1. CHANG SHEN
Sandy Springs, GA30328 |(C) 404-268-7036 |johnson1820@qq.com
Professional summary
I was an injection engineer after graduation, because of my penetrations and earnests, I became an
industry engineering engineer, and be promoted to management. I think my advantages are from
my education and experiences. I know the new technologies from university and I have the
experiences to manage a team, a workshop, an operation or a company. Fortunately I had the
change to apply these new technologies in my daily management, then I knew them more. Above
that, I am the one who love to solve problem, it makes me happy.
Skills
Modern logistic technology,
Quality systems of manufacturing including QS9000、VDA6.1、TS16949;
Material management;
Lean Manufacturing; QAD (one of MRP)
Leadership and teamwork;
Efficient communication;
Designation
Education
2004.2-2008.6 Shanghai Jiaotong University
Master of Logistic Engineering
1994.8-1998.7 East China University of Science & Technology
Bachelor of Polymer & Engineering
Work history:
Deputy General Manager,
Jan. 2011-Feb. 2015
Yanfeng Group-Yankang Auto Parts Rugao Co. Ltd
Established and managed the company, including: Manufacture, Quality, Logistic, Facility,
HR&Admin and Financial.
Trained the supervisors of manufacture, quality and logistic from engineers.
Applied MRP, WMS and MES in the plant
In change of commodity purchase
This company products auto parts, like grill and other plastic plating parts
I managed about 200 employees and about 150 million RMB revenue when I left
Manufacture Manager and VA/VE Manager
Mar. 2008-Jan.2011
Yanfeng Group-Shanghai Yanfeng Industry & Commerce Co. Ltd
2. Support on the sustainable improvement for manufacture and logistic function of subordinate
companies.
Analysis and summarize the standard operational process and define the operational target.
Manage on VA/VE for subordinate companies. In these 3 years the cost saving of 10 plants is
totally 5 million RMB.
In 2009, I supported YFV to establish YFUSA in Detroit, MI.
Assistant manager of General Manager and Operational manager
Dec.2007-Feb.2008
Shanghai Dazhong Lianxiang Automotive Parts Co.Ltd
Manage four departments: Manufacture, Logistic, Quality assurance and procurement.
Improve Timely Delivery Rate from 75% to 100%
Injection Area Manager of Exterior System Plant
Feb.2007-Aug.2007
Yanfeng Group-Yanfeng Plastic Omnium Automotive Exterior Systems Co., Ltd
.
Control production
Ensure safety and high efficiency during production to meet the customer requirements
Training stuffs on quality and safety system for better implementation during production
Production trial of new projects
Material Plan & Logistic Manager of Exterior System Plant
Jan.2006-Feb.2007
YanFeng Visteon Automotive Trim System Ltd
Communicate with customers;
Make production plan and material plan accordingly;
Order material for production; Ensure on time delivery。
Injection Area Manager
Jan.2005-Dec.2006
YanFeng Visteon Automotive Trim System Ltd
MP&L Manager of Exterior System Plant
Jan.2004-Dec.2004
YanFeng Visteon Automotive Trim System Ltd
MP&L Manager of Zhenbei Plant
Jan.2003-Dec.2003
YanFeng Visteon Automotive Trim System Ltd
Injection Area Manager of Zhenbei Plant
Jan.2002-Dec.2002
3. YanFeng Visteon Automotive Trim System Ltd
IE Engineer in Engineering Section Manufacturing Department
May.2001-Dec.2001
YanFeng Visteon Automotive Trim System Ltd
Plan the layout and logistic of new projection;
Support interior plant in improving the layout;
Draft out/modify the procedures;
To improve the operation procedure system in plant level;
Part-time trainer for plant management
Process Engineer in Technology Section Bumper plant & Team leader of Injection Technique Group
Sep.2000-Apr.2001
YanFeng Visteon Automotive Trim System Ltd
Control the process and the quality,
continuous improvement
Planer in MP&L Section
Jan.2000-Aug.2000
YanFeng Visteon Automotive Trim System Ltd
Plan the injection production in accordance with customers to ensure in time supply
Process Engineer of Technology Section & supervisor of Injection Workshop
Aug.1998-Dec.1999
YanFeng Visteon Automotive Trim System Ltd
Control the production quality; draw injection production plan;
Arrange three shifts for production.
Recent Projects:
New Plating Line (with capability of 240,000 square meter/year)
New Painting Line (including Stamping Line, with capability of 800,000 grill/year)
Applicate barcode and WMS, improve our MRP and MES