SlideShare a Scribd company logo
Remington Square
Houston TX
Daylight Simulations Report
9am 3pm
LRV @ Floor= 30%
LRV @ Walls= 50%
LRV @ Ceiling= 75%
remington square - Level 1 Plan
Date & Time of Simulation= Sept 21st @ 9am
Software Used= Ecotect/Radiance
Glare Control provided for areas above 500 fc (5400 lux)
NOTE: THE RESULTS DISPLAYED ARE PERCENTAGES OF THE AREAS COVERED BY THE ANALYSIS GRID
% of regularly occupied spaces below 10 fc (108 lux) = 3.00%
% of regularly occupied spaces between 10 fc (108 lux) and 540 fc (5400 lux)= 93.02%
% of regularly occupied spaces above 500 fc (5400 lux) = 6.92%
LOBBY
LOBBYGYM
RESTAURANT OPEN OFFICE
G
LAR
E
C
O
N
TR
O
L
AS
PR
O
VID
ED
OPEN OFFICE
IMPROMPTU
MEETING AREA
CONFERENCE
ROOMS
PRIVATE
OFFICE
LRV @ Floor= 20%
LRV @ Walls= 40%
LRV @ Ceiling= 70%
LRV @ Floor= 30%
LRV @ Walls= 50%
LRV @ Ceiling= 75%
remington square - Level 1 Plan
Date & Time of Simulation= Sept 21st @ 3pm
Software Used= Ecotect/Radiance
NOTE: THE RESULTS DISPLAYED ARE PERCENTAGES OF THE AREAS COVERED BY THE ANALYSIS GRID
GLARE CONTROL AS PROVIDED
Glare Control provided for areas above 500 fc (5400 lux)
% of regularly occupied spaces below 10 fc (108 lux) = 0.08%
% of regularly occupied spaces between 10 fc (108 lux) and 540 fc (5400 lux)= 90.93%
% of regularly occupied spaces above 500 fc (5400 lux) = 8.98%
GLARE CONTROL AS PROVIDEDGLARE CONTROL AS PROVIDED
LOBBY
LOBBYGYM
RESTAURANT OPEN OFFICE
OPEN OFFICE
IMPROMPTU
MEETING AREA
CONFERENCE
ROOMS
PRIVATE
OFFICES
LRV @ Floor= 20%
LRV @ Walls= 40%
LRV @ Ceiling= 70%
LRV @ Floor= 30%
LRV @ Walls= 50%
LRV @ Ceiling= 75%
remington square - Level 2 Plan
Date & Time of Simulation= Sept 21st @ 9am
Software Used= Ecotect/Radiance
NOTE: THE RESULTS DISPLAYED ARE PERCENTAGES OF THE AREAS COVERED BY THE ANALYSIS GRID
Glare Control provided for areas above 500 fc (5400 lux)
% of regularly occupied spaces below 10 fc (108 lux) = 13.53%
% of regularly occupied spaces between 10 fc (108 lux) and 540 fc (5400 lux)= 78.78%
% of regularly occupied spaces above 500 fc (5400 lux) = 7.68%
GLARE CONTROL AS PROVIDED
GLARECONTROLASPROVIDED
OPEN OFFICE
OPEN OFFICE
IMPROMPTU
MEETING
AREA
CONFERENCEROOMS
PRIVATEOFFICES
LRV @ Floor= 20%
LRV @ Walls= 40%
LRV @ Ceiling= 70%
LRV @ Floor= 30%
LRV @ Walls= 50%
LRV @ Ceiling= 75%
remington square - Level 2 Plan
Date & Time of Simulation= Sept 21st @ 3pm
Software Used= Ecotect/Radiance
NOTE: THE RESULTS DISPLAYED ARE PERCENTAGES OF THE AREAS COVERED BY THE ANALYSIS GRID
GLARE CONTROL AS PROVIDED
Glare Control provided for areas above 500 fc (5400 lux)
% of regularly occupied spaces below 10 fc (108 lux) = 12.23%
% of regularly occupied spaces between 10 fc (108 lux) and 540 fc (5400 lux)= 80.02%
% of regularly occupied spaces above 500 fc (5400 lux) = 7.74%
GLARE CONTROL AS PROVIDED
GLARECONTROLASPROVIDED
OPEN OFFICE
OPEN OFFICE
IMPROMPTU
MEETING
AREA
CONFERENCEROOMS
PRIVATEOFFICE
LRV @ Floor= 20%
LRV @ Walls= 40%
LRV @ Ceiling= 70%
LRV @ Floor= 30%
LRV @ Walls= 50%
LRV @ Ceiling= 75%
remington square - Levels 3-7 (typ.) Plan
Date & Time of Simulation= Sept 21st @ 9am
Software Used= Ecotect/Radiance
NOTE: THE RESULTS DISPLAYED ARE PERCENTAGES OF THE AREAS COVERED BY THE ANALYSIS GRID
Glare Control provided for areas above 500 fc (5400 lux)
% of regularly occupied spaces below 10 fc (108 lux) = 8.37%%
% of regularly occupied spaces between 10 fc (108 lux) and 540 fc (5400 lux)= 80.31%
% of regularly occupied spaces above 500 fc (5400 lux) = 11.30%
GLARE CONTROL AS PROVIDED
G
LAR
E
C
O
N
TR
O
L
AS
PR
O
VID
ED
GLARECONTROLASPROVIDED
OPEN OFFICE
OPEN OFFICE
IMPROMPTU
MEETING
AREA
CONFERENCEROOMS
PRIVATEOFFICES
LRV @ Floor= 20%
LRV @ Walls= 40%
LRV @ Ceiling= 70%
LRV @ Floor= 30%
LRV @ Walls= 50%
LRV @ Ceiling= 75%
remington square - Levels 3-7 (typ.) Plan
Date & Time of Simulation= Sept 21st @ 3pm
Software Used= Ecotect/Radiance
Glare Control provided for areas above 500 fc (5400 lux)
NOTE: THE RESULTS DISPLAYED ARE PERCENTAGES OF THE AREAS COVERED BY THE ANALYSIS GRID
% of regularly occupied spaces below 10 fc (108 lux) = 9.44%
% of regularly occupied spaces between 10 fc (108 lux) and 540 fc (5400 lux)= 83.6%
% of regularly occupied spaces above 500 fc (5400 lux) = 6.97%
GLARE CONTROL AS PROVIDED
GLARECONTROLASPROVIDED
OPEN OFFICE
OPEN OFFICE
IMPROMPTU
MEETING
AREA
CONFERENCEROOMS
PRIVATEOFFICES
LRV @ Floor= 20%
LRV @ Walls= 40%
LRV @ Ceiling= 70%
LRV @ Floor= 30%
LRV @ Walls= 50%
LRV @ Ceiling= 75%
remington square - Level 8 Plan
Date & Time of Simulation= Sept 21st @ 9am
Software Used= Ecotect/Radiance
Glare Control provided for areas above 500 fc (5400 lux)
NOTE: THE RESULTS DISPLAYED ARE PERCENTAGES OF THE AREAS COVERED BY THE ANALYSIS GRID
% of regularly occupied spaces below 10 fc (108 lux) = 0.00%
% of regularly occupied spaces between 10 fc (108 lux) and 540 fc (5400 lux)= 90.11%
% of regularly occupied spaces above 500 fc (5400 lux) = 9.88%
GLARE CONTROL AS PROVIDED
G
LAR
E
C
O
N
TR
O
L
AS
PR
O
VID
ED
GLARECONTROLASPROVIDED
OPEN OFFICE
OPEN OFFICE
IMPROMPTU
MEETING
AREA
CONFERENCEROOMS
PRIVATEOFFICES
LRV @ Floor= 20%
LRV @ Walls= 40%
LRV @ Ceiling= 70%
LRV @ Floor= 30%
LRV @ Walls= 50%
LRV @ Ceiling= 75%
remington square - Level 8 Plan
Date & Time of Simulation= Sept 21st @ 3pm
Software Used= Ecotect/Radiance
NOTE: THE RESULTS DISPLAYED ARE PERCENTAGES OF THE AREAS COVERED BY THE ANALYSIS GRID
Glare Control provided for areas above 500 fc (5400 lux)
% of regularly occupied spaces below 10 fc (108 lux) = 0.00%
% of regularly occupied spaces between 10 fc (108 lux) and 540 fc (5400 lux)= 92.90%
% of regularly occupied spaces above 500 fc (5400 lux) = 7.09%
GLARE CONTROL AS PROVIDED
GLARECONTROLASPROVIDED
OPEN OFFICE
OPEN OFFICE
IMPROMPTU
MEETING
AREA
CONFERENCEROOMS
PRIVATEOFFICES
LRV @ Floor= 20%
LRV @ Walls= 40%
LRV @ Ceiling= 70%
remington square - Lease Area 1st Floor
Software Used= Ecotect/Radiance
daylight illuminance at selected points (lux) @ 9 am daylight illuminance in contour lines (lux) @ 9 am
daylight illuminance at selected points (lux) @ 3 pm daylight illuminance in contour lines (lux) @ 3 pm
NOTE: THESE SIMULATIONS WERE RUN WITHOUT OPERABLE SHADES/BLINDS FOR
ACCURACY. VIEW PRESERVING SHADES/BLINDS WILL BE ADDED AT POINTS OF
GLARE WHERE INDICATED.
remington square - Restaurant 1st Floor
Software Used= Ecotect/Radiance
daylight illuminance at selected points (lux) @ 9 am daylight illuminance in contour lines (lux) @ 9 am
daylight illuminance at selected points (lux) @ 3 pm daylight illuminance in contour lines (lux) @ 3 pm
NOTE: THESE SIMULATIONS WERE RUN WITHOUT OPERABLE SHADES/BLINDS FOR
ACCURACY. VIEW PRESERVING SHADES/BLINDS WILL BE ADDED AT POINTS OF
GLARE WHERE INDICATED.
remington square - Gym 1st Floor
Software Used= Ecotect/Radiance
daylight illuminance at selected points (lux) @ 9 am daylight illuminance in contour lines (lux) @ 9 am
daylight illuminance at selected points (lux) @ 3 pm daylight illuminance in contour lines (lux) @ 3 pm
NOTE: THESE SIMULATIONS WERE RUN WITHOUT OPERABLE SHADES/BLINDS FOR
ACCURACY. VIEW PRESERVING SHADES/BLINDS WILL BE ADDED AT POINTS OF
GLARE WHERE INDICATED.
remington square- Lease Area 2nd Floor
Software Used= Ecotect/Radiance
daylight illuminance at selected points (lux) @ 9 am daylight illuminance in contour lines (lux) @ 9 am
daylight illuminance at selected points (lux) @ 3 pm daylight illuminance in contour lines (lux) @ 3 pm
NOTE: THESE SIMULATIONS WERE RUN WITHOUT OPERABLE SHADES/BLINDS FOR
ACCURACY. VIEW PRESERVING SHADES/BLINDS WILL BE ADDED AT POINTS OF
GLARE WHERE INDICATED.
remington square - Lease Area 5th (Typ) Floor
Software Used= Ecotect/Radiance
daylight illuminance at selected points (lux) @ 9 am daylight illuminance in contour lines (lux) @ 9 am
daylight illuminance at selected points (lux) @ 3 pm daylight illuminance in contour lines (lux) @ 3 pm
NOTE: THESE SIMULATIONS WERE RUN WITHOUT OPERABLE SHADES/BLINDS FOR
ACCURACY. VIEW PRESERVING SHADES/BLINDS WILL BE ADDED AT POINTS OF
GLARE WHERE INDICATED.
daylight illuminance at selected points (lux) @ 9 am daylight illuminance in contour lines (lux) @ 9 am
daylight illuminance at selected points (lux) @ 3 pm daylight illuminance in contour lines (lux) @ 3 pm
NOTE: THESE SIMULATIONS WERE RUN WITHOUT OPERABLE SHADES/BLINDS FOR
ACCURACY. VIEW PRESERVING SHADES/BLINDS WILL BE ADDED AT POINTS OF
GLARE WHERE INDICATED.
remington square - Lease Area 8th Floor
Software Used= Ecotect/Radiance

More Related Content

What's hot

Hydrology/Hydraulic Model for South Boston CSO Project
Hydrology/Hydraulic Model for South Boston CSO Project Hydrology/Hydraulic Model for South Boston CSO Project
Hydrology/Hydraulic Model for South Boston CSO Project
dingfangliu
 
Testing the global grid of master events for waveform cross correlation with ...
Testing the global grid of master events for waveform cross correlation with ...Testing the global grid of master events for waveform cross correlation with ...
Testing the global grid of master events for waveform cross correlation with ...
Ivan Kitov
 
Patriarca_3668.ppt
Patriarca_3668.pptPatriarca_3668.ppt
Patriarca_3668.ppt
grssieee
 
OPHA Supplemental Site Investigation for Groundwater
OPHA Supplemental Site Investigation for GroundwaterOPHA Supplemental Site Investigation for Groundwater
OPHA Supplemental Site Investigation for Groundwater
Steve Williams
 
Department of Avionics Engineering The Superior University, Lahore Lab Manual...
Department of Avionics Engineering The Superior University, Lahore Lab Manual...Department of Avionics Engineering The Superior University, Lahore Lab Manual...
Department of Avionics Engineering The Superior University, Lahore Lab Manual...
MIbrar4
 
Centre Of Geographic Sciences Remote Sensing Field Camp 2015
Centre Of Geographic Sciences Remote Sensing Field Camp 2015Centre Of Geographic Sciences Remote Sensing Field Camp 2015
Centre Of Geographic Sciences Remote Sensing Field Camp 2015
COGS Presentations
 
Schrader, Frederik: Research infrastructures as modular platforms for reactiv...
Schrader, Frederik: Research infrastructures as modular platforms for reactiv...Schrader, Frederik: Research infrastructures as modular platforms for reactiv...
Schrader, Frederik: Research infrastructures as modular platforms for reactiv...
Integrated Carbon Observation System (ICOS)
 

What's hot (7)

Hydrology/Hydraulic Model for South Boston CSO Project
Hydrology/Hydraulic Model for South Boston CSO Project Hydrology/Hydraulic Model for South Boston CSO Project
Hydrology/Hydraulic Model for South Boston CSO Project
 
Testing the global grid of master events for waveform cross correlation with ...
Testing the global grid of master events for waveform cross correlation with ...Testing the global grid of master events for waveform cross correlation with ...
Testing the global grid of master events for waveform cross correlation with ...
 
Patriarca_3668.ppt
Patriarca_3668.pptPatriarca_3668.ppt
Patriarca_3668.ppt
 
OPHA Supplemental Site Investigation for Groundwater
OPHA Supplemental Site Investigation for GroundwaterOPHA Supplemental Site Investigation for Groundwater
OPHA Supplemental Site Investigation for Groundwater
 
Department of Avionics Engineering The Superior University, Lahore Lab Manual...
Department of Avionics Engineering The Superior University, Lahore Lab Manual...Department of Avionics Engineering The Superior University, Lahore Lab Manual...
Department of Avionics Engineering The Superior University, Lahore Lab Manual...
 
Centre Of Geographic Sciences Remote Sensing Field Camp 2015
Centre Of Geographic Sciences Remote Sensing Field Camp 2015Centre Of Geographic Sciences Remote Sensing Field Camp 2015
Centre Of Geographic Sciences Remote Sensing Field Camp 2015
 
Schrader, Frederik: Research infrastructures as modular platforms for reactiv...
Schrader, Frederik: Research infrastructures as modular platforms for reactiv...Schrader, Frederik: Research infrastructures as modular platforms for reactiv...
Schrader, Frederik: Research infrastructures as modular platforms for reactiv...
 

Viewers also liked

London
LondonLondon
London
saraachhd04
 
Telemedicine - A Dynamic Solution For All Healthcare Needs
Telemedicine - A Dynamic Solution For All Healthcare NeedsTelemedicine - A Dynamic Solution For All Healthcare Needs
Telemedicine - A Dynamic Solution For All Healthcare Needs
james hadley
 
Mohamed abdelwahab CV
Mohamed abdelwahab CVMohamed abdelwahab CV
Mohamed abdelwahab CV
Mohamed Abdelwahab
 
GEORGE OWUOR ONYANGO cv SEVERIN wth photo1
GEORGE OWUOR ONYANGO cv SEVERIN wth photo1GEORGE OWUOR ONYANGO cv SEVERIN wth photo1
GEORGE OWUOR ONYANGO cv SEVERIN wth photo1
george onyango
 
Ramo bolic - Philanthropist, Avid Volunteer & Marketing Leader
Ramo bolic - Philanthropist, Avid Volunteer & Marketing LeaderRamo bolic - Philanthropist, Avid Volunteer & Marketing Leader
Ramo bolic - Philanthropist, Avid Volunteer & Marketing Leader
ramobolic
 
Glare
GlareGlare
Controlled low-strength-material-clsm
Controlled low-strength-material-clsmControlled low-strength-material-clsm
Controlled low-strength-material-clsm
Mechanical Online
 
Benefits of Installing Skylights
Benefits of Installing SkylightsBenefits of Installing Skylights
Benefits of Installing Skylights
Skyspan Australia
 
Daylight _architecture_magazine_-_2007_autumn
Daylight  _architecture_magazine_-_2007_autumnDaylight  _architecture_magazine_-_2007_autumn
Daylight _architecture_magazine_-_2007_autumn
GABRIELA Narvaez
 
Daylighting Analysis and Tools
Daylighting Analysis and ToolsDaylighting Analysis and Tools
Daylighting Analysis and Tools
ramanakoti
 
Daylight Legislation- Peter Raynham
Daylight Legislation- Peter RaynhamDaylight Legislation- Peter Raynham
Daylight Legislation- Peter Raynham
Fagerhult Lighting
 
Glare
GlareGlare
Glare
Rajendran
 
Skylight
SkylightSkylight
انعكاس وانكسار ضوء النهار علي اسطح المباني Daylight reflecting surfaces
انعكاس وانكسار ضوء النهار علي اسطح المباني  Daylight reflecting surfacesانعكاس وانكسار ضوء النهار علي اسطح المباني  Daylight reflecting surfaces
انعكاس وانكسار ضوء النهار علي اسطح المباني Daylight reflecting surfaces
Ahmed SHoukry ELhfnawy
 
Hennepin County Brookdale Regional Center - High Performance Building Case Study
Hennepin County Brookdale Regional Center - High Performance Building Case StudyHennepin County Brookdale Regional Center - High Performance Building Case Study
Hennepin County Brookdale Regional Center - High Performance Building Case Study
Loren Abraham
 
Daylighting slideshare
Daylighting slideshareDaylighting slideshare
Daylighting slideshare
Parween Karim
 
Daylighting Buildings
Daylighting BuildingsDaylighting Buildings
Daylighting Buildings
Sustainable Performance Institute
 
Natural light & illumination
Natural light & illuminationNatural light & illumination
Natural light & illumination
chunnuchauhan
 
Natural lighting
Natural lightingNatural lighting
Natural lighting
Jyoti Rautela
 

Viewers also liked (19)

London
LondonLondon
London
 
Telemedicine - A Dynamic Solution For All Healthcare Needs
Telemedicine - A Dynamic Solution For All Healthcare NeedsTelemedicine - A Dynamic Solution For All Healthcare Needs
Telemedicine - A Dynamic Solution For All Healthcare Needs
 
Mohamed abdelwahab CV
Mohamed abdelwahab CVMohamed abdelwahab CV
Mohamed abdelwahab CV
 
GEORGE OWUOR ONYANGO cv SEVERIN wth photo1
GEORGE OWUOR ONYANGO cv SEVERIN wth photo1GEORGE OWUOR ONYANGO cv SEVERIN wth photo1
GEORGE OWUOR ONYANGO cv SEVERIN wth photo1
 
Ramo bolic - Philanthropist, Avid Volunteer & Marketing Leader
Ramo bolic - Philanthropist, Avid Volunteer & Marketing LeaderRamo bolic - Philanthropist, Avid Volunteer & Marketing Leader
Ramo bolic - Philanthropist, Avid Volunteer & Marketing Leader
 
Glare
GlareGlare
Glare
 
Controlled low-strength-material-clsm
Controlled low-strength-material-clsmControlled low-strength-material-clsm
Controlled low-strength-material-clsm
 
Benefits of Installing Skylights
Benefits of Installing SkylightsBenefits of Installing Skylights
Benefits of Installing Skylights
 
Daylight _architecture_magazine_-_2007_autumn
Daylight  _architecture_magazine_-_2007_autumnDaylight  _architecture_magazine_-_2007_autumn
Daylight _architecture_magazine_-_2007_autumn
 
Daylighting Analysis and Tools
Daylighting Analysis and ToolsDaylighting Analysis and Tools
Daylighting Analysis and Tools
 
Daylight Legislation- Peter Raynham
Daylight Legislation- Peter RaynhamDaylight Legislation- Peter Raynham
Daylight Legislation- Peter Raynham
 
Glare
GlareGlare
Glare
 
Skylight
SkylightSkylight
Skylight
 
انعكاس وانكسار ضوء النهار علي اسطح المباني Daylight reflecting surfaces
انعكاس وانكسار ضوء النهار علي اسطح المباني  Daylight reflecting surfacesانعكاس وانكسار ضوء النهار علي اسطح المباني  Daylight reflecting surfaces
انعكاس وانكسار ضوء النهار علي اسطح المباني Daylight reflecting surfaces
 
Hennepin County Brookdale Regional Center - High Performance Building Case Study
Hennepin County Brookdale Regional Center - High Performance Building Case StudyHennepin County Brookdale Regional Center - High Performance Building Case Study
Hennepin County Brookdale Regional Center - High Performance Building Case Study
 
Daylighting slideshare
Daylighting slideshareDaylighting slideshare
Daylighting slideshare
 
Daylighting Buildings
Daylighting BuildingsDaylighting Buildings
Daylighting Buildings
 
Natural light & illumination
Natural light & illuminationNatural light & illumination
Natural light & illumination
 
Natural lighting
Natural lightingNatural lighting
Natural lighting
 

Similar to Remington Square - Daylight Sims Summary

Earth Viewing Infrared Space System Sensor
Earth Viewing Infrared Space System SensorEarth Viewing Infrared Space System Sensor
Earth Viewing Infrared Space System Sensor
M. Faisal Halim
 
Lighting simulation i
Lighting simulation iLighting simulation i
Lighting simulation i
Nguyen Khuong
 
DMUG 2016 - Scott Hamilton, Ricardo Energy & Environment
DMUG 2016 - Scott Hamilton, Ricardo Energy & EnvironmentDMUG 2016 - Scott Hamilton, Ricardo Energy & Environment
DMUG 2016 - Scott Hamilton, Ricardo Energy & Environment
IES / IAQM
 
IRJET- Efficient Shift add Implementation of Fir Filter using Variable Pa...
IRJET-  	  Efficient Shift add Implementation of Fir Filter using Variable Pa...IRJET-  	  Efficient Shift add Implementation of Fir Filter using Variable Pa...
IRJET- Efficient Shift add Implementation of Fir Filter using Variable Pa...
IRJET Journal
 
Microwave Radiometer Analysis for Imaging and Vehicular Systems
Microwave Radiometer Analysis for Imaging and Vehicular SystemsMicrowave Radiometer Analysis for Imaging and Vehicular Systems
Microwave Radiometer Analysis for Imaging and Vehicular Systems
IRJET Journal
 
How to build a DMR Simulcast Network
How to build a DMR Simulcast NetworkHow to build a DMR Simulcast Network
How to build a DMR Simulcast Network
Leonardo
 
Ecotect Sound Analysis
Ecotect Sound AnalysisEcotect Sound Analysis
Ecotect Sound Analysis
Divyesh Kumar
 
Zd n2010 son-in_4g_mobile_networks (1)
Zd n2010 son-in_4g_mobile_networks (1)Zd n2010 son-in_4g_mobile_networks (1)
Zd n2010 son-in_4g_mobile_networks (1)
derejew
 
Colored inversion
Colored inversionColored inversion
Colored inversion
Jalal Neshat
 
friis formula
friis formulafriis formula
friis formula
Harshavardhan K
 
Maximising ROI and User Experience with Outdoor Small Cells: Airspan
Maximising ROI and User Experience with Outdoor Small Cells: AirspanMaximising ROI and User Experience with Outdoor Small Cells: Airspan
Maximising ROI and User Experience with Outdoor Small Cells: Airspan
Small Cell Forum
 
LTE KPI Optimization - A to Z Abiola.pptx
LTE KPI Optimization - A to Z Abiola.pptxLTE KPI Optimization - A to Z Abiola.pptx
LTE KPI Optimization - A to Z Abiola.pptx
ssuser574918
 
3-Experiences_and_results_VD
3-Experiences_and_results_VD3-Experiences_and_results_VD
3-Experiences_and_results_VD
Vygintas Dūda
 
Flow Field Measurements in a Large Controlled Ventilated Room
Flow Field Measurements in a Large Controlled Ventilated RoomFlow Field Measurements in a Large Controlled Ventilated Room
Flow Field Measurements in a Large Controlled Ventilated Room
IRJET Journal
 
Link budget calculation
Link budget calculationLink budget calculation
Link budget calculation
sitimunirah88
 
Link budget calculation
Link budget calculationLink budget calculation
Link budget calculation
Hesham Yousef
 
IRJET- Comparative Study of Sidelobe Roll-Off Ratio for Various Window Functi...
IRJET- Comparative Study of Sidelobe Roll-Off Ratio for Various Window Functi...IRJET- Comparative Study of Sidelobe Roll-Off Ratio for Various Window Functi...
IRJET- Comparative Study of Sidelobe Roll-Off Ratio for Various Window Functi...
IRJET Journal
 
APPROVED - Raytheon - Capstone Final Poster
APPROVED - Raytheon - Capstone Final PosterAPPROVED - Raytheon - Capstone Final Poster
APPROVED - Raytheon - Capstone Final Poster
Nicolas Barceloni
 
Flight Inspection practical.pptx
Flight Inspection practical.pptxFlight Inspection practical.pptx
Flight Inspection practical.pptx
ssuser1edd921
 
Application note signal_generator_spectral_purity
Application note signal_generator_spectral_purityApplication note signal_generator_spectral_purity
Application note signal_generator_spectral_purity
S.c. Lu
 

Similar to Remington Square - Daylight Sims Summary (20)

Earth Viewing Infrared Space System Sensor
Earth Viewing Infrared Space System SensorEarth Viewing Infrared Space System Sensor
Earth Viewing Infrared Space System Sensor
 
Lighting simulation i
Lighting simulation iLighting simulation i
Lighting simulation i
 
DMUG 2016 - Scott Hamilton, Ricardo Energy & Environment
DMUG 2016 - Scott Hamilton, Ricardo Energy & EnvironmentDMUG 2016 - Scott Hamilton, Ricardo Energy & Environment
DMUG 2016 - Scott Hamilton, Ricardo Energy & Environment
 
IRJET- Efficient Shift add Implementation of Fir Filter using Variable Pa...
IRJET-  	  Efficient Shift add Implementation of Fir Filter using Variable Pa...IRJET-  	  Efficient Shift add Implementation of Fir Filter using Variable Pa...
IRJET- Efficient Shift add Implementation of Fir Filter using Variable Pa...
 
Microwave Radiometer Analysis for Imaging and Vehicular Systems
Microwave Radiometer Analysis for Imaging and Vehicular SystemsMicrowave Radiometer Analysis for Imaging and Vehicular Systems
Microwave Radiometer Analysis for Imaging and Vehicular Systems
 
How to build a DMR Simulcast Network
How to build a DMR Simulcast NetworkHow to build a DMR Simulcast Network
How to build a DMR Simulcast Network
 
Ecotect Sound Analysis
Ecotect Sound AnalysisEcotect Sound Analysis
Ecotect Sound Analysis
 
Zd n2010 son-in_4g_mobile_networks (1)
Zd n2010 son-in_4g_mobile_networks (1)Zd n2010 son-in_4g_mobile_networks (1)
Zd n2010 son-in_4g_mobile_networks (1)
 
Colored inversion
Colored inversionColored inversion
Colored inversion
 
friis formula
friis formulafriis formula
friis formula
 
Maximising ROI and User Experience with Outdoor Small Cells: Airspan
Maximising ROI and User Experience with Outdoor Small Cells: AirspanMaximising ROI and User Experience with Outdoor Small Cells: Airspan
Maximising ROI and User Experience with Outdoor Small Cells: Airspan
 
LTE KPI Optimization - A to Z Abiola.pptx
LTE KPI Optimization - A to Z Abiola.pptxLTE KPI Optimization - A to Z Abiola.pptx
LTE KPI Optimization - A to Z Abiola.pptx
 
3-Experiences_and_results_VD
3-Experiences_and_results_VD3-Experiences_and_results_VD
3-Experiences_and_results_VD
 
Flow Field Measurements in a Large Controlled Ventilated Room
Flow Field Measurements in a Large Controlled Ventilated RoomFlow Field Measurements in a Large Controlled Ventilated Room
Flow Field Measurements in a Large Controlled Ventilated Room
 
Link budget calculation
Link budget calculationLink budget calculation
Link budget calculation
 
Link budget calculation
Link budget calculationLink budget calculation
Link budget calculation
 
IRJET- Comparative Study of Sidelobe Roll-Off Ratio for Various Window Functi...
IRJET- Comparative Study of Sidelobe Roll-Off Ratio for Various Window Functi...IRJET- Comparative Study of Sidelobe Roll-Off Ratio for Various Window Functi...
IRJET- Comparative Study of Sidelobe Roll-Off Ratio for Various Window Functi...
 
APPROVED - Raytheon - Capstone Final Poster
APPROVED - Raytheon - Capstone Final PosterAPPROVED - Raytheon - Capstone Final Poster
APPROVED - Raytheon - Capstone Final Poster
 
Flight Inspection practical.pptx
Flight Inspection practical.pptxFlight Inspection practical.pptx
Flight Inspection practical.pptx
 
Application note signal_generator_spectral_purity
Application note signal_generator_spectral_purityApplication note signal_generator_spectral_purity
Application note signal_generator_spectral_purity
 

Remington Square - Daylight Sims Summary

  • 1. Remington Square Houston TX Daylight Simulations Report 9am 3pm
  • 2. LRV @ Floor= 30% LRV @ Walls= 50% LRV @ Ceiling= 75% remington square - Level 1 Plan Date & Time of Simulation= Sept 21st @ 9am Software Used= Ecotect/Radiance Glare Control provided for areas above 500 fc (5400 lux) NOTE: THE RESULTS DISPLAYED ARE PERCENTAGES OF THE AREAS COVERED BY THE ANALYSIS GRID % of regularly occupied spaces below 10 fc (108 lux) = 3.00% % of regularly occupied spaces between 10 fc (108 lux) and 540 fc (5400 lux)= 93.02% % of regularly occupied spaces above 500 fc (5400 lux) = 6.92% LOBBY LOBBYGYM RESTAURANT OPEN OFFICE G LAR E C O N TR O L AS PR O VID ED OPEN OFFICE IMPROMPTU MEETING AREA CONFERENCE ROOMS PRIVATE OFFICE LRV @ Floor= 20% LRV @ Walls= 40% LRV @ Ceiling= 70%
  • 3. LRV @ Floor= 30% LRV @ Walls= 50% LRV @ Ceiling= 75% remington square - Level 1 Plan Date & Time of Simulation= Sept 21st @ 3pm Software Used= Ecotect/Radiance NOTE: THE RESULTS DISPLAYED ARE PERCENTAGES OF THE AREAS COVERED BY THE ANALYSIS GRID GLARE CONTROL AS PROVIDED Glare Control provided for areas above 500 fc (5400 lux) % of regularly occupied spaces below 10 fc (108 lux) = 0.08% % of regularly occupied spaces between 10 fc (108 lux) and 540 fc (5400 lux)= 90.93% % of regularly occupied spaces above 500 fc (5400 lux) = 8.98% GLARE CONTROL AS PROVIDEDGLARE CONTROL AS PROVIDED LOBBY LOBBYGYM RESTAURANT OPEN OFFICE OPEN OFFICE IMPROMPTU MEETING AREA CONFERENCE ROOMS PRIVATE OFFICES LRV @ Floor= 20% LRV @ Walls= 40% LRV @ Ceiling= 70%
  • 4. LRV @ Floor= 30% LRV @ Walls= 50% LRV @ Ceiling= 75% remington square - Level 2 Plan Date & Time of Simulation= Sept 21st @ 9am Software Used= Ecotect/Radiance NOTE: THE RESULTS DISPLAYED ARE PERCENTAGES OF THE AREAS COVERED BY THE ANALYSIS GRID Glare Control provided for areas above 500 fc (5400 lux) % of regularly occupied spaces below 10 fc (108 lux) = 13.53% % of regularly occupied spaces between 10 fc (108 lux) and 540 fc (5400 lux)= 78.78% % of regularly occupied spaces above 500 fc (5400 lux) = 7.68% GLARE CONTROL AS PROVIDED GLARECONTROLASPROVIDED OPEN OFFICE OPEN OFFICE IMPROMPTU MEETING AREA CONFERENCEROOMS PRIVATEOFFICES LRV @ Floor= 20% LRV @ Walls= 40% LRV @ Ceiling= 70%
  • 5. LRV @ Floor= 30% LRV @ Walls= 50% LRV @ Ceiling= 75% remington square - Level 2 Plan Date & Time of Simulation= Sept 21st @ 3pm Software Used= Ecotect/Radiance NOTE: THE RESULTS DISPLAYED ARE PERCENTAGES OF THE AREAS COVERED BY THE ANALYSIS GRID GLARE CONTROL AS PROVIDED Glare Control provided for areas above 500 fc (5400 lux) % of regularly occupied spaces below 10 fc (108 lux) = 12.23% % of regularly occupied spaces between 10 fc (108 lux) and 540 fc (5400 lux)= 80.02% % of regularly occupied spaces above 500 fc (5400 lux) = 7.74% GLARE CONTROL AS PROVIDED GLARECONTROLASPROVIDED OPEN OFFICE OPEN OFFICE IMPROMPTU MEETING AREA CONFERENCEROOMS PRIVATEOFFICE LRV @ Floor= 20% LRV @ Walls= 40% LRV @ Ceiling= 70%
  • 6. LRV @ Floor= 30% LRV @ Walls= 50% LRV @ Ceiling= 75% remington square - Levels 3-7 (typ.) Plan Date & Time of Simulation= Sept 21st @ 9am Software Used= Ecotect/Radiance NOTE: THE RESULTS DISPLAYED ARE PERCENTAGES OF THE AREAS COVERED BY THE ANALYSIS GRID Glare Control provided for areas above 500 fc (5400 lux) % of regularly occupied spaces below 10 fc (108 lux) = 8.37%% % of regularly occupied spaces between 10 fc (108 lux) and 540 fc (5400 lux)= 80.31% % of regularly occupied spaces above 500 fc (5400 lux) = 11.30% GLARE CONTROL AS PROVIDED G LAR E C O N TR O L AS PR O VID ED GLARECONTROLASPROVIDED OPEN OFFICE OPEN OFFICE IMPROMPTU MEETING AREA CONFERENCEROOMS PRIVATEOFFICES LRV @ Floor= 20% LRV @ Walls= 40% LRV @ Ceiling= 70%
  • 7. LRV @ Floor= 30% LRV @ Walls= 50% LRV @ Ceiling= 75% remington square - Levels 3-7 (typ.) Plan Date & Time of Simulation= Sept 21st @ 3pm Software Used= Ecotect/Radiance Glare Control provided for areas above 500 fc (5400 lux) NOTE: THE RESULTS DISPLAYED ARE PERCENTAGES OF THE AREAS COVERED BY THE ANALYSIS GRID % of regularly occupied spaces below 10 fc (108 lux) = 9.44% % of regularly occupied spaces between 10 fc (108 lux) and 540 fc (5400 lux)= 83.6% % of regularly occupied spaces above 500 fc (5400 lux) = 6.97% GLARE CONTROL AS PROVIDED GLARECONTROLASPROVIDED OPEN OFFICE OPEN OFFICE IMPROMPTU MEETING AREA CONFERENCEROOMS PRIVATEOFFICES LRV @ Floor= 20% LRV @ Walls= 40% LRV @ Ceiling= 70%
  • 8. LRV @ Floor= 30% LRV @ Walls= 50% LRV @ Ceiling= 75% remington square - Level 8 Plan Date & Time of Simulation= Sept 21st @ 9am Software Used= Ecotect/Radiance Glare Control provided for areas above 500 fc (5400 lux) NOTE: THE RESULTS DISPLAYED ARE PERCENTAGES OF THE AREAS COVERED BY THE ANALYSIS GRID % of regularly occupied spaces below 10 fc (108 lux) = 0.00% % of regularly occupied spaces between 10 fc (108 lux) and 540 fc (5400 lux)= 90.11% % of regularly occupied spaces above 500 fc (5400 lux) = 9.88% GLARE CONTROL AS PROVIDED G LAR E C O N TR O L AS PR O VID ED GLARECONTROLASPROVIDED OPEN OFFICE OPEN OFFICE IMPROMPTU MEETING AREA CONFERENCEROOMS PRIVATEOFFICES LRV @ Floor= 20% LRV @ Walls= 40% LRV @ Ceiling= 70%
  • 9. LRV @ Floor= 30% LRV @ Walls= 50% LRV @ Ceiling= 75% remington square - Level 8 Plan Date & Time of Simulation= Sept 21st @ 3pm Software Used= Ecotect/Radiance NOTE: THE RESULTS DISPLAYED ARE PERCENTAGES OF THE AREAS COVERED BY THE ANALYSIS GRID Glare Control provided for areas above 500 fc (5400 lux) % of regularly occupied spaces below 10 fc (108 lux) = 0.00% % of regularly occupied spaces between 10 fc (108 lux) and 540 fc (5400 lux)= 92.90% % of regularly occupied spaces above 500 fc (5400 lux) = 7.09% GLARE CONTROL AS PROVIDED GLARECONTROLASPROVIDED OPEN OFFICE OPEN OFFICE IMPROMPTU MEETING AREA CONFERENCEROOMS PRIVATEOFFICES LRV @ Floor= 20% LRV @ Walls= 40% LRV @ Ceiling= 70%
  • 10. remington square - Lease Area 1st Floor Software Used= Ecotect/Radiance daylight illuminance at selected points (lux) @ 9 am daylight illuminance in contour lines (lux) @ 9 am daylight illuminance at selected points (lux) @ 3 pm daylight illuminance in contour lines (lux) @ 3 pm NOTE: THESE SIMULATIONS WERE RUN WITHOUT OPERABLE SHADES/BLINDS FOR ACCURACY. VIEW PRESERVING SHADES/BLINDS WILL BE ADDED AT POINTS OF GLARE WHERE INDICATED.
  • 11. remington square - Restaurant 1st Floor Software Used= Ecotect/Radiance daylight illuminance at selected points (lux) @ 9 am daylight illuminance in contour lines (lux) @ 9 am daylight illuminance at selected points (lux) @ 3 pm daylight illuminance in contour lines (lux) @ 3 pm NOTE: THESE SIMULATIONS WERE RUN WITHOUT OPERABLE SHADES/BLINDS FOR ACCURACY. VIEW PRESERVING SHADES/BLINDS WILL BE ADDED AT POINTS OF GLARE WHERE INDICATED.
  • 12. remington square - Gym 1st Floor Software Used= Ecotect/Radiance daylight illuminance at selected points (lux) @ 9 am daylight illuminance in contour lines (lux) @ 9 am daylight illuminance at selected points (lux) @ 3 pm daylight illuminance in contour lines (lux) @ 3 pm NOTE: THESE SIMULATIONS WERE RUN WITHOUT OPERABLE SHADES/BLINDS FOR ACCURACY. VIEW PRESERVING SHADES/BLINDS WILL BE ADDED AT POINTS OF GLARE WHERE INDICATED.
  • 13. remington square- Lease Area 2nd Floor Software Used= Ecotect/Radiance daylight illuminance at selected points (lux) @ 9 am daylight illuminance in contour lines (lux) @ 9 am daylight illuminance at selected points (lux) @ 3 pm daylight illuminance in contour lines (lux) @ 3 pm NOTE: THESE SIMULATIONS WERE RUN WITHOUT OPERABLE SHADES/BLINDS FOR ACCURACY. VIEW PRESERVING SHADES/BLINDS WILL BE ADDED AT POINTS OF GLARE WHERE INDICATED.
  • 14. remington square - Lease Area 5th (Typ) Floor Software Used= Ecotect/Radiance daylight illuminance at selected points (lux) @ 9 am daylight illuminance in contour lines (lux) @ 9 am daylight illuminance at selected points (lux) @ 3 pm daylight illuminance in contour lines (lux) @ 3 pm NOTE: THESE SIMULATIONS WERE RUN WITHOUT OPERABLE SHADES/BLINDS FOR ACCURACY. VIEW PRESERVING SHADES/BLINDS WILL BE ADDED AT POINTS OF GLARE WHERE INDICATED.
  • 15. daylight illuminance at selected points (lux) @ 9 am daylight illuminance in contour lines (lux) @ 9 am daylight illuminance at selected points (lux) @ 3 pm daylight illuminance in contour lines (lux) @ 3 pm NOTE: THESE SIMULATIONS WERE RUN WITHOUT OPERABLE SHADES/BLINDS FOR ACCURACY. VIEW PRESERVING SHADES/BLINDS WILL BE ADDED AT POINTS OF GLARE WHERE INDICATED. remington square - Lease Area 8th Floor Software Used= Ecotect/Radiance