ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
The 30-Inch View ®
ROI of Ergonomic Improvements:
Demonstrating Value to the Business
Winnie Ip, CPE
Director of Consulting
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Agenda Topics
● Introduction
● Cost Justification Methods
• Regulatory Compliance
• Health and Safety Performance
• Production Enhancement
● Creating Business Value
● Calculating ROI
● Summary and Question Period
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Why Are We Here?
● Tough times
● Save money
● Weather the storm
● Measurable gains
● Demonstrate value
● Stay on course
● Reduce costs
● Cash is king
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Designing for Human Performance Ergonomics
● If we design workstations within the limits of human
performance, we will…
• Eliminate work-related musculoskeletal disorders
• Maximize productivity
• Enhance process stability and product quality
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
● Ergonomics is an Engineering issue, not a
Health & Safety Issue.
• The majority of ergonomic issues are typically
rooted in process and workstation design.
• Ergonomic issues only become Health &
Safety concerns once an injury has occurred.
• Long-term fixes for ergonomic issues are
typically related to engineering controls.
IntroductionWhy Does Everyone Need to be Involved?
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
The Ergonomics Maturity Curve™
EHS &
Medical
Engineers / Designers
EHS / Lean / CI
EHS & Human
Resources
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Agenda Topics
● Introduction
● Cost Justification Methods
• Regulatory Compliance
• Health and Safety Performance
• Production Enhancement
● Creating Business Value
● Calculating ROI
● Summary and Question Period
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Regulatory Compliance
• Regulatory Compliance
• Health & Safety Performance
• Production Enhancement
● U.S. Standards
• Federal OSHA
• General Duty Clause
"every employer must provide a safe working
environment for their employees"
● OSHA approved state plans
• California State Ergonomics Rule
● Outside U.S. Standards
• European Union Directives
• Non-European Union country standards
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Regulatory Compliance
● Why it’s not effective:
• If your site’s incidence
rates are below industry
standards, management
may believe that they are
in a “no or low” risk
situation for non-
compliance.
● Let’s consider another
approach…
• Regulatory Compliance
• Health & Safety Performance
• Production Enhancement
(Source: BLS, 2001)
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Health and Safety Performance
• Regulatory Compliance
• Health & Safety Performance
• Production Enhancement
Average Costs of WMSD Incidents
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
$4 TO $10
INDIRECT COSTS
$1 • Building damage
• Tool and equipment damage
• Product and material damage
• Production delays and
interruptions
• Legal expenses
• Expenditure of emergency
supplies
• Interim equipment rentals
 2003 SALCON, Inc. All Rights Reserved
• Investigation time
• Wages paid for time lost
• Cost of hiring and/or training
replacements
• Overtime
• Extra supervisory time
• Clerical time
• Decreased output of injured
worker upon return
• Loss of business and goodwill
INJURY & ILLNESS COSTS
• Medical
• Compensation Costs (Insured Costs)
Incident Cost Iceberg
• Regulatory Compliance
• Health & Safety Performance
• Production Enhancement
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Health & Safety
• Regulatory Compliance
• Health & Safety Performance
• Production Enhancement
● Why it’s not effective:
• If there are no previous
injuries, management may
not see the urgency to
improve the job
● Let’s consider yet another
approach…
There were ergonomic
issues when reaching to a
torque wrench in this
assembly operation.
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Production Enhancements
● Ergonomic improvements are more likely to be
supported and accelerated if they can fit into a cost
justification process.
● Leads to cost savings in many areas including:
• Quality
• Delivery
• Production (measured at the workstation level)
• Elimination of non-value-added tasks
• Reduction in motion waste
• Regulatory Compliance
• Health & Safety Performance
• Production Enhancement
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Quality Improvements
● Cell re-design project for
drill process
● Chipped blank = $30,000
revenue loss
● Installed an articulating arm
to transfer lens blanks
• Regulatory Compliance
• Health & Safety Performance
• Production Enhancement
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Delivery Improvements
Fender Finishing Operation
• 30 minute cycle time
• Awkward postures (> 28” reach)
• Multiple handling (24 lifts/cycle)
• High scrap rate
• Built freestanding fixture and
redesigned workstation
• Reduced reaches (< 15”)
• Reduced handling (2 lifts/cycle)
• Reduced scrap by 83%
• Reduced cycle time by 50%
• Regulatory Compliance
• Health & Safety Performance
• Production Enhancement
2002 ErgoCup Winner
Applied Ergonomics Conference
Baltimore, MD
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
● Introduction
● Cost Justification Methods
• Regulatory Compliance
• Health and Safety Performance
• Production Enhancement
● Creating Business Value
● Calculating ROI
● Summary and Question Period
Agenda Topics
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
● How are companies achieving ergonomics excellence?
• Key activities
• Communications
• Tools and training
Creating Business Value
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
2007, 2009, and 2011 Benchmarking Studies
● Involved large companies in:
• Aerospace
• Automotive
• Health care products
• Diversified products
• Computer systems
• Semiconductors
● Looked at:
• Methods
• Roles
• Training
• Metrics
• Construction equipment
• Industrial products
• Pharmaceutical
• Aluminum products
• Steel products
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Ergonomics Excellence - What to Expect
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Benchmarking Study: Success Metrics
Leading Indicators
Measures that describe the prevention of future incidents include:
● Percent of job conditions with medium or high ergonomic risk
● Number of countermeasures implemented
● Ergonomic risk reduction
● Conformance of new equipment with ergonomic design criteria
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Process Characteristics
● “C” level support and sponsorship
● Management system in place
• Policy & Guidance Document
• Clear roles and responsibilities
• Accountability for metrics at all levels in organisation
● Data driven with the focus on risk management
● Heavy on engineering and workplace improvement
● Engage the workforce in the process
● Integrated with other company initiatives
● VISIBLE demonstration of value to the business
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Ergonomics Risk Management – Visible Change
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Ergonomics Risk Management – Visible Change
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Lean/Continuous Improvement – Data Driven
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
● 23 sites have implemented
process
● All facilities trained in
ergonomics process and tools
● Over 3,600 workplace
improvements in place
● 2 year Total Incident Rate
(TIR) reduction:
• 67% EU
• 48% NA tire
• 55% Globally
111.0
97.0
58.0
0
50
100
150
Q1-05 Q1-06 Q1-07
Baseline
Creating Business Value - Example
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
● IR & WC Costs Decrease as Ergonomics Is “Designed In”
Creating Business Value - Example
1999 2000 2001 2002 2003 2004 2005 2006 2007
ESI
Project
Ergo
Guideline
Ergo in
DA
Incident Rate
Camry Solara Avalon Camry
Workers
Compensation
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
The Ergonomics Maturity Curve™
EHS &
Medical
Engineers / Designers
EHS / Lean / CI
EHS & Human
Resources
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
● Using Digital Assembly
• Clearance, Reach, Fit, Posture can be
checked for each part and process
Product Design
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
● Introduction
● Cost Justification Methods
• Regulatory Compliance
• Health and Safety Performance
• Production Enhancement
● Creating Business Value
● Calculating ROI
● Summary and Question Period
Agenda Topics
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Business Reality 101
● In today’s business climate any initiative that does not
deliver measurable value is an option.
● Ergonomic improvements are more likely to be supported
and accelerated if they can fit into a cost justification
process.
● Time can be converted to money
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Ergonomic Projects that Result in ROI
● Are effective in reducing hazard exposures
• Eliminate risk
• Engineering controls
• Administrative controls
• Work practices
● Are efficient in reducing hazard exposures
• Start with low cost/high impact
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Cost Justification
● In the manufacturing environment time is the dominant
currency.
● And we know that awkward postures, high forces and
repetitive movements take more time to complete.
● The challenge is quantifying financial benefit of
reducing force, frequency and posture.
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Motion Waste – Reaching and Walking
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Motion Waste – Reaching and Walking
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Time Penalties for Reaching
● The STEP methodology uses reach
arcs to define 5 zones
● Each reach zone is separated by a
6" (15 cm) increment
● Time penalties for each reach zone
vary by 0.2 seconds each and are
based on round-trip movements
● Other data you’ll need:
• Time savings per cycle
• # of cycles per hour
• Burdened labour costs
• Current production and quality
numbers
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Time Penalties for Reaching - Example
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Time Penalties for Walking
● Time savings are assigned for each
step eliminated for walking tasks.
● The first step, using to begin
walking, corresponds to 0.8
seconds time penalty.
● Subsequent steps correspond to 0.5
seconds each.
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
2
1
3
4
5
6
7
8910
Time Penalties for Walking – Example
● BEFORE: Poor Layout
• Lack of continuous product flow
• Excessive walking with product
Current OQA/FQA Area Layout
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Time Penalties for Walking - Example
● AFTER:
• "U" – shaped work cells
• Improved product flow
• Reduced prolonged/
multiple handling
• Motion savings = 34.8
seconds/cycle
New OQA/FQA Area Layout
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Check the Effects - Calculating Ergonomics ROI
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Cost Justification – An Example
● There were ergonomic issues when reaching to a
torque wrench in this assembly operation. Because
there was no previous injury, management didn’t see
the urgency to improve the job.
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Cost Justification – An Example
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Cost Justification – An Example
● After brainstorming, the ergonomics team came up
with several solutions
● Short term solutions
• Move bins closer
• Relocate tool lower
● Long term solution
• Self-feeding driver
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Cost Justification – An Example
• The ergonomics team was able
to illustrate a 0.4 second time
savings that would result by
lowering the tool, in addition to
improved working postures
• In addition, the screw bin was
relocated closer resulting in an
additional 0.4 second time
savings.
• Cost: $0
Before
After
0.4 seconds saved
Short term solution: Relocate driver and parts bin closer
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Cost Justification – An Example
Reduce time on tasks by 0.8 seconds
Total time savings = 32 minutes/shift
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Cost Justification – An Example
• The ergonomics team wanted
to continue with improving the
job and investigated installing a
self-feeding driver
• Cost: $2,500
Long term solution: Self-feeding driver
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Cost Justification – An Example
Eliminate 3 tasks = 3.2 Seconds
Total time savings = 128 minutes/shift
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Cost Justification – An Example
● Self-Feeding Driver
• Elimination of 3 non-value-added tasks saves a
total of 3.2 seconds
• Cycle time is 12 seconds
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Cost Justification – An Example
● Self-Feeding Driver
• Conservative productivity impact is 17%
• Direct labor cost = $29,000 / year
• Benefits burden = 25%
• Cost of the improvement = $2,500
= 17% (productivity impact) x $36,250 (annual direct cost)
= $6,162
= $2,500 (cost of improvement)
$6,162 (annual savings)
= 0.4 years (4.8 months)
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Calculating Return on Investment
3-Year ROI =
3-Year Savings – Initial Investment
Initial Investment
X 100%
● Self-Feeding Driver
• Annual savings = $6,162
• Cost of the improvement = $2,500
3-Year ROI =
(3 x $6,162) – $2,500
$2,500
X 100%
= 639%
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Cost Justification – An Example
• The ergonomics team wanted to
continue with improving the job
and investigated installing a self-
feeding driver
• Cost: $2,500
• Payback is less than 4 months!
• 3-year ROI of 639%
Long term solution: Self-feeding driver
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
● Introduction
● Cost Justification Methods
• Regulatory Compliance
• Health and Safety Performance
• Production Enhancement
● Creating Business Value
● Calculating ROI
● Summary and Question Period
Agenda Topics
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
What Have We Learned?
● In today’s business climate any initiative that does not
deliver measurable value is an option.
● Ergonomics is an engineering issue, not a safety issue
● Most effective way of cost justifying ergonomic
improvements is through production enhancements
(quality, delivery, productivity)
● Engage all levels of the organization (management,
union, engineering, design, procurement)
● Critical elements for success:
• Risk based. Data driven.
• Focus on engineering controls.
• Cost justification and Return on Investment are key.
ROI of Ergonomic Improvements: Demonstrating Value to the Business
© 2012 Humantech, Inc.
Winnie Ip, CPE
Director of Consulting
734.663.3330 x147
wip@humantech.com
Thank you!
ROI of Ergonomic Improvements

More Related Content

What's hot

Agile Manufacturing Information System
Agile Manufacturing Information System Agile Manufacturing Information System
Agile Manufacturing Information System SunilKr94
 
Reduction of Un-safe Work Practices by Enhancing Shop floor Safety– A case study
Reduction of Un-safe Work Practices by Enhancing Shop floor Safety– A case studyReduction of Un-safe Work Practices by Enhancing Shop floor Safety– A case study
Reduction of Un-safe Work Practices by Enhancing Shop floor Safety– A case studyIJERA Editor
 
IRJET- Application of Continuous Improvement Process in Manufacturing Industry
IRJET- Application of Continuous Improvement Process in Manufacturing IndustryIRJET- Application of Continuous Improvement Process in Manufacturing Industry
IRJET- Application of Continuous Improvement Process in Manufacturing IndustryIRJET Journal
 
Operations and productivity
Operations and productivityOperations and productivity
Operations and productivityRajThakuri
 
The Advantages Of Operations Management By Jason LeDay
The Advantages Of Operations Management By Jason LeDayThe Advantages Of Operations Management By Jason LeDay
The Advantages Of Operations Management By Jason LeDayJason LeDay
 
HP case study sloution
HP case study sloutionHP case study sloution
HP case study sloutionSurbhi Jindal
 
Session 1_OM
Session 1_OMSession 1_OM
Session 1_OMthangv
 
Agile manufacturing(1)
Agile manufacturing(1)Agile manufacturing(1)
Agile manufacturing(1)Vivek Vs
 
IRJET- Enhance the Capacity of Outer Tube Machining Cell
IRJET-  	  Enhance the Capacity of Outer Tube Machining CellIRJET-  	  Enhance the Capacity of Outer Tube Machining Cell
IRJET- Enhance the Capacity of Outer Tube Machining CellIRJET Journal
 
Analysis of agile manufacturing and comparison with other manufacturing systems
Analysis of agile manufacturing and comparison with other manufacturing systemsAnalysis of agile manufacturing and comparison with other manufacturing systems
Analysis of agile manufacturing and comparison with other manufacturing systemsIrfan Ullah Khan
 
What is Industrial Engineering
What is Industrial EngineeringWhat is Industrial Engineering
What is Industrial EngineeringAkhmad Hidayatno
 
10 Principles Of Ops Management
10 Principles Of Ops Management10 Principles Of Ops Management
10 Principles Of Ops Managementrajjangupta
 
Tuning the planning and control system to product and process design: G1
Tuning the planning and control system to product and process design: G1Tuning the planning and control system to product and process design: G1
Tuning the planning and control system to product and process design: G1i4VC
 
OPERATIONS MANAGEMENT chapter 1
OPERATIONS MANAGEMENT chapter 1OPERATIONS MANAGEMENT chapter 1
OPERATIONS MANAGEMENT chapter 1MuhammadZeeshan535
 
Mba8155 slides1
Mba8155 slides1Mba8155 slides1
Mba8155 slides1AYM1979
 

What's hot (18)

Lean management
Lean management Lean management
Lean management
 
Pizzuto Russ Resume Fina Lv2
Pizzuto Russ Resume Fina Lv2Pizzuto Russ Resume Fina Lv2
Pizzuto Russ Resume Fina Lv2
 
Lean management ppt
Lean management pptLean management ppt
Lean management ppt
 
Agile Manufacturing Information System
Agile Manufacturing Information System Agile Manufacturing Information System
Agile Manufacturing Information System
 
Reduction of Un-safe Work Practices by Enhancing Shop floor Safety– A case study
Reduction of Un-safe Work Practices by Enhancing Shop floor Safety– A case studyReduction of Un-safe Work Practices by Enhancing Shop floor Safety– A case study
Reduction of Un-safe Work Practices by Enhancing Shop floor Safety– A case study
 
IRJET- Application of Continuous Improvement Process in Manufacturing Industry
IRJET- Application of Continuous Improvement Process in Manufacturing IndustryIRJET- Application of Continuous Improvement Process in Manufacturing Industry
IRJET- Application of Continuous Improvement Process in Manufacturing Industry
 
Operations and productivity
Operations and productivityOperations and productivity
Operations and productivity
 
The Advantages Of Operations Management By Jason LeDay
The Advantages Of Operations Management By Jason LeDayThe Advantages Of Operations Management By Jason LeDay
The Advantages Of Operations Management By Jason LeDay
 
HP case study sloution
HP case study sloutionHP case study sloution
HP case study sloution
 
Session 1_OM
Session 1_OMSession 1_OM
Session 1_OM
 
Agile manufacturing(1)
Agile manufacturing(1)Agile manufacturing(1)
Agile manufacturing(1)
 
IRJET- Enhance the Capacity of Outer Tube Machining Cell
IRJET-  	  Enhance the Capacity of Outer Tube Machining CellIRJET-  	  Enhance the Capacity of Outer Tube Machining Cell
IRJET- Enhance the Capacity of Outer Tube Machining Cell
 
Analysis of agile manufacturing and comparison with other manufacturing systems
Analysis of agile manufacturing and comparison with other manufacturing systemsAnalysis of agile manufacturing and comparison with other manufacturing systems
Analysis of agile manufacturing and comparison with other manufacturing systems
 
What is Industrial Engineering
What is Industrial EngineeringWhat is Industrial Engineering
What is Industrial Engineering
 
10 Principles Of Ops Management
10 Principles Of Ops Management10 Principles Of Ops Management
10 Principles Of Ops Management
 
Tuning the planning and control system to product and process design: G1
Tuning the planning and control system to product and process design: G1Tuning the planning and control system to product and process design: G1
Tuning the planning and control system to product and process design: G1
 
OPERATIONS MANAGEMENT chapter 1
OPERATIONS MANAGEMENT chapter 1OPERATIONS MANAGEMENT chapter 1
OPERATIONS MANAGEMENT chapter 1
 
Mba8155 slides1
Mba8155 slides1Mba8155 slides1
Mba8155 slides1
 

Viewers also liked (20)

Roi of ergonomic improvements
Roi of ergonomic improvementsRoi of ergonomic improvements
Roi of ergonomic improvements
 
Certificates of Internship
Certificates of InternshipCertificates of Internship
Certificates of Internship
 
Hot Jobs
Hot JobsHot Jobs
Hot Jobs
 
Resume Parsons Kliwinski 03-2015
Resume Parsons Kliwinski 03-2015Resume Parsons Kliwinski 03-2015
Resume Parsons Kliwinski 03-2015
 
Reflections on the_reflexive_universe
Reflections on the_reflexive_universeReflections on the_reflexive_universe
Reflections on the_reflexive_universe
 
Giao trinh autodesk inventor 2014
Giao trinh autodesk inventor 2014Giao trinh autodesk inventor 2014
Giao trinh autodesk inventor 2014
 
Lentils
LentilsLentils
Lentils
 
linked_in_profile
linked_in_profilelinked_in_profile
linked_in_profile
 
ISH flyer Marcelo Barros
ISH flyer Marcelo BarrosISH flyer Marcelo Barros
ISH flyer Marcelo Barros
 
день св. валентина
день  св. валентинадень  св. валентина
день св. валентина
 
my_thesis
my_thesismy_thesis
my_thesis
 
Egg sandwich
Egg sandwichEgg sandwich
Egg sandwich
 
Gusano o worms
Gusano o wormsGusano o worms
Gusano o worms
 
Merging The Military Health System (Peake)
Merging The Military Health System (Peake)Merging The Military Health System (Peake)
Merging The Military Health System (Peake)
 
Evaluation and Analysis of Office Workstation and Worker
Evaluation and Analysis of Office Workstation and WorkerEvaluation and Analysis of Office Workstation and Worker
Evaluation and Analysis of Office Workstation and Worker
 
DoD onboarding slides
DoD onboarding slidesDoD onboarding slides
DoD onboarding slides
 
Eric & phil presentation final
Eric & phil presentation finalEric & phil presentation final
Eric & phil presentation final
 
Ech 5511 ergonomic control
Ech 5511 ergonomic controlEch 5511 ergonomic control
Ech 5511 ergonomic control
 
1.1 intro process_safety
1.1 intro process_safety1.1 intro process_safety
1.1 intro process_safety
 
Machinery safety inspection
Machinery safety inspectionMachinery safety inspection
Machinery safety inspection
 

Similar to Return of investment of ergonomic improvements

Agile Gurugram 2022 - Dinker Charak | Line of Sight from Engineering Excellen...
Agile Gurugram 2022 - Dinker Charak | Line of Sight from Engineering Excellen...Agile Gurugram 2022 - Dinker Charak | Line of Sight from Engineering Excellen...
Agile Gurugram 2022 - Dinker Charak | Line of Sight from Engineering Excellen...AgileNetwork
 
Chapter 5 Process Management
Chapter 5 Process ManagementChapter 5 Process Management
Chapter 5 Process ManagementDr. John V. Padua
 
Study on the Impact of ISO Certification on the Quality Culture of Constructi...
Study on the Impact of ISO Certification on the Quality Culture of Constructi...Study on the Impact of ISO Certification on the Quality Culture of Constructi...
Study on the Impact of ISO Certification on the Quality Culture of Constructi...IRJET Journal
 
Chandrashekar_ Resume - U
Chandrashekar_ Resume - UChandrashekar_ Resume - U
Chandrashekar_ Resume - Uchandrashekar B
 
Chandrashekar_ Resume - U
Chandrashekar_ Resume - UChandrashekar_ Resume - U
Chandrashekar_ Resume - Uchandrashekar B
 
Kamal singh-15.09.15
Kamal singh-15.09.15Kamal singh-15.09.15
Kamal singh-15.09.15kamal singh
 
ISO 50001 - The Energy Management Journey
ISO 50001 - The Energy Management JourneyISO 50001 - The Energy Management Journey
ISO 50001 - The Energy Management JourneyArantico Ltd
 
Ergo Solutions for Lean Mnftring_FINAL1 (2)
Ergo Solutions for Lean Mnftring_FINAL1 (2)Ergo Solutions for Lean Mnftring_FINAL1 (2)
Ergo Solutions for Lean Mnftring_FINAL1 (2)Jason Parko
 
Chapter 0 of Performance Based Project Management (sm)
Chapter 0 of Performance Based Project Management (sm)Chapter 0 of Performance Based Project Management (sm)
Chapter 0 of Performance Based Project Management (sm)Glen Alleman
 
Connecting Reliability & Business + ISO 55000 Framework
Connecting Reliability & Business + ISO 55000 FrameworkConnecting Reliability & Business + ISO 55000 Framework
Connecting Reliability & Business + ISO 55000 FrameworkLife Cycle Engineering
 
IDSL Company Profile 2016
IDSL Company Profile 2016IDSL Company Profile 2016
IDSL Company Profile 2016Scott Strutton
 
JTMS Company Information Pack 2015
JTMS Company Information Pack 2015JTMS Company Information Pack 2015
JTMS Company Information Pack 2015Julie Turner
 
A Review paper on "Improve the Quality of product"
A Review paper on "Improve the Quality of product"A Review paper on "Improve the Quality of product"
A Review paper on "Improve the Quality of product"IRJET Journal
 
How To Beat The Recession: BOS, Operations Excellence and a Problem Solving C...
How To Beat The Recession: BOS, Operations Excellence and a Problem Solving C...How To Beat The Recession: BOS, Operations Excellence and a Problem Solving C...
How To Beat The Recession: BOS, Operations Excellence and a Problem Solving C...Dave Watkins
 
Bridging business analysis and business architecture - The Open Group webinar
Bridging business analysis and business architecture - The Open Group webinarBridging business analysis and business architecture - The Open Group webinar
Bridging business analysis and business architecture - The Open Group webinarCraig Martin
 
Quality engineering instead of testing... Why? How?
Quality engineering instead of testing... Why? How?Quality engineering instead of testing... Why? How?
Quality engineering instead of testing... Why? How?Rik Marselis
 
Flexible On Demand Software Testing
Flexible On Demand Software TestingFlexible On Demand Software Testing
Flexible On Demand Software Testingraebrand
 

Similar to Return of investment of ergonomic improvements (20)

Agile Gurugram 2022 - Dinker Charak | Line of Sight from Engineering Excellen...
Agile Gurugram 2022 - Dinker Charak | Line of Sight from Engineering Excellen...Agile Gurugram 2022 - Dinker Charak | Line of Sight from Engineering Excellen...
Agile Gurugram 2022 - Dinker Charak | Line of Sight from Engineering Excellen...
 
Chapter 5 Process Management
Chapter 5 Process ManagementChapter 5 Process Management
Chapter 5 Process Management
 
Study on the Impact of ISO Certification on the Quality Culture of Constructi...
Study on the Impact of ISO Certification on the Quality Culture of Constructi...Study on the Impact of ISO Certification on the Quality Culture of Constructi...
Study on the Impact of ISO Certification on the Quality Culture of Constructi...
 
Chandrashekar_ Resume - U
Chandrashekar_ Resume - UChandrashekar_ Resume - U
Chandrashekar_ Resume - U
 
Chandrashekar_ Resume - U
Chandrashekar_ Resume - UChandrashekar_ Resume - U
Chandrashekar_ Resume - U
 
Kamal singh-15.09.15
Kamal singh-15.09.15Kamal singh-15.09.15
Kamal singh-15.09.15
 
ISO 50001 - The Energy Management Journey
ISO 50001 - The Energy Management JourneyISO 50001 - The Energy Management Journey
ISO 50001 - The Energy Management Journey
 
Ergo Solutions for Lean Mnftring_FINAL1 (2)
Ergo Solutions for Lean Mnftring_FINAL1 (2)Ergo Solutions for Lean Mnftring_FINAL1 (2)
Ergo Solutions for Lean Mnftring_FINAL1 (2)
 
Chapter 0 of Performance Based Project Management (sm)
Chapter 0 of Performance Based Project Management (sm)Chapter 0 of Performance Based Project Management (sm)
Chapter 0 of Performance Based Project Management (sm)
 
CV_Vinod
CV_VinodCV_Vinod
CV_Vinod
 
Connecting Reliability & Business + ISO 55000 Framework
Connecting Reliability & Business + ISO 55000 FrameworkConnecting Reliability & Business + ISO 55000 Framework
Connecting Reliability & Business + ISO 55000 Framework
 
IDSL Company Profile 2016
IDSL Company Profile 2016IDSL Company Profile 2016
IDSL Company Profile 2016
 
JTMS Company Information Pack 2015
JTMS Company Information Pack 2015JTMS Company Information Pack 2015
JTMS Company Information Pack 2015
 
A Review paper on "Improve the Quality of product"
A Review paper on "Improve the Quality of product"A Review paper on "Improve the Quality of product"
A Review paper on "Improve the Quality of product"
 
How To Beat The Recession: BOS, Operations Excellence and a Problem Solving C...
How To Beat The Recession: BOS, Operations Excellence and a Problem Solving C...How To Beat The Recession: BOS, Operations Excellence and a Problem Solving C...
How To Beat The Recession: BOS, Operations Excellence and a Problem Solving C...
 
Ikea 2
Ikea 2Ikea 2
Ikea 2
 
Bridging business analysis and business architecture - The Open Group webinar
Bridging business analysis and business architecture - The Open Group webinarBridging business analysis and business architecture - The Open Group webinar
Bridging business analysis and business architecture - The Open Group webinar
 
Spi link
Spi linkSpi link
Spi link
 
Quality engineering instead of testing... Why? How?
Quality engineering instead of testing... Why? How?Quality engineering instead of testing... Why? How?
Quality engineering instead of testing... Why? How?
 
Flexible On Demand Software Testing
Flexible On Demand Software TestingFlexible On Demand Software Testing
Flexible On Demand Software Testing
 

Recently uploaded

Bangalore Call Girls Majestic 📞 9907093804 High Profile Service 100% Safe
Bangalore Call Girls Majestic 📞 9907093804 High Profile Service 100% SafeBangalore Call Girls Majestic 📞 9907093804 High Profile Service 100% Safe
Bangalore Call Girls Majestic 📞 9907093804 High Profile Service 100% Safenarwatsonia7
 
Call Girls Darjeeling Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Darjeeling Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Darjeeling Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Darjeeling Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Lucknow Call girls - 8800925952 - 24x7 service with hotel room
Lucknow Call girls - 8800925952 - 24x7 service with hotel roomLucknow Call girls - 8800925952 - 24x7 service with hotel room
Lucknow Call girls - 8800925952 - 24x7 service with hotel roomdiscovermytutordmt
 
Best Rate (Hyderabad) Call Girls Jahanuma ⟟ 8250192130 ⟟ High Class Call Girl...
Best Rate (Hyderabad) Call Girls Jahanuma ⟟ 8250192130 ⟟ High Class Call Girl...Best Rate (Hyderabad) Call Girls Jahanuma ⟟ 8250192130 ⟟ High Class Call Girl...
Best Rate (Hyderabad) Call Girls Jahanuma ⟟ 8250192130 ⟟ High Class Call Girl...astropune
 
Bangalore Call Girls Nelamangala Number 7001035870 Meetin With Bangalore Esc...
Bangalore Call Girls Nelamangala Number 7001035870  Meetin With Bangalore Esc...Bangalore Call Girls Nelamangala Number 7001035870  Meetin With Bangalore Esc...
Bangalore Call Girls Nelamangala Number 7001035870 Meetin With Bangalore Esc...narwatsonia7
 
VIP Call Girls Pune Vani 9907093804 Short 1500 Night 6000 Best call girls Ser...
VIP Call Girls Pune Vani 9907093804 Short 1500 Night 6000 Best call girls Ser...VIP Call Girls Pune Vani 9907093804 Short 1500 Night 6000 Best call girls Ser...
VIP Call Girls Pune Vani 9907093804 Short 1500 Night 6000 Best call girls Ser...Miss joya
 
Call Girls Service In Shyam Nagar Whatsapp 8445551418 Independent Escort Service
Call Girls Service In Shyam Nagar Whatsapp 8445551418 Independent Escort ServiceCall Girls Service In Shyam Nagar Whatsapp 8445551418 Independent Escort Service
Call Girls Service In Shyam Nagar Whatsapp 8445551418 Independent Escort Serviceparulsinha
 
Call Girl Coimbatore Prisha☎️ 8250192130 Independent Escort Service Coimbatore
Call Girl Coimbatore Prisha☎️  8250192130 Independent Escort Service CoimbatoreCall Girl Coimbatore Prisha☎️  8250192130 Independent Escort Service Coimbatore
Call Girl Coimbatore Prisha☎️ 8250192130 Independent Escort Service Coimbatorenarwatsonia7
 
Aspirin presentation slides by Dr. Rewas Ali
Aspirin presentation slides by Dr. Rewas AliAspirin presentation slides by Dr. Rewas Ali
Aspirin presentation slides by Dr. Rewas AliRewAs ALI
 
VIP Call Girls Tirunelveli Aaradhya 8250192130 Independent Escort Service Tir...
VIP Call Girls Tirunelveli Aaradhya 8250192130 Independent Escort Service Tir...VIP Call Girls Tirunelveli Aaradhya 8250192130 Independent Escort Service Tir...
VIP Call Girls Tirunelveli Aaradhya 8250192130 Independent Escort Service Tir...narwatsonia7
 
♛VVIP Hyderabad Call Girls Chintalkunta🖕7001035870🖕Riya Kappor Top Call Girl ...
♛VVIP Hyderabad Call Girls Chintalkunta🖕7001035870🖕Riya Kappor Top Call Girl ...♛VVIP Hyderabad Call Girls Chintalkunta🖕7001035870🖕Riya Kappor Top Call Girl ...
♛VVIP Hyderabad Call Girls Chintalkunta🖕7001035870🖕Riya Kappor Top Call Girl ...astropune
 
VIP Call Girls Indore Kirti 💚😋 9256729539 🚀 Indore Escorts
VIP Call Girls Indore Kirti 💚😋  9256729539 🚀 Indore EscortsVIP Call Girls Indore Kirti 💚😋  9256729539 🚀 Indore Escorts
VIP Call Girls Indore Kirti 💚😋 9256729539 🚀 Indore Escortsaditipandeya
 
CALL ON ➥9907093804 🔝 Call Girls Baramati ( Pune) Girls Service
CALL ON ➥9907093804 🔝 Call Girls Baramati ( Pune)  Girls ServiceCALL ON ➥9907093804 🔝 Call Girls Baramati ( Pune)  Girls Service
CALL ON ➥9907093804 🔝 Call Girls Baramati ( Pune) Girls ServiceMiss joya
 
(👑VVIP ISHAAN ) Russian Call Girls Service Navi Mumbai🖕9920874524🖕Independent...
(👑VVIP ISHAAN ) Russian Call Girls Service Navi Mumbai🖕9920874524🖕Independent...(👑VVIP ISHAAN ) Russian Call Girls Service Navi Mumbai🖕9920874524🖕Independent...
(👑VVIP ISHAAN ) Russian Call Girls Service Navi Mumbai🖕9920874524🖕Independent...Taniya Sharma
 
Artifacts in Nuclear Medicine with Identifying and resolving artifacts.
Artifacts in Nuclear Medicine with Identifying and resolving artifacts.Artifacts in Nuclear Medicine with Identifying and resolving artifacts.
Artifacts in Nuclear Medicine with Identifying and resolving artifacts.MiadAlsulami
 
Call Girls Service Pune Vaishnavi 9907093804 Short 1500 Night 6000 Best call ...
Call Girls Service Pune Vaishnavi 9907093804 Short 1500 Night 6000 Best call ...Call Girls Service Pune Vaishnavi 9907093804 Short 1500 Night 6000 Best call ...
Call Girls Service Pune Vaishnavi 9907093804 Short 1500 Night 6000 Best call ...Miss joya
 
Russian Call Girls in Pune Tanvi 9907093804 Short 1500 Night 6000 Best call g...
Russian Call Girls in Pune Tanvi 9907093804 Short 1500 Night 6000 Best call g...Russian Call Girls in Pune Tanvi 9907093804 Short 1500 Night 6000 Best call g...
Russian Call Girls in Pune Tanvi 9907093804 Short 1500 Night 6000 Best call g...Miss joya
 
Kesar Bagh Call Girl Price 9548273370 , Lucknow Call Girls Service
Kesar Bagh Call Girl Price 9548273370 , Lucknow Call Girls ServiceKesar Bagh Call Girl Price 9548273370 , Lucknow Call Girls Service
Kesar Bagh Call Girl Price 9548273370 , Lucknow Call Girls Servicemakika9823
 
VIP Mumbai Call Girls Hiranandani Gardens Just Call 9920874524 with A/C Room ...
VIP Mumbai Call Girls Hiranandani Gardens Just Call 9920874524 with A/C Room ...VIP Mumbai Call Girls Hiranandani Gardens Just Call 9920874524 with A/C Room ...
VIP Mumbai Call Girls Hiranandani Gardens Just Call 9920874524 with A/C Room ...Garima Khatri
 

Recently uploaded (20)

Bangalore Call Girls Majestic 📞 9907093804 High Profile Service 100% Safe
Bangalore Call Girls Majestic 📞 9907093804 High Profile Service 100% SafeBangalore Call Girls Majestic 📞 9907093804 High Profile Service 100% Safe
Bangalore Call Girls Majestic 📞 9907093804 High Profile Service 100% Safe
 
Call Girls Darjeeling Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Darjeeling Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Darjeeling Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Darjeeling Just Call 9907093804 Top Class Call Girl Service Available
 
Lucknow Call girls - 8800925952 - 24x7 service with hotel room
Lucknow Call girls - 8800925952 - 24x7 service with hotel roomLucknow Call girls - 8800925952 - 24x7 service with hotel room
Lucknow Call girls - 8800925952 - 24x7 service with hotel room
 
Best Rate (Hyderabad) Call Girls Jahanuma ⟟ 8250192130 ⟟ High Class Call Girl...
Best Rate (Hyderabad) Call Girls Jahanuma ⟟ 8250192130 ⟟ High Class Call Girl...Best Rate (Hyderabad) Call Girls Jahanuma ⟟ 8250192130 ⟟ High Class Call Girl...
Best Rate (Hyderabad) Call Girls Jahanuma ⟟ 8250192130 ⟟ High Class Call Girl...
 
Bangalore Call Girls Nelamangala Number 7001035870 Meetin With Bangalore Esc...
Bangalore Call Girls Nelamangala Number 7001035870  Meetin With Bangalore Esc...Bangalore Call Girls Nelamangala Number 7001035870  Meetin With Bangalore Esc...
Bangalore Call Girls Nelamangala Number 7001035870 Meetin With Bangalore Esc...
 
VIP Call Girls Pune Vani 9907093804 Short 1500 Night 6000 Best call girls Ser...
VIP Call Girls Pune Vani 9907093804 Short 1500 Night 6000 Best call girls Ser...VIP Call Girls Pune Vani 9907093804 Short 1500 Night 6000 Best call girls Ser...
VIP Call Girls Pune Vani 9907093804 Short 1500 Night 6000 Best call girls Ser...
 
Call Girls Service In Shyam Nagar Whatsapp 8445551418 Independent Escort Service
Call Girls Service In Shyam Nagar Whatsapp 8445551418 Independent Escort ServiceCall Girls Service In Shyam Nagar Whatsapp 8445551418 Independent Escort Service
Call Girls Service In Shyam Nagar Whatsapp 8445551418 Independent Escort Service
 
Call Girl Coimbatore Prisha☎️ 8250192130 Independent Escort Service Coimbatore
Call Girl Coimbatore Prisha☎️  8250192130 Independent Escort Service CoimbatoreCall Girl Coimbatore Prisha☎️  8250192130 Independent Escort Service Coimbatore
Call Girl Coimbatore Prisha☎️ 8250192130 Independent Escort Service Coimbatore
 
sauth delhi call girls in Bhajanpura 🔝 9953056974 🔝 escort Service
sauth delhi call girls in Bhajanpura 🔝 9953056974 🔝 escort Servicesauth delhi call girls in Bhajanpura 🔝 9953056974 🔝 escort Service
sauth delhi call girls in Bhajanpura 🔝 9953056974 🔝 escort Service
 
Aspirin presentation slides by Dr. Rewas Ali
Aspirin presentation slides by Dr. Rewas AliAspirin presentation slides by Dr. Rewas Ali
Aspirin presentation slides by Dr. Rewas Ali
 
VIP Call Girls Tirunelveli Aaradhya 8250192130 Independent Escort Service Tir...
VIP Call Girls Tirunelveli Aaradhya 8250192130 Independent Escort Service Tir...VIP Call Girls Tirunelveli Aaradhya 8250192130 Independent Escort Service Tir...
VIP Call Girls Tirunelveli Aaradhya 8250192130 Independent Escort Service Tir...
 
♛VVIP Hyderabad Call Girls Chintalkunta🖕7001035870🖕Riya Kappor Top Call Girl ...
♛VVIP Hyderabad Call Girls Chintalkunta🖕7001035870🖕Riya Kappor Top Call Girl ...♛VVIP Hyderabad Call Girls Chintalkunta🖕7001035870🖕Riya Kappor Top Call Girl ...
♛VVIP Hyderabad Call Girls Chintalkunta🖕7001035870🖕Riya Kappor Top Call Girl ...
 
VIP Call Girls Indore Kirti 💚😋 9256729539 🚀 Indore Escorts
VIP Call Girls Indore Kirti 💚😋  9256729539 🚀 Indore EscortsVIP Call Girls Indore Kirti 💚😋  9256729539 🚀 Indore Escorts
VIP Call Girls Indore Kirti 💚😋 9256729539 🚀 Indore Escorts
 
CALL ON ➥9907093804 🔝 Call Girls Baramati ( Pune) Girls Service
CALL ON ➥9907093804 🔝 Call Girls Baramati ( Pune)  Girls ServiceCALL ON ➥9907093804 🔝 Call Girls Baramati ( Pune)  Girls Service
CALL ON ➥9907093804 🔝 Call Girls Baramati ( Pune) Girls Service
 
(👑VVIP ISHAAN ) Russian Call Girls Service Navi Mumbai🖕9920874524🖕Independent...
(👑VVIP ISHAAN ) Russian Call Girls Service Navi Mumbai🖕9920874524🖕Independent...(👑VVIP ISHAAN ) Russian Call Girls Service Navi Mumbai🖕9920874524🖕Independent...
(👑VVIP ISHAAN ) Russian Call Girls Service Navi Mumbai🖕9920874524🖕Independent...
 
Artifacts in Nuclear Medicine with Identifying and resolving artifacts.
Artifacts in Nuclear Medicine with Identifying and resolving artifacts.Artifacts in Nuclear Medicine with Identifying and resolving artifacts.
Artifacts in Nuclear Medicine with Identifying and resolving artifacts.
 
Call Girls Service Pune Vaishnavi 9907093804 Short 1500 Night 6000 Best call ...
Call Girls Service Pune Vaishnavi 9907093804 Short 1500 Night 6000 Best call ...Call Girls Service Pune Vaishnavi 9907093804 Short 1500 Night 6000 Best call ...
Call Girls Service Pune Vaishnavi 9907093804 Short 1500 Night 6000 Best call ...
 
Russian Call Girls in Pune Tanvi 9907093804 Short 1500 Night 6000 Best call g...
Russian Call Girls in Pune Tanvi 9907093804 Short 1500 Night 6000 Best call g...Russian Call Girls in Pune Tanvi 9907093804 Short 1500 Night 6000 Best call g...
Russian Call Girls in Pune Tanvi 9907093804 Short 1500 Night 6000 Best call g...
 
Kesar Bagh Call Girl Price 9548273370 , Lucknow Call Girls Service
Kesar Bagh Call Girl Price 9548273370 , Lucknow Call Girls ServiceKesar Bagh Call Girl Price 9548273370 , Lucknow Call Girls Service
Kesar Bagh Call Girl Price 9548273370 , Lucknow Call Girls Service
 
VIP Mumbai Call Girls Hiranandani Gardens Just Call 9920874524 with A/C Room ...
VIP Mumbai Call Girls Hiranandani Gardens Just Call 9920874524 with A/C Room ...VIP Mumbai Call Girls Hiranandani Gardens Just Call 9920874524 with A/C Room ...
VIP Mumbai Call Girls Hiranandani Gardens Just Call 9920874524 with A/C Room ...
 

Return of investment of ergonomic improvements

  • 1. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. The 30-Inch View ® ROI of Ergonomic Improvements: Demonstrating Value to the Business Winnie Ip, CPE Director of Consulting
  • 2. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Agenda Topics ● Introduction ● Cost Justification Methods • Regulatory Compliance • Health and Safety Performance • Production Enhancement ● Creating Business Value ● Calculating ROI ● Summary and Question Period
  • 3. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Why Are We Here? ● Tough times ● Save money ● Weather the storm ● Measurable gains ● Demonstrate value ● Stay on course ● Reduce costs ● Cash is king
  • 4. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Designing for Human Performance Ergonomics ● If we design workstations within the limits of human performance, we will… • Eliminate work-related musculoskeletal disorders • Maximize productivity • Enhance process stability and product quality
  • 5. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. ● Ergonomics is an Engineering issue, not a Health & Safety Issue. • The majority of ergonomic issues are typically rooted in process and workstation design. • Ergonomic issues only become Health & Safety concerns once an injury has occurred. • Long-term fixes for ergonomic issues are typically related to engineering controls. IntroductionWhy Does Everyone Need to be Involved?
  • 6. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. The Ergonomics Maturity Curve™ EHS & Medical Engineers / Designers EHS / Lean / CI EHS & Human Resources
  • 7. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Agenda Topics ● Introduction ● Cost Justification Methods • Regulatory Compliance • Health and Safety Performance • Production Enhancement ● Creating Business Value ● Calculating ROI ● Summary and Question Period
  • 8. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Regulatory Compliance • Regulatory Compliance • Health & Safety Performance • Production Enhancement ● U.S. Standards • Federal OSHA • General Duty Clause "every employer must provide a safe working environment for their employees" ● OSHA approved state plans • California State Ergonomics Rule ● Outside U.S. Standards • European Union Directives • Non-European Union country standards
  • 9. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Regulatory Compliance ● Why it’s not effective: • If your site’s incidence rates are below industry standards, management may believe that they are in a “no or low” risk situation for non- compliance. ● Let’s consider another approach… • Regulatory Compliance • Health & Safety Performance • Production Enhancement (Source: BLS, 2001)
  • 10. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Health and Safety Performance • Regulatory Compliance • Health & Safety Performance • Production Enhancement Average Costs of WMSD Incidents
  • 11. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. $4 TO $10 INDIRECT COSTS $1 • Building damage • Tool and equipment damage • Product and material damage • Production delays and interruptions • Legal expenses • Expenditure of emergency supplies • Interim equipment rentals  2003 SALCON, Inc. All Rights Reserved • Investigation time • Wages paid for time lost • Cost of hiring and/or training replacements • Overtime • Extra supervisory time • Clerical time • Decreased output of injured worker upon return • Loss of business and goodwill INJURY & ILLNESS COSTS • Medical • Compensation Costs (Insured Costs) Incident Cost Iceberg • Regulatory Compliance • Health & Safety Performance • Production Enhancement
  • 12. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Health & Safety • Regulatory Compliance • Health & Safety Performance • Production Enhancement ● Why it’s not effective: • If there are no previous injuries, management may not see the urgency to improve the job ● Let’s consider yet another approach… There were ergonomic issues when reaching to a torque wrench in this assembly operation.
  • 13. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Production Enhancements ● Ergonomic improvements are more likely to be supported and accelerated if they can fit into a cost justification process. ● Leads to cost savings in many areas including: • Quality • Delivery • Production (measured at the workstation level) • Elimination of non-value-added tasks • Reduction in motion waste • Regulatory Compliance • Health & Safety Performance • Production Enhancement
  • 14. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Quality Improvements ● Cell re-design project for drill process ● Chipped blank = $30,000 revenue loss ● Installed an articulating arm to transfer lens blanks • Regulatory Compliance • Health & Safety Performance • Production Enhancement
  • 15. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Delivery Improvements Fender Finishing Operation • 30 minute cycle time • Awkward postures (> 28” reach) • Multiple handling (24 lifts/cycle) • High scrap rate • Built freestanding fixture and redesigned workstation • Reduced reaches (< 15”) • Reduced handling (2 lifts/cycle) • Reduced scrap by 83% • Reduced cycle time by 50% • Regulatory Compliance • Health & Safety Performance • Production Enhancement 2002 ErgoCup Winner Applied Ergonomics Conference Baltimore, MD
  • 16. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. ● Introduction ● Cost Justification Methods • Regulatory Compliance • Health and Safety Performance • Production Enhancement ● Creating Business Value ● Calculating ROI ● Summary and Question Period Agenda Topics
  • 17. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. ● How are companies achieving ergonomics excellence? • Key activities • Communications • Tools and training Creating Business Value
  • 18. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. 2007, 2009, and 2011 Benchmarking Studies ● Involved large companies in: • Aerospace • Automotive • Health care products • Diversified products • Computer systems • Semiconductors ● Looked at: • Methods • Roles • Training • Metrics • Construction equipment • Industrial products • Pharmaceutical • Aluminum products • Steel products
  • 19. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Ergonomics Excellence - What to Expect
  • 20. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Benchmarking Study: Success Metrics Leading Indicators Measures that describe the prevention of future incidents include: ● Percent of job conditions with medium or high ergonomic risk ● Number of countermeasures implemented ● Ergonomic risk reduction ● Conformance of new equipment with ergonomic design criteria
  • 21. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Process Characteristics ● “C” level support and sponsorship ● Management system in place • Policy & Guidance Document • Clear roles and responsibilities • Accountability for metrics at all levels in organisation ● Data driven with the focus on risk management ● Heavy on engineering and workplace improvement ● Engage the workforce in the process ● Integrated with other company initiatives ● VISIBLE demonstration of value to the business
  • 22. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Ergonomics Risk Management – Visible Change
  • 23. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Ergonomics Risk Management – Visible Change
  • 24. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Lean/Continuous Improvement – Data Driven
  • 25. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. ● 23 sites have implemented process ● All facilities trained in ergonomics process and tools ● Over 3,600 workplace improvements in place ● 2 year Total Incident Rate (TIR) reduction: • 67% EU • 48% NA tire • 55% Globally 111.0 97.0 58.0 0 50 100 150 Q1-05 Q1-06 Q1-07 Baseline Creating Business Value - Example
  • 26. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. ● IR & WC Costs Decrease as Ergonomics Is “Designed In” Creating Business Value - Example 1999 2000 2001 2002 2003 2004 2005 2006 2007 ESI Project Ergo Guideline Ergo in DA Incident Rate Camry Solara Avalon Camry Workers Compensation
  • 27. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. The Ergonomics Maturity Curve™ EHS & Medical Engineers / Designers EHS / Lean / CI EHS & Human Resources
  • 28. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. ● Using Digital Assembly • Clearance, Reach, Fit, Posture can be checked for each part and process Product Design
  • 29. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. ● Introduction ● Cost Justification Methods • Regulatory Compliance • Health and Safety Performance • Production Enhancement ● Creating Business Value ● Calculating ROI ● Summary and Question Period Agenda Topics
  • 30. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Business Reality 101 ● In today’s business climate any initiative that does not deliver measurable value is an option. ● Ergonomic improvements are more likely to be supported and accelerated if they can fit into a cost justification process. ● Time can be converted to money
  • 31. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Ergonomic Projects that Result in ROI ● Are effective in reducing hazard exposures • Eliminate risk • Engineering controls • Administrative controls • Work practices ● Are efficient in reducing hazard exposures • Start with low cost/high impact
  • 32. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Cost Justification ● In the manufacturing environment time is the dominant currency. ● And we know that awkward postures, high forces and repetitive movements take more time to complete. ● The challenge is quantifying financial benefit of reducing force, frequency and posture.
  • 33. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Motion Waste – Reaching and Walking
  • 34. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Motion Waste – Reaching and Walking
  • 35. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Time Penalties for Reaching ● The STEP methodology uses reach arcs to define 5 zones ● Each reach zone is separated by a 6" (15 cm) increment ● Time penalties for each reach zone vary by 0.2 seconds each and are based on round-trip movements ● Other data you’ll need: • Time savings per cycle • # of cycles per hour • Burdened labour costs • Current production and quality numbers
  • 36. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Time Penalties for Reaching - Example
  • 37. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Time Penalties for Walking ● Time savings are assigned for each step eliminated for walking tasks. ● The first step, using to begin walking, corresponds to 0.8 seconds time penalty. ● Subsequent steps correspond to 0.5 seconds each.
  • 38. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. 2 1 3 4 5 6 7 8910 Time Penalties for Walking – Example ● BEFORE: Poor Layout • Lack of continuous product flow • Excessive walking with product Current OQA/FQA Area Layout
  • 39. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Time Penalties for Walking - Example ● AFTER: • "U" – shaped work cells • Improved product flow • Reduced prolonged/ multiple handling • Motion savings = 34.8 seconds/cycle New OQA/FQA Area Layout
  • 40. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Check the Effects - Calculating Ergonomics ROI
  • 41. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Cost Justification – An Example ● There were ergonomic issues when reaching to a torque wrench in this assembly operation. Because there was no previous injury, management didn’t see the urgency to improve the job.
  • 42. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Cost Justification – An Example
  • 43. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Cost Justification – An Example ● After brainstorming, the ergonomics team came up with several solutions ● Short term solutions • Move bins closer • Relocate tool lower ● Long term solution • Self-feeding driver
  • 44. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Cost Justification – An Example • The ergonomics team was able to illustrate a 0.4 second time savings that would result by lowering the tool, in addition to improved working postures • In addition, the screw bin was relocated closer resulting in an additional 0.4 second time savings. • Cost: $0 Before After 0.4 seconds saved Short term solution: Relocate driver and parts bin closer
  • 45. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Cost Justification – An Example Reduce time on tasks by 0.8 seconds Total time savings = 32 minutes/shift
  • 46. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Cost Justification – An Example • The ergonomics team wanted to continue with improving the job and investigated installing a self-feeding driver • Cost: $2,500 Long term solution: Self-feeding driver
  • 47. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Cost Justification – An Example Eliminate 3 tasks = 3.2 Seconds Total time savings = 128 minutes/shift
  • 48. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Cost Justification – An Example ● Self-Feeding Driver • Elimination of 3 non-value-added tasks saves a total of 3.2 seconds • Cycle time is 12 seconds
  • 49. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Cost Justification – An Example ● Self-Feeding Driver • Conservative productivity impact is 17% • Direct labor cost = $29,000 / year • Benefits burden = 25% • Cost of the improvement = $2,500 = 17% (productivity impact) x $36,250 (annual direct cost) = $6,162 = $2,500 (cost of improvement) $6,162 (annual savings) = 0.4 years (4.8 months)
  • 50. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Calculating Return on Investment 3-Year ROI = 3-Year Savings – Initial Investment Initial Investment X 100% ● Self-Feeding Driver • Annual savings = $6,162 • Cost of the improvement = $2,500 3-Year ROI = (3 x $6,162) – $2,500 $2,500 X 100% = 639%
  • 51. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Cost Justification – An Example • The ergonomics team wanted to continue with improving the job and investigated installing a self- feeding driver • Cost: $2,500 • Payback is less than 4 months! • 3-year ROI of 639% Long term solution: Self-feeding driver
  • 52. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. ● Introduction ● Cost Justification Methods • Regulatory Compliance • Health and Safety Performance • Production Enhancement ● Creating Business Value ● Calculating ROI ● Summary and Question Period Agenda Topics
  • 53. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. What Have We Learned? ● In today’s business climate any initiative that does not deliver measurable value is an option. ● Ergonomics is an engineering issue, not a safety issue ● Most effective way of cost justifying ergonomic improvements is through production enhancements (quality, delivery, productivity) ● Engage all levels of the organization (management, union, engineering, design, procurement) ● Critical elements for success: • Risk based. Data driven. • Focus on engineering controls. • Cost justification and Return on Investment are key.
  • 54. ROI of Ergonomic Improvements: Demonstrating Value to the Business © 2012 Humantech, Inc. Winnie Ip, CPE Director of Consulting 734.663.3330 x147 wip@humantech.com Thank you! ROI of Ergonomic Improvements