CLAYTON CONGER - PROJECT ARCHITECT
KEY EXPERIENCE AND STREGNTHS
Clay has demonstrated expertise in the following areas:
Leadership
Client interaction
Project Management
Team Leadership
Motivation
Professionalism
Staffing
Design
Client satisfaction
User livability
Energy conservation
Code compliance
Visualization
Presentation drawings, videos and graphics
Construction
Contracts, Drawings & Specifications
Interdisciplinary Coordination
Give and take among Civil, Structural, Mechanical and Electrical engineers.
Clay was the Architectural Team Leader for all architectural team members as they developed designs,
drawings and other deliverables. He was responsible for Client satisfaction with, and overall design
completeness, thoroughness of all Architectural deliverables.
In addition, he was responsible for all progress reporting, design approvals, client interface, code
compliance, and all inter-discipline coordination.
He uses his leadership skills to motivate team members to deliver superior quality designs and
deliverables. Clients and management appreciate his abilities.
All graphics provided below are examples of Clay’s work with “Revit”, a new Architectural Graphics software that Clay has been
using for two years. It is completely compatible with MicroStation and AutoCAD. Clay’s experience with Revit may deliver this
exciting new capability to your operations.
Power Business Project (current) –
Prairie Creek – Flood Recovery Project
A power plant in Iowa was flooded this spring. The Client called on URS Architects to remodel the Control Room and ancillary areas on a
Fast track basis. Clay was assigned and the above drawing is an example of the first phase results. Entire Control and Rack room
construction drawings and specification complete in three weeks.
Mining Business Unit Projects –
AREVA Uranium Project, Niger, Africa
This project includes prefabricated modules and tents arranged around Courtyards to provide livable spaces at a very remote
desert site.
GEOVIC Cobalt / Nickel Mine, Cameroon, Africa
This remote site is within a Cameroonian rainforest. Clay proposed that the major structural material should be timber- the
locally grown and available material. This design includes livable spaces for two very different cultural groups; the native and
western populations.
Industrial Process Business Unit Project –
Qatar Gas Common Sulfur Project, Ras Lafan, Qatar.
This construction progress photos shows the scale of sulfur storage building. The scale of this project was overwhelming for
Team members, so Clay encouraged his Bucharest Team to get the simple things right.
EMPLOYMENT HISTORY
2005-Present URS Washington Division
LEAD PROJECT ARCHITECT
2002 – 2004 MERRICK
Construction Management – Architect
1999 – 2002 HARRIS GROUP
Chief Architect for High Tech and Power Divisions
1997 – 1999 RAYTHEON ENGINEERS & CONSTRUCTORS, INC.
Project Manager/Project Architect - KOPEC/South Korea
1990 – 1997 KAISER HILL ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE
Project Architect/Project Manager
1983 – 1990 RAYTHEON ENGINEERS & CONSTRUCTORS, INC.
EDUCATION
Master of Architecture, University of Utah, 1980
Bachelor of Science, University of Utah, 1978
PROFESSIONAL REGISTRATION
Project Management Professional (PMI Certified)
Architect, Colorado License# B2012, 1984
NCARB Registered, #32710,1986, allows for reciprocity in most States
REFERENCES- (Other References available on request)
Steve Van Winkle, Chief Architect, Washington Group International - 303-843-2511
Mike Young, Project Manager City of Thornton
Sam Kalat, Structural Engineer, Washington Group International - Skalat@aol.com

More Related Content

What's hot

Tanveer_Phansopkar_-__piping_Draughtsman (1)
Tanveer_Phansopkar_-__piping_Draughtsman (1)Tanveer_Phansopkar_-__piping_Draughtsman (1)
Tanveer_Phansopkar_-__piping_Draughtsman (1)
TANVEER MOHAMMED PHANSOPKAR
 
Clinton l collier Resume
Clinton l collier ResumeClinton l collier Resume
Clinton l collier Resume
clinton collier
 
Alexander_Pace_Resume2016
Alexander_Pace_Resume2016Alexander_Pace_Resume2016
Alexander_Pace_Resume2016
Alexander Pace
 
Civil Consultant Resume
Civil Consultant ResumeCivil Consultant Resume
Civil Consultant Resume
Haseeb Ahmed
 
Aathikesavan CV
Aathikesavan CVAathikesavan CV
Aathikesavan CV
Aathikesavan Thangavelu
 
Resume.
Resume.Resume.
Resume.
Raja Sekar
 
Ramanathan CV
Ramanathan CVRamanathan CV
GIRIRAJAN
GIRIRAJANGIRIRAJAN
Resume(1)(1) - Copy
Resume(1)(1) - CopyResume(1)(1) - Copy
Resume(1)(1) - Copy
Rajesh Sharma
 
David Choi
David ChoiDavid Choi
David Choi
david choi
 
nizamuddinG Planning Engineer
nizamuddinG Planning EngineernizamuddinG Planning Engineer
nizamuddinG Planning Engineer
ghulam nizamuddin
 
Resume-Structural Engineering
Resume-Structural EngineeringResume-Structural Engineering
Resume-Structural Engineering
Praveen E
 
Bob Goswell CV - December 2015 Mk2
Bob Goswell CV - December 2015 Mk2Bob Goswell CV - December 2015 Mk2
Bob Goswell CV - December 2015 Mk2
Bob Goswell
 
CV Richard Furuhovde
CV Richard FuruhovdeCV Richard Furuhovde
CV Richard Furuhovde
Richard Furuhovde
 
RESUME Miles Palmateer
RESUME Miles PalmateerRESUME Miles Palmateer
RESUME Miles Palmateer
Miles Palmateer
 
CV Bernard Graves
CV Bernard GravesCV Bernard Graves
CV Bernard Graves
bernard graves
 
CV - Hassan-Planning
CV - Hassan-PlanningCV - Hassan-Planning
CV - Hassan-Planning
Hassan Khawaja
 
ALI SHARTOOH CV
ALI SHARTOOH CVALI SHARTOOH CV
ALI SHARTOOH CV
Ali Shartooh
 
RAJESH RAMU CV
RAJESH RAMU CVRAJESH RAMU CV
RAJESH RAMU CV
Rajesh Ramu
 
Planning_Engineer_Ramesh Babu P
Planning_Engineer_Ramesh Babu PPlanning_Engineer_Ramesh Babu P
Planning_Engineer_Ramesh Babu P
ramesh babu pamarthi
 

What's hot (20)

Tanveer_Phansopkar_-__piping_Draughtsman (1)
Tanveer_Phansopkar_-__piping_Draughtsman (1)Tanveer_Phansopkar_-__piping_Draughtsman (1)
Tanveer_Phansopkar_-__piping_Draughtsman (1)
 
Clinton l collier Resume
Clinton l collier ResumeClinton l collier Resume
Clinton l collier Resume
 
Alexander_Pace_Resume2016
Alexander_Pace_Resume2016Alexander_Pace_Resume2016
Alexander_Pace_Resume2016
 
Civil Consultant Resume
Civil Consultant ResumeCivil Consultant Resume
Civil Consultant Resume
 
Aathikesavan CV
Aathikesavan CVAathikesavan CV
Aathikesavan CV
 
Resume.
Resume.Resume.
Resume.
 
Ramanathan CV
Ramanathan CVRamanathan CV
Ramanathan CV
 
GIRIRAJAN
GIRIRAJANGIRIRAJAN
GIRIRAJAN
 
Resume(1)(1) - Copy
Resume(1)(1) - CopyResume(1)(1) - Copy
Resume(1)(1) - Copy
 
David Choi
David ChoiDavid Choi
David Choi
 
nizamuddinG Planning Engineer
nizamuddinG Planning EngineernizamuddinG Planning Engineer
nizamuddinG Planning Engineer
 
Resume-Structural Engineering
Resume-Structural EngineeringResume-Structural Engineering
Resume-Structural Engineering
 
Bob Goswell CV - December 2015 Mk2
Bob Goswell CV - December 2015 Mk2Bob Goswell CV - December 2015 Mk2
Bob Goswell CV - December 2015 Mk2
 
CV Richard Furuhovde
CV Richard FuruhovdeCV Richard Furuhovde
CV Richard Furuhovde
 
RESUME Miles Palmateer
RESUME Miles PalmateerRESUME Miles Palmateer
RESUME Miles Palmateer
 
CV Bernard Graves
CV Bernard GravesCV Bernard Graves
CV Bernard Graves
 
CV - Hassan-Planning
CV - Hassan-PlanningCV - Hassan-Planning
CV - Hassan-Planning
 
ALI SHARTOOH CV
ALI SHARTOOH CVALI SHARTOOH CV
ALI SHARTOOH CV
 
RAJESH RAMU CV
RAJESH RAMU CVRAJESH RAMU CV
RAJESH RAMU CV
 
Planning_Engineer_Ramesh Babu P
Planning_Engineer_Ramesh Babu PPlanning_Engineer_Ramesh Babu P
Planning_Engineer_Ramesh Babu P
 

Similar to RESUME_CConger

MS CV May 2016
MS CV May 2016MS CV May 2016
MS CV May 2016
Maurice Strachan PMP
 
Resume - Raveendra S
Resume - Raveendra SResume - Raveendra S
Resume - Raveendra S
Raveendra Babu Cherukuru
 
4 YEARS EXP RESUME
4 YEARS EXP RESUME4 YEARS EXP RESUME
4 YEARS EXP RESUME
MS MOHAN KUMAR
 
KWKCV16
KWKCV16KWKCV16
KWKCV16
Klaus Kucyk
 
Mohamed Nabil Omar - CV
Mohamed Nabil Omar - CVMohamed Nabil Omar - CV
Mohamed Nabil Omar - CV
Mohamed Omer
 
Arul Jose
Arul JoseArul Jose
Noufal CV
Noufal CVNoufal CV
Noufal CV
Noufal Thanal
 
EDUARDO H. PARE CV -- circa 10.2018
EDUARDO H. PARE CV  --  circa 10.2018EDUARDO H. PARE CV  --  circa 10.2018
EDUARDO H. PARE CV -- circa 10.2018
Eduardo H. Pare
 
AASHRAY DESIGN CONSULTANTS - RESIDENTIAL TOWNSHIP PROJECTS
AASHRAY DESIGN CONSULTANTS - RESIDENTIAL TOWNSHIP PROJECTSAASHRAY DESIGN CONSULTANTS - RESIDENTIAL TOWNSHIP PROJECTS
AASHRAY DESIGN CONSULTANTS - RESIDENTIAL TOWNSHIP PROJECTS
ADCPL : Aashray Design Consultants Pvt Ltd
 
Vinod kumar senior structural lead engineer
Vinod kumar  senior structural lead  engineerVinod kumar  senior structural lead  engineer
Vinod kumar senior structural lead engineer
Vinodh Kumar
 
_Mark_Maudsley_CV_2015
_Mark_Maudsley_CV_2015_Mark_Maudsley_CV_2015
_Mark_Maudsley_CV_2015
Mark Maudsley
 
my CV Hashim project/Site engineer
my CV   Hashim project/Site engineermy CV   Hashim project/Site engineer
my CV Hashim project/Site engineer
Hashim Vayalilakath
 
Curriculum vita mohamed nabil
Curriculum vita  mohamed nabilCurriculum vita  mohamed nabil
Curriculum vita mohamed nabil
Mohamed Omer
 
Curriculum Vitae of R M Rico
Curriculum Vitae of R M RicoCurriculum Vitae of R M Rico
Curriculum Vitae of R M Rico
Rene Rico
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
Eduardo H. Pare
 
Cv phaniraz
Cv   phanirazCv   phaniraz
Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011
Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011
Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011
Hans Goetze
 
Susant-Resume_BIM
Susant-Resume_BIMSusant-Resume_BIM
Susant-Resume_BIM
Susanta Mandal
 
DavidG_CV 2017
DavidG_CV 2017DavidG_CV 2017
DavidG_CV 2017
David Goulding
 
Wicker, L.W. July 2016
Wicker, L.W. July 2016Wicker, L.W. July 2016
Wicker, L.W. July 2016
Larry Wicker
 

Similar to RESUME_CConger (20)

MS CV May 2016
MS CV May 2016MS CV May 2016
MS CV May 2016
 
Resume - Raveendra S
Resume - Raveendra SResume - Raveendra S
Resume - Raveendra S
 
4 YEARS EXP RESUME
4 YEARS EXP RESUME4 YEARS EXP RESUME
4 YEARS EXP RESUME
 
KWKCV16
KWKCV16KWKCV16
KWKCV16
 
Mohamed Nabil Omar - CV
Mohamed Nabil Omar - CVMohamed Nabil Omar - CV
Mohamed Nabil Omar - CV
 
Arul Jose
Arul JoseArul Jose
Arul Jose
 
Noufal CV
Noufal CVNoufal CV
Noufal CV
 
EDUARDO H. PARE CV -- circa 10.2018
EDUARDO H. PARE CV  --  circa 10.2018EDUARDO H. PARE CV  --  circa 10.2018
EDUARDO H. PARE CV -- circa 10.2018
 
AASHRAY DESIGN CONSULTANTS - RESIDENTIAL TOWNSHIP PROJECTS
AASHRAY DESIGN CONSULTANTS - RESIDENTIAL TOWNSHIP PROJECTSAASHRAY DESIGN CONSULTANTS - RESIDENTIAL TOWNSHIP PROJECTS
AASHRAY DESIGN CONSULTANTS - RESIDENTIAL TOWNSHIP PROJECTS
 
Vinod kumar senior structural lead engineer
Vinod kumar  senior structural lead  engineerVinod kumar  senior structural lead  engineer
Vinod kumar senior structural lead engineer
 
_Mark_Maudsley_CV_2015
_Mark_Maudsley_CV_2015_Mark_Maudsley_CV_2015
_Mark_Maudsley_CV_2015
 
my CV Hashim project/Site engineer
my CV   Hashim project/Site engineermy CV   Hashim project/Site engineer
my CV Hashim project/Site engineer
 
Curriculum vita mohamed nabil
Curriculum vita  mohamed nabilCurriculum vita  mohamed nabil
Curriculum vita mohamed nabil
 
Curriculum Vitae of R M Rico
Curriculum Vitae of R M RicoCurriculum Vitae of R M Rico
Curriculum Vitae of R M Rico
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
 
Cv phaniraz
Cv   phanirazCv   phaniraz
Cv phaniraz
 
Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011
Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011
Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011
 
Susant-Resume_BIM
Susant-Resume_BIMSusant-Resume_BIM
Susant-Resume_BIM
 
DavidG_CV 2017
DavidG_CV 2017DavidG_CV 2017
DavidG_CV 2017
 
Wicker, L.W. July 2016
Wicker, L.W. July 2016Wicker, L.W. July 2016
Wicker, L.W. July 2016
 

RESUME_CConger

  • 1. CLAYTON CONGER - PROJECT ARCHITECT KEY EXPERIENCE AND STREGNTHS Clay has demonstrated expertise in the following areas: Leadership Client interaction Project Management Team Leadership Motivation Professionalism Staffing Design Client satisfaction User livability Energy conservation Code compliance Visualization Presentation drawings, videos and graphics Construction Contracts, Drawings & Specifications Interdisciplinary Coordination Give and take among Civil, Structural, Mechanical and Electrical engineers. Clay was the Architectural Team Leader for all architectural team members as they developed designs, drawings and other deliverables. He was responsible for Client satisfaction with, and overall design completeness, thoroughness of all Architectural deliverables. In addition, he was responsible for all progress reporting, design approvals, client interface, code compliance, and all inter-discipline coordination. He uses his leadership skills to motivate team members to deliver superior quality designs and deliverables. Clients and management appreciate his abilities. All graphics provided below are examples of Clay’s work with “Revit”, a new Architectural Graphics software that Clay has been using for two years. It is completely compatible with MicroStation and AutoCAD. Clay’s experience with Revit may deliver this exciting new capability to your operations. Power Business Project (current) – Prairie Creek – Flood Recovery Project A power plant in Iowa was flooded this spring. The Client called on URS Architects to remodel the Control Room and ancillary areas on a Fast track basis. Clay was assigned and the above drawing is an example of the first phase results. Entire Control and Rack room construction drawings and specification complete in three weeks.
  • 2. Mining Business Unit Projects – AREVA Uranium Project, Niger, Africa This project includes prefabricated modules and tents arranged around Courtyards to provide livable spaces at a very remote desert site. GEOVIC Cobalt / Nickel Mine, Cameroon, Africa This remote site is within a Cameroonian rainforest. Clay proposed that the major structural material should be timber- the locally grown and available material. This design includes livable spaces for two very different cultural groups; the native and western populations.
  • 3. Industrial Process Business Unit Project – Qatar Gas Common Sulfur Project, Ras Lafan, Qatar. This construction progress photos shows the scale of sulfur storage building. The scale of this project was overwhelming for Team members, so Clay encouraged his Bucharest Team to get the simple things right. EMPLOYMENT HISTORY 2005-Present URS Washington Division LEAD PROJECT ARCHITECT 2002 – 2004 MERRICK Construction Management – Architect 1999 – 2002 HARRIS GROUP Chief Architect for High Tech and Power Divisions 1997 – 1999 RAYTHEON ENGINEERS & CONSTRUCTORS, INC. Project Manager/Project Architect - KOPEC/South Korea 1990 – 1997 KAISER HILL ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE Project Architect/Project Manager 1983 – 1990 RAYTHEON ENGINEERS & CONSTRUCTORS, INC. EDUCATION Master of Architecture, University of Utah, 1980 Bachelor of Science, University of Utah, 1978
  • 4. PROFESSIONAL REGISTRATION Project Management Professional (PMI Certified) Architect, Colorado License# B2012, 1984 NCARB Registered, #32710,1986, allows for reciprocity in most States REFERENCES- (Other References available on request) Steve Van Winkle, Chief Architect, Washington Group International - 303-843-2511 Mike Young, Project Manager City of Thornton Sam Kalat, Structural Engineer, Washington Group International - Skalat@aol.com