SlideShare a Scribd company logo
www.rcrtom.com.au
Engineering Division Manager Projects
Examples of design and construction projects completed
Engineering Manager
Responsible for managing a team of engineers, project managers and draftsmen responsible
for sales, design, project management (including procurement) and manufacture of equipment
for materials handling and mineral processing.
The team completed the design and construction of equipment for materials handling and
minerals processing. This included Apron Feeders, Belt Feeders, Slide Gates, Scrubbers, etc. for
build and supply to all major resources customers including BHP Billiton, Rio Tinto and FMG.
In addition to projects for other equipment, in the twelve month period 2007 completed
projects included fifty one feeders with total value exceeding A$50m.
It takes a team to design and construct equipment
Design and construction
requires a complete team
many of them are shown
here together with some of
the major equipment
completed during the
period.
Big apron feeders including the largest buit at RCR up to that point in time
BHP Area C apron feeder
D10 x 26m x 2400mm, exceeds 150 tons
D9H Apron Feeders for Rio Tinto Hope Downs
Project
Apron Feeders for BHP Car Dumpers
Not only apron feeders
D8N Apron Feeders for Goro Nickel Project Scrubber for Cawse Nickel
Not only apron feeders 2
Oceana Gold Reefton Project, pre-assembled
prior to stripping for delivery to New Zealand
Rock Screen Plant
Belt Feeders
Belt Feeders installed at FMG Belt Feeders at Hope Downs
What do we do?
Sales and Engineering
• In order to deliver the required product to our
clients we carry out the combination of tasks.
• Sales Negotiations
• Contract Management
• Project Management
• Safety Management
• Quality Management
• Engineering and Design
• Drafting
• Manuals and Manufacturers Data Records
• Procurement
What do we do?
Workshops
In order to manufacture and deliver the product
• Fabrication
• Manufacture of components
• Machining
• Fitting
• Assembly
• Hydraulics
• Rubber
• Commissioning
• Packaging and transport
SALES NEGOTIATION
PROJECT MANAGEMENT
PROCUREMENT
Track Rollers
Track Chain
Apron Feeder Pans Hydraulic Drives

More Related Content

What's hot

Updated Paul CV.docx 2015 (1)
Updated Paul CV.docx 2015 (1)Updated Paul CV.docx 2015 (1)
Updated Paul CV.docx 2015 (1)Paul Scrase
 
GLOBAL Engineers & Constructors -KENTZ
GLOBAL Engineers & Constructors -KENTZGLOBAL Engineers & Constructors -KENTZ
GLOBAL Engineers & Constructors -KENTZ
John Jeffers
 
01 Monadelphous Marine Capability
01 Monadelphous Marine Capability01 Monadelphous Marine Capability
01 Monadelphous Marine CapabilityLeigh Walters
 
Keech Australia - Strategic Plan
Keech Australia - Strategic PlanKeech Australia - Strategic Plan
Keech Australia - Strategic Plan
Keech Australia
 
BRAVO Presentation ODonoghue email email
BRAVO Presentation ODonoghue email emailBRAVO Presentation ODonoghue email email
BRAVO Presentation ODonoghue email emaillisamariaodonoghue
 
Nigel Bradshaw CV 2016
Nigel Bradshaw CV 2016Nigel Bradshaw CV 2016
Nigel Bradshaw CV 2016
Nigel Bradshaw
 
IQ Academy Lunch & Learn Webinar | Basis of Plant Design with Nick Peatling |...
IQ Academy Lunch & Learn Webinar | Basis of Plant Design with Nick Peatling |...IQ Academy Lunch & Learn Webinar | Basis of Plant Design with Nick Peatling |...
IQ Academy Lunch & Learn Webinar | Basis of Plant Design with Nick Peatling |...
IQ_UK
 
Paul Scrase August 2015 CV
Paul Scrase August 2015 CVPaul Scrase August 2015 CV
Paul Scrase August 2015 CVPaul Scrase
 
Andrew Carige_Resume_Detailed Version 25-02-16
Andrew Carige_Resume_Detailed Version 25-02-16Andrew Carige_Resume_Detailed Version 25-02-16
Andrew Carige_Resume_Detailed Version 25-02-16Carige Andrew
 
Robert Pate Resume-1 2
Robert Pate Resume-1 2Robert Pate Resume-1 2
Robert Pate Resume-1 2Robert Pate
 
Mark Warren Consulting Engineers Ltd
Mark Warren Consulting Engineers LtdMark Warren Consulting Engineers Ltd
Mark Warren Consulting Engineers LtdMark Warren
 
Simon Coles, Dounreay: Strategic Challenges in a Decommissioning Context
Simon Coles, Dounreay: Strategic Challenges in a Decommissioning ContextSimon Coles, Dounreay: Strategic Challenges in a Decommissioning Context
Simon Coles, Dounreay: Strategic Challenges in a Decommissioning Context
Association for Project Management
 
Argenta case study
Argenta case studyArgenta case study
Argenta case study
Danny Mears
 
Office fit out from Dribuild
Office fit out from DribuildOffice fit out from Dribuild
Office fit out from Dribuild
Michael McVey
 
Resume Ricardo Schiesser
Resume Ricardo SchiesserResume Ricardo Schiesser
Resume Ricardo Schiesser
Ricardo Schiesser
 
Analyst presentation: Energy – 02 October 2014
Analyst presentation: Energy – 02 October 2014Analyst presentation: Energy – 02 October 2014
Analyst presentation: Energy – 02 October 2014
Atkins
 
Introduction to The Cylinder Service Centre
Introduction to The Cylinder Service CentreIntroduction to The Cylinder Service Centre
Introduction to The Cylinder Service Centre
The Cylinder Service Centre Ltd
 
Ten square mall in Koyambedu Chennai
Ten square mall in Koyambedu ChennaiTen square mall in Koyambedu Chennai
Ten square mall in Koyambedu Chennai
VME Group
 
Paul Scrase August 2015 CV
Paul Scrase August 2015 CVPaul Scrase August 2015 CV
Paul Scrase August 2015 CVPaul Scrase
 

What's hot (19)

Updated Paul CV.docx 2015 (1)
Updated Paul CV.docx 2015 (1)Updated Paul CV.docx 2015 (1)
Updated Paul CV.docx 2015 (1)
 
GLOBAL Engineers & Constructors -KENTZ
GLOBAL Engineers & Constructors -KENTZGLOBAL Engineers & Constructors -KENTZ
GLOBAL Engineers & Constructors -KENTZ
 
01 Monadelphous Marine Capability
01 Monadelphous Marine Capability01 Monadelphous Marine Capability
01 Monadelphous Marine Capability
 
Keech Australia - Strategic Plan
Keech Australia - Strategic PlanKeech Australia - Strategic Plan
Keech Australia - Strategic Plan
 
BRAVO Presentation ODonoghue email email
BRAVO Presentation ODonoghue email emailBRAVO Presentation ODonoghue email email
BRAVO Presentation ODonoghue email email
 
Nigel Bradshaw CV 2016
Nigel Bradshaw CV 2016Nigel Bradshaw CV 2016
Nigel Bradshaw CV 2016
 
IQ Academy Lunch & Learn Webinar | Basis of Plant Design with Nick Peatling |...
IQ Academy Lunch & Learn Webinar | Basis of Plant Design with Nick Peatling |...IQ Academy Lunch & Learn Webinar | Basis of Plant Design with Nick Peatling |...
IQ Academy Lunch & Learn Webinar | Basis of Plant Design with Nick Peatling |...
 
Paul Scrase August 2015 CV
Paul Scrase August 2015 CVPaul Scrase August 2015 CV
Paul Scrase August 2015 CV
 
Andrew Carige_Resume_Detailed Version 25-02-16
Andrew Carige_Resume_Detailed Version 25-02-16Andrew Carige_Resume_Detailed Version 25-02-16
Andrew Carige_Resume_Detailed Version 25-02-16
 
Robert Pate Resume-1 2
Robert Pate Resume-1 2Robert Pate Resume-1 2
Robert Pate Resume-1 2
 
Mark Warren Consulting Engineers Ltd
Mark Warren Consulting Engineers LtdMark Warren Consulting Engineers Ltd
Mark Warren Consulting Engineers Ltd
 
Simon Coles, Dounreay: Strategic Challenges in a Decommissioning Context
Simon Coles, Dounreay: Strategic Challenges in a Decommissioning ContextSimon Coles, Dounreay: Strategic Challenges in a Decommissioning Context
Simon Coles, Dounreay: Strategic Challenges in a Decommissioning Context
 
Argenta case study
Argenta case studyArgenta case study
Argenta case study
 
Office fit out from Dribuild
Office fit out from DribuildOffice fit out from Dribuild
Office fit out from Dribuild
 
Resume Ricardo Schiesser
Resume Ricardo SchiesserResume Ricardo Schiesser
Resume Ricardo Schiesser
 
Analyst presentation: Energy – 02 October 2014
Analyst presentation: Energy – 02 October 2014Analyst presentation: Energy – 02 October 2014
Analyst presentation: Energy – 02 October 2014
 
Introduction to The Cylinder Service Centre
Introduction to The Cylinder Service CentreIntroduction to The Cylinder Service Centre
Introduction to The Cylinder Service Centre
 
Ten square mall in Koyambedu Chennai
Ten square mall in Koyambedu ChennaiTen square mall in Koyambedu Chennai
Ten square mall in Koyambedu Chennai
 
Paul Scrase August 2015 CV
Paul Scrase August 2015 CVPaul Scrase August 2015 CV
Paul Scrase August 2015 CV
 

Similar to RCR Project Summary Eng Manager 1.pptx

Tega Corporate Presentation
Tega Corporate PresentationTega Corporate Presentation
Tega Corporate Presentation
Tega Industries Limited
 
Cv jason dixon dated 20160124
Cv jason dixon dated 20160124Cv jason dixon dated 20160124
Cv jason dixon dated 20160124
Jason Dixon
 
CDE Introduction Presentation for Potential Dealers
CDE Introduction Presentation for Potential DealersCDE Introduction Presentation for Potential Dealers
CDE Introduction Presentation for Potential DealersJonathan Usher
 
Quadro-capability
Quadro-capabilityQuadro-capability
Quadro-capabilityMerry Owen
 
DevOps+ to Leverage Software Development
DevOps+ to Leverage Software DevelopmentDevOps+ to Leverage Software Development
DevOps+ to Leverage Software Development
DOCOMO Innovations, Inc.
 
Roevin
RoevinRoevin
Roevin
Iainwatson
 
A1 Company Profile Secure Supplies 1.pdf
A1 Company Profile Secure Supplies 1.pdfA1 Company Profile Secure Supplies 1.pdf
A1 Company Profile Secure Supplies 1.pdf
Daniel Donatelli
 
Ben Mullins Resume
Ben Mullins ResumeBen Mullins Resume
Ben Mullins ResumeBen Mullins
 
Bid corporate presentation
Bid corporate presentationBid corporate presentation
Bid corporate presentationdlawrence
 
David Goodwin Resume 2015 LP
David Goodwin Resume 2015 LPDavid Goodwin Resume 2015 LP
David Goodwin Resume 2015 LPDavid Goodwin
 
TIG GROUP | TOTAL SITE SOLUTIONS
TIG GROUP | TOTAL SITE SOLUTIONSTIG GROUP | TOTAL SITE SOLUTIONS
TIG GROUP | TOTAL SITE SOLUTIONS
tigmena
 
Demolition, Deconstruction & Dismantling
Demolition, Deconstruction & Dismantling Demolition, Deconstruction & Dismantling
Demolition, Deconstruction & Dismantling
Emma Attwood
 
Zindzi Mining & Engineering Company Profile
Zindzi Mining & Engineering Company ProfileZindzi Mining & Engineering Company Profile
Zindzi Mining & Engineering Company ProfileShamima Mulla
 
Rick Hatlen Resume Oct 2016 A
Rick Hatlen Resume Oct 2016 ARick Hatlen Resume Oct 2016 A
Rick Hatlen Resume Oct 2016 ARick Hatlen
 

Similar to RCR Project Summary Eng Manager 1.pptx (20)

Tega Corporate Presentation
Tega Corporate PresentationTega Corporate Presentation
Tega Corporate Presentation
 
jim. resume2015
jim. resume2015jim. resume2015
jim. resume2015
 
Cv jason dixon dated 20160124
Cv jason dixon dated 20160124Cv jason dixon dated 20160124
Cv jason dixon dated 20160124
 
CDE Introduction Presentation for Potential Dealers
CDE Introduction Presentation for Potential DealersCDE Introduction Presentation for Potential Dealers
CDE Introduction Presentation for Potential Dealers
 
Infotech oiland gas brochure 13
Infotech oiland gas brochure 13Infotech oiland gas brochure 13
Infotech oiland gas brochure 13
 
Infotech oiland gas brochure 13
Infotech oiland gas brochure 13Infotech oiland gas brochure 13
Infotech oiland gas brochure 13
 
PIC Brochure 101615
PIC Brochure 101615PIC Brochure 101615
PIC Brochure 101615
 
PCI Company Brochure
PCI Company BrochurePCI Company Brochure
PCI Company Brochure
 
Quadro-capability
Quadro-capabilityQuadro-capability
Quadro-capability
 
DevOps+ to Leverage Software Development
DevOps+ to Leverage Software DevelopmentDevOps+ to Leverage Software Development
DevOps+ to Leverage Software Development
 
Roevin
RoevinRoevin
Roevin
 
A1 Company Profile Secure Supplies 1.pdf
A1 Company Profile Secure Supplies 1.pdfA1 Company Profile Secure Supplies 1.pdf
A1 Company Profile Secure Supplies 1.pdf
 
Ben Mullins Resume
Ben Mullins ResumeBen Mullins Resume
Ben Mullins Resume
 
Bid corporate presentation
Bid corporate presentationBid corporate presentation
Bid corporate presentation
 
David Goodwin Resume 2015 LP
David Goodwin Resume 2015 LPDavid Goodwin Resume 2015 LP
David Goodwin Resume 2015 LP
 
TIG GROUP | TOTAL SITE SOLUTIONS
TIG GROUP | TOTAL SITE SOLUTIONSTIG GROUP | TOTAL SITE SOLUTIONS
TIG GROUP | TOTAL SITE SOLUTIONS
 
Demolition, Deconstruction & Dismantling
Demolition, Deconstruction & Dismantling Demolition, Deconstruction & Dismantling
Demolition, Deconstruction & Dismantling
 
Mchael_Gorelik_Design
Mchael_Gorelik_DesignMchael_Gorelik_Design
Mchael_Gorelik_Design
 
Zindzi Mining & Engineering Company Profile
Zindzi Mining & Engineering Company ProfileZindzi Mining & Engineering Company Profile
Zindzi Mining & Engineering Company Profile
 
Rick Hatlen Resume Oct 2016 A
Rick Hatlen Resume Oct 2016 ARick Hatlen Resume Oct 2016 A
Rick Hatlen Resume Oct 2016 A
 

More from Steve Coady

Attracting business professionals
Attracting business professionalsAttracting business professionals
Attracting business professionals
Steve Coady
 
GSE D9465 to D5870 Steve D9465 clubs presentation online version
GSE D9465 to D5870 Steve D9465 clubs presentation online versionGSE D9465 to D5870 Steve D9465 clubs presentation online version
GSE D9465 to D5870 Steve D9465 clubs presentation online version
Steve Coady
 
GSE D9465 to D5870 Team Presentation to clubs
GSE D9465 to D5870 Team Presentation to clubsGSE D9465 to D5870 Team Presentation to clubs
GSE D9465 to D5870 Team Presentation to clubs
Steve Coady
 
After GSE - Across the USA
After GSE -  Across the USAAfter GSE -  Across the USA
After GSE - Across the USA
Steve Coady
 
Critical Success Factors in ERP Implementations
Critical Success Factors in ERP ImplementationsCritical Success Factors in ERP Implementations
Critical Success Factors in ERP ImplementationsSteve Coady
 
Water for Education handout
Water for Education handoutWater for Education handout
Water for Education handoutSteve Coady
 
Water for Education
Water for EducationWater for Education
Water for EducationSteve Coady
 
A Members Perspective of Rotary Convention at Sydney 2014
A Members Perspective of Rotary Convention at Sydney 2014A Members Perspective of Rotary Convention at Sydney 2014
A Members Perspective of Rotary Convention at Sydney 2014Steve Coady
 
Vocational Service presentation 2
Vocational Service presentation 2Vocational Service presentation 2
Vocational Service presentation 2Steve Coady
 
RCR Project Summary Construction Division Manager
RCR Project Summary Construction Division ManagerRCR Project Summary Construction Division Manager
RCR Project Summary Construction Division ManagerSteve Coady
 

More from Steve Coady (12)

Attracting business professionals
Attracting business professionalsAttracting business professionals
Attracting business professionals
 
GSE D9465 to D5870 Steve D9465 clubs presentation online version
GSE D9465 to D5870 Steve D9465 clubs presentation online versionGSE D9465 to D5870 Steve D9465 clubs presentation online version
GSE D9465 to D5870 Steve D9465 clubs presentation online version
 
GSE D9465 to D5870 Team Presentation to clubs
GSE D9465 to D5870 Team Presentation to clubsGSE D9465 to D5870 Team Presentation to clubs
GSE D9465 to D5870 Team Presentation to clubs
 
Report 20
Report 20Report 20
Report 20
 
Report 03
Report 03Report 03
Report 03
 
After GSE - Across the USA
After GSE -  Across the USAAfter GSE -  Across the USA
After GSE - Across the USA
 
Critical Success Factors in ERP Implementations
Critical Success Factors in ERP ImplementationsCritical Success Factors in ERP Implementations
Critical Success Factors in ERP Implementations
 
Water for Education handout
Water for Education handoutWater for Education handout
Water for Education handout
 
Water for Education
Water for EducationWater for Education
Water for Education
 
A Members Perspective of Rotary Convention at Sydney 2014
A Members Perspective of Rotary Convention at Sydney 2014A Members Perspective of Rotary Convention at Sydney 2014
A Members Perspective of Rotary Convention at Sydney 2014
 
Vocational Service presentation 2
Vocational Service presentation 2Vocational Service presentation 2
Vocational Service presentation 2
 
RCR Project Summary Construction Division Manager
RCR Project Summary Construction Division ManagerRCR Project Summary Construction Division Manager
RCR Project Summary Construction Division Manager
 

RCR Project Summary Eng Manager 1.pptx

  • 1. www.rcrtom.com.au Engineering Division Manager Projects Examples of design and construction projects completed
  • 2. Engineering Manager Responsible for managing a team of engineers, project managers and draftsmen responsible for sales, design, project management (including procurement) and manufacture of equipment for materials handling and mineral processing. The team completed the design and construction of equipment for materials handling and minerals processing. This included Apron Feeders, Belt Feeders, Slide Gates, Scrubbers, etc. for build and supply to all major resources customers including BHP Billiton, Rio Tinto and FMG. In addition to projects for other equipment, in the twelve month period 2007 completed projects included fifty one feeders with total value exceeding A$50m.
  • 3. It takes a team to design and construct equipment Design and construction requires a complete team many of them are shown here together with some of the major equipment completed during the period.
  • 4. Big apron feeders including the largest buit at RCR up to that point in time BHP Area C apron feeder D10 x 26m x 2400mm, exceeds 150 tons D9H Apron Feeders for Rio Tinto Hope Downs Project
  • 5. Apron Feeders for BHP Car Dumpers
  • 6. Not only apron feeders D8N Apron Feeders for Goro Nickel Project Scrubber for Cawse Nickel
  • 7. Not only apron feeders 2 Oceana Gold Reefton Project, pre-assembled prior to stripping for delivery to New Zealand Rock Screen Plant
  • 8. Belt Feeders Belt Feeders installed at FMG Belt Feeders at Hope Downs
  • 9. What do we do? Sales and Engineering • In order to deliver the required product to our clients we carry out the combination of tasks. • Sales Negotiations • Contract Management • Project Management • Safety Management • Quality Management • Engineering and Design • Drafting • Manuals and Manufacturers Data Records • Procurement
  • 10. What do we do? Workshops In order to manufacture and deliver the product • Fabrication • Manufacture of components • Machining • Fitting • Assembly • Hydraulics • Rubber • Commissioning • Packaging and transport
  • 13. PROCUREMENT Track Rollers Track Chain Apron Feeder Pans Hydraulic Drives