SlideShare a Scribd company logo
Resume of LEE SENG KEONG
LEE, SENG KEONG
Male
31 yearsold
Address:
No.2, JalanMelati Utama 3,
Taman Melati Utama,
53100 KualaLumpur.
Mobile : +6 010 434 0844
Email : LSENGKEONG@HOTMAIL.COM
8 years of experience as field engineer working at well site involving
Mud Logging and Mud Engineering
ProfessionalExperience
Schlumberger Drilling Services (M-I SWACO) April 2013 –June 2015
Job title:Drilling Fluids Specialist
Date September2014 – June 2015
Rig SKD T-19
Client EORC, BOKORProject
Position SecondMud Engineer
Fluid KCl/PHPA/Glycol
Well Description
MaximumDepth: 9260 ft MD / 6615 ftTVD
max MW : 9.3 ppg
max Inclination : 63°
max Bottom Hole Temperature :140°F
waterdepth : 217 ft
LessonLearned
 Blendtreatedoldmudwithnewmudtominimizemixingtimefortotal
drillingfluidvolume.
 Control chemical concentration in active mud by streaming higher
concentration mud into active system corresponding with ROP and
formationcharacter.
 Screen up to API 120 (200 mesh) with 1000 gpm without overflow at
shakers.
 Reducedlossrate from150 bphto 10 bph with50 ppbLCM pill.
 Prepare KCl/NaCl Brine with higher initial concentration and then
dilute intoprogramed%WKCl andMW to reduce mixingtime.
 Reduce brine lossrate incompletionjob from 250 bphto 15 bph with
2.5 gal/bbl HECPill.
Resume of LEE SENG KEONG
Date November2013 – August2014
Rig Rig RowanEXL 4
Client Carigali Hess,BUMI Project
Position Second Mud Engineer
Fluid ParathermSBM
Well Description
MaximumDepth: 12248 ft MD / 6853 ft TVD
max MW : 11.8 ppg
max Inclination : 60°
max Bottom Hole Temperature :255°F
waterdepth : 118 ft
LessonLearned
 Pilottestonactive mudto avoidovertreatment.
 Inspectoncuttingsize,shape andhardnesstocheck fluidefficiency.
 Inspect shaker screens condition to obtain maximum solid control
efficiency.
 Run degasseranduse DEFOAMER to reduce foaminginmud.
Date July2013 – October2013
Location AsianSupplyBase (Labuan) and KemamanSupplyBase (Kemaman)
Client PETRONASandSHELL
Position Trainee Mud Engineer
Fluid SBM
LessonLearned
 Mud check onold SBM.
 Treat Oil WaterRatio andother Chemical Properties.
 Mix new SBM.
 Inspectmudtank before loadouttovessel.
Others Responsibility
1. Job Preparation
 Reviewfluidprogram toprepare chemical order.
 Write mixingprocedure andhandlingof products.
 Pitplanningforactive pits,reserve pits,highviscositypill,LCMpill,Spacer,Kill mudandBrine.
 Orderand maintain chemical andscreensinventoryonsite.
2. Drilling
 Run mudcheck to determinetrendandtype of contamination.
 Maintainfluidpropertiesforoptimal performance.
 Monitorsolidcontrol (shakerandcentrifuge) performance.
 Conductpilottestfindthe best chemical concentrationtotreata contamination.
3. Other Operation
 Provide recommendationtoclienttooptimize drillingefficiency while complyingHSEpolicy.
 Cooperate withonsite geologisttoadjustfluidpropertiescorrespondtoformationcharacter.
 Cooperate with Measurement While Drilling Engineers and Wireline Engineers to ensure
downhole toolsrunatoptimal efficiency.
 Cooperate with CementerEngineerinplanningformixingspacers/inhibitedseawater,cementjob,
displacementandmonitorloss/gainof fluidvolume during/aftercementjob.
 Cooperate withcompletionengineersinpreparingsufficientbrinevolumeincompletionjob.
Resume of LEE SENG KEONG
4. Reporting
 Reportto clientandprojectengineerswhile onsite.
 Prepare dailyreportandwell recapof eachwell.
 Recordlessonlearntfromeachwell andrecommendationinwellrecap fornextwell planning.
DHI Services June 2009 –March 2013
Job title:DataEngineer
 Operate and maintain real time computer based data acquisition in all rig activity (drilling,
cementing,andcompletion)
 On-site maintenance oncomputerandsensorswithsufficientmechanical andelectrical knowledge,
 Well monitoringonhazardousgasandhighpressure conditionin healthandsafetyrole.
 Recordreal time data.
 Reportingtowell site geologistandCompany-maninwrittenreports.
International Logging Services (ILO) July 2007 –May 2009
Job title: MudLogger
 Collect,processandanalyze geological sample (cuttingsandgassample)
 Evaluate cuttingandgas sample forindicationof hydrocarbon.
 Interpret formation from samples and feed that information back to drilling team and enhance
safetyandsuccess.
 Assistwell site geologistinpreparingmudlogsandcoringoperation.
Certificates
Basic Mud School June 2013
ONE-TRAXTraining June 2013
Basic Drillsense Software andHardware TrainingforGeologist May 2009
Electrical SafetyInductionCourse May 2009
Basic Hardware Course May 2009
IntermediateHardware One Training May 2009
Basic Mud Logging January2008
FormationLoggingInduction January2008
Educational Background
Universityof Malaya– Departmentof Geology
Bachelorof Science inAppliedGeology
2004 – 2007
Result:CGPA 3.56 out of 4.0
TunkuAbdul RahmanCollege –Pre-UniversityDepartment
MalaysianHigherSchool Certificate inScience (STPM)
2002 – 2004
Result:Physics(A),Mathematic(A),
Chemistry(A-),Biology(B)
Resume of LEE SENG KEONG
Other Information
 SpokenandwritteninEnglish,Chinese (Mandarin) andBahasaMalaysia.
 FamiliarwithMicrosoftExcel andWord.
 Willingtotravel andrelocate.
 Hobby:backpacking(10 monthsworkingholidayin New Zealand),camping,swimming andother
outdooractivities.
Reference
MR. SHAFRI ARIFIN
ProjectEngineer
SchlumbergerDrillingServices(MISWACO)
ssaifularifin@slb.com
+6 012 3249170
MR. MOHAMMAD IQBAL
Lead Mud Engineer
SchlumbergerDrillingServices(MISWACO)
Iqbal.hadzir@gmail.com
+6 019 2777652
MS. CATHERINE WONG
DHI Services
AdminManagerand OperationSupport
catherine@dhiservices.com
+6 012 2775600
MR. Vun Boon Onn
Total E&P Uganda
Wellsite Geologist
Boon-onn.vun@total.com
+6 016 3491879
Resume of LEE SENG KEONG
Attachment
OPERATOR DEVIATION* LOCATION DEPTH DENSITY TEMP. MUD TYPE WATER DEPTH
Carigali Hess 4 (78°) Bumi D (BLB 06-02 LOC G) 11000 ft MD / 4394 ft TVD 11.2 ppg 248°F PARATHERM SBM 175.85ft
Carigali Hess 3 (44°) Bumi D (BLB 05-05 LOC E) 5000 ft MD / 4494 ft TVD 10.7 ppg 180°F ULTRADRIL 175.85ft
Carigali Hess 4 (81°) Bumi D (BMD 03/01 LOC E) 11226 ft MD / 4262 ft TVD 11.2 ppg 231°F PARATHERM SBM 188.00ft
Carigali Hess 4 (63°) Bumi D (BMD 05/08 LOC A) 12248 ft MD / 6853 ft TVD 11.8 ppg 255°F PARATHERM SBM 188.00ft
Carigali Hess 4 (79°) Bumi D (BMD 02/10 LOC F) 12082 ft MD / 5178 ft TVD 10.9 ppg 240°F PARATHERM SBM 188.00ft
EORC 3 (50°) BOKOR (BO-107 ST) 6347 ft MD / 5455 ft TVD 8.6 ppg 147°F KCl/Glycol/PHPA 217.00ft
EORC 4 (63°) BOKOR (BO-108 ST) 5040 ft MD / 3829 ft TVD 9.3 ppg 131°F KCl/Glycol/PHPA 217.00ft
EORC 4 (61°) BOKOR (BO-115 ST) 3647 ft MD / 2564 ft TVD 9.1 ppg 133°F KCl/Glycol/PHPA 217.00ft
EORC 3 (60°) BOKOR (BO-122 ST) 9260 ft MD / 6615 ft TVD 9.3 ppg 140°F KCl/Glycol/PHPA 217.00ft
EORC 3 (54°) BOKOR (BO-123 ST) 4895 ft MD / 4059 ft TVD 9.3 ppg 130°F KCl/Glycol/PHPA 217.00ft
EORC 3 (50°) BOKOR (BO-124 ST) 1485 ft MD / 1473 ft TVD 8.8 ppg 90°F KCl/Glycol/PHPA 217.00ft
EORC 3 (59°) BOKOR (BO-125 ST) 6153 ft MD / 4544 ft TVD 9.5 ppg 143°F KCl/Glycol/PHPA 217.00ft
SPECIFIC WELLS WORKED

More Related Content

What's hot

Corrocoat USA Lowers Costs and Increases Reliability at Chemical Plant
Corrocoat USA Lowers Costs and Increases Reliability at Chemical PlantCorrocoat USA Lowers Costs and Increases Reliability at Chemical Plant
Corrocoat USA Lowers Costs and Increases Reliability at Chemical Plant
Ed Cilli
 
Rubberized Hot Mix Asphalt (RHMA) Mix Design
Rubberized Hot Mix Asphalt (RHMA) Mix DesignRubberized Hot Mix Asphalt (RHMA) Mix Design
Rubberized Hot Mix Asphalt (RHMA) Mix Design
California Asphalt Pavement Association
 
HPHT2014_Presentation_Larry_Vincent
HPHT2014_Presentation_Larry_VincentHPHT2014_Presentation_Larry_Vincent
HPHT2014_Presentation_Larry_Vincent
Larry W. Vincent - (832) 326-9056
 
Roadway design presentation
Roadway design presentationRoadway design presentation
Roadway design presentation
Jessika Northrup
 
Kellingray
KellingrayKellingray
Kellingray
Guembour Hamza
 
06b PFLOTRAN-RepoTREND Code Inter-comparison: Inter-comparison Plan & First P...
06b PFLOTRAN-RepoTREND Code Inter-comparison: Inter-comparison Plan & First P...06b PFLOTRAN-RepoTREND Code Inter-comparison: Inter-comparison Plan & First P...
06b PFLOTRAN-RepoTREND Code Inter-comparison: Inter-comparison Plan & First P...
Sandia National Laboratories: Energy & Climate: Renewables
 
Summer training project on drilling fluid at ongc ppt
Summer training project on drilling fluid at ongc pptSummer training project on drilling fluid at ongc ppt
Summer training project on drilling fluid at ongc ppt
Keshar Saini
 
17 Salt Reconsolidation
17 Salt Reconsolidation17 Salt Reconsolidation
Cliff Ashcroft
Cliff AshcroftCliff Ashcroft
SPE 106712
SPE 106712SPE 106712
SPE 106712
Nghi Nguyen
 
Civil Eng. priject presentation
Civil Eng. priject presentationCivil Eng. priject presentation
Civil Eng. priject presentation
Vj NiroSh
 
Mix design
Mix designMix design
Mix design
Abdul Habib Zaray
 
IRJET - To Study the effects of partially replacement of aggregate with RAP M...
IRJET - To Study the effects of partially replacement of aggregate with RAP M...IRJET - To Study the effects of partially replacement of aggregate with RAP M...
IRJET - To Study the effects of partially replacement of aggregate with RAP M...
IRJET Journal
 
10 Current status of research in the Joint Project WEIMOS
10 Current status of research in the Joint Project WEIMOS10 Current status of research in the Joint Project WEIMOS
10 Current status of research in the Joint Project WEIMOS
Sandia National Laboratories: Energy & Climate: Renewables
 
Field Development Project : Gelama Merah
Field Development Project : Gelama MerahField Development Project : Gelama Merah
Field Development Project : Gelama Merah
Hami Asma'i
 
RoaDrain Brochure Web spreads
RoaDrain Brochure Web spreadsRoaDrain Brochure Web spreads
RoaDrain Brochure Web spreads
Robin Vodenlic
 
16 Reconsolidation of granular salt (DAEF report)
16 Reconsolidation of granular salt (DAEF report)16 Reconsolidation of granular salt (DAEF report)
16 Reconsolidation of granular salt (DAEF report)
Sandia National Laboratories: Energy & Climate: Renewables
 
Cdw sed tank_tech_memo1111
Cdw sed tank_tech_memo1111Cdw sed tank_tech_memo1111
Cdw sed tank_tech_memo1111
Mazen Alqadi
 
IRJET-Replacement of Cement by Granite Powder in Paver Blocks
IRJET-Replacement of Cement by Granite Powder in Paver BlocksIRJET-Replacement of Cement by Granite Powder in Paver Blocks
IRJET-Replacement of Cement by Granite Powder in Paver Blocks
IRJET Journal
 
Manufacturing process optimization by means of simulation for technical and s...
Manufacturing process optimization by means of simulation for technical and s...Manufacturing process optimization by means of simulation for technical and s...
Manufacturing process optimization by means of simulation for technical and s...
TRANSVALOR S.A.
 

What's hot (20)

Corrocoat USA Lowers Costs and Increases Reliability at Chemical Plant
Corrocoat USA Lowers Costs and Increases Reliability at Chemical PlantCorrocoat USA Lowers Costs and Increases Reliability at Chemical Plant
Corrocoat USA Lowers Costs and Increases Reliability at Chemical Plant
 
Rubberized Hot Mix Asphalt (RHMA) Mix Design
Rubberized Hot Mix Asphalt (RHMA) Mix DesignRubberized Hot Mix Asphalt (RHMA) Mix Design
Rubberized Hot Mix Asphalt (RHMA) Mix Design
 
HPHT2014_Presentation_Larry_Vincent
HPHT2014_Presentation_Larry_VincentHPHT2014_Presentation_Larry_Vincent
HPHT2014_Presentation_Larry_Vincent
 
Roadway design presentation
Roadway design presentationRoadway design presentation
Roadway design presentation
 
Kellingray
KellingrayKellingray
Kellingray
 
06b PFLOTRAN-RepoTREND Code Inter-comparison: Inter-comparison Plan & First P...
06b PFLOTRAN-RepoTREND Code Inter-comparison: Inter-comparison Plan & First P...06b PFLOTRAN-RepoTREND Code Inter-comparison: Inter-comparison Plan & First P...
06b PFLOTRAN-RepoTREND Code Inter-comparison: Inter-comparison Plan & First P...
 
Summer training project on drilling fluid at ongc ppt
Summer training project on drilling fluid at ongc pptSummer training project on drilling fluid at ongc ppt
Summer training project on drilling fluid at ongc ppt
 
17 Salt Reconsolidation
17 Salt Reconsolidation17 Salt Reconsolidation
17 Salt Reconsolidation
 
Cliff Ashcroft
Cliff AshcroftCliff Ashcroft
Cliff Ashcroft
 
SPE 106712
SPE 106712SPE 106712
SPE 106712
 
Civil Eng. priject presentation
Civil Eng. priject presentationCivil Eng. priject presentation
Civil Eng. priject presentation
 
Mix design
Mix designMix design
Mix design
 
IRJET - To Study the effects of partially replacement of aggregate with RAP M...
IRJET - To Study the effects of partially replacement of aggregate with RAP M...IRJET - To Study the effects of partially replacement of aggregate with RAP M...
IRJET - To Study the effects of partially replacement of aggregate with RAP M...
 
10 Current status of research in the Joint Project WEIMOS
10 Current status of research in the Joint Project WEIMOS10 Current status of research in the Joint Project WEIMOS
10 Current status of research in the Joint Project WEIMOS
 
Field Development Project : Gelama Merah
Field Development Project : Gelama MerahField Development Project : Gelama Merah
Field Development Project : Gelama Merah
 
RoaDrain Brochure Web spreads
RoaDrain Brochure Web spreadsRoaDrain Brochure Web spreads
RoaDrain Brochure Web spreads
 
16 Reconsolidation of granular salt (DAEF report)
16 Reconsolidation of granular salt (DAEF report)16 Reconsolidation of granular salt (DAEF report)
16 Reconsolidation of granular salt (DAEF report)
 
Cdw sed tank_tech_memo1111
Cdw sed tank_tech_memo1111Cdw sed tank_tech_memo1111
Cdw sed tank_tech_memo1111
 
IRJET-Replacement of Cement by Granite Powder in Paver Blocks
IRJET-Replacement of Cement by Granite Powder in Paver BlocksIRJET-Replacement of Cement by Granite Powder in Paver Blocks
IRJET-Replacement of Cement by Granite Powder in Paver Blocks
 
Manufacturing process optimization by means of simulation for technical and s...
Manufacturing process optimization by means of simulation for technical and s...Manufacturing process optimization by means of simulation for technical and s...
Manufacturing process optimization by means of simulation for technical and s...
 

Viewers also liked

Advert research further
Advert research furtherAdvert research further
Advert research further
Lucy Taylor
 
Star cement-works
Star cement-worksStar cement-works
Star cement-works
Star Cement Works
 
Mazepa by Eric Plety
Mazepa by Eric PletyMazepa by Eric Plety
Mazepa by Eric Pletymegy
 
who-were-the-magi-chuck-missler
who-were-the-magi-chuck-misslerwho-were-the-magi-chuck-missler
who-were-the-magi-chuck-missler
Katuri Susmitha
 
Anima by Eric Plety
Anima by Eric PletyAnima by Eric Plety
Anima by Eric Pletymegy
 
Noir & Blanc by Eric Plety
Noir & Blanc by Eric PletyNoir & Blanc by Eric Plety
Noir & Blanc by Eric Pletymegy
 

Viewers also liked (6)

Advert research further
Advert research furtherAdvert research further
Advert research further
 
Star cement-works
Star cement-worksStar cement-works
Star cement-works
 
Mazepa by Eric Plety
Mazepa by Eric PletyMazepa by Eric Plety
Mazepa by Eric Plety
 
who-were-the-magi-chuck-missler
who-were-the-magi-chuck-misslerwho-were-the-magi-chuck-missler
who-were-the-magi-chuck-missler
 
Anima by Eric Plety
Anima by Eric PletyAnima by Eric Plety
Anima by Eric Plety
 
Noir & Blanc by Eric Plety
Noir & Blanc by Eric PletyNoir & Blanc by Eric Plety
Noir & Blanc by Eric Plety
 

Similar to Resume - LEE SENG KEONG - 2015

My FS2 DEE
My FS2 DEEMy FS2 DEE
CO2 capture, transport and geological storage programmes
CO2 capture, transport and geological storage programmesCO2 capture, transport and geological storage programmes
CO2 capture, transport and geological storage programmes
Global CCS Institute
 
CV_Mohammad Iqbal Hadzir
CV_Mohammad Iqbal HadzirCV_Mohammad Iqbal Hadzir
CV_Mohammad Iqbal Hadzir
Mohammad Iqbal Hadzir
 
Recap final celeus 1
Recap final celeus 1Recap final celeus 1
Recap final celeus 1
jose notario torres
 
CV for the post of Mud Specialist I Drilling Fluids Engineer
CV for the post of Mud Specialist I Drilling Fluids EngineerCV for the post of Mud Specialist I Drilling Fluids Engineer
CV for the post of Mud Specialist I Drilling Fluids Engineer
Bhaskar Hazarika
 
BHI NSP Final 14_6_12
BHI NSP Final 14_6_12BHI NSP Final 14_6_12
BHI NSP Final 14_6_12
John Grover
 
GNwafor Group 1 Project
GNwafor Group 1 ProjectGNwafor Group 1 Project
OKEREKE CHISOM CV
OKEREKE CHISOM CVOKEREKE CHISOM CV
OKEREKE CHISOM CV
Chisom Okereke
 
MECHANICAL PROPERTIES OF HIGH VOLUME FLY ASH CONCRETE SUBJECTED TO ELEVATED ...
MECHANICAL PROPERTIES OF HIGH VOLUME FLY ASH CONCRETE  SUBJECTED TO ELEVATED ...MECHANICAL PROPERTIES OF HIGH VOLUME FLY ASH CONCRETE  SUBJECTED TO ELEVATED ...
MECHANICAL PROPERTIES OF HIGH VOLUME FLY ASH CONCRETE SUBJECTED TO ELEVATED ...
Umer Farooq
 
326074628-FDP-Presentation-Slide.pptx
326074628-FDP-Presentation-Slide.pptx326074628-FDP-Presentation-Slide.pptx
326074628-FDP-Presentation-Slide.pptx
mohdsuriamohdsuhaimi
 
Meshak cv
Meshak cv Meshak cv
Meshak cv
Meshak Mathew
 
Meshak cv
Meshak cv Meshak cv
Meshak cv
Meshak Mathew
 
Iapg jornadas shale neuquén vaca muerta a regional vision- 2013 neuquén
Iapg jornadas shale neuquén vaca muerta a regional vision- 2013 neuquénIapg jornadas shale neuquén vaca muerta a regional vision- 2013 neuquén
Iapg jornadas shale neuquén vaca muerta a regional vision- 2013 neuquén
Juan Carlos Bonapace
 
Graphite Heat Exchangers
Graphite Heat ExchangersGraphite Heat Exchangers
Graphite Heat Exchangers
Gerard B. Hawkins
 
Delta Group 2018.pdf
Delta Group 2018.pdfDelta Group 2018.pdf
Delta Group 2018.pdf
GiacobbeBaldini1
 
younggeun_Lee.pdf
younggeun_Lee.pdfyounggeun_Lee.pdf
younggeun_Lee.pdf
ssuserea0355
 
Sheldon Lyle V. Marquez CV -PDF file
Sheldon Lyle V. Marquez CV -PDF fileSheldon Lyle V. Marquez CV -PDF file
Sheldon Lyle V. Marquez CV -PDF file
Sheldon Lyle Marquez
 
20120140504022 2
20120140504022 220120140504022 2
20120140504022 2
IAEME Publication
 
Mg innovation flng cn 2010
Mg innovation flng cn 2010Mg innovation flng cn 2010
Mg innovation flng cn 2010
Mukesh Kumar Gupta
 
Summer training project on drilling fluid at ongc ppt
Summer training project on drilling fluid at ongc pptSummer training project on drilling fluid at ongc ppt
Summer training project on drilling fluid at ongc ppt
Keshar Saini
 

Similar to Resume - LEE SENG KEONG - 2015 (20)

My FS2 DEE
My FS2 DEEMy FS2 DEE
My FS2 DEE
 
CO2 capture, transport and geological storage programmes
CO2 capture, transport and geological storage programmesCO2 capture, transport and geological storage programmes
CO2 capture, transport and geological storage programmes
 
CV_Mohammad Iqbal Hadzir
CV_Mohammad Iqbal HadzirCV_Mohammad Iqbal Hadzir
CV_Mohammad Iqbal Hadzir
 
Recap final celeus 1
Recap final celeus 1Recap final celeus 1
Recap final celeus 1
 
CV for the post of Mud Specialist I Drilling Fluids Engineer
CV for the post of Mud Specialist I Drilling Fluids EngineerCV for the post of Mud Specialist I Drilling Fluids Engineer
CV for the post of Mud Specialist I Drilling Fluids Engineer
 
BHI NSP Final 14_6_12
BHI NSP Final 14_6_12BHI NSP Final 14_6_12
BHI NSP Final 14_6_12
 
GNwafor Group 1 Project
GNwafor Group 1 ProjectGNwafor Group 1 Project
GNwafor Group 1 Project
 
OKEREKE CHISOM CV
OKEREKE CHISOM CVOKEREKE CHISOM CV
OKEREKE CHISOM CV
 
MECHANICAL PROPERTIES OF HIGH VOLUME FLY ASH CONCRETE SUBJECTED TO ELEVATED ...
MECHANICAL PROPERTIES OF HIGH VOLUME FLY ASH CONCRETE  SUBJECTED TO ELEVATED ...MECHANICAL PROPERTIES OF HIGH VOLUME FLY ASH CONCRETE  SUBJECTED TO ELEVATED ...
MECHANICAL PROPERTIES OF HIGH VOLUME FLY ASH CONCRETE SUBJECTED TO ELEVATED ...
 
326074628-FDP-Presentation-Slide.pptx
326074628-FDP-Presentation-Slide.pptx326074628-FDP-Presentation-Slide.pptx
326074628-FDP-Presentation-Slide.pptx
 
Meshak cv
Meshak cv Meshak cv
Meshak cv
 
Meshak cv
Meshak cv Meshak cv
Meshak cv
 
Iapg jornadas shale neuquén vaca muerta a regional vision- 2013 neuquén
Iapg jornadas shale neuquén vaca muerta a regional vision- 2013 neuquénIapg jornadas shale neuquén vaca muerta a regional vision- 2013 neuquén
Iapg jornadas shale neuquén vaca muerta a regional vision- 2013 neuquén
 
Graphite Heat Exchangers
Graphite Heat ExchangersGraphite Heat Exchangers
Graphite Heat Exchangers
 
Delta Group 2018.pdf
Delta Group 2018.pdfDelta Group 2018.pdf
Delta Group 2018.pdf
 
younggeun_Lee.pdf
younggeun_Lee.pdfyounggeun_Lee.pdf
younggeun_Lee.pdf
 
Sheldon Lyle V. Marquez CV -PDF file
Sheldon Lyle V. Marquez CV -PDF fileSheldon Lyle V. Marquez CV -PDF file
Sheldon Lyle V. Marquez CV -PDF file
 
20120140504022 2
20120140504022 220120140504022 2
20120140504022 2
 
Mg innovation flng cn 2010
Mg innovation flng cn 2010Mg innovation flng cn 2010
Mg innovation flng cn 2010
 
Summer training project on drilling fluid at ongc ppt
Summer training project on drilling fluid at ongc pptSummer training project on drilling fluid at ongc ppt
Summer training project on drilling fluid at ongc ppt
 

Resume - LEE SENG KEONG - 2015

  • 1. Resume of LEE SENG KEONG LEE, SENG KEONG Male 31 yearsold Address: No.2, JalanMelati Utama 3, Taman Melati Utama, 53100 KualaLumpur. Mobile : +6 010 434 0844 Email : LSENGKEONG@HOTMAIL.COM 8 years of experience as field engineer working at well site involving Mud Logging and Mud Engineering ProfessionalExperience Schlumberger Drilling Services (M-I SWACO) April 2013 –June 2015 Job title:Drilling Fluids Specialist Date September2014 – June 2015 Rig SKD T-19 Client EORC, BOKORProject Position SecondMud Engineer Fluid KCl/PHPA/Glycol Well Description MaximumDepth: 9260 ft MD / 6615 ftTVD max MW : 9.3 ppg max Inclination : 63° max Bottom Hole Temperature :140°F waterdepth : 217 ft LessonLearned  Blendtreatedoldmudwithnewmudtominimizemixingtimefortotal drillingfluidvolume.  Control chemical concentration in active mud by streaming higher concentration mud into active system corresponding with ROP and formationcharacter.  Screen up to API 120 (200 mesh) with 1000 gpm without overflow at shakers.  Reducedlossrate from150 bphto 10 bph with50 ppbLCM pill.  Prepare KCl/NaCl Brine with higher initial concentration and then dilute intoprogramed%WKCl andMW to reduce mixingtime.  Reduce brine lossrate incompletionjob from 250 bphto 15 bph with 2.5 gal/bbl HECPill.
  • 2. Resume of LEE SENG KEONG Date November2013 – August2014 Rig Rig RowanEXL 4 Client Carigali Hess,BUMI Project Position Second Mud Engineer Fluid ParathermSBM Well Description MaximumDepth: 12248 ft MD / 6853 ft TVD max MW : 11.8 ppg max Inclination : 60° max Bottom Hole Temperature :255°F waterdepth : 118 ft LessonLearned  Pilottestonactive mudto avoidovertreatment.  Inspectoncuttingsize,shape andhardnesstocheck fluidefficiency.  Inspect shaker screens condition to obtain maximum solid control efficiency.  Run degasseranduse DEFOAMER to reduce foaminginmud. Date July2013 – October2013 Location AsianSupplyBase (Labuan) and KemamanSupplyBase (Kemaman) Client PETRONASandSHELL Position Trainee Mud Engineer Fluid SBM LessonLearned  Mud check onold SBM.  Treat Oil WaterRatio andother Chemical Properties.  Mix new SBM.  Inspectmudtank before loadouttovessel. Others Responsibility 1. Job Preparation  Reviewfluidprogram toprepare chemical order.  Write mixingprocedure andhandlingof products.  Pitplanningforactive pits,reserve pits,highviscositypill,LCMpill,Spacer,Kill mudandBrine.  Orderand maintain chemical andscreensinventoryonsite. 2. Drilling  Run mudcheck to determinetrendandtype of contamination.  Maintainfluidpropertiesforoptimal performance.  Monitorsolidcontrol (shakerandcentrifuge) performance.  Conductpilottestfindthe best chemical concentrationtotreata contamination. 3. Other Operation  Provide recommendationtoclienttooptimize drillingefficiency while complyingHSEpolicy.  Cooperate withonsite geologisttoadjustfluidpropertiescorrespondtoformationcharacter.  Cooperate with Measurement While Drilling Engineers and Wireline Engineers to ensure downhole toolsrunatoptimal efficiency.  Cooperate with CementerEngineerinplanningformixingspacers/inhibitedseawater,cementjob, displacementandmonitorloss/gainof fluidvolume during/aftercementjob.  Cooperate withcompletionengineersinpreparingsufficientbrinevolumeincompletionjob.
  • 3. Resume of LEE SENG KEONG 4. Reporting  Reportto clientandprojectengineerswhile onsite.  Prepare dailyreportandwell recapof eachwell.  Recordlessonlearntfromeachwell andrecommendationinwellrecap fornextwell planning. DHI Services June 2009 –March 2013 Job title:DataEngineer  Operate and maintain real time computer based data acquisition in all rig activity (drilling, cementing,andcompletion)  On-site maintenance oncomputerandsensorswithsufficientmechanical andelectrical knowledge,  Well monitoringonhazardousgasandhighpressure conditionin healthandsafetyrole.  Recordreal time data.  Reportingtowell site geologistandCompany-maninwrittenreports. International Logging Services (ILO) July 2007 –May 2009 Job title: MudLogger  Collect,processandanalyze geological sample (cuttingsandgassample)  Evaluate cuttingandgas sample forindicationof hydrocarbon.  Interpret formation from samples and feed that information back to drilling team and enhance safetyandsuccess.  Assistwell site geologistinpreparingmudlogsandcoringoperation. Certificates Basic Mud School June 2013 ONE-TRAXTraining June 2013 Basic Drillsense Software andHardware TrainingforGeologist May 2009 Electrical SafetyInductionCourse May 2009 Basic Hardware Course May 2009 IntermediateHardware One Training May 2009 Basic Mud Logging January2008 FormationLoggingInduction January2008 Educational Background Universityof Malaya– Departmentof Geology Bachelorof Science inAppliedGeology 2004 – 2007 Result:CGPA 3.56 out of 4.0 TunkuAbdul RahmanCollege –Pre-UniversityDepartment MalaysianHigherSchool Certificate inScience (STPM) 2002 – 2004 Result:Physics(A),Mathematic(A), Chemistry(A-),Biology(B)
  • 4. Resume of LEE SENG KEONG Other Information  SpokenandwritteninEnglish,Chinese (Mandarin) andBahasaMalaysia.  FamiliarwithMicrosoftExcel andWord.  Willingtotravel andrelocate.  Hobby:backpacking(10 monthsworkingholidayin New Zealand),camping,swimming andother outdooractivities. Reference MR. SHAFRI ARIFIN ProjectEngineer SchlumbergerDrillingServices(MISWACO) ssaifularifin@slb.com +6 012 3249170 MR. MOHAMMAD IQBAL Lead Mud Engineer SchlumbergerDrillingServices(MISWACO) Iqbal.hadzir@gmail.com +6 019 2777652 MS. CATHERINE WONG DHI Services AdminManagerand OperationSupport catherine@dhiservices.com +6 012 2775600 MR. Vun Boon Onn Total E&P Uganda Wellsite Geologist Boon-onn.vun@total.com +6 016 3491879
  • 5. Resume of LEE SENG KEONG Attachment OPERATOR DEVIATION* LOCATION DEPTH DENSITY TEMP. MUD TYPE WATER DEPTH Carigali Hess 4 (78°) Bumi D (BLB 06-02 LOC G) 11000 ft MD / 4394 ft TVD 11.2 ppg 248°F PARATHERM SBM 175.85ft Carigali Hess 3 (44°) Bumi D (BLB 05-05 LOC E) 5000 ft MD / 4494 ft TVD 10.7 ppg 180°F ULTRADRIL 175.85ft Carigali Hess 4 (81°) Bumi D (BMD 03/01 LOC E) 11226 ft MD / 4262 ft TVD 11.2 ppg 231°F PARATHERM SBM 188.00ft Carigali Hess 4 (63°) Bumi D (BMD 05/08 LOC A) 12248 ft MD / 6853 ft TVD 11.8 ppg 255°F PARATHERM SBM 188.00ft Carigali Hess 4 (79°) Bumi D (BMD 02/10 LOC F) 12082 ft MD / 5178 ft TVD 10.9 ppg 240°F PARATHERM SBM 188.00ft EORC 3 (50°) BOKOR (BO-107 ST) 6347 ft MD / 5455 ft TVD 8.6 ppg 147°F KCl/Glycol/PHPA 217.00ft EORC 4 (63°) BOKOR (BO-108 ST) 5040 ft MD / 3829 ft TVD 9.3 ppg 131°F KCl/Glycol/PHPA 217.00ft EORC 4 (61°) BOKOR (BO-115 ST) 3647 ft MD / 2564 ft TVD 9.1 ppg 133°F KCl/Glycol/PHPA 217.00ft EORC 3 (60°) BOKOR (BO-122 ST) 9260 ft MD / 6615 ft TVD 9.3 ppg 140°F KCl/Glycol/PHPA 217.00ft EORC 3 (54°) BOKOR (BO-123 ST) 4895 ft MD / 4059 ft TVD 9.3 ppg 130°F KCl/Glycol/PHPA 217.00ft EORC 3 (50°) BOKOR (BO-124 ST) 1485 ft MD / 1473 ft TVD 8.8 ppg 90°F KCl/Glycol/PHPA 217.00ft EORC 3 (59°) BOKOR (BO-125 ST) 6153 ft MD / 4544 ft TVD 9.5 ppg 143°F KCl/Glycol/PHPA 217.00ft SPECIFIC WELLS WORKED