SlideShare a Scribd company logo
1 of 2
Omar El Maghraby
V 523 (2/3 D), St 36, Palms Resort, Police Academy, 1st
Settlement, Ring Road, Cairo, Email: maghraby10@hotmail.com, M: +201001383444
Career Objective
Challenging job in the mechanical engineering field to make use of & enhance my academic, technical & managerial experience and develop
& build on my communication, leadership, organization, planning, innovation, decision making and analytical skills
Education
Master of Engineering, the American University in Cairo (AUC), Dec 2013
• Major: Mechanical Engineering, Specialized in: Industrial Engineering
• Coursework included: Production Systems Design, Total Quality Management & Reliability, Facilities Planning & Design, Materials in
Design Manufacturing (Design for Manufacturability & Assembly ), Systems Modeling and Optimization, Engineering Statistics,
Engineering for a Sustainable Environment, Marketing Management & Introduction to Nanomaterials
Bachelor of Science, the American University in Cairo (AUC), June 2010
• Major: Mechanical Engineering, Specialized in 1. Industrial Engineering 2. Design Engineering
• Coursework included: Automated manufacturing systems, Quality Control, Production & Inventory Control, Computer Aided Design,
Ergonomics, Manufacturing Processes, Mech. Design, Thermodynamics, Fluid Mechanics, Automatic Control & Manage. Fundamentals
Work Experience
March 2015 - Present, Continuous Improvement Engineer, Candy & Count Lines at Mondelez International (Kraft Foods), 10th
of Ramadan
• Working on replacing conventional lighting systems by motion detection systems in all plant warehouses and in main meeting rooms
• Working on a safety & productivity project at biscuit line where mixer area is automated instead of manual operation
• Replaced outdated mech. clutch of biscuit line packaging MCs by servo-motors; improved efficiency by reducing minor stops. & rework
• Working on improv. steam net. of Candy & Count Lines by replacing steam traps & pressure reducers to minimize energy consumption
• Worked on rolling out Integrated Lean Six Sigma program across Candy, Count & Flake Lines throughout phase 1
• Working on 3 Sigma Certification for Jelly Production Line
June 2013 – Feb 2015, Continuous Improvement Engineer, Count Lines at Mondelez International (Kraft Foods), 10th
of Ramadan Plant (CTOR)
• Worked on Safety kaizens to minimize near misses & LTIRs; manufacturing safe ladders, sieves & safety covers installment … etc.
• Worked on Quality kaizens to improve GMP; manufacturing hygiene components to avoid product contamination
• Worked on placing hygiene separators between product rows to minimize rework due to sticky bars
• Worked on replacing weak & tight belts with wider ones to reduce their breakdowns & raise product stability on production line
• Worked on standardizing the process of choosing the suitable belt for each work station
• Worked on drums repair using Stainless steel 316 filling to reduce rework & improve nougat quality to reduce rejections
• Lead & Participated in Kaizen events targeting Workplace Organization, Rework Minimization & Breakdowns Minimization
• Replaced normal tighten. tools by more efficient ones e.g. revers. wrenches & original bearing installers; reduce MTTR & raise efficiency
• Leading a team of 3 Operation Analysts
- Managing production data reporting process including daily, weekly, monthly & Annual Reports, Data Audits & Weights
- Managing the Idea Management System (IMS) process across CTOR Plant including Ideas Recording & IMS reports
- Developing analysts in terms of time management skills, English language, Advanced Microsoft office tools & Minimizing mistakes
• Performed a study on segmenting energy sources across the 14 lines; for more accurate measurements & more precise Cost Allocation
• Participated in 3 Sigma Validation for the Halls 1 Line including Measurement System Analysis & Process Capability
• Lead a series of root cause analysis meetings targeting quality complaints elimination across CTOR & got a corresponding action plan
• Performed a time & motion study on count lines to calculate the utilization of operators in order to find productivity opportunities
• Contributed in passing phase 0 of Integrated Lean Six Sigma, passed qualification exam & finally, appointed Deputy FI Pillar Lead
• Attended Lean 6σ GB Sessions, got highest score among candidates scoring 94% & Bubbly Weight Minimization project is in progress
• Rolling out 5S by training & implement. through organiz. Materials WIP & finished product areas & placing toolbox in specified locations
March 2012 – April 2013, Project Engineer at Egyptian Spanish Company for producing cardboards at Badr Industrial City
• Planned & Coordinated the plant premises construction tasks performed by subcontractors: Concrete & Steel structures
• Researched for the requirements of the production process: machineries, material types, suppliers, labor and inventories
• Performed the feasibility Study & Planned the production flow in terms of Plant Layout, material handling and Inventory
Jan 11-Feb 12, Operation & Maintenance Engineer at National Gas Company’s Pressure Reduction Station at 10th
of Ramadan
• Lead a team of 6 emergency technicians, 3 station technicians, 2 Network technicians, 4 drivers and 3 security men
- Planned and Implemented Operation and Preventive & corrective maintenance of station components i.e. pipelines, regulators …etc.
- Implemented operation & preventive & corrective maintenance of gas pipelines, regulators, network valves & industrial modules
- Applied company’s quality, health, safety and environment (QHSE) certified policies in documents and technicalities
August-December 2010, Mechanical Design Engineer at Akhnaton Mechatronics Company, EVA, Armanious Group
• Designed and manufactured machines and their components using CAD/CAM systems, and conventional systems
- Designed and Supervised the manufacturing of a gear pump producing a pressure of 3 bar
- Designed and Supervised the manufacturing of a pomegranate crusher working by a motor- gear system
- Designed a facilities layout for a production line of shower gel filled bottles including air-conditioning, fire, water…etc.
Internship Experiences
July - August 2012, Intern, Cementos La Union - Arabian Cement Company, Ain Sokhna, Egypt – Field Mechanical Engineering
Extracurricular Activities
• Regularly donating blood & funds at different charity organizations e.g. Resala, Egyptian Blood Bank… etc.
Personal Skills and Interests
• Fluent in the Arabic language and in the English language
• Professional in Solid Works, Solid CAM, Microsoft Office& AutoCAD & very good in Minitab, Qeystone & CES for Material Selection
• Practice outdoor sports (Soccer and Running) & Gymnastics – Birth Date: 28/3/1988 - Marital Status: Single – Military Status: Exempted

More Related Content

What's hot

What's hot (20)

RESUME_MECHANICAL_VARUN RAWAL 2015
RESUME_MECHANICAL_VARUN RAWAL 2015 RESUME_MECHANICAL_VARUN RAWAL 2015
RESUME_MECHANICAL_VARUN RAWAL 2015
 
Plant location and lay out planning
Plant location and lay out planningPlant location and lay out planning
Plant location and lay out planning
 
Ganesh - Resume
Ganesh - ResumeGanesh - Resume
Ganesh - Resume
 
30120140504022
3012014050402230120140504022
30120140504022
 
Plant layout
Plant layout Plant layout
Plant layout
 
Eng. Mohamed Ali cv2015
Eng. Mohamed Ali cv2015Eng. Mohamed Ali cv2015
Eng. Mohamed Ali cv2015
 
Plant location and layout in any industry
Plant location and layout in any industryPlant location and layout in any industry
Plant location and layout in any industry
 
Ms ii unit ppt by DURGA PRASAD NAVULLA (jntuk)
Ms ii unit ppt by DURGA PRASAD NAVULLA (jntuk)Ms ii unit ppt by DURGA PRASAD NAVULLA (jntuk)
Ms ii unit ppt by DURGA PRASAD NAVULLA (jntuk)
 
Resume
ResumeResume
Resume
 
CV
CVCV
CV
 
Plant location and layout
Plant location and layoutPlant location and layout
Plant location and layout
 
Executive Summary El
Executive Summary ElExecutive Summary El
Executive Summary El
 
3 4 chemplantdesign-general plant consideration
3 4 chemplantdesign-general plant consideration3 4 chemplantdesign-general plant consideration
3 4 chemplantdesign-general plant consideration
 
Facility & Layout Design Case Study
Facility & Layout Design Case StudyFacility & Layout Design Case Study
Facility & Layout Design Case Study
 
Resume of Srinivas
Resume of SrinivasResume of Srinivas
Resume of Srinivas
 
Plant layout
Plant layoutPlant layout
Plant layout
 
Zis layout
Zis  layoutZis  layout
Zis layout
 
new cv kishor
new cv kishornew cv kishor
new cv kishor
 
Drying plant layout ,blender ,mixer, emulsification mills, homogenizers
Drying plant layout ,blender ,mixer, emulsification mills, homogenizersDrying plant layout ,blender ,mixer, emulsification mills, homogenizers
Drying plant layout ,blender ,mixer, emulsification mills, homogenizers
 
Industiral engineering (ie)
Industiral engineering (ie)Industiral engineering (ie)
Industiral engineering (ie)
 

Similar to Resume_(June 2015) Industrial Engineering

Similar to Resume_(June 2015) Industrial Engineering (20)

Pranshu Resume (Jan16)
Pranshu Resume (Jan16)Pranshu Resume (Jan16)
Pranshu Resume (Jan16)
 
Mutsa CV current.01_20 PM,07-May-16
Mutsa CV current.01_20 PM,07-May-16Mutsa CV current.01_20 PM,07-May-16
Mutsa CV current.01_20 PM,07-May-16
 
Debahis CV
Debahis CVDebahis CV
Debahis CV
 
Choudhary Divyang Resume
Choudhary Divyang ResumeChoudhary Divyang Resume
Choudhary Divyang Resume
 
Choudhary Divyang resume
Choudhary Divyang resumeChoudhary Divyang resume
Choudhary Divyang resume
 
Vijai CV
Vijai CVVijai CV
Vijai CV
 
Sachin be mech_8_yrs_exp
Sachin be mech_8_yrs_expSachin be mech_8_yrs_exp
Sachin be mech_8_yrs_exp
 
Tito Camps Resume
Tito Camps ResumeTito Camps Resume
Tito Camps Resume
 
Samaa CV
Samaa CVSamaa CV
Samaa CV
 
SumitGaur_Resume
SumitGaur_ResumeSumitGaur_Resume
SumitGaur_Resume
 
karthik 123
karthik 123karthik 123
karthik 123
 
vikas goel
vikas goelvikas goel
vikas goel
 
vikas goel
vikas goelvikas goel
vikas goel
 
Harsh Patel (Resume)
Harsh Patel (Resume)Harsh Patel (Resume)
Harsh Patel (Resume)
 
Ghafari Resume-Anthony Toney
Ghafari Resume-Anthony ToneyGhafari Resume-Anthony Toney
Ghafari Resume-Anthony Toney
 
Charly CV - 2015
Charly CV - 2015Charly CV - 2015
Charly CV - 2015
 
Resume Kai Kendall 6-2015
Resume Kai Kendall 6-2015Resume Kai Kendall 6-2015
Resume Kai Kendall 6-2015
 
resume-niheer
resume-niheerresume-niheer
resume-niheer
 
Steve Majors resume
Steve Majors resumeSteve Majors resume
Steve Majors resume
 
Engineering & Project Management
Engineering & Project ManagementEngineering & Project Management
Engineering & Project Management
 

Resume_(June 2015) Industrial Engineering

  • 1. Omar El Maghraby V 523 (2/3 D), St 36, Palms Resort, Police Academy, 1st Settlement, Ring Road, Cairo, Email: maghraby10@hotmail.com, M: +201001383444 Career Objective Challenging job in the mechanical engineering field to make use of & enhance my academic, technical & managerial experience and develop & build on my communication, leadership, organization, planning, innovation, decision making and analytical skills Education Master of Engineering, the American University in Cairo (AUC), Dec 2013 • Major: Mechanical Engineering, Specialized in: Industrial Engineering • Coursework included: Production Systems Design, Total Quality Management & Reliability, Facilities Planning & Design, Materials in Design Manufacturing (Design for Manufacturability & Assembly ), Systems Modeling and Optimization, Engineering Statistics, Engineering for a Sustainable Environment, Marketing Management & Introduction to Nanomaterials Bachelor of Science, the American University in Cairo (AUC), June 2010 • Major: Mechanical Engineering, Specialized in 1. Industrial Engineering 2. Design Engineering • Coursework included: Automated manufacturing systems, Quality Control, Production & Inventory Control, Computer Aided Design, Ergonomics, Manufacturing Processes, Mech. Design, Thermodynamics, Fluid Mechanics, Automatic Control & Manage. Fundamentals Work Experience March 2015 - Present, Continuous Improvement Engineer, Candy & Count Lines at Mondelez International (Kraft Foods), 10th of Ramadan • Working on replacing conventional lighting systems by motion detection systems in all plant warehouses and in main meeting rooms • Working on a safety & productivity project at biscuit line where mixer area is automated instead of manual operation • Replaced outdated mech. clutch of biscuit line packaging MCs by servo-motors; improved efficiency by reducing minor stops. & rework • Working on improv. steam net. of Candy & Count Lines by replacing steam traps & pressure reducers to minimize energy consumption • Worked on rolling out Integrated Lean Six Sigma program across Candy, Count & Flake Lines throughout phase 1 • Working on 3 Sigma Certification for Jelly Production Line June 2013 – Feb 2015, Continuous Improvement Engineer, Count Lines at Mondelez International (Kraft Foods), 10th of Ramadan Plant (CTOR) • Worked on Safety kaizens to minimize near misses & LTIRs; manufacturing safe ladders, sieves & safety covers installment … etc. • Worked on Quality kaizens to improve GMP; manufacturing hygiene components to avoid product contamination • Worked on placing hygiene separators between product rows to minimize rework due to sticky bars • Worked on replacing weak & tight belts with wider ones to reduce their breakdowns & raise product stability on production line • Worked on standardizing the process of choosing the suitable belt for each work station • Worked on drums repair using Stainless steel 316 filling to reduce rework & improve nougat quality to reduce rejections • Lead & Participated in Kaizen events targeting Workplace Organization, Rework Minimization & Breakdowns Minimization • Replaced normal tighten. tools by more efficient ones e.g. revers. wrenches & original bearing installers; reduce MTTR & raise efficiency • Leading a team of 3 Operation Analysts - Managing production data reporting process including daily, weekly, monthly & Annual Reports, Data Audits & Weights - Managing the Idea Management System (IMS) process across CTOR Plant including Ideas Recording & IMS reports - Developing analysts in terms of time management skills, English language, Advanced Microsoft office tools & Minimizing mistakes • Performed a study on segmenting energy sources across the 14 lines; for more accurate measurements & more precise Cost Allocation • Participated in 3 Sigma Validation for the Halls 1 Line including Measurement System Analysis & Process Capability • Lead a series of root cause analysis meetings targeting quality complaints elimination across CTOR & got a corresponding action plan • Performed a time & motion study on count lines to calculate the utilization of operators in order to find productivity opportunities • Contributed in passing phase 0 of Integrated Lean Six Sigma, passed qualification exam & finally, appointed Deputy FI Pillar Lead • Attended Lean 6σ GB Sessions, got highest score among candidates scoring 94% & Bubbly Weight Minimization project is in progress • Rolling out 5S by training & implement. through organiz. Materials WIP & finished product areas & placing toolbox in specified locations March 2012 – April 2013, Project Engineer at Egyptian Spanish Company for producing cardboards at Badr Industrial City • Planned & Coordinated the plant premises construction tasks performed by subcontractors: Concrete & Steel structures • Researched for the requirements of the production process: machineries, material types, suppliers, labor and inventories • Performed the feasibility Study & Planned the production flow in terms of Plant Layout, material handling and Inventory Jan 11-Feb 12, Operation & Maintenance Engineer at National Gas Company’s Pressure Reduction Station at 10th of Ramadan • Lead a team of 6 emergency technicians, 3 station technicians, 2 Network technicians, 4 drivers and 3 security men - Planned and Implemented Operation and Preventive & corrective maintenance of station components i.e. pipelines, regulators …etc. - Implemented operation & preventive & corrective maintenance of gas pipelines, regulators, network valves & industrial modules - Applied company’s quality, health, safety and environment (QHSE) certified policies in documents and technicalities August-December 2010, Mechanical Design Engineer at Akhnaton Mechatronics Company, EVA, Armanious Group • Designed and manufactured machines and their components using CAD/CAM systems, and conventional systems - Designed and Supervised the manufacturing of a gear pump producing a pressure of 3 bar - Designed and Supervised the manufacturing of a pomegranate crusher working by a motor- gear system - Designed a facilities layout for a production line of shower gel filled bottles including air-conditioning, fire, water…etc. Internship Experiences July - August 2012, Intern, Cementos La Union - Arabian Cement Company, Ain Sokhna, Egypt – Field Mechanical Engineering Extracurricular Activities • Regularly donating blood & funds at different charity organizations e.g. Resala, Egyptian Blood Bank… etc. Personal Skills and Interests • Fluent in the Arabic language and in the English language • Professional in Solid Works, Solid CAM, Microsoft Office& AutoCAD & very good in Minitab, Qeystone & CES for Material Selection
  • 2. • Practice outdoor sports (Soccer and Running) & Gymnastics – Birth Date: 28/3/1988 - Marital Status: Single – Military Status: Exempted