Andrea Bollini1 & David Wilcox2
1 4Science 2 DuraSpace
Repository
Technologies
A new level of interoperability
In the past years we have focused on
interoperability at the Repository level,
now we need interoperability at the
resource level (and below)
Resources need to talk to each other to be
reusable, this in turn will make the
Repositories the base of a global scholarly
ecosystem
2
Andrea Bollini, 4Science / David Wilcox, Duraspace – OR 2017 – Brisbane, Australia
IIIF - http://iiif.io/
IIIF International Image Interoperability
Framework is a set of shared APIs to
provide access to image based
resources in a strongly interoperable
way.
It is growing in adoption and scope
covering now also audio/video and 3D
objects.
Andrea Bollini, 4Science / David Wilcox, Duraspace – OR 2017 – Brisbane, Australia
IIIF - http://iiif.io/
What Is an Interoperable Resource?
• Discoverable
• Viewable via APIs
• Interactive and Manipulable (for tools, analytics)
• Citable / Shareable
• Mash Up-able
• Annotation-ready
• With attribution, license and links (back to the
image in local context)
Credits: Tom Craimer
International Image Interoperability Framework
Why is it relevant in the context of the NGR
work?
It is a concrete example of technology that enables
interoperability at the resource level
You can combine resources hosted in different
repositories at any level of granularity:
- Single images in a set
- Region of a specific image
Other repositories can host additional related
resources like web annotation, comments, etc.
Andrea Bollini, 4Science / David Wilcox, Duraspace – OR 2017 – Brisbane, Australia
Le manuscrit 5 de la
Bibliothèque municipale de
Châteauroux, c. 1460
Folio in BVMM
Miniature in the BNF
Credits: Tom Craimer
International Image Interoperability Framework
Put the pieces togheter
IIIF and Repositories
• Several projects are exploring the use of IIIF
technologies in the repositories software (DSpace,
Fedora, Hydra)
https://wiki.duraspace.org/display/DSPACE/IIIF+and+DSpace
• Don’t miss my presentation:
DSpace for Cultural Heritage: adding support for
images visualization,audio/video streaming and
enhancing the data model
Session: DSpace IG 3: Integrating DSpace
Room: Ballroom C
Session time: 29/Jun/2017, 3:30pm - 5:00pm
8
Andrea Bollini, 4Science / David Wilcox, Duraspace – OR 2017 – Brisbane, Australia
Dataset – OpenDATA
• Datasets need to be usable: preview,
sampling, visualization, remote
computation & more
• OpenDATA: standards formats & APIs
required. CKAN provides automatic REST
WS on top of your tabular data. Now
available also to the DSpace users thanks
to the open source DSpace-CKAN
integration by 4Science
9
Andrea Bollini, 4Science / David Wilcox, Duraspace – OR 2017 – Brisbane, Australia
Signposting -
http://signposting.org/
Signposting is an approach to make the scholarly web
more friendly to machines exposing relations as Typed
Links in HTTP Link headers
The following discovering patterns are currently defined:
• Author
• Bibliographic Metadata
• Identifier
• Publication Boundary
• Resource Type
The Signposting approach is fully aligned with
hypermedia (REST, HATEOAS) lines of thinking
regarding web interoperability. (DSpace7 REST –
Fedora API)
Andrea Bollini, 4Science / David Wilcox, Duraspace – OR 2017 – Brisbane, Australia
Signposting -
http://signposting.org/
As an example, Herbert Van de Sompel and
Michael L. Nelson are the authors of the paper
with DOI https://doi.org/10.1045/november2015-
vandesompel; their
respective ORCIDs are http://orcid.org/0000-0002-
0715-6126 and http://orcid.org/0000-0003-3749-
8116
Andrea Bollini, 4Science / David Wilcox, Duraspace – OR 2017 – Brisbane, Australia
Signposting -
http://signposting.org/
curl -I "https://doi.org/10.1045/november2015-
vandesompel”
HTTP/1.1 303 See Other
Location:
http://www.dlib.org/dlib/november15/vandesompel/11vande
sompel.html
Link: <http://orcid.org/0000-0002-0715-6126> ;
rel="author",
<http://orcid.org/0000-0003-3749-8116> ;
rel="author"
Andrea Bollini, 4Science / David Wilcox, Duraspace – OR 2017 – Brisbane, Australia
Signposting -
http://signposting.org/
• The new versions of DSpace-CRIS 5.7 &
6.1 ship with support for the following
patterns:
– Author
– Identifier
– Publication Boundary
– An issue has been open to track this
requirement also for DSpace 7
https://jira.duraspace.org/browse/DS-3589
Andrea Bollini, 4Science / David Wilcox, Duraspace – OR 2017 – Brisbane, Australia
A reflection on the current
repositories data model
• A revision of the current data model is
needed
• Precise identification of persons,
organizations, projects, concepts and
linked resources (dataset, different
versions etc.)
• Avoid loss of details to allow a fine grain
and effective interoperability
Andrea Bollini, 4Science / David Wilcox, Duraspace – OR 2017 – Brisbane, Australia
ResourceSync -
http://www.openarchives.org/rs/1.1/resourcesync
• Successor of the OAI-PMH protocol and
much more…
• Faster, reliable and scalable
• Allows real-time notification (and
recovering of missed messages)
• Drives resource synchronization: content
and metadata are both managed
Andrea Bollini, 4Science / David Wilcox, Duraspace – OR 2017 – Brisbane, Australia
ResourceSync -
http://www.openarchives.org/rs/1.1/resourcesync
A first implementation of resourcesync for
DSpace was produced in the past years:
https://github.com/CottageLabs/DSpaceRes
ourceSync
a ticket now exists to resume such
implementation and maybe include in the
mainstream:
https://jira.duraspace.org/browse/DS-3590
Andrea Bollini, 4Science / David Wilcox, Duraspace – OR 2017 – Brisbane, Australia
ResourceSync -
http://www.openarchives.org/rs/1.1/resourcesync
The Hydra-in-a-box team tested ResourceSync
with the Hyku repository:
http://hydrainabox.samvera.org/2017/06/22/resou
rcesync.html
ResourceSync shows great promise and the
team will continue working toward an
implementation
Andrea Bollini, 4Science / David Wilcox, Duraspace – OR 2017 – Brisbane, Australia
Thank for you
attention!
Andrea Bollini
andrea.bollini@4science.it
skype: a.bollini
linkedin: andreabollini
orcid: 0000-0002-9029-
1854
David Wilcox
dwilcox@duraspace.org
twitter: d_wilcox
linkedin: dwilcox1

Repository technologies

  • 1.
    Andrea Bollini1 &David Wilcox2 1 4Science 2 DuraSpace Repository Technologies
  • 2.
    A new levelof interoperability In the past years we have focused on interoperability at the Repository level, now we need interoperability at the resource level (and below) Resources need to talk to each other to be reusable, this in turn will make the Repositories the base of a global scholarly ecosystem 2 Andrea Bollini, 4Science / David Wilcox, Duraspace – OR 2017 – Brisbane, Australia
  • 3.
    IIIF - http://iiif.io/ IIIFInternational Image Interoperability Framework is a set of shared APIs to provide access to image based resources in a strongly interoperable way. It is growing in adoption and scope covering now also audio/video and 3D objects. Andrea Bollini, 4Science / David Wilcox, Duraspace – OR 2017 – Brisbane, Australia
  • 4.
    IIIF - http://iiif.io/ WhatIs an Interoperable Resource? • Discoverable • Viewable via APIs • Interactive and Manipulable (for tools, analytics) • Citable / Shareable • Mash Up-able • Annotation-ready • With attribution, license and links (back to the image in local context) Credits: Tom Craimer International Image Interoperability Framework
  • 5.
    Why is itrelevant in the context of the NGR work? It is a concrete example of technology that enables interoperability at the resource level You can combine resources hosted in different repositories at any level of granularity: - Single images in a set - Region of a specific image Other repositories can host additional related resources like web annotation, comments, etc. Andrea Bollini, 4Science / David Wilcox, Duraspace – OR 2017 – Brisbane, Australia
  • 6.
    Le manuscrit 5de la Bibliothèque municipale de Châteauroux, c. 1460 Folio in BVMM Miniature in the BNF Credits: Tom Craimer International Image Interoperability Framework
  • 7.
  • 8.
    IIIF and Repositories •Several projects are exploring the use of IIIF technologies in the repositories software (DSpace, Fedora, Hydra) https://wiki.duraspace.org/display/DSPACE/IIIF+and+DSpace • Don’t miss my presentation: DSpace for Cultural Heritage: adding support for images visualization,audio/video streaming and enhancing the data model Session: DSpace IG 3: Integrating DSpace Room: Ballroom C Session time: 29/Jun/2017, 3:30pm - 5:00pm 8 Andrea Bollini, 4Science / David Wilcox, Duraspace – OR 2017 – Brisbane, Australia
  • 9.
    Dataset – OpenDATA •Datasets need to be usable: preview, sampling, visualization, remote computation & more • OpenDATA: standards formats & APIs required. CKAN provides automatic REST WS on top of your tabular data. Now available also to the DSpace users thanks to the open source DSpace-CKAN integration by 4Science 9 Andrea Bollini, 4Science / David Wilcox, Duraspace – OR 2017 – Brisbane, Australia
  • 10.
    Signposting - http://signposting.org/ Signposting isan approach to make the scholarly web more friendly to machines exposing relations as Typed Links in HTTP Link headers The following discovering patterns are currently defined: • Author • Bibliographic Metadata • Identifier • Publication Boundary • Resource Type The Signposting approach is fully aligned with hypermedia (REST, HATEOAS) lines of thinking regarding web interoperability. (DSpace7 REST – Fedora API) Andrea Bollini, 4Science / David Wilcox, Duraspace – OR 2017 – Brisbane, Australia
  • 11.
    Signposting - http://signposting.org/ As anexample, Herbert Van de Sompel and Michael L. Nelson are the authors of the paper with DOI https://doi.org/10.1045/november2015- vandesompel; their respective ORCIDs are http://orcid.org/0000-0002- 0715-6126 and http://orcid.org/0000-0003-3749- 8116 Andrea Bollini, 4Science / David Wilcox, Duraspace – OR 2017 – Brisbane, Australia
  • 12.
    Signposting - http://signposting.org/ curl -I"https://doi.org/10.1045/november2015- vandesompel” HTTP/1.1 303 See Other Location: http://www.dlib.org/dlib/november15/vandesompel/11vande sompel.html Link: <http://orcid.org/0000-0002-0715-6126> ; rel="author", <http://orcid.org/0000-0003-3749-8116> ; rel="author" Andrea Bollini, 4Science / David Wilcox, Duraspace – OR 2017 – Brisbane, Australia
  • 13.
    Signposting - http://signposting.org/ • Thenew versions of DSpace-CRIS 5.7 & 6.1 ship with support for the following patterns: – Author – Identifier – Publication Boundary – An issue has been open to track this requirement also for DSpace 7 https://jira.duraspace.org/browse/DS-3589 Andrea Bollini, 4Science / David Wilcox, Duraspace – OR 2017 – Brisbane, Australia
  • 14.
    A reflection onthe current repositories data model • A revision of the current data model is needed • Precise identification of persons, organizations, projects, concepts and linked resources (dataset, different versions etc.) • Avoid loss of details to allow a fine grain and effective interoperability Andrea Bollini, 4Science / David Wilcox, Duraspace – OR 2017 – Brisbane, Australia
  • 15.
    ResourceSync - http://www.openarchives.org/rs/1.1/resourcesync • Successorof the OAI-PMH protocol and much more… • Faster, reliable and scalable • Allows real-time notification (and recovering of missed messages) • Drives resource synchronization: content and metadata are both managed Andrea Bollini, 4Science / David Wilcox, Duraspace – OR 2017 – Brisbane, Australia
  • 16.
    ResourceSync - http://www.openarchives.org/rs/1.1/resourcesync A firstimplementation of resourcesync for DSpace was produced in the past years: https://github.com/CottageLabs/DSpaceRes ourceSync a ticket now exists to resume such implementation and maybe include in the mainstream: https://jira.duraspace.org/browse/DS-3590 Andrea Bollini, 4Science / David Wilcox, Duraspace – OR 2017 – Brisbane, Australia
  • 17.
    ResourceSync - http://www.openarchives.org/rs/1.1/resourcesync The Hydra-in-a-boxteam tested ResourceSync with the Hyku repository: http://hydrainabox.samvera.org/2017/06/22/resou rcesync.html ResourceSync shows great promise and the team will continue working toward an implementation Andrea Bollini, 4Science / David Wilcox, Duraspace – OR 2017 – Brisbane, Australia
  • 18.
    Thank for you attention! AndreaBollini andrea.bollini@4science.it skype: a.bollini linkedin: andreabollini orcid: 0000-0002-9029- 1854 David Wilcox dwilcox@duraspace.org twitter: d_wilcox linkedin: dwilcox1