm that both drive test software and devices can work normally. 3.1.3 Collecting Network Information Data Drive test engineers must collect relevant information, such as data of the network to be tested (including engineering parameters and cell information) and maps, and then import them to drive test devices before a test. 3.1.4 Selecting Routes Select drive test routes based on test scope, objectives and requirements. For example , to ensure popularity of the drive test, avoid selecting repetitive routes for a city test. However, specific requirements from operators should be satisfied. 3.1.5 Vehicles and Time Arrangement Arranging appropriate vehicles and test time based on drive test requirements and objectives. For example, specific requirements of operators for time should be 2005-01-10 All rights reserved Page two of six
  • 5. Radio Network Drive Test Guide Internal open satisfied. To diagnose network problems, select the time period when call traffic is busy, such as 10:00am to 11:00am. Usually, saloon cars for passengers or automobiles are selected for drive test. Trunks/vans are not recommended but dedicated test vehicles are preferred. For coverage comparison tests, should use the same test vehicles and select consistent test time period. 3.2 During a Drive Test 3.2.1 Antenna Position of Test Terminals The external antenna should be installed on the roof above the assistant driver’s seat in the test vehicle. If there is a dedicated test workbench (or drive test box), the test terminal should be placed at the special purpose position on the test workbench. If there is no test workbench (or drive test box), the test terminal should be placed on the position almost satisfying the above requirements. Note that all tests should be carried out at the assistant driver’s seat in case of no test workbench. Engineers must record actual situations not in compliance with the above cases. Test terminals must not be placed randomly. 3.2.2 Vehicle Speed and Carriage Environment during a Test Drive a vehicle at a required speed. If an external antenna is installed, there is no requirement for the carriage; if not, it is recommended to close windows in the carriage. 3.2.3 Recording Test File Information During a drive test, record the test file name and the information related to actual test routes, and fill in drive test information table. Note 2005-01-10 All rights reserved Page two of six
  • 6. Radio Network Drive Test Guide Internal open that this table and the drive test data should be saved into same directory. 3.3 After a Drive Test Based on test requirements and drive test guides for specific products, perform corresponding background processing on test data and output corresponding test result documents. Where, it is recommended to set legends based on the software default value. List of references for common drive test instruments: 1. ANT Drive Test Instrument Guide (V1.0)-20020508-B-1.0 2. EDGE Test Supported by TEMS Guide (G)-20041102-B-1.0 3. GPRS Drive Test E7478A Guide -20010301-A-1.0 4. CDMA1X Drive Test Equipment Guide -20021205-B-1.02 5. RG001604 Drive Test Tool -20030618-A-1.0 2005-01-10 All rights reserved Page two of six