What Are The Drone Anti-jamming Systems Technology?
Revised Proposals For Check Dam N Bhuj
1. Rotary club Of Bombay pier Proposed check dam On river khari bhuj
2. Rotary club Of Bombay pier Proposed rcc check dam On river khari ,bhuj PROJECT: Construction of Check Dam on River Khari LOCATION: Dam Site: BHUJ RAINFALL 5 To 14 inches annually POPULATION : Around One Lakh Fifty Thousand inhabitants would benefit from this project. Local Communities are Hindus , Muslims, Jains, Brahmins Rabaris , Harijans and around 2000 cattle. EDUCATION INFRASTRUCTURE : Good educational Institutes like the Law College, Engineering ,Arts, Commerce, Science Colleges are located nearby. LOCAL COORDINATOR IN SERVICE Gramya Shilpi , a Registered NGO from Bhuj working with Water Harvesting/Conservation projects in Kutch District Since 1994 will be assisting us. They have so far carried out 150 such projects.
3. Rotary club Of Bombay pier Proposed rcc check dam On river khari ,bhuj DESCRIPTION OF THE PROJECT WORK: The Project involves the construction of Check Dam on the River Khari. This river passes from western direction of Bhuj. The catchments area is about 10km away from this river. This project will stop the water from just flowing away and give it sufficient time to percolate within the subsoil thereby increasing the water table.
4. Rotary club Of Bombay pier Proposed rcc check dam On river khari ,bhuj CHECK DAM SITE ON RIVER KHARI: The increase in water table will benefit the villages of Kodki, Ratiya,Makhna etc with a population of around 2 lakh inhabitants. At present there is some salty water (internal and underground Surface) found in this area but the quality of water will be improved upon by the collection of rain water. There will be more agricultural tilling as this water stored can be used for Agriculture and Human needs
5. Rotary club Of Bombay pier Proposed rcc check dam On river khari ,bhuj ESTIMATED PROJECT COST: Rs 25,00,000 PROJECT BENEFIT Many villages and around 2 Lakh Local Human and Animal Population TIME REQUIRED Around 12 months from the start of the project CERTIFICATION Gramya Shilpi, would obtain the Work Completed certificate from the Local Gramya Panchayat or the Project Architect.
6. Rotary club Of Bombay pier Proposed rcc check dam On river khari ,bhuj ESTIMATED PROJECT COST: Rs 25,00,000 approx $ 49900 Funds available : DDF 2008-2009- $19800 Foreign funds : German Town $ 5000 DDF 2009-2010- $ 1,000 Total amount available : $25800 Amounts balance $24100 Approximately Rs 12 lakhs deficit.